Loading...
HomeMy WebLinkAboutCT 94-07; Poinsettia Shores PA A-4; Tentative Map (CT) (4)July 14, 1997 TO: BOBBIE HODER PLANNING DEPARTMENT - GRAPHICS TRAFFIC ENGINEER RAENETTE ABBEY, BUILDING DEPARTMENT STEVE RUGGLES, STATION #6 FIRE DEPARTMENT GREG CLAVIER, COMMUNITY SERVICES PAT ZAVALA, POLICE DEPARTMENT KARL VON SCHLIEDER - GIS FROM: Planning Director STREET NAMES FOR CT 94-07; PLANNING AREA A-4 The following street names have been approved as a part of the final map processing for CT94-07. A map delineating street locations is attached. Private Streets: Rudder Avenue Reeve Road Knots Lane Stern Way Magellan Street (Continuation from Poinsettia Shores A-3) Attachment H:\Admin\Streets4 P P LEGEND; STREET NAME MAGELLAN STREET 0'3001 150' SCALE: 1" = 150' STREET NAME EXHIBIT PLANNING AREA 'A-4* C.T. 94-07 CONSULT tSN T S TIJO AwrfM Cffcftwi bM 104 K9CMCO W: -H.R. OMt: OCT. 1996 DRUM •* C.M.JI.B..T.C. son* I" - 150" PROJECT UCH.L T.C. JOB MO.; 96-1019 or •on* WTC: rtUOIHT 0. CWROU MX: JU8I Eriday, Jiffle19,1998 5:34 PM To: Clyde Wickham From: Larry S. Hinck Date: Friday, June 19,1998 Total Pages: 2 Name: Larry S. Hinck Company: Power Plus! 436 North Quince St. Escondido, CA 92025 Voice Number: (760)839-9430 Fax Number: (760)839-9436 Name: Clyde Wickham Company: City of Carlsbad Voice Number: (760) 438-1161 x4353 Fax Number: (760) 431-5769 Subject: Poinettia Shores Area A4, Replace Poles Note: Attache si a drawing of the steel pole that will replace the existing 2 pole wood structure that exists at the site now. Call me if you have any questions. Friday, June 19,1998 5:34 PM To: Clyde Wickham From: Larry S. Hinck Page: 2 of 2 70 + TANGS & FLUTES FOR MCI COMMUNICATIONS. FIBER OPTIC CABLE. GROUND LEVEL 1MARCH 30, 1995 TO: ASSOCIATE PLANNER, ERIC MUNOZ FROM: Associate Engineer, Davis VIA: ASSISTANT CITY ENGINEER /t CT 94-07, PUD 94-06, POINSETTIA SHORES PLANNING AREA A-4 ENGINEERING REPORT AND CONDITIONS TRANSMITTAL The Engineering Department has completed it's review of the project and recommends approval under the attached conditions. An engineering report was prepared to assist you in the preparation of the staff Report to the Planning commission as follows: I. TRAFFIC AND CIRCULATION Projected ADT: 610 Traffic and circulation were reviewed and all their issues were resolved with the Master Plan. Cul-de-sac standards require that Avenida Encinas be extended across the railroad and connected to Carlsbad Boulevard before any unit within the Master Plan area can be occupied. Construction of the needed facilities was guaranteed with the final map for CT 94-01. Upon the completion of Avenida Encinas, additionally the project has been found to meet cul-de-sac standard internally by having a wider than normal street with two roadways and a median at the project entrance. Once pass the entrance the project has an internal loop road system providing two ways of travel. II. SEWER Projected EDU'S 61 Both sewer and water issues were resolved with the review of the master plan and master tentative map CT 94-01. District: CMWD III. WATER Projected use CPD 13,420 District: CMWD IV. GRADING Cut 17,100 Cubic Yards Fill 21,300 Cubic yards import 4,200 Cubic Yards H :\LIBRARY\ENC\WPDATA\DAVIS\CT947Con. RPT The grading quantities shown above are the additional grading needed to create lot pads and streets for this project. This site was a part of the mass grading for CT 94-01 and basic sheet grading is in the process of being done as this report is being written. The import will come from other planning areas in the Master Plan area. V. DRAINAGE AND EROSION CONTROL Drainage Basin D, Batiquitos Lagoon. The preliminary hydrology study was prepared by George O'Day of O'Day Consultants, dated April 30,1993. There are no drainage issues within this Planning Area A-4. There were major issues within the Master Plan area but these were resolved with CT 94-01. construction of the needed facilities were guaranteed with that final map. The project is conditioned to meet NPDES to reduce pollutants in the runoff with best management practices. VI. LAND TITLE The parcel boundaries for this project were established by the recording of the final map for CT 94-01. There are no major land title issues with this project. Coordinating of utilities with the construction of the extension Avenida Encinas may necessitate certain utility easements being removed by the final map for this project or separate quitclaim action may be required. The project will be required to dedicate on the map water easements and/or general utility and access easements over the private streets. VII. IMPROVEMENTS The project does not require any public improvements except the offsite completion of Avenida Encinas in order to meet cul-de-sac standards. These improvements will consist of the extension of Avenida Encinas to connect with Carlsbad Boulevard. The construction of Avenida Encinas has been guaranteed with the final map for CT 94-01. NO occupancy will be granted in this project until the improvements are constructed. To insure that the extension of Avenida Encinas will be available prior to occupancy, the project has a condition that these improvements be constructed to the City Engineer's satisfaction prior to occupancy. H:\LIBRARY\ENG\WPDATA\DAVIS\CT947Con.RPT ENGINEERING CONDITIONS FOR CT 94-07 33. This project is located within the West Batiquitos Lagoon Local Coastal Plan. All development design shall comply with the requirements of that plan. 34. Unless a standards variance has been issued, no variance from City Standards is authorized by virtue of approval of this tentative map. 35. The applicant shall comply with all the rules, regulations and design requirements of the respective sewer and water agencies regarding services to the project. 36. The applicant shall be responsible for coordination with S.D.G.&E., Pacific Bell Telephone, and Cable TV authorities. 37. This project is approved specifically as 1 (single) unit for recordation. 38. If the applicant chooses to construct out of phase, the new phasing must be reviewed and approved by the City Engineer and Planning Director. 39. The applicant shall provide an acceptable means for maintaining the private easements within the subdivision and all the private: streets, sidewalks, street lights, storm drain facilities and sewer facilities located therein and to distribute the costs of such maintenance in an equitable manner among the owners of the properties within the subdivision. Adequate provision for such maintenance shall be included with the CC&R's subject to the approval of the City Engineer prior to approval of the final map. < > A note to the effect of the following shall be placed on a non-mapping data sheet of the final map: "Improvements designated on the improvement plans for this subdivision are private and are to be privately maintained." A note shall be placed on the improvement plans stating which utilities are public and which are private. 41. All concrete terrace drains shall be maintained by the homeowner's association (if on commonly owned property) or the individual property owner (if on an individually owned lot). An appropriately worded statement clearly identifying the responsibility shall be placed in the CC&R's. 43. Approval of this tentative tract map shall expire twenty-four (24) months from the date of City Council approval unless a final map is recorded. An extension may be requested by the applicant. Said extension shall be approved or denied at the discretion of the City Council. In approving an extension, the City Council may impose new conditions and may revise existing conditions pursuant to Section 20.12.110(a)(2) Carlsbad Municipal Code. H:\LIBRARY\ENC\WPDATA\DAVIS\CT947Con.RPT 44. The applicant shall defend, indemnify and hold harmless the City and its agents, officers, and employees from any claim, action or proceeding against the City or its agents, officers, or employees to attack, set aside, void or null an approval of the City, the Planning Commission or City Engineer which has been brought against the City within the time period provided for by Section 66499.37 of the Subdivision Map Act. CR 45A. Prior to approval of the final map, the applicant shall pay all current fees and deposits required. 47. Prior to approval of the final map, the owner of the subject property shall execute an agreement holding the City harmless regarding drainage across the adjacent property. CR 54. Based upon a review of the proposed grading and the grading quantities shown on the tentative map, a grading permit for this project is required. Prior to approval of the final map, the applicant must submit and receive approval for grading plans in accordance with City codes and standards. 