HomeMy WebLinkAboutCT 84-02; LA COSTA POINTE; Engineering ApplicationIN
SUBDIVISION' L 0 G (7o
SUBDIVISION NO. DATE 'I'VED..J. 7,141
ry
OWNER ENGINEER_______________________________
ADDRESS ADDRESS
PHONE . "
PHONE( /CD i—s—
TENTATIVE PARCEL MAP SENT LETTERS
DATE PRELIM. DUE
PLANNING p FIRE 0 0 PRELIM. SENT
UTIL/MAINT. 0 CRMWD 0 -0 FINAL DUE
PARKS 0 LCWD .0 FINAL SENT
REQUIREMENTS:
PLANNING REPORT FOR DATE TO DCC
DATE TO P.C. ACTION: 0 APPROVED 0 DENIED
DATE TO C.C. 'ACTION: 0 APPROVED 0 DENIED
El STREET DEDICATION DEED NO. RECORDED_____________________
O FUTURE IMPROVEMENT AGREEMENT. TO C.C. D APPROVED
0 OTHER
C.C. CONDITIONS:
TENATIVE PARCEL MAP
PRELIMINARY TITLE REPORT
GRADING PLAN
PUBLIC FACILITIES FEE AGREEMENT
EIGHT COPIES OF TENTATIVE PARCEL MAP
300' RADIUS MAP
PROPERTY OWNER'S LIST.& ENVELOPES'
ENVIRONMENTAL IMPACT ASSSSMENT
SCHOOL AND SEWER LETTER
TIME EXTENSION AGREEMENT
1ST CHECK IN OUT________
2ND CHECK IN OUT_________
3RD CHECK IN OUT_________
APPROVED__________________________
FINAL OR PARCEL MAP
1st Check IN OUT_____
2nd Check IN OUT_____
3rd Check IN OUT_____
SIGNED BY C.E.
TO 'CITY CLERK
RECORDED
COPIES RECEIVED
BONDS
ENGINEER'S ESTIMATE $______________________
AMOUNT IN
FAITHFUL PERFORMANCE
' 0
MATERIALS& LABOR
' .0
GRADING & EROSION
MONUMENTATION
-.IMPROVEMENT AGREEMENT •, _p
BONDING CO. . •
ADDRESS
REPORTS
REQUIRED
TITLE REPORT .0
SUBDIVISION GUARANTEE .0
SOILS REPORT 0
ENGINEER'S ESTIMATE 0
TRAVERSE CALC. 0
0 13
IMPROVEMENT PLANS
PROJECT 1'1O. , DRAWING NO.__________
1st Check . IN OUT_____
2nd Check IN OUT_____
3rd Check IN OUT_____
SIGNED BY C.E._____________________________
SIGNED "AS-BUILT"
GRADING PLANS
GRADING PERMIT NO._______________
1st Check , IN OUT_____
2nd Check IN , OUT_____
3rd Check IN OUT_____ '
SIGNED BY C.E.
PERMIT iSSUED_____________
DEPOSITS REQUIRED
ITEM ' , AMOUNT PAID
TENT. EXAM FEE
ØPARKS-IN-LIEU FEE
0
'
GRADING PERMIT FEE4'f7 fl'_________
&FINAL MAP FEE ________
IMP. PLAN CHECK EEL * &74 -
INSPECTION FEE ' • ' 0
WATER CONNECTION DEPOSIT EJ
STREET SIGN DEPOSIT Li
STREET TREE DEPOSIT '
'GRADING PLAN CHECK FEE ..5c'2
STREET LIGHT ENERGY" FEE
DUPLICATE TRACING FEE
DRAINAGE AREA FEE ________
0
REVISED PLAN CHECK FEE ' 0'
TOTAL DEPOS.I-TS$
COMMENTS • OR PROBLEMS
'AYI4-j pL i4L._
I 4, 6 4 -
CITY OF CARLSBAD . .
ENGINEERING DEPARTMENT
FEES, AND DEPOSITS WORKSHEE.
PROJECT NAME: PREPARED BY:
" DATE-
-TENTATIVE MAP FEE
,• .- •- -_. S 4'eO FINAL MAP FEE ( I LOTS) 5C) , IMPROVEMENT PLAN-CHECK FEE:.
-S. .
. . . . ITEM . VALUE •
TOTAL: . . Y . . . . .. Percentage
.1 . IMPROVEMENT INSPECTION FEE: .
VALUE
. . . TOTAL: S. x piq _______ Percentage
PARKS-IN-LIEU FEE (CIRCLE ONE):
SI : DWELLING TYPE -. SF. MF NH . I. . AREA •1 •. 2 3 •- . . - 121. .
OF UNITS: VNUMBER
.
.5
.
. .
Area Fee/Unit
STREET LIGHT ENERGrzrNG:
.
5,800 •Luriyen . @ 81.00 9,50.0 Lumen
___________ . : : • .
@
16.000 Lumel
_________
20.000 Lumen _ @ 169.38 =• 38.'7(, ., . .
TOTAL:
GRADING PLAN CHECK FEE ( CUBIC: YARDS) .........
S - DUPLICATE TRACING DEPOSIT ......................
.5 ...z.00 GRADING CASH DEPOSIT. . . . .. . . . . . . . . .. . . STREET SIGN DEPOSIT .
5__. . . . .•
- TOTAL: .
. .5 . .
STREET STRIPING DEPOSIT.. . -...................
..
0
- FRONT LINE OR AREA FEE (TYPE - . ) .................
DRAINAGE AREA FEE (AREA
. TOTAL ACRES: X
Area Fee
LESS VALUE OF MASTER DRAINAGE IMPROVEMENTS
. . AS NOTED IN MASTER DRAINAGE PLAN DOCUMENTS
MULTIPLIED BY CURRENT INFLATION FACTOR.
S . . LIME.-VALUE, X FACTOR AMOUNT . •• -
-.
., •_x_ ..•• -. S. -
-----_--
S •.. S
''
5-,- - -- x
x
S • TOTAL: .
5 5
DRAINAGE FEE DUE: S
. S;
ADDITIONAL FEES: • • . .. • .
S.
•
•
•:•
•
-.
5
.• - - - TYPE: • S • • -. S . S
TYPE: - • - . S
• ••
S
-
5-
. •
•
,.
..
5
;:: • 'TOTAL FEES ANDDEPOSIT: -•_-
(IN ADDITION, A GRADING PERMIT FEE OF IS DUE UPON
. ISSUANCE OF THE GRADING PERMIT).
. - . . . ;
•
S 5 -. S
•••-- - /