Loading...
HomeMy WebLinkAboutCT 94-01; Poinsettia Shores; Tentative Map (CT) (14)March 28, 1994 TO: FINANCE DIRECTOR FROM: City Engineer AVENIDA ENCINAS ASSESSMENT DISTRICT As a follow-up to the March 28,1994, Policy 33 Committee meeting rt was concluded that in order to qualify for public financing Avenida Encinas would be required to be constructed to full secondary arterial standards from Carlsbad Boulevard to Its current terminus. This will involve a 64 foot curb to curb width with sidewalks behind curb in developed portions. The bridge over the railroad would require a minimum width of 58 curb to curb to accommodate 4 travel lanes and 2 bike lanes plus 5 foot sidewalks behind curb on each side. A full 64 foot section throughout would be most desirable. To provide adequate local access to the Ponto Storage area and to qualify drainage structures into the district it is recommended that the district incorporate the demolition and reconstruction of the Ponto interchange and construction of an additional signalized intersection approximately 1000 feet northerly of the proposed Avenida Encinas intersection with Carlsbad Boulevard. Reconstruction of the Ponto interchange shall incorporate a realignment of Carlsbad Boulevard and construction of a minimum of two northbound travel lanes and adequate shoulders in the new alignment. Full frontage improvements to Carlsbad Boulevard fronting the Kaiza property should be a consideration in the assessment spread. If you have any questions or clarifications, please let me know. LLOYD'S. HUBBS, P.E. LBH:brg c: Assistant City Engineer Traffic Engineer -^ Associate Engineer, Jantz