56. No grading shall occur outside the limits of the subdivision unless a grading or slope easement is obtained from the owners of the affected properties. If the applicant is unable to obtain the grading or slope easement, no grading permit will be issued. In that case the applicant must either amend the tentative map or modify the plans so grading will not occur outside the project site in a manner which substantially conforms to the approved tentative map as determined by the City Engineer and Planning Director. 57. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, the applicant shall submit to and receive approval from the City Engineer for the proposed haul route. The applicant shall comply with all conditions and requirements the City Engineer may impose with regards to the hauling operation. CR 58. The developer shall exercise special care during the construction phase of this project to prevent offsite siltation. Planting and erosion control shall be provided in accordance with the Carlsbad Municipal Code and the City Engineer. Reference Chapter 11.06. 60. Rain gutters must be provided to convey roof drainage to an approved drainage course or street to the satisfaction of the City Engineer. 61. Additional drainage easements may be required. Drainage structures shall be provided or installed prior to or concurrent with any grading or building permit as may be required by the City Engineer. 63. The owner shall make an offer of dedication to the City for all public streets and easements required by these conditions or shown on the tentative map. The offer shall be made by a certificate on the final map. All land so offered shall be granted to the City free and clear of all liens and encumbrances and without cost to the City. Streets that are already public are not required to be rededicated. 65. Prior to issuance of building permits, the applicant shall underground all existing overhead H:\LIBRARY\ENC\WPDATA\DAVIS\CT947Con.RPT utilities within the subdivision boundary. Phasing of the undergrounding in accordance with construction phasing may be done with the approval of the City Engineer and the Planning Director. 71. The applicant shall comply with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The applicant shall provide best management practices, as referenced in the "California Storm Water Best Management Practice Handbook", to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer prior to approval of the final map, issuance of grading or building permit, whichever occurs first. 77. Prior to approval of the final map, the design of all private streets and drainage systems shall be approved by the City Engineer. The structural section of all private streets shall conform to City of Carlsbad Standards based on R-value tests. All private streets and drainage systems shall be inspected by the City. The standard improvement plan check and inspection fees shall be paid prior to approval of the final map for this project. < > The improvement plans for the above private streets system shall include the public street access on Avenida Encinas, Street "M", and the following, all to the satisfaction of the City Engineer: A. Remove median and replace with pavement in the public portion of Windrose Circle between Navigator Circle and the private street entrance to this project and Area-3, CT 94-06. B. Restripe the above portion of Windrose Circle. < > Prior to occupancy of any unit within this project, the public improvements of Avenida Encinas shown on D-337-9 shall be completed to the satisfaction of the City Engineer. < > In order to meet the cul-de-sac standard, prior to approval of the final map the developer shall agree to construct Street "M" through Area A-3, CT 94-06, to the satisfaction of the City Engineer. Street "M" at Avenida Encinas shall be gated for egress and emergency access only. Prior to final map approval the design and functional operation of the gate in Street "M" shall be approved by the City Engineer. The City shall have the right but not the obh'gation to enforce restriction via Street "M". Wording to this affect shall be approved by the City Engineer and placed in the project CC&Rs. A note to this affect shall be placed on the final map. < > Prior to approval of the final map the applicant shall enter into a secured Basin Maintenance Agreement for the existing basin adjacent to and west of the Roselina development. The applicant shall shall maintain the basin, to the satisfaction of the City Engineer, until all construction in the Master Plan area contributing drainage to the basin is completed. The Basin Maintenance Agreement shall then turn over the maintenance obligation to the Master Homeowners Association. Notification of this obligation shall be included in the Master Homeowners Association CC&Rs. H:\LIBRARY\ENC\WPDATA\DAVIS\CT947Con.RPT N C T D January 23, 1995 Mr. Eric Munoz City of Carlsbad Planning Department 2975 Las Palmas Drive Carlsbad, CA 92009 Re: Poinsettia Shores Site Development Plans LOT 3 - Poinsettia Shores - PA A-3 LOT 4 - Poinsettia Shores - PA A-4 Dear Mr. Munoz: NCTD has reviewed the plans for the above mentioned project areas within the Poinsettia Shores Master Plan development. We have the following comments with regard to transit service to the area. v . . As stated in previous letters, NCTD requests that the residential development of Poinsettia Shores be designed in a manner which emphasizes pedestrian and transit access to local amenities such as the beaches, bicycle facilities, retail shopping and the Poinsettia commuter rail station. We recommended that the street designs of the housing developments be redesigned in grid or radial patterns which create direct access to Avenida Encinas and help to develop a pedestrian and transit-oriented community. According to the plans for Lot 3, there is only one entryway into the development. Although this entry is located on Avenida Encinas, directly across from a proposed transit stop, it is not within walking distance from many lots within the development. The six cul-de-sacs in Lot 3 severely limit pedestrian access to Avenida Encinas. For instance, a resident of lot 42 resides only four lots away from the development entry and yet, he/she must walk down Street "4" to Street "K" to Street "L" and finally down Street "M" in order to reach Avenida Encinas and the transit stop. NCTD requests that pedestrian pathways be integrated into the development design to address this issue. Pedestrian walkways along the east and west sides of Lot 3, coupled with gated openings in the development wall on Avenida Encinas would improve pedestrian access to the street. NCTD requests that these pathways be located inside the walled development so that they are safer, more appealing to pedestrians and better used than if they were placed outside the development wall. NORTH COUNTY TRANSIT DISTRICT 31 1 South Tremont Street, Oceonside, CA 92054 61 9-967-2828 Similar comments apply to the development plans for Lot 4. Again, the entire development is surrounded by a noise attenuation wall and there is only one entryway into the development. Direct pedestrian access to Avenida Encinas through Lot 3 is blocked by the wall separating Lot 3 and Lot 4. According to the plans, the only access to Avenida Encinas is via Windrose Circle, nearly 1,400 feet from the entryway of the Lot 4 development. Again, NCTD requests that the street design for the development be reviewed. At a minimum, pedestrian pathways along the east, west and south sides of the Lot would improve access to transit on Avenida Encinas. These pathways if integrated into the open space corridors, should be placed inside the walled area, or the wall should be replaced by a landscaped berm. NCTD planning staff would be glad to answer any questions regarding our requests for improved transit access as stated in this letter or in our letters dated December 15, January 4 or January 11. Sincerely. Paul W. Price Director Service Development cc: Julianne Nygaard, Carlsbad City Council George Franck, SANDAG George O'Day, O'Day Consultants Doug Avis, Kaiza Poinsettia Corp. Carlsbad Municipal Water District 5950 El Camino Real, Carlsbad, CA 92008 Engineering: (619) 438-3367 Administration: (619) 438-2722 Fax: (619) 431-1601 January 23, 1995 City of Carlsbad Planning Department 2075 Las Palmas Drive Carlsbad, California 92009 TO: FROM: ERIC MUNOZ Jerry Whitley SUBJECT: POINSETTIA SHORES PLANNING AREA NO. A-4, CARLSBAD TRACT 94-7/PUD 94-6 - CMWD PROJECT NO. 95-502 In response to your inquiry of January 11,1995, the District has reviewed the entire area to be developed. The subject project is a portion of this area and on March 21, 1994, Carlsbad Municipal Water District set conditions for the potable water, reclaimed water and sewer systems as follows: POTABLE WATER SYSTEM: (See approved potable water system analysis map). 