Loading...
HomeMy WebLinkAboutCT 97-09; La Costa Lucky Sav-On Shopping Center; Tentative Map (CT) (8)December 14, 1995 TO: CHRISTER WESTMAN, ASSOCIATE PLANNER FROM: Associate Engineer Quon VIA: Principal Civil Engineer y^,2< ^ ^ LA COSTA PLAZA RENOVATION, PRE 95-46 We offer the following comments: 1. Any discretionary application for this site would include conditions of approval to provide the following frontage improvements: 4 Sidewalk, curb, and gutter along El Camino Real and La Costa Avenue; 4- Raised concrete landscaped median on El Camino Real; 4 Dedication of right-of-way and installation of a deceleration lane on El Camino Real; 4 Dedication of 13' of right-of-way and installation of a dedicated right-turn lane on La Costa Avenue. 2. A traffic study may be required to determine if additional improvements are warranted on La Costa Avenue. These improvements could consist of a traffic signal and/or a dedicated right turn lane for the driveway entrance, and median improvements. 3. We recommend removal of the westernmost driveway entrance to the site on La Costa Avenue. 4. We recommend removal of the two existing driveway entrances to the site on El Camino Real, and replace them with a deceleration lane leading to a single driveway entrance with right-in/right-out access only. 5. Renovation of the site should include a review of the existing site circulation to eliminate one-way parking lot aisles, and to assure that the site layout is in compliance with current City engineering standards. Please forward the red-lined check print to the applicant. If you have questions regarding any of the comments above, please contact me at extension 4380. KENNETH W. QUON Associate Engineer RECORD 2075 LAS PALMAS DRIVE CARLSBAD, CALIFORNIA 92009-4859 Office of the City Engineer By of (Earls bail (619) 433-1161TELEPHONE Project Date »/<=>'Time H > Project Title .(amnpm), Individual Title Organization.Location Phone No. ( Subject ITEMS DISCUSSED LA OP-g>P»gnr ID LOCArbn -TH6" ar- U5VQ COMMENTS OR ACTION REQUIRED Wilay-Fisk Form 4-7 June 27, 1994 TO: CHRISTER WESTMAN, ASSOCIATE PLANNER FROM: Associate Engineer VIA: Principal Land Use Engineer LA COSTA PLAZA, PRE 94-20 We offer the following comments: 1. High volume traffic areas such as the major parking lot aisles and the areas in front of the proposed market and retail sites should be free of parking stalls to avoid conflicts between through traffic and vehicles backing out. 2. Truck turning radii should be plotted on the site plan to demonstrate that trucks can safely access delivery areas. 3. The alignment of the driving aisle in front of the Water District offices appears awkward and could be confusing to drivers. 4. Because of sight distance concerns and limited horizontal curve radii, the City is considering limiting left turns out of the proposed driveway on La Costa Avenue, or widening the roadway in this area to improve sight distance. 5. Please note that the City is in the process of obtaining the following documents, in accordance with the conditions of approval for the Los Ninos Preschool: • A Future Improvement Agreement for sidewalks and half median along the frontage of this property on El Camino Real and for sidewalks along the frontage of this property on La Costa Avenue. • An irrevocable offer of dedication for 13 feet of additional right-of-way along La Costa Avenue. 6. Please note that City standards limit driveway access on prime arterial roads, such as El Camino Real, to right in/out only. 7. A traffic study may be required of this project to determine if additional improvements are required, such as a traffic signal and dedicated right turn lane at the entrance on La Costa Avenue, or a dedicated right turn lane for the entrance on El Camino Real. 8. As this property is located within the 100-year flood plain, any proposed development will require an application for a Special Use Permit. Please forward the red-lined check print to the applicant. If you have questions regarding any of the comments above, please contact me at extension 4380. KENNETH W. QUON Associate Engineer H:\LffiRARY\ENG\WPDATA\QUON\LCPPRERV.MEM City of Carlsbad Planning Department June 24, 1994 Michael LaBarre 517 Fourth Avenue Suite 102-B San Diego, CA 92101 SUBJECT: PRE 94-02 - LA COST* PLAZA APN: 216-124-01, 02, & 18 Preliminary review of your project was conducted on June 23,1994. Listed below are the issues raised by staff. