Loading...
HomeMy WebLinkAboutCT 93-09; Ocean Bluff; Tentative Map (CT) (8)MARCH 15,1.995 TO: ASSISTANT PLANNER, ANNE HYSONG FROM Associate Engineer, Jim Davis VIA PRINCIPAL CIVIL ENGINEER FOR LAND USE CT 93-09, OCEANBLUFF we have reviewed the submittal dated March 7,1995. There remains a major issue about the details of the conceptual alignment for offsite Poinsettia Lane. This issue is separated into the following points: 1. We need to have the approximate property lines of the affected parcels shown along the alignment of the proposed right-of-way. 2. we need to have the approximate tops and toes of slopes of the proposed grading shown. 3. we need to have approximate grading quantities for off-site Poinsettia Lane shown. As per the letter to Jack Henthorne from Bob wojcik dated January 24,1995 the City will require by condition that the improvements for Poinsettia Lane onsite and improvements for both Blackrail and Poinsettia offsite be different than they are shown on this tentative map. These differences are as follows: a. Poinsettia Lane shall be fully graded on the project site. The map shows the onsite portion basically ungraded. b. Poinsettia Lane offsite shall have a concrete curb on both sides of the 32 foot wide section of roadway. c. Blackrail court shall have one side fully improved with curb, gutter sidewalk and street lights.