1. 12" P.V.C. class 150 water main shall be constructed from connection point #2 (westerly end of Avenida Encinas) to connection point #3 (in Windrose Drive, approximately 100' west of west Navigator Circle). 2. 12" P.V.C. class 150 water main shall be constructed from connection point #9 (in east Navigator Circle, approximately 200' south of Windrose Drive) to connection point #6 (located on the westerly boundary line of interstate #5 freeway). 3. 8" P.V.C. class 150 water mains shall be installed in remaining streets (except for portion of Avenida Encinas as shown on approved map). "Serving Carlsbad for over 35 years" Page 2 Eric Munoz, City Planning Department January 23, 1995 4. Fire hydrants shall be installed as shown on approved map. 5. Gate valves shall be installed as shown on approved map. 6. Existing 8" and 10" service stubs in Windrose Drive shall be disconnected at the existing main and sealed and abandoned. 7. The existing 16" A.C.P. and 8" A.C.P. and 8" "temporary" steel hi-line shall be put out of service and removed. Arrangements shall be made to keep residences in service. Developers Engineer shall prepare a phasing procedure for District approval. 8. There are existing bonds and agreements on file at District between the District and Batiquitos Pointe, C.T. 82-18 (CMWD 82-210 & 84-514 BLEP) for onsite and offsite (San Dieguito Water District Inter-tie System) improvements. Developer will place on hold the bonds and agreements until City resolves the Carlsbad Blvd. and Ponto Drive intersection alignment. After the City establishes alignment, the Developer will be required to enter into a new agreement. After its execution, the District will exonerate bonds, void the agreement and establish financial conditions. PUBLIC RECLAIMED WATER SYSTEM: (See approved reclaimed water system analysis map). 1. 6" P.V.C. class 200 water mains shall be installed in Windrose Drive and Avenida Encinas from the north boundary to the west boundary. 2. Gate valves shall be installed as shown on approved plan. 3. Prepare a colored reclaimed water use map for the private reclaimed system and submit to City Planning Department for processing. After review, possible additional public water mains may be required. PUBLIC SEWER SYSTEM LAYOUT: (See approved sewer system layout). 1. A minimum 10" diameter sewer main shall be installed beginning at Basin No. 2 connection point to the existing manhole at Windrose Drive and west Navigator Circle intersection. 2. The sewer mains shall be installed per the approved sewer system layout. Page 3 Eric Munoz, City Planning Department January 23, 1995 3. A portion of the existing sewer main in Windrose Drive and its northwesterly prolongation shall be removed. The Developers engineer will provide a "order of work" to insure continuous service to the effected residence. 4. The Developer shall prepare a sewer study which will include size, calculations and capacity information. The study will be based on the "Carlsbad Standard Sewer System Design Criteria and Standard Drawings and Specifications". The potable water system computer readouts establishing sizing and flows are on file for review at the District Engineering Department. Please contact the undersigned with any questions. Very truly yours, Associate Engineer FJW:jm City of Carlsbad 95007 Fire Department Bureau of Prevention Plan Review: Requirements Category: Fire Conditions Date of Report: Tuesday, January 17,1995 Reviewed by:. Contact Name Address Eric Munoz City, State CA Bldg. Dept. No.Planning No. CT94-7 Job Name Poinsettia Shores-A4 Job Address Ste. or Bldg. No. Approved - The item you have submitted for review has been approved. The approval is based on plans; information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifica- tions, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. Disapproved - Please see the attached report of deficiencies. Please make corrections to plans or specifications necessary to indicate compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. For Fire Department Use Only Review 1 st 2nd 3rd CFD Job# 95007 File* Other Agency ID 2560 Orion Way Carlsbad, California 92008 (619) 931-2121 DATE: CITY OF CARLSBAD REVIEW AND COMMENT MEMO JAN. 9, 1995 REVISED PLAN TO ENGINEERING DEPARTMENT * POLICE DEPARTMENT, -..ATJN: J. SASWAY "gFJRE. DEPARTMENT ~" Ml KE/SMIT HV^ ^BUILDING DEPARTMENT -rPA"T-KEtLEY * COMMUNITY SERVICES - MARK STEYAERT * COMMUNITY SERVICES - VIRGINIA McCOY CARLSBAD WATER DISTRICT LANDSCAPE PLANCHECK CONSULTANT - LARRY BLACK _ CARLSBAD UNIFIED ' _ SCHOOL DISTRICT * NORTH COUNTY TRANSIT DISTRICT - THOMAS LIGHTERMAN SAN DIEGO GAS & ELECTRIC - BICH TRAN (Memo Only) * ALWAYS SEND EXHIBITS FROM: PLANNING DEPARTMENT REQUEST FOR REVIEW AND COMMENT ON APPLICATION NO. CT 9'1-7/PUD 94 Note: Please use this number on all correspondence. PROJECT TITLE: APPLICANT: PROPOSAL: POINSETTIA SHORES - PA A-4 KAIZA POINSETTIA CORP. Tentative Map to create 61 residential lots, two (2) open space lots, one (1) private street lot and one (1) lot for sewer pump station. Please review and submit written comments and/or conditions to: _ ERIC MUNOZ _ the Project Planner in the Planning Dept. . If not received by that2075 Las Palmas Drive, by JAN. 23,. 1995_ . _ date, it will be assumed that you have no comment and the proposal has your endorsement as submitted. If you have any questions, please contact 4441ERIC MUNQZ at 438-1161, ext. THANK YOU COMMENTS: ~f~—t^jzwi^ &K, yiffiZh*-. 7^- -T^I^ ^g ^v^z^e/^1 ^ cV^^^^ ^7 PLANS ATTACHED FRM0020 5/94 CITY OF CARLSBAD REVIEW AND COMMENT MEMO DATE:JAN. 9, 1995 REVISED PLAN X TO: ENGINEERING DEPARTMENT * POLICE DEPARTMENT - ATTN: J. SASWAY * FIRE DEPARTMENT - MIKE SMITH * BUILDING DEPARTMENT - PAT KELLEY * COMMUNITY SERVICES - MARK STEYAERT * COMMUNITY SERVICES - VIRGINIA McCOY * CARLSBAD WATER DISTRICT LANDSCAPE PLANCHECK CONSULTANT - LARRY BL] CARLSBAD UNIFIED SCHOOL DIST * NORTH COUNTY TRANSIT DISTRICT - THOMAS LIGHT SAN DIEGO GAS & ELECTRIC - BICH TRAN (Memo Only) * ALWAYS SEND EXHIBITS FROM: PLANNING DEPARTMENT REQUEST FOR REVIEW AND COMMENT ON APPLICATION NO. CT 94-7/PUD 94|-6 Note: Please use this number on all correspondence. PROJECT TITLE: APPLICANT: PROPOSAL: POINSETTIA SHORES - PA A-4 KAIZA POINSETTIA CORP. Tentative Map to create 61 residential lots, two (2) open space lots, one (1) private street lot and one (1) lot for sewer pump station. Please review and submit written comments and/or conditions to: ERIC MUNOZ the Project Planner in the Planning Dept. 2075 Las Palmas Drive, by JAN. 23, 1995 If not received by that date, it will be assumed that you have no comment and the proposal has your endorsement as submitted. If you have any questions, please contact 4441ERIC MUNOZ at 438-1161, ext. THANK YOU COMMENTS: PLANS ATTACHED FRM0020 5/94 Date: 01-19-95 To: Planning Department From: Police Department/Crime Prevention Subject: Plan Review CT 94-7/PUD 94-6 The area of concern to the Police Department with this plan is: General building security. General security for residents. Keying- Upon occupancy by the owner or proprietor, each single unit in a tract, or construction under the same general plan, shall have locks using combinations which are interchange-free from locks used in all other separate dwellings, proprietorships or similar distinct occupancies. Lighting- Aisles, passageways, and recesses related to and within the building complex shall be illuminated with an intensity of at least twenty-five one hundredths (.25) footcandles at the ground level during the hours of darkness. A lamp other than Incandescent is best used in this application. They shall be installed with a timer so as to go on when it starts to get dark and go off when it starts to get light. Porch lights and balcony or deck lights shall also be installed with timers or sensors. Lighting devices shall be protected by weather and vandalism covers. Walkway and entrance way lighting shall be designed with landscaping in mind. One should not deter from he other. Landscaping- The exterior landscaping should be kept at a minimal height and fullness giving police, security services and the general public surveillance capabilities of the area. There shall be vision through trees and scrubs to buildings, walkways, carports and parking areas from the street. Trees shall be designed