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. The preliminary review does not represent an in-depth analysis of vour project. Additional issues of concern may be raised after your application is submitted and processed for a more specific and detailed review. Planning: 1. Development of parcel 216-124-18 is subject to the issuance of a Hillside Development Permit (HDP). Associated with an HDP will be the submittal and review of an Environmental Impact Assessment Part I. 2. Development of parcels 216-124-01 & 02 are subject to the approval of a Special Use Permit (SUP). Associated with the application will be the submittal and review of an Environmental Impact Assessment Part I. 3. The La Costa community is very sensitive to development in and around La Costa. If you choose to pursue development approvals for this site, staff strongly recommends that a community outreach and information program be included in the process. 4. Parcels 216-124-01 & 02 are subject to the El Camino Real Corridor Development Standards. All buildings and other structures, trellises, must maintain a 30 foot setback from the El Camino Real right-of-way. Screen walls up to six feet in height and parking may be allowed up to 25 feet from the right-of-way. Building height is limited to 35 feet from pad grade. However, protrusions per Section 21.46.020 (Yards) of the Zoning Ordinance are allowed up to 45 feet. Per Section 21.28T030 (C-2), building height is allowed up to 45 feet with the approval of a Site Development Plan (SDP) by City Council. Specified protrusions may then be permitted up to a maximum of 55 feet above pad grade. 2O75 Las Palmas Drive • Carlsbad, California 92OO9-1576 - (619) 438-1161 Michael LaBarre June 24, 1994 Page 2 5. Per numbers 3 and 4 above all building elevations visible from the public right-of- way should be well detailed, any sense of mass should be tempered by the use of landscaping and variation in building wall height and depth, and service and loading areas should also be well screened. Staff recommends that the architectural detailing and general theme be carried over with any formal submittals. 6. Setbacks are not required along the property's La Costa Avenue frontage per Chapter 21.28 (C-2) of the Zoning Ordinance, but setbacks can be required per Chapter 21.40 (S-P). 7. Staff encourages that the existing center's community uses such as Los Ninos and P.A.T.H. be accommodated within the new center. 8. Gear pedestrian links should be provided within the parking lot. Engineering 1. High volume traffic areas such as the major parking lot aisles and the areas in front of the proposed market and retail sites should be free of parking stalls to avoid conflicts between through traffic and vehicles backing out. 2. Truck turning radii should be plotted on the site plan to demonstrate that trucks can safely access delivery areas. •>" 3. The alignment of the driving aisle in front of the Water District offices appears awkward and could be confusing to drivers. 4. Because of site distance concerns and limited horizontal curve radii, the City is considering limiting left turns out of the proposed driveway on La Costa Avenue, or widening the roadway in this area to improve site distance. 5. Please note that the City is in the process of obtaining the following documents, in accordance with the conditions of approval for the Los Ninos Preschool: A future improvement agreement for sidewalks and half median along the frontage of this property on El Camino Real and for sidewalks along the frontage of this property on La Costa Avenue. An_irrevocable offer of dedication for 13 feet of additional right-of-way along La Cdsta Avenue. 6. Please note that City Standards limit driveway access on prime arterial roads, such as El Camino Real, to right-in/right-out only. Michael LaBarre June 24, 1994 Page 3 7. A traffic study may be required of this project to determine if additional improvements are required, such as a traffic signal and dedicated right turn lane at the entrance on La Costa Avenue, or a dedicated right turn lane for the entrance on El Camino Real. 8. As this property is located within the 100-year flood plain, any proposed development will require an application for a Special Use Permit (Floodplain). Refer to the redlined checkprint for Engineering comments—The checkprint should also be submitted with any formal permit applications. Please contact Christer Westman at (619) 438-1161, extension 4448 if you have any questions. Sinc IY JL WAYNE / Assistant Planning Director GEW:CW:lh c: Bobbie Hoder Ken Quon File Copy Data Entry June 24, 1994 Michael LaBarre 517 Fourth Avenue Suite 102B San Diego, CA. 92101 SUBJECT: PRE 94-02 - LA COSTA PLAZA APN: 216-124-01,02, & 18 Preliminary review of your project was conducted on June 23, 1994. Listed below are the issues raised by staff. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. The preliminary review does not represent an in-depth analysis of your project. Additional issues of concern may be raised after your application is submitted and processed for a more specific and detailed review. 1. Development of parcel 216-124-18 is subject to the issuance of a Hillside Dveleopment Permit (HDP). Associated with an HDP will be the submittal and review of an Environmental Impact Assessment Part I. 2. Development of parcels 216-124-01 & 02 are subject to the approval of a Special Use Permit (SUP). Associated with the application will be the submittal and review of an Environmental Impact Assessment Part I. 3. The La Costa community is very sensitive to development in and around La Costa. If you choose to pursue development approvals for this site, staff stongly recommends that a community outreach and information program be included in the process. 4. Parcels 216-124-01 & 02 are subject to the El Camino Real Corridor Development Standards. All buildings and other structures, trellises, must maintain a 30 foot setback from the El Camino Real right-of-way. Screen walls up to six feet in height and parking may be allowed up to 25 feet from the right-of-way. Building height is limited to 35 feet from pad grade. However, protrusions per Section 21.46.020 (Yards) of the Zoning Ordinance are allowed up to 45 feet. Per Section 21.28.030 (C-2), building height is allowed up to 45 feet with the approval of a Site Development Plan (SDP) by City Council. Specified protrusions may then be permitted up to a maximum of 55 feet above pad grade. 5. Per numbers 3 and 4 above all building elevations visible from the public right-of-way should be well detailed, any sense of mass should be tempered by the use of landscaping and variation in building wall height and depth, and service and loading areas should also be \vell screened. Staff recommends that the architectural detailing and general theme be carried over with any formal submittals. 6. Setbacks are not required along the property's La Costa Avenue frontage per Chapter 21.28 (C-2) of the Zoning Ordinance, but setbacks can be required per Chapter 21.40 (S-P). 7. Staff encourages that the existing center's community uses such as Los Nifios and P.A.T.H. be accomodated within the new center. 8. Clear pedestrian links should be provided within the parking lot. ENGINEERING 1. Circulation vs. parking in front of market. 2. Stacking vs. parking in front of 10.6 com. and 7.2 pad. 3. Median break in ECR. 4. Encroachment into the floodplain. 5. Truck turning radii at loading locations. Please contact Christer Westman at (619) 438-1161, extension 4448 if you have any questions. Sincerely, GARY E. WAYNE Assistant Planning Director GW:cw Bobbie Hoder File Copy Data Entry ARCHITECTURE PLANNING 517 Fourth Avenue Suite 102B San Diego, CA 92101 Tel [619] 234-0789 Fax [619] 234-8136 CONFERENCE REPORT Project: Conference Place: Date of Conference: Present: Report Preparer: Date of Report: La Costa Plaza 94009 City of Carlsbad Wednesday, June 8, 1994 Christer Westman — Planning Department Bob Wojcik — Engineering Department Mark Fehlman — Fehlman LaBarre Mike LaBarre — Fehlman LaBarre Mike LaBarre June 14, 1994 The purpose of the meeting was to discuss the project development and processing issues as outlined in the June 7, letter to Mr. Gary Wayne. 1. The submittal package information was obtained from the City of Carlsbad. Specific drawing requirements included site plan, building elevations, landscape plan, preliminary grading plan. Submittal of the sign program is optional; the sign program can be processed at a later date. 2. Processing fees were identified in a fee schedule distributed by Christer. We briefly discussed the fee requirements for a Site Development Permit, Special Use Permit for the flood plain, and Environmental Assessment. All other fees are described in the Fee Schedule. 3. We briefly discussed the development impact fees required by the City including traffic fees, public facilities fees, as outlined in the Fee Schedule. Conference Report City of Carlsbad La Costa Plaza - 94009 June 8, 1994 Page 2 4. Christer and Bob confirmed that we can build within the flood plain area provided that the building is elevated out of the flood plain, consistent with the daycare facility occupying the site. 5. The timeline for processing these permits is approximately 6 months (8 months is more realistic). 6. An Environmental Assessment Study will be required. It is anticipated that traffic, and biological impacts on the flood plain will be issues and therefore a traffic study and a biological study will be necessary. Staff did anticipate however that a negative declaration or a mitigated negative declaration could be anticipated. 