Loading...
HomeMy WebLinkAboutCT 93-09; Ocean Bluff; Tentative Map (CT) (57)ntii||,|||imi| mill PACIFIC RIM ENGINEERING, INC. July 9, 1992 1345 Scher-Voit 4370 La Jolla Village Drive Suite 120 San Diego, CA 92122-1233 Attn: Robert L. Wineteer Re: Ocean Bluff, Carlsbad, California ACCESS ANALYSIS Background Existing Conditions Single Access Policy Per your request, I have made a preliminary study of access options for your proposed Ocean Bluff project in Carlsbad, California. Given the time frame and the instructions from your other consultants, I have assumed for the purposes of this analysis that the main constraint to providing access will be conformance to the City of Carlsbad Engineering Department Policy No. 1 on Single Entrance (Cul-de-sac) Development (attached). The two most likely points from which improved physical access could be provided to the site at this point are the intersection of Poinsettia Lane and Alga Road, and the northerly terminus of Blackrail Road. A dirt access road in the San Diego Gas & Electric Co. easement provides access to West Oaks Way and Palomar Airport Road, but this access could not be improved to meet City street standards. The City of Carlsbad Engineering Department Policy on Single Access Development enumerates the conditions under which it is acceptable for a development to have only one entrance. The goal of the policy is to ensure adequate traffic circulation and fire access. For the purposes of the Ocean Bluff project, subsections 2 and 3 apply. Subsection 1 is for local streets with driveways, and allows a maximum length of 600 feet, or 1200 feet with special permission from the City Engineer. Due to the size and layout of the project, without an internal through connection, no significant portion of the project can be built within the guidelines given. 1025 Service Place, Suite 103 • Vista, CA 92084 • (619) 941-7500 • FAX: (619) 941-9203 Ocean Bluff Access Analysis July 9,1992 Page 2 Subsection 2 Analysis Subsection 3 Analysis Subsection 2 of the Single Entrance Policy allows for a single entry point when a the access is a 40-foot curb-to-curb local street and the following conditions are present: Q Driveways and intersections are spaced at least 150 feet apart. Q The length along streets from entrance to most remote point does not exceed 1 /2 mile. Q The traffic volume at entrance is 1200 ADT or less. Q The number of dwelling units is 120 or less. Because of the requirement that there be very few driveways or intersections, this subsection is basically intended for an offsite access road. The Ocean Bluff project meets the traffic volume and dwelling unit criteria. From the project to existing Poinsettia is 0.3 miles from the most westerly entrance, and a total of 0.52 miles from the easterly entrance. The offsite portion of a 40-foot wide road along the Poinsettia Lane alignment could meet all the criteria. However, the onsite portion of the project could not meet the first two criteria without having another access point. The Blackrail alternative poses similar problems. From the intersection of Blackrail and Alga to the project site is approximately 0.6 mile. To the most remote point within the project is another 0.3 mile. Subsection 3 of the Single Entrance Policy allows for a single entry point when the access is a 4-lane secondary or major arterial with a raised median and the following conditions are present: Q The length of the street does not exceed 1 /2 mile. d The traffic volume at entrance is 3000 ADT or less. O The net buildable lot area served by the street does not exceed 25 acres. Since Poinsettia Lane is shown as a major arterial per the Specific Plan, extending Poinsettia to the site would fulfill the general condition of Subsection 3. If Poinsettia was extended to the proposed easterly project entrance, and the westerly entrance was constructed, the point of single access would become the westerly entrance. For all points east of the westerly entrance, there would be two access points. Therefor, the distance of 0.3 mile to the westerly entrance from the existing Poinsettia/Alga intersection would meet the 1/2 mile criteria. The traffic volume at the entrance would be 970 ADT from the proposed 97 lots, under the 3,000 ADT allowed. Taking only the Ocean Bluff project into account, the net buildable area could be approximated as follows: Ocean Bluff Access Analysis July 9,1992 Page3 Combination Alternative Conclusion Gross area 31.0 ac. less unbuildable open space -2.4 ac. less 'Phase II' (sewer lowest) -4.8 ac. less streets -4.6 ac. Net buildable lot area 19.2 ac. Thus, the buildable lot area is within the limits established by the policy also. Based upon the analysis of Subsection 3, it appears that constructing a full section of Poinsettia Lane would meet the requirements of the single entry policy, and would be suitable for access to the project. While an estimate of construction costs is beyond the scope of this analysis, the costs of constructing a full width major arterial would be considerable. If Blackrail Road was extended and a partial width of Poinsettia were both constructed, then the project would have internal circulation, and the single entry policy would not apply. Discussions with the City of Carlsbad would be necessary to determine probable improvement requirements, then the construction costs and cost sharing opportunities would have to be evaluated to determine the best course of action. While further analysis is necessary, it appears as if a combination of improving both Poinsettia and Blackrail would be the best solution to providing access to the project. The main access would be Poinsettia, most likely graded to full width, and constructed to half-street standards, up to the westerly project entrance. Then access would continue through the project, connecting up with Blackrail Road at the southeasterly corner. Blackrail Road would be improved to 24- foot wide paving as secondary access. The Ocean Bluff project would either construct or secure the improvements of Poinsettia Lane within the subdivision boundary. The offsite construction of Poinsettia would stop at the westerly project entrance. This concept is shown on the attached sketch. Ocean Bluff Access Analysis July 9, 1992 Page 4 Respectfully submitted, PACIFIC RIM ENGINEERING, INC. Glen K. Van Peski Principal GVPrbhs enc. cc: Tony Lawson, ADL Planning Associates (enc.) Jack Henthorn, Jack Henthorn & Associates (enc.) CITY OF CARLSBAD ENGINEERING DEPARTMENT POLICY NUMBER: EFFECTIVE: SUPERSEDES: 1 12/20/90 9/5/84 SUBJECT: SINGLE ENTRANCE (CUL-,DE-SAC) Development A""7^^^4^LLOY'D B.I HU^B^^CITY ENGINEER PURPOSE: To establish a set of conditions under which it is acceptable for a development to have only one entrance while ensuring adequate traffic circulation and fire access. POLICY: Single entry point (cul-de-sac) developments shall be permitted only when the cul-de-sac street is: A 30-foot or 32-foot curb-to-curb private street, a 36-foot or 40-foot curb-to-curb residential street and all the following conditions are met: a. Length of street does not exceed 600 feet.* b. Traffic volume at entrance does not exceed 500 ADT. c. Number of dwelling units does not exceed 50. *Length may be increased to a maximum special permission of the City Engineer. of 1200 feet with A 40-foot curb-to-curb local street and all of the following conditions are met: a. Driveway and street intersections are spaced 150 feet or more apart. b. The length along streets from entrance to most remote point does not exceed one-half mile. c. Traffic volume at entrance does not exceed 1200 ADT. d. Number of dwelling units does not exceed 120. A 4-lane secondary or major arterial with a raised median and all of the following conditions are met: a. The length of street does not exceed one-half mile. b. Traffic volume at entrance does not exceed 3000 ADT. c. The net buildable lot area served by the street does not exceed 25 acres. A 52-foot wide curb-to-curb industrial street and all of the following conditions are met: a. The length of street does not exceed one-half mile. b. Traffic volume at entrance does not exceed 3000 ADT. c. The net buildable lot area served by the street does not exceed 25 acres. TYPICAL £>eCT)ONS M.T.€». mill HIM! PACIFIC RIM ENGINEERING, INC. 1025 SERVICE PLACE • SUITE 103 • PH: (619) 941-7500 VISTA, CALIFORNIA 92084 • FX: (619) 941-9203