as to not provide access to the roof or balcony areas. Walkways and entrance ways shall be keep clear and free from clutter. Fences shall be see through to provide surveillance. It is recommended that the perimeter of the properties be enclosed with a see through fence. Gates shall have locking devices. Addressing- All residential dwellings shall display a street number in a prominent location on the street side of the residence in such a position that the number is easily visible to approaching emergency vehicles. The numerals shall be no less than four (4) inches in height and shall be of a contrasting color to the background to which they are attached. It is recommended that house numbers be displayed in illuminated fixtures on the front of residences, clearly visible from the street. , Entrance Ways- There shall be vision into front entrance ways from a main street. Doors-Dead-bolt locks shall be installed on all access doors of any residential building and attached garages, including the door leading from the garage area into the dwelling. Dead-bolts shall have a minimum protection of one inch and be constructed so as to repel cutting tool attacks. The dead-bolt shall have an embedment of at least three-fourths inch into the strike plate area. Strike Plate and dead-bolt are to be installed with wood screws that are three inches in length. It is not recommended to install double cylinder dead-bolt locks on a residential dwelling. The Fire Department considers them a hazard in an emergency situation. All entry and exit doors to dwelling units should be arranged so that the occupant has a view of the area immediately outside the door without opening the door. Except for doors requiring a fire protection rating which prohibits them, such view may be provided by a door viewer having a field of view of not less than 190 degrees. Mounting height shall not exceed fifty-four inches from the floor. It is not recommended to place glass panels within forty inches of a locking device.. The inactive leaf of a double door shall be equipped with metal flush bolts have a minimum embedment of five-eights inch into the head and threshold or the door frame. Horizontal sliding doors shall be equipped with a metal guide track at top and bottom. The bottom track shall be so designed that the door cannot be lifted from the track when the door is in the locked position. Security hardware such as a pin shall be installed on a sliding glass door. Hinges for out-swinging doors shall be equipped with non-removable hinge pins or a mechanical interlock to preclude removal of the door from the exterior by removing the hinge pins. Garage Doors-Doors that exceed sixteen feet in width shall have two lock receiving points; or, if the door does not exceed nineteen feet, a single bolt may be used if placed in the center of the door with the locking point located either at the floor or door frame header; or, torsion spring counter balance type hardware may be used. Windows-Security hardware shall be installed in all windows to prevent them from being lifted from their frame or forced open. By, Jodeene R. Sasway Crime Prevention Specialist (619) 931-2105 CITY OF CARLSBAD REVIEW AND COMMENT MEMO DATE: JAN. 9, 1995 REVISED PLAN TO: ENGINEERING DEPARTMENT * POLICE DEPARTMENT - ATTN: J. SASWAY * FIRE DEPARTMENT - MIKE SMITH * BUILDING DEPARTMENT - PAT KELLEY * COMMUNITY SERVICES - MARK STEYAERT * COMMUNITY SERVICES - VIRGINIA McCOY * CARLSBAD WATER DISTRICT LANDSCAPE PLANCHECK CONSULTANT - LARRY BLACK CARLSBAD UNIFIED SCHOOL DISTRICT * NORTH COUNTY TRANSIT DISTRICT - THOMAS LIGHTERMAN SAN DIEGO GAS & ELECTRIC - BICH TRAN (Memo Only) * ALWAYS SEND EXHIBITS FROM: PLANNING DEPARTMENT REQUEST FOR REVIEW AND COMMENT ON APPLICATION NO. CT 94-7/PUD 94 Note: Please use this number on all correspondence. -6 PROJECT TITLE: POINSETTIA SHORES - PA A-4 APPLICANT: KAIZA POINSETTIA CORP. PROPOSAL: Tentative Map to create 61 residential lots, two (2) open space lots, one (1) private street lot and one (1) lot for sewer pump station. Please review and submit written comments and/or conditions to: ERIC MUNOZ the Project Planner in the Planning Dept. 2075 Las Palmas Drive, by JAN. 23, 1995 If not received by that date, it will be assumed that you have no comment and the proposal has your endorsement as submitted. If you have any questions, pJea-s.e contact ERIC MUNQZ at 438-1161, ext. THANK YOU COMMENTS: PLANS ATTACHED FRM0020 5/94 DECEMBER 19, 1994 ^c t^' TO: ASSOCIATE PLANNER, ERIC MUNOZ . ..-7-i FROM: Associate Engineer, Davis VIA: ASSISTANT CITY ENGINEER CT 94-07, PUD 94-06, POINSETTIA SHORES AREA A-4 we have completed our review of the re-submitted project and find that it is complete and suitable for further engineering review, we made a preliminary review of the project for issues and these issues follow: 1. The driveways for each unit need to be plotted. 2. All street lots need a consecutive number. If the final map for CT 94-1 will be recorded first and this map is to be recorded separately, then the lot numbering for this project can began with number one. We have not seen a complete plan of recordation and lot numbering scheme for this project. 3. Typical lot drainage needs to show a five foot distance from property line, toe/ top of slope or wall to the structure, one side shows five foot including a slope. The five foot minimum begins at the toe of the slope. 4. The easement item numbers do not correspond to the numbers in the latest title report. 5. A grade for street "10" is not shown. 6. Please show the width of Lot 10, CT 94-01, and the width of the "grass-crete" surface. The emergency access shown on Lot 10 may be potentially acceptable. The status of Lot as trail may cloud this potential acceptability. An 18 foot gras- crete width is also potentially acceptable. MAY 25, 1994 TO: ASSOCIATE PLANNER, Eric Munoz FROM: ASSOCIATE ENGINEER, Jim Davis VIA ASSISTANT CITY ENGINEER, */»• CT 94-07, POINSETTIA SHORES PLANNING AREA A-4 This submittal is incomplete. A list of items needed to make the application complete follows: 1. It appears that two different directions of processing are being sought,. I. Some items appear to indicate that the Master Tentative Map, CT 94-01 will become final before this map and this map will then become a subdivision upon Lot 4 of that final map. Examples are lack of offsite streets and sewers needed for this map to stand alone. II. Other items appear to indicate that this map is intended to not depend on CT 94- 01 becoming final first. Examples are the legal description, the listing of all easements over the master tentative map without an explanation which easements apply to this map. The applicant must choose one direction of processing and make all items consistent with that choice. We believe that having each planning area capable of becoming a final map on it's own merits will require a lot of duplication of requirements for the offsite improvements for Avenida Encinas, the drainage west of the railroad, grading and sewer improvements. 2. Footprints of structures are not plotted. 3. Offsite water which is needed to serve the project is not shown. We suggest that the overall systems be shown on the "key map". 4. State the traffic generation for this map alone. We continued the review on the assumption that this map is not intended to stand alone but will depends on CT 94-01 becoming final first. Under this assumption there a few issues, as follows: i. The design has a drainage sump condition in Street "P"near lots 86, 87 102, and 103. Providing a fail-safe overflow is a City requirement. It appears that the some redesign of grades in this area will be needed. H:\LIBRARY\ENG\WPDATA\DA VIS\947PSAR.AIV ii. The project will not meet cul-de-sac standard for no more than 50 units on a single entry. A secondary access will be required. iii. Verify and identify on the map that the only existing easements on this map are Items 25, 28 and 41 on the easement list. State the disposition of all easements that will not handled on CT94-01. iv. This lot, Lot 4 of CT 94-01, has no frontage on a public street. We believe this issue must be resolved before the final map for CT 94-01. If not, then this project will need to satisfy requirements for a dedicated public easement through other property. v. The grading analysis as presented is likely to be confusing to one not familiar with the processing of the overall project. Please clearly show the grading needed for this map alone. A reference to the sheet grading done on the Master Tentative Map CT 94-01 may be needed for a complete explanation. A statement such as "this map proposes minimum grading