7. We obtained a copy of the El Camino Real corridor design guidelines. 8. The only public hearing required for the project is a Planning Commission upon completion of the staff analysis and recommendations. 9. We discussed the possibility of excluding the office building site from the Site Development and Special Use Permit process, recognizing that the office building would be outside the El Camino Real corridor as a separate parcel. A lot line adjustment process, taking approximately 2 months, will be required. cc: Jack Naliboff. RCU BY:XEROX TELECOPIER 7010 ; 6- 7-94 11:55«M ; 6192348136^ . 6194380894;» 1 r;JUN-=- -J---34 TUE 1 1 :5^ REHLMAM L_ A B A R R E ^ l= c* 1•-••>••>.& ^^^ r^ . 13 1 CJFI2 F £ H LMll L AB A R R E ARCHITECTURE 51 / Fourth Awnuo PLANNING $uitnl02B !ki(Dici]u,r.A9?ioi loi [619] 234'U/89 i..,'""' Fux 1619) 234-813A June 7, 1994 ,,.A; v Mr. Planning Director CITY OF CARLSBAD 2075 Las Palmas Drive Carlsbad, CA 92009 Re: La Costa Plaza 94009 Dear Gary: you for the opportunity to meet with you on Wednesday. To make -p/7* ^.^this meeting more effective, I am sending to you a list of issues that we would like to address in the meeting. In addition, I have included a sketch site plan showing the site layout as well as square footage of various that are proposed. 3700.0^ As I related to you on the phone, out Client has received a very positive response from various tenants in the marketplace and is ready to proceed i6Tp£forwarcj we are intending to develop a package for him to take to his "^*" company on June 15, for final approval to proceed forward with processing of this site plan. Answers to following questions will allow us to provide a complete package for him. As you may note from the site plan, we are proposing a complete demolition in redevelopment of the site. In addition, we have noted a thirteen foot additional street dedication on La Costa Avenue per Bob Wojcik's recommendation. In our meeting we would like to have the following questions answered: What elements are required for complete submittal package for planning review? ^0(sct^&r\/&\^^.^l'fFf^l^vPlCtTi-Pindiuidwil 2. What fees are required for the processing of this planning approval? RCU BY:XEROX TELECOPIER 7010 ; 6- 7-94 11:55PM ; 6192348136^ ' 6194380894;* 2 JUN- T-3.4 TUE li:u REHLMrtN l_, Mr, Gary Wayne City of Carlsbad June 7, 1994 Page 2 3. What fees are required for the development of this project? 4. It is our understanding that a flood plain area currently exists around the former daycare center in the northeast side of our property. We have been told that if the elevation in this area is raised, we will no longer be restricted from construction because of the flood plain, Is this true? If-ino or. b. What is the typical schedule for processing a project of this sort? 'jtfts>miffct~ <?<ynifter& Fnv/Pem 6. What environmental review is required? "?fe*&fty fa^vrtied. ~frt>jP>C' <&wvk<w ^]tv&t A »-AmV;i( r> fl^ v&c- 7. May we get a copy of the El Camino Real design guidelines? J£e. 8. What hearings are required for planning approval? 9. Certain office tenants that currently lease space on site would like to relocate in the proposed office building. Is there a way to build the office building on site "by right", without going through the planning approval process? This is of concern primarily because of the timeline. The current center is largely vacant. The Client would like to proceed with an office building as soon as possible to accommodate these tenants. If there is any additional information you would like from me prior to the meeting, please do not hesitate to call. Thank you again for your quick response. 1 look forward to meeting with you on Wednesday regarding this project. Sincerely, Mark Fehlman, AIA Principal Enclosures en u\co ™ €0n 5 0W III <rj z<r E J I 111 in ui -•e TOfAt PARXHG REDUCED PARKMG PROVIDED PARKNG RATIO SfTE AREA 45.000 Sf 27.900 Sf 16.000 SF 17.800 SF 106.70CSF MS SPACES 535 SPACES 1/200 1026 ACHES LA COSTA PLAZA -- LA COSTA SHOPPING CENTER. INC. («1«1 <5Z-6WO City of Carlsbad AEngineering Department November 17, 1993 Fehlman LaBarre 517 4th Avenue, Ste 102B San Diego GA 92101 ATTN: Michael LaBarre LA COSTA PLAZA ADT In response to our phone conversation today, I have researched the assigned ADT for your site that is currently being used in SANDAG calculations. Because the SANDAG calculation area is larger than just your site, I have had to interpolate some of the numbers. The best figures I could come up with for your