Loading...
HomeMy WebLinkAboutCT 94-04; Poinsettia Shores PA 1; Tentative Map (CT) (25)MARCH 13,1995 TO: PLANNING DEPARTMENT FROM: ENGINEERING DEPARTMENT CT 94-05 AND CT 94-08, POINSETTIA SHORES PLANNING AREAS A-1 AND A-2 Please modify conditions NO.S 43 and 53 for both CT 94-04 and CT 94-08 as per the following: 43. Prior to approval of the final map, the applicant shall pay the current Planned Local Drainage Area fee or shall construct drainage systems in conformance with Master Drainage Plan and City of Carlsbad standards as required by the City Engineer. 53. Prior to issuance of building permits, the applicant shall underground all existing overhead utilities within the subdivision boundary, (add) The under grounding may be phased in accordance with construction phasing as approved by the City Engineer and the Planning Director. H:\LIBRARY\ENG\WPDATA\DAVIS\CT948CND.CHC