upon the sheet grading for Master Tentative Map sufficient only to establish streets, drainage and lot padsTAddress if this map will balance or identify the amount and location of offsite export or import. vi. The sewer pump plant will require CMWD approval prior to approval of the tentative map. vii. Cross out or remove any information not appropriate to this map alone, such as the cross-sections for streets not in or adjacent to this subdivision. viii. Check driveway grades and need for vertical curves. ix. A statement is made that private streets will be separate lots. Will this lot numbering be done and maintain consecutive numbers from map to map? x. A letter from a soils engineer will be required for drainage less than five feet from structure to the drainage swale. H:\LIBRARY\ENG\WPDATA\DAVIS\947PSAR.AIV REPORT DATE 05/27/94 PROJECT ID : CT 94-07 MASTER PROJECT ID : MP 175D SYSTEM STATUS LUR APPLICATION INFORMATION SUBMITTAL DATE ACCEPTANCE DATE PROJECT CATEGORY STATUS APPROVAL DATE EXPIRATION DATE 04/29/94 MIN ACTIVE PROJECT NAME : POINSETTIA SHORES A-4 LOCATION : N/BATIQUITOS LAGOON BTWN 1-5 & CARLSBAD BLVD DESCRIPTION : 61 RESIDENTIAL UNITS APPLICANT : KAIZA POINSETTIA CORP. KAIZA POINSETTIA CORPORATION 7220 AVENIDA ENCINAS STE 200 CARLSBAD , CA 92009 PHONE 619-931-9100 FACILITY ZONE : 9 ACREAGE : 12.6 APN : 216-140-25, 36 SUBDIVISION INFORMATION SUBDIV. TYPE NO. OF LOTS NO. OF D/U'S RES 65 61 LAND USE ENGINEER : DAVIS PROJECT PLANNER : MUNOZ ISSUES : REPORT DATE 05/04/94 PROJECT ID : PUD 94-06 MASTER PROJECT ID : MP 175D SYSTEM STATUS LUR APPLICATION INFORMATION SUBMITTAL DATE ACCEPTANCE DATE PROJECT CATEGORY STATJJS APPROVAL DATE EXPIRATION DATE 04/29/94 MIN ACTIVE PROJECT NAME : POINSETTIA SHORES A-4 LOCATION : N/BATIQUITOS LAGOON BTWN 1-5 & CARLSBAD BLVD DESCRIPTION : 61 RESIDENTIAL UNITS APPLICANT : KAIZA POINSETTIA CORP. KAIZA POINSETTIA CORPORATION 7220 AVENIDA ENCINAS STE 200 CARLSBAD , CA 92009 PHONE : 619-931-9100 FACILITY ZONE : 9 ACREAGE : 12.6 APN : 216-140-25, 36 SUBDIVISION INFORMATION SUBDIV. TYPE NO. OF LOTS NO. OF D/U'S N/A LAND USE ENGINEER : DAVIS PROJECT PLANNER : MUNOZ ISSUES : i ran iCITY OF CARLSBAD - ENGINEWlNG DEPARTMENT LAND USE REVIEW INTITIAL REVIEW AND ASSESSMENT CHECKLIST lancheck First Second Third Date Inltal PAGE 1 OF 4 TRAFFIC AND CIRCULATION Inadequate traffic projection provided Street level of service problems Intersection level of service problems Driveway problems Comer sight distance problems Non standard street improvements proposed Pedestrian circulation problems Offsite street improvements needed Street parking problems Intersection distance problems Cul-de-sac length problems Parking aisles lack turnarounds Parking lot dimension inadequate Truck access inadequate Parking lot adequate circulation Private street widths not to code End space needs 5' side backup area Adjacent property access not considered Surrounding circulation conflicts exist Inadequate street/parking lot lighting Growth management circulation requirements not met Handicap ramps Other (list) EXPLANATION sfej'ts/y&3 /Z&f^^ ^>;^?~< y£4 - st/£&Z4 ^^-^ &*sf^}~ H:\LlBRARY\ENG\WPDATA\MISC\INITREVI.CHK REV. 10/20/93 }ial Review and Assessment Checklist Page: 2 of 4 | SEWERAGE DISPOSAL Easement widths not to standard Gravity flow not maintained All weather access not provided Offsite sewer improvements required Non-standard facilities proposed Facilities not in compliance with sewer master plan Growth management requirements not met Other Qist) WATER FACILITIES Fire hydrants not properly shown or located Water meter access problems Water line conflict with sewer line Water easements inadequate Offsite water facilities required Other Gist) DRAINAGE Proposed desiltation controls inadequate Improper discharge of drainage into sewer system Erosion problems at proposed outlets Overland flow exceeds City standard Excessive or nuisance flow at cross gutters Improper diversion of drainage proposed Ribbon gutter proposed in parking lot Parking lot drains across sidewalk Inadequate site or lot drainage Inadequate drainage behind retaining wall Proposed drainage too close to structure Lot drainage not to street or approved drainage course Excessive use of curb drains Narrow sideyard requires special design EXPLANATION /fcf^^g-J /*tA3ff>^ /s*S. / /& . /%ssi<o jftfTia'^ s$4*s'&'l<^? L- /ejgzz&gr? /?jS"3<f&>£$ s^sQ-J. /S07/0. //*'-' tf/^^T^ f/07/4 /g£^;s&g^3 EXPLANATION <*#sj*s<#gS /*?&] , ts&^ /s^ r&s EXPLANATION /t/^j 72> j~x£?>*f ^Jterrr <£=> /e^fd S**,i-S l^frr-rt^. H:\LIBRARY\ENQ\WPDATA\MISC\INrrREVI.CHK REV. 10/20/93 Review and Assessment Checklist Page: 3 of 4 I Pad sites not proposed to surface drain All weather access not provided to facilities Offsite drainage improvements required Facilities not in compliance with master drainage plan Easement widths not to standard Inadequate facilities proposed to handle upstream flows Encroachment into flood hazard area Failsafe over-flow not provided at sumps Growth management requirements not met Urban Pollutant Mitigation Required Within Mello II - Onsite Retention Required Other Gist) SOILS AND GEOLOGY Soils report inadequate for scope of work Site requires geologic review Geologic hazards not properly mitigated Excessive grading proposed for site Onsite spoil/borrow site problems Cut and/or fill height problems Proposed slopes exceed 2:1 standard Inadequate slope setbacks from site boundary Slope stability problems exist Retaining or cribwall height problems Other (list) CONSTRUCTION Offsite grading requires easement Site lacks adequate construction staging area Construction Phasing Project Phasing problems Offsite haulage into sensitive neighborhood proposed Construction access problems Other Gist) /jjJlS^fJ ^t^t /s*?/>^ ls*^> s*?S4^^r&J ^*^J. J~r<4 ^^f*^ ^-"^F^EasT & /-&J3 /^9 -J&3 S?$S"<*>r*rj 4^J/**^ ^^^ EXPLANATION EXPLANATION sfJSs/SVZJ s***?J7&73- <4~<4<&s^& H:\LIBRARY\ENGWPDATA\MISC\INITREVI.CHK REV. 10/20/93 sal Review and Assessment Checklist Page: 4 of 4 I LANDTTTLE Utility easement conflicts exist Notice of violation on property Unpaid liens or taxes exist Assessment district reapportionment required Access to public resources not provided Facilities reimbursement agreement exists Tide Report boundary conflicts with site plan boundary Other (list) FIELD CONDITIONS Site plan conflicts with field conditions Existing public facilities damaged or inadequate Existing overhead facilities to be addressed Utility conflicts with proposed improvement Major utility relocations required Other (list) GENERAL LOT REQUIREMENTS Lot width not per Code requirements Lot area is less than required per zoning Lot not fronting on dedicated public street or easement Panhandle lot not to code Lot depth to width exceed 3:1 Lot depth less than 90 feet MAPPING Recording in units Remainder Parcel Subdivision boundary bearings and distances Other (list) EXPLANATION || EXPLANATION EXPLANATION EXPLANATION H:\LIBRARY\ENG\WPDATA\MISC\INfTREVl.CHK MAY 25, 1994 TO: ASSOCIATE PLANNER, Eric Munoz FROM: ASSOCIATE ENGINEER, Jim Davis VIA ASSISTANT CITY ENGINEER CT 94-07, POINSETTIA SHORES PLANNING AREA A-4 This submittal is incomplete. A list of items needed to make the application complete follows: 1. It appears that two different directions of processing are being sought,. I. Some items appear to indicate that the Master Tentative Map, CT 94-01 will become final before this map and this map will then become a subdivision upon Lot 4 of that final map. Examples are lack of offsite streets and sewers needed for this map to stand alone. II. Other items appear to indicate that this map is intended to not depend on CT 94- 01 becoming final first. Examples are the legal description, the listing of all easements over the master tentative map without an explanation which easements apply to this map. The applicant must choose one direction of processing and make all items consistent with that choice. We believe that having each planning area capable of becoming a final map on it's own merits will require a lot of duplication of requirements for the offsite improvements for Avenida Encinas, the drainage west of the railroad, grading and sewer improvements. 2. Footprints of structures are not plotted. 3. Offsite water which is needed to serve the project is not shown. We suggest that the overall systems be shown on the "key map". 