Loading...
HomeMy WebLinkAboutCT 93-09; Ocean Bluff; Tentative Map (CT) (13)AUGUST 31, 1993 TO: ANNE HYSONG FROM: Associate Engineer, Davis VIA: .^ASSISTANT CITY ENGINEER COMPLETENESS REVIEW AND INITIAL ISSUES STATEMENT CT 93-09, SDP 93-07, ZC 93-04, HDP 93-09, OCEAN BLUFF The Engineering Department has completed its review of the subject project for application completeness. The application and plans submitted for this project are incomplete and unsuitable for further review due to the following missing or incomplete items: 1. A preliminary hydrology study is needed. In addition, the Engineering Department made a preliminary review of the overall (external) aspects of the project for engineering issues. We did not make an in depth review for internal issues, because the external issues are major and need resolution first. Major engineering issues which need to be resolved or adequately addressed before any further review can be done are as follows: 1. The emergency access roadway is not acceptable as shown. Grades and paving have to allow two way use by regular and emergency vehicles in the event that primary access is closed. A 15 foot wide section of D.G.paving with no design grade will not serve two-way traffic for regular and emergency vehicles. We require a paved section, 20 feet wide with acceptable drainage control. We believe that an absolute maximum of 20 percent grade is needed and that the length of 20 percent grade should be held to short sections, of about 200 feet in length. All grades over 12 percent need special paving for wheel traction. Engineering believes that constructing an acceptable secondary access along the proposed route is virtually impossible due the amount of grading in an area of habitat and mostly within an SDG&E easement. 2. The proposed primary access of Blackrail Court will not meet the cul-de-sac standard for a single entry since the length is over one half mile. This project has an obligation for a portion of Poinsettia Lane. Therefore engineering believes the primary entry should be Poinsettia Lane. Having a partially improved two lane Blackrail Court could be very useful for the H:\LIBRARY\ENO\WPDATA\DA VIS\CT9390CE.BLF C D C 3^iHp. >*&r >»&>- -•<*& existing land uses but without Poinsettia Lane connecting to another road east or west, development in the area of this project appears to be premature. 3. Along the easterly project frontage the required improvements for Blackrail Court will be half street plus 12 feet of paving. Since the 12 feet of paving is shown on adjacent parcel APN 215-080-01, we need to have evidence that the owner has reviewed your proposal in detail and accepts: A. The roadway as proposed. B. The drainage outlet as proposed. C. The grading proposed. If permission and ultimately grant deeds cannot be obtained the project must be redesigned. 4. Providing an opportunity for a connection for CT 84-32, Cobblestone Sea Village, has not been made. We need to see how Ct 84-32 can make the connection and meet City standards. 5. As regards the one incomplete item, the preliminary hydrology report should also address the Mello II Coastal requirement to reduce 10 year peak drainage flows to the pre project levels. 6. The proposal appears to be premature in terms of public facilities proceeding or being concurrent with development, especially as regards circulation and sewer. 1. There appears to be a way to make this project work as regards to circulation: (l)Complete Poinsettia Lane along project's southern boundary (2) make a secondary access through Lot 84 (3) continue Poinsettia Lane east or west to connect to another street connected to the public street system, i.e. either Alga Road or Ambrosia Lane, if Ambrosia Lane has been guaranteed. 8. A letter from the owner(s) permitting the offsite and grading to be on their property is needed. Prior to final map grant deeds will be required. If the grant deeds cannot be obtained, the project must be redesigned. Attached is a redlined check print set of the project. Please forward this plan set to the applicant for a more complete understanding of these issues and changes as needed. The applicant should return this plan set with any resubmittals of this project in order to assist and facilitate our review. H:\UBRARY\ENG\WPDATA\DAVIS\CT9390CE.BLF If you or the applicant have questions regarding any of the comments above, please contact me at (619) 438-1161, extension 4500. H:\UBRARY\ENO\WPDATA\DAV1S\CT9390CE.BLF