HomeMy WebLinkAboutCT 84-03; VINEDALE CONDOMINIUMS; Engineering ApplicationSUBDIVISION LOG
- 0_*t
SUBDIVISION , NO. '781-3 DATE RECEIVED
OWNER ENGINEER _-
ADDRESS ADDRESS .57,,ç'_
* PHONE - - PHONE
TENTATIVEPARCELMAPSENT LETTERS"
DATE .. PRELIM. DUE
PLANNING 0 FIRE 0 0 PRELIM. SENT
UTIL/MAINT. 0 CRMWD 0 0 FINAL DUE
PARKS 0 LCWD 0 •, FINAL SENT
REQUIREMENTS:
RLANNING REPORT FOR ___DATE TO DCC
DATE TO P.C. ACTION: 0 APPROVED 0 DENIED
DATE TO C.C. ACTION: 0 APPROVED 0 DENIED
O STREET DEDICATION DEED,NO. RECORDED____________________
O FUTURE IMPROVEMENT AGREEMENT. TO C.C. 0 APPROVED
0 OTHER
C.C. CONDITIONS:
a
TENATIVE PARCEL MAP
PRELIMINARY TITLE REPORT
GRADING PLAN
PUBLIC FACILITIES FEE AGREEMENT
EIGHT COPIES OF TENTATIVE PARCEL MAP
300' RADIUS MAP
PROPERTY OWNER'S .LIST & ENVELOPES
ENVIRONMENTAL IMPACT ASSESSMENT
SCHOOL AND SEWER LETTER
TIME EXTENSION AGREEMENT
1ST CHECK IN OUT_________
2NDCHECK IN OUT_________
3RD CHECK IN OUT________
APPROVED . . .
1st Check
:2nd Check
3rd Check
FINAL'OR'PARCEL .MAP
IN : OUT.
IN.. OUT .............
IN OUT_____
'SIGNED BY C.E.
CITY CLERK '.
RECORDED
COPIES RECEIVED
BONDS
ENGINEER'S ESTIMATE $_______________________ :.AMOUNT , IN
FAITHFUL PER El MATERIALS & LABOR GRADING & EROSION "0' MONUMENTATION
' o' IMPROVEMENT AGREEMENT
. o 0
BONDING CO. , -- ADDRESS*
REPORTS
REQUIRED IN
'TITLE REPORT ' ,....D 0'
SUBDIVISION GUARANTEE. 0 ,, . .
SOILS REPORT 0 El
ENGINEER'S ESTIMATE
TRAVERSE CALC. 0 0,
IM PROVEMENT PLANS
PROJECT NO._T84.-3.,DRAWING NO4Oi4)
1st Check IN OUT .
2nd Check IN. OUT_____
3rd Check IN_____ OUT_____
SIGNED BY C.E.____________________________
SIGNED "AS-BUILT"_____________________________
GRADING _PLAsjS
GRADING PERMIT NO.,9e
1st Check . IN OUT
2nd Check IN , OUT______
3rd Check IN OUT_____
SIGNED BY C.E._____________________________
PERMIT iSSUED_______________
DEPOSITSREQUIRED '
ITEM ' AMOUNT PAID
TENT. EXAM FEE
PARKS-IN-LIEU /
GRADING PERMIT -FEE-
FINAL MAP FEE
IMP. PLAN CHECK FEE
INSPECTION FEE ......
WATER CONNECTION DEPOSIT
STREET SIGN DEPOSIT
STREET TREE DEPOSIT
GRADING. PLAN CHECK FEE
STREET LIGHT ENERGY FEE . ' 0
i DUPLICATE TRACING FEE
DRAINAGE AREA _'FEE
REVISED PLAN CHECK FEE ' 0
TOTAL DEPOSITS $
- .. OR PROBLEMS
Wiip KIOA'TFZD -
CITY OF CARLSBAD
V ENGINEERING DEPARTMENT / V
FEES AND DEPOSITS WORKSHEET V
PROJECT NAME: V .
.. PREPARED BY: '
DATE
V
TENTATIVE MAP FEE .....................................V ............_________________________
FINAL MAP FEE ( . LOTS) .......
V
V IMPROVEMENT PLAN CHECK FEE:
ITEM
V '• V
,
', VALUE V
TOTAL: . x
Percentage
V ' IMPROVEMENT INSPECTION FEE: •, V
V
V , V VLLJ1
V
VALUE '
V V
TOTAL:'.,WOO 00 X ' 0. OZ- ,
V . Percentage
V PARKS-IN-LIEU FEE (CIRCLE ONE):
V
, .
' MF NH
V
DWELLING TYPE - SF
V. " AREA . 1 2 3 4 , ,,
NUMBER' OF UNITS: . X
Area Fee/Unit
V
STREET LIGHT ENERGrzrNG:
'
V ' 5,800 Lumen @. 81.00 = V
V V
. 9.500 Lumen @ 111.06 = . V
V , 16,000 Lumen @ 152.10
20,000 Lumen @ 169.38
TOTAL:
V GRADING -PLAN CHECK FEE C CUBIC YARDS) ........... V
DUPLICATE TRACING DEPOSIT ..............
V V ...
GRADING CASH DEPOSIT. . . . ......................
STREET SIGN DEPOSIT ' V.
TOTAL:
V
STREET STRIPING DEPOSIT .....
V ., .....................
V
FRONT LINE OR AREA FEES (TYPE ) ...............
DRAINAGE AREA FEE (AREA NO. V
.............
• 'V
V. • TOTAL ACRES: . X
Area Fee ,, , V • ' ,
LESS VALUE OF MASTER DRAINAGE IMPROVEMENTS
AS NOTED IN MASTER DRAINAGE PLAN DOCUMENTS V V V MULTIPLIED BY CURRENT INFLATION FACTOR. V
LINE ' VALUE X FACTOR AMOUNT ' V
,
•
V
V , ____ V , ' V = V V • . ,
X._ VV
V '
,,•
.
V TOTAL,:'
V '
V '
•
,
V
V
DRAINAGE FEE DUE,: V
•
V ADDITIONAL FEES:
, V ' V V V • , V
TYPE:
V
•
•
TYPE:
V
, ,
V
,•
V
'
' TOTALFEES AND DEPOSITS': V ' • V
,
(IN ADDITION, A GRADING PERMIT FEE OF IS DUE UPON V
V ISSUANCE OF THE GRADING PERMIT). V ' ' •
V V V