4. State the traffic generation for this map alone. We continued the review on the assumption that this map is not intended to stand alone but will depends on CT 94-01 becoming final first. Under this assumption there a few issues, as follows: i. The design has a drainage sump condition in Street "P"near lots 86, 87 102, and 103. Providing a fail-safe overflow is a City requirement. It appears that the some redesign of grades in this area will be needed. H:\LIBRARY\ENG\WPDATA\DAVIS\947PSAR.AIV ii. The project will not meet cul-de-sac standard for no more than 50 units on a single entry. A secondary access will be required. iii. Verify and identify on the map that the only existing easements on this map are Items 25, 28 and 41 on the easement list. State the disposition of all easements that will not handled on CT94-01. iv. This lot, Lot 4 of CT 94-01, has no frontage on a public street. We believe this issue must be resolved before the final map for CT 94-01. If not, then this project will need to satisfy requirements for a dedicated public easement through other property. v. The grading analysis as presented is likely to be confusing to one not familiar with the processing of the overall project. Please clearly show the grading needed for this map alone. A reference to the sheet grading done on the Master Tentative Map CT 94-01 may be needed for a complete explanation. A statement such as "this map proposes minimum grading upon the sheet grading for Master Tentative Map sufficient only to establish streets, drainage and lot pads. Address if this map will balance or identify the amount and location of offsite export or import. vi. The sewer pump plant will require CMWD approval prior to approval of the tentative map. vii. Cross out or remove any information not appropriate to this map alone, such as the cross-sections for streets not in or adjacent to this subdivision. viii. Check driveway grades and need for vertical curves. ix. A statement is made that private streets will be separate lots. Will this lot numbering be done and maintain consecutive numbers from map to map? x. A letter from a soils engineer will be required for drainage less than five feet from structure to the drainage swale. H:\LIBRARY\ENGYWPDATA\DA VISV947PSAR.AIV City of Carlsbad Engineering Department May 13, 1998 Poinsettia Homebuilding Partners, L.P. » Attn: Colin Seid 4141 Jutland Dr., Suite 200 San Diego, Ca 92117 SUBJECT: Placing overhead utilities under ground on Poinsettia Shore's Planning Area's A-3 and A-4. Based upon a recent inspection of the aforementioned project sites, we observed that the overhead utilities which extend from the south end of Planning Area A-4 to the north end of Planning Area A-3 have not been placed underground as of to date. It is also our understanding that you will soon be applying for building permits. Per condition no. 42 of Planning Commission Resolution No. 3771 (CT 94-07, Planning Area A-4) and condition no. 41 of Planning Commission Resolution No. 3769 (CT 94-06, Area A-3), all existing overhead utility lines within these subdivisions must be placed underground prior to issuance of building permits. This condition applies to all types of building permits, including retaining walls and model homes. We are informing you about this requirement merely as a courtesy to ensure that you understand the impacts that these utilities impose upon development of these subdivisions. If you have any questions, please call me at 438-1161 ext. 4324. Sincerely, David Rick Engineering Technician c: Bob Wojcik Clyde Wickham Eric Munoz 2O75 Las Palmas Dr. • Carlsbad, CA 92OO9-157G • (76O) 438-1161 • FAX (76O) 431-5769 JULY 11, 1995 TO: CITY COUNCILMEMBERS FROM: Associate Planner C CT 94-07/PUD 94-06 - POINSETTIA SHORES PLANNING AREA "A-4" - ERRATA SHEET Please note the following correction to the above referenced project: 1. Modify Condition No. 13(G) on page 7 of Planning Commission Resolution No. 3771. This condition incorrectly references and lists five other conditions (27, 33, 34, 48 and 49). The correct conditions that are intended to be referenced are condition numbers 26, 32, 33, 47 and 48. ERIC MUNOZ City of Carlsbad Planning Department PLANNING COMMISSION NOTICE OF DECISION May 11, 1995 Brian Murphy Kaiza Poinsettia Corporation 7220 Avenida Encinas, Suite 200 Carlsbad, CA 92009 RE: CT 94-06/PUD 94-05 - POINSETTIA SHORES PLANNING AREA "A-3" CT 94-07/PUD 94-06 - POINSETTIA SHORES PLANNING AREA "A-4" At the Planning Commission meeting of May 3, 1995, your application was considered. The Commission voted 6-1 (Monroy) to RECOMMEND APPROVAL of your request. Some decisions are final at Planning Commission, and others automatically go forward to City Council. If you have any questions regarding the final dispositions of your application, please call the Planning Department at (619) 438-1161. Sincerely, MICHAEL J. HOtZMILLER Planning Director MJH:EM:vd Enclosed: Planning Commission Resolution No. 3769, 3770, 3771 and 3772. 2O75 Las Palmas Drive • Carlsbad, California 92OO9-1576 • (619) 438-1161 MAY 3, 1995 TO: PLANNING COMMISSIONERS FROM: Associate Planner CT 94-07/PUD 94-06 - POINSETTIA SHORES PLANNING AREA "A-4" - ERRATA SHEET Please note the following corrections/modifications to the above referenced projects: 1. Delete Condition No. 14 from page 7 of Planning Commission Resolution No. 3771. 2. Delete Condition No. 56 from page 12 of Planning Commission Resolution No. 3771. 3. Delete Condition No. 56 from the listing of conditions contained within Condition No. 13 (G) on page 7 of Planning Commission Resolution No. 3771. 4. On page 5 of the A-4 staff report, in the last sentence of the first complete paragraph, an incorrect reference is made to Condition No. 31; the correct condition number that is intended to be referenced is Condition No. 27. 5. In the project's exhibits, Exhibit "E" provides an index showing the location of the three cross sections which depict the proposed blufftop area development. The base map used for this index exhibit is an earlier version of the tentative map and does not reflect the revisions that were made resulting in the final project exhibits. On the cross section index base map (Exhibit "E") an emergency access and vehicular gate are shown on the project's western edge adjacent to, and providing emergency access to and through the public trail segment next to the railroad right of way. This emergency gate and access are not part of the proposed project for A-4. No emergency access is associated or proposed within or adjacent to the public trail segment as correctly reflected by the project's tentative map exhibits (Exhibits "A" - "D"). ERIC MUNOZ ENM:lh A4.ERR City of Carlsbad Planning Department April 10, 1995 Brian Murphy Kaiza Poinsettia Corporation 7220 Avenida Encinas Suite 200 Carlsbad, CA 92009 SUBJECT: CT 94-07/PUD 94-06 - POINSETTIA SHORES PLANNING AREA "A-4" The preliminary staff report for the above referenced project will be available for you to pick up on Monday, April 17, 1995 after 8:00 a.m. This preliminary report will be discussed by staff at the Development Coordinating Committee (D.C.C.) meeting which will be held on Monday, April 24,1995. A twenty (20) minute appointment has been set aside for you at 10:00 a.m. If you have any questions concerning your project, you should attend the D.C.C. meeting. It is necessary that you bring your required unmounted colored exhibits(s) with you to this meeting in order for your project to go forward to the Planning Commission. If you do not plan to attend this meeting, please make arrangements to have your colored exhibit(s) here by the scheduled time above. If you need additional information concerning this matter, please contact Eric Munoz, at (619) 438-1161, extension 4441. CITY OF CARLSBAD GARY E.WAYNE Assistant Planning Director QEW:ENM:lh 2O75 Las Palmas Drive • Carlsbad, California 92OO9-1576 • (619) 438-1161 Citv of Carlsbad Planning Department FAX TRANSMITTAL DATE: TIME SENT: TO: COMPANY: PHONE #: FAX#: NUMBER OF PAGES BEING TRANSMITTED: /_ (INCLUDING FAX TRANSMITTAL) FROM: DEPT: PLANNING PHONE #: (619) 438-1161 ext. FAX #: (619 438-0894 SPECIAL INSTRUCTIONS: (s\<^rpQrA-k<£ ,u-£> -fw S L/h*A /-/''/v}-/ " / p. 2O75 Las Palmas Drive • Carlsbad, California 92OO9-4859 • (619)438-1161 '4 _ / Gitv of Carlsbad Planning FAX TRANSMITTAL 'x*a*"i*""""i DATE: TIME SENT: TO: COMPANY: PHONE #: FAX#: 4;^ NUMBER OF PAGES BEING TRANSMITTED: (INCLUDING FAX TRANSMnTAL) FROM: DEPT: PLANNING PHONE #: (619) 438-1161 FAX#: (619438-0894 SPECIAL INSTRUCTIONS: ^ H ; - S <i<^AzjQj> p\A-xN d-tygLd^ <V -^V*- f'r^, px\<i^> r . Ill ^^te^M^ w 2O75 Las Palmas Drive • Carlsbad. California 92OO9-4859 • (619) 438-1161 City of Carlsbad Planning Department December 22, 1994 Brian Murphy Kaiza Poinsettia Corporation 7220 Avenida Encinas, Suite 200 Carlsbad, CA 92009 SUHJECT: CT 94-07/PUD 94-06 - PLANNING AREA A-4 Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning and Engineering Departments have reviewed your resubmitted Tentative Tract Map and Planned Development Permit, application nos. CT 94-07/PUD 94-06, as to its completeness for processing. The items requested from you earlier to make your application complete have been received and reviewed by the Planning and Engineering Departments. It has been determined that the application is now complete for processing. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. Please note that although the application is now considered complete, there may be issues that could be discovered during project review and/or environmental review in addition to those already identified. Attached is a list of additional issues identified during the resubmittal review. All issues need to be resolved prior to work commencing on the project's staff report and scheduling for public hearing. In addition, the City may request in the course of processing the application, that you clarify, amplify, correct, or otherwise, supplement the basic information required for the application. Please contact your staff planner, Eric Munoz, at (619) 438-1161 extension 4441, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, MICHAEL J. HOLZMILLER Planning Director Gary Wayne Don Neu Bob Wojcik Jim Davis File Copy Data Entry Marjorie/Rich MIH:ENM:v<tlh A.4LCT.COM 2O75 Las Palmas Drive • Carlsbad, California 92OO9-1576 • (619) 438-1161 INITIAL PROJECT ISSUES PROJECT NOS. CT 94-07/PUD 94-06 - PLANNING AREA A-4 Planning; 1. Please provide a legend for the floor plans explaining any symbols and abbreviations as shown on the plans. 2. Per item #26 of the CT/PD checklists please provide a materials board with color samples that will correspond with the colors and materials noted on the architectural/elevations exhibit (roofing, exterior walls, pavement, glass, wood, etc.) 3. Please verify that no roof top equipment is proposed or will be required with the project; otherwise provide roof plans that depict all roof top equipment, etc. 4. The landscape plan will be reviewed in detail by the City's landscape consultant now that a complete application has been achieved. 5. Only provide wall and fence details that correspond and pertain to the walls and fences involved in this project as noted on the plans. Use the same terminology between the plans and details when referencing walls/fences. For example, "noise barrier wall" is called out on the plans but not given a corresponding detail with the same name. All wall heights, materials and colors need to be indicated. Noise wall details need to specify the materials and thickness proposed consistent with the requirements of the noise study in order to achieve adequate noise attenuation. The landscape plan and site plan must be consistent with each other including wall/fence information. On the plans, the noise wall height appears to be called out; however, please call out all wall heights (noise, retaining, etc.) throughout the length of the walls including endpoints, midpoints and highest elevation. Noise wall heights must be in compliance with the project's noise study. Where noise wall heights are required to be higher than 6', the master plan requires berming under the wall so that no more than a 6' high wall exists above the berm. The noise wall detail should clearly show this through details that depict noise walls up to 6' and noise walls over 6'. 6. As part of the landscape plans, please provide an exhibit clearing showing the details (materials, copy, colors, height and length dimensions) of all proposed signage consistent with master plan provisions. Also indicate sign illumination styles and techniques consistent with the master plan (Exhibit 30, etc). 7. On the project's floor plans, please indicate a minimum of 5' foot sideyard setbacks. 8. Maximum encroachment of fireplaces into sideyard setback areas is 2 feet. Please dimension this on the plans. Also, please label all fireplaces on the project's floor plans and give a corresponding symbol for the floor plans' legend. 9. On sheets 3-4 of the tentative map, lot numbers are in circles with the floor plan type underneath; please use the same label on the map exhibits as the floor plan exhibits (either plan types A, B, C or 1,2,3). 10. On the project's architectural elevation exhibits, please note the typical building materials and colors consistent with the materials/colors board. Brian Murphy CT 94-07/PUD 94-06 - Planning Area A-4 December 22, 1994 Page 3 11. Both the tentative and landscape plan exhibits need to show the trail required with this planing area by the master plaa Please provide typical details/cross sections of the trail and depict all trail amenities (seating nodes, lookouts, etc per the master plan). At the ends of the trail, indicate the trail's continue onto another planning area/trail segment consistent with the master plan's trail system. The tentative map and landscape plans must be consistent with each other. For A-4, the master plan requires construction and completion of the trail prior to the issuance of building permits. Please indicate this as a note on the trail plans or on a corresponding trail detail. In addition, also please indicate the following: (1) that the Homeowners Association shall assume all trail maintenance and liability responsibilities; and (2) prior to final map approval, an open space easement shall be dedicated to the property owner/Homeowners Association for trail purposes. 12. On the cover sheet of the tentative map, under Grading Analysis, please insert the following wording above the cut, fill and import quantities given: This site was mass graded under the approval of Master Tentative Map, CT 94-01. Final grading for this Planning Area involves: cut fill ~ import — 13. On the cover sheet of the tentative map under the Parking Summary, please place in parentheses (on-street parking) underneath visitor parking. Parking spaces for guests are allowed to be located on both sides of the 36 foot wide private street per the PD ordinance. Please plot these onstreet parking spaces on the tentative map exhibit to clearly show the guest spaces provided; and to verify the number of guest spaces present. 14. A check will be made for compliance with the Small Lot Architectural Guidelines. 15. Please provide entry gate/call box details for all planning areas proposing gated entries. 16. Provide one original and one reproduced copy of a signed Public Facilities Fee agreement (PFF). Submit a PFF agreement consistent with the comments made for the A-l and A-2 PFF agreements that were returned to Kaiza by the City for those projects. 17. Special treatment and landscaping for buffering and screening of the sewer pump station will be a project issue. 18. Please submit a brief written overview, citing examples from the project's site plan, explaining the approach taken in the design of this planning area to address the potential visual impacts associated with bluff facing homes/development as required by the master plan's Mitigated Negative Declaration. This is also required by the master plan under Design Criteria and Environmental Mitigation Conditions for Planning Area A-4. Engineering; 1. The driveways for each unit need to be plotted. 2. All street lots need a consecutive number. If the final map for CT 94-01 will be recorded first Brian Murphy CT 94-07/PUD 94-06 - Planning Area A-4 December 22, 1994 Page 4 and this map is to be recorded separately, then the lot numbering for this project can begin with number one. We have not seen a complete plan of recordation and lot numbering scheme for this project 3. Typical lot drainage needs to show a five foot distance from property line, toe/top of slope or wall to the structure. One side shows five foot including a slope. The five foot minimum begins at the toe of the slope. 4. The easement item numbers do not correspond to the numbers in the latest title report. 5. A grade for Street "10" is not shown. 6. Please show the width of Lot 10, CT 94-01, and the width of the "grass-crete" surface. The emergency access shown on Lot 10 may be potentially acceptable. The status of Lot as trail may cloud this potential acceptability. An 18 foot grass-crete width is also potentially acceptable. KAIZATOINSETTIA CORPORATION 7220 Avenida Encinas, Suite 200. Carlsbad, CA 92009 Telephone: (619) 931-9100 Fax: (619) 931-8386 October 25, 1994 Mr. Eric Munoz City of Carlsbad Planning Department 2075 La Palmas Drive Carlsbad, CA 92009 Dear Eric: This letter represents Kaiza's waiver of any and all required timelines for the processing of pending incomplete applications (CT 94.04, CT 94.05, CT 94.06, CT 94.07, CT 94.08, and CP 94.02) so that Planning Area D (CT 94.10) may first be deemed complete by either an on-site or off-site project. The pending applications referenced above may be re-submitted for a new 30 day completeness review but will not be deemed complete until Planning Area D is deemed complete. Because the re-submittals will be made under the original pending applications, no fees will be required with the re-submittals and all fees previously paid are applicable to the re- submittal. As we have discussed, both the City and Kaiza will work as diligently as possible to process and approve the above referenced maps. Please do not hesitate to call with any questions that you may have. Sincerely, x, V • is Noriko President City of Carlsbad Planning Department May 27, 1994 Brian Murphy Kaiza Poinsettia Corporation 7220 Avenida Encinas, Suite 200 San Diego, CA 92121 SUBJECT: CT 94-07/PUD 94-06 - POINSETTIA SHORES PLANNING AREA A-4 Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Tentative Tract Map/Planned Unit Development, application no. CT 94-07/PUD 94-06, as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. This list of items must be submitted directly to your staff planner by appointment. All list items must be submitted simultaneously and a copy of this list must be included with your submittals. No processing of your application can occur until the application is determined to be complete. The second list is a list of initial project issues of concern to staff. More project design issues will likely be identified and require resolution after the application is deemed complete. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, April 29, 1994, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Eric Munoz, at (619) 438-1161 extension 4441, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, MICHAEL J. HOLZI Planning Director c: Gary Wayne Don Neu Bob Wojcik Jim Davis File Copy Data Entry Marjorie/Rich LER 2O75 Las Palmas Drive Carlsbad, California 92OO9-1576 (619) 438-1161 LIST OF ITEMS NEEDED TO COMPLETE APPLICATION: No. CT 94-07/PUD 94-06 - PLANNING AREA A-4 PLANNING: 1. A complete application for an affordable housing project Site Development Plan (SDP) is required for either on-site or off-site affordable units; unless off-site affordable housing units are existing in which case a draft affordable housing agreement must be submitted to make the individual tentative map applications complete. 2. As proposed, this map requires the final map approval of the master tentative map currently under review (CT 94-01). Otherwise, this map must be a "stand alone" map with all offsite improvements shown, etc. On the cover sheet for this map, eliminate all lot and footprints shown for areas outside this specific planning area. Show the lots created by the master tentative map (CT 94-01) and label area outside this planning area as "not a part". List only the easements relevant to this planning area. The grading summary needs to reflect minor finished grading beyond the mass grading associated with CT 94-01. The amount of finished grading beyond the mass grading will be the basis for determining if additional environmental review specific to this planning area is required; or if the grading is minor enough so that it was covered with the master tentative's mass grading. 3. Show information such as easements, lot areas and street cross sections that are relevant to this planning area and not on a master tentative map level. Sheets cannot be missing from exhibits packages for application completeness. 4. Plotting of units/footprints on lots and pads; and full architectural exhibits for all proposed plan types, all elevations and all floor plans. These exhibits must reflect items a-e as shown under #17 on the application checklist. 5. Landscape plans at 40 scale including trail and any noise wall landscaping. Provide items a-f as shown under #16 on the application checklist. 6. Trail plans for the trail system required for this planning area consistent with the Poinsettia Shores Master Plan. 7. Noise study with attenuation/mitigation measures to comply with City's noise policy. 8. List the Average Daily Traffic amount specific to this planning area. 9. Provide percent of landscaping for this planning area. 10. Provide number of parking spaces required/provided for this planning area. Distinguish between resident parking and guest parking. 11. Provide location, height and materials of all walls and fences. Indicate top, bottom and highest condition elevations at both ends and in the middle of walls/fences. 12. One copy of 81/2x11" reduced site plan and building elevations. 13. Provide an Environmental Impact Assessment form. The environmental assessment needs to, at a minimum, address the proposed project and the environmental issues specific to this planning area as outlined in the master plan. 14. Public Facility Fee Agreement: Two (2) copies: one (1) notarized original and one (1) reproduced copy. 15. Three copies of the Preliminary Title Report (current within the last six (6) months). 16. The SDP for Planning Areas E and M must be deemed complete for this application to be deemed complete. ENGINEERING: 1. It appears that two different directions of processing are being sought. a. Some items appear to indicate that the Master Tentative Map, CT 94-01 will become final before this map and this map will then become a subdivision upon Lot 4 of that final map. Examples are lack of offsite streets and sewers needed for this map to stand alone. b. Other items appear to indicate that this map is intended to not depend on CT 94-01 becoming final first. Examples are the legal description, the listing of all easements over the master tentative map without an explanation which easements apply to this map. The applicant must choose one direction of processing and make all items consistent with that choice. We believe that having each planning area capable of becoming a final map on it's own merits will require a lot of duplication of requirements for the offsite improvements for Avenida Encinas, the drainage west of the railroad, grading and sewer improvements. 2. Footprints of structures are not plotted. 3. Offsite water which is needed to serve the project is not shown. We suggest that the overall systems be shown on the "key map". 4. State the traffic generation for this map alone. INITIAL ISSUES OF CONCERN PLANNING: 1. Please add the project application numbers (CT 94-07/PUD 94-06) to the upper right corners of plans for future resubmittals. 2. Follow all development standards and design criteria for this planning area as outlined in the Poinsettia Shores Master Plan. ENGINEERING: 1. The design has a drainage sump condition in Street T'near lots 86, 87 102, and 103. Providing a fail-safe overflow is a City requirement. It appears that the some redesign of grades in this area will be needed. 2. The project will not meet cul-de-sac standard for no more than 50 units on a single entry. A secondary access will be required. 3. Verify and identify on the map that the only existing easements on this map are Items 25, 28 and 41 on the easement list. State the disposition of all easements that will not handled on CT 94-01. 4. This lot, Lot 4 of CT 94-01, has no frontage on a public street. We believe this issue must be resolved before the final map for CT 94-01. If not, then this project will need to satisfy requirements for a dedicated public easement through other property. 5. The grading analysis as presented is likely to be confusing to one not familiar with the processing of the overall project. Please clearly show the grading needed for this map alone. A reference to the sheet grading done on the Master Tentative Map CT 94-01 may be needed for a complete explanation. A statement such as "this map proposes minimum grading upon the sheet grading for Master Tentative Map sufficient only to establish streets, drainage and lot pads. Address if this map will balance or identify the amount and location of offsite export or import. 6. The sewer pump plant will require CMWD approval prior to approval of the tentative map. 7. Cross out or remove any information not appropriate to this map alone, such as the cross- sections for streets not in or adjacent to this subdivision. 8. Check driveway grades and need for vertical curves. 9. A statement is made that private streets will be separate lots. Will this lot numbering be done and maintain consecutive numbers from map to map? 10. A letter from a soils engineer will be required for drainage less than five feet from structure to the drainage swale.