site would be 5990 ADT. This number was used in the Green Valley Traffic Report. I am enclosing portions of that Traffic Report showing existing and buildout conditions for intersection and road segments that would be impacted. As I told you over the phone, a traffic report would most likely be required for redevelopment of your project. The report would address any impacts to circulation elements, any mitigations to those impacts and what the true maximum ADT for your site would be. One comment I have received from our Traffic Engineer regarding the redevelopment of your site is that we would be very interested in trying to relocate and/or remove the driveways at the ARCO site. We have currently a history of accidents at the ARGO site and we will be working with you on ways to mitigate that situation. I hope this answers your questions. If you do have any other questions, please call me Sincerely, ROBERT J. WOJCIK Principal Civil Engineer RJW.Tz 2O75 Las Palmas Dr. - Carlsbad, CA 92009-1576 - (619) 438-1161 • FAX (619) 438-0894 City of Carlsbad Planning Department August 11, 1992 La Costa Plaza Retail Center Allegis Development Services, Inc. 427 "C" Street #210 San Diego, CA 92101 ,f < §U SUBJECT: LA COSTA PLAZA RETAIL CENTER * APN: 216-124-02 Preliminary review of your project was conducted on July 31 , 1 992. Listed below are the issues raised by staff. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. The preliminary review does not represent an in-depth analysis of vour project. Additional Issues of concern may be raised after vour application is submitted and processed for a more specific and detailed review. Planning: 1. The project would require a Special Use Permit for the flood plain and El Camino Real Scenic Corridor, and a Hillside Development Permit due to grading of slopes greater than 1 5% with an elevation differential greater than 1 5 feet. 2. Eliminate the parking along the front of the major tenant to create less auto and pedestrian conflicts and to enhance the entryway to the store. To mitigate the visual impacts created by large areas of parking, add several more fully landscaped medians between rows of parking spaces. 3. The 6K retail pad at the corner encroaches into the 30 foot building setback along El Camino Real. This setback is required by the El Camino Real Corridor Standards. 4. Walls are not permitted to exceed a height of 6 feet when located within 25 feet of El Camino Real per the requirements of the El Camino Real Corridor Standards. 5. Loading areas for the individual stores should not face the scenic corridor. The architecture along El Camino Real should be enhanced to create visual interest along the scenic corridor, by providing adequate visual relief, and quality materials and detailing. 2O75 Las Palmas Drive • Carlsbad, California 92OO9-1576 • (619) 438-1161 La Costa Plaza Retail Center August 11, 1992 Page 2 ~ Engineering: 1. A review of traffic circulation on La Costa Ave and ECR will be needed. The review will need to be made in sufficient depth to produce a detailed striping plan and determine how much additional right-of-way will be needed. At this time some of the needs may be: A. 88 foot right-of-way width, going easterly from the main entrance on La Costa Ave. (2-12 ft. through lanes each direction , 1-10 ft. left turn lane, 2-5 ft. bike lanes and 2-10 ft. parkway & sidewalk lanes. B. Dual left turn lanes from LCA going West to ECR going South. C. A free right turn lane from LC-west to ECR-north. D. LCA may need to be realigned to flatten the horizontal curve at the easterly end of the site. C. A traffic signal may be needed on LCA at the entrance to the site which also aligns with the entrance to the southerly shopping center. D. In lieu of the traffic signal a median may be needed. E. Additional widening of LCA near the intersection with ECR for the needed lanes. The length of the widening will have to be determined from the traffic review. F. Traffic signal modifications may needed at LCA and ECR. 2. The site access locations are in question at this time. Some of these questions follow: A. The most easterly access as shown on this preliminary site plan from LCA will not be supported by engineering. B. The access (from ECR) that is the first one northerly of LCA needs to be relocated farther North of LCA. 3. The internal access to the Leucadia County Water District Facility presents potential conflicts. 4. Backing out from parking spaces into the main aisle coming from LCA cannot be supported. 5. Truck turns into or out of the "service drive" will not work. 6. Traffic conflicts between the "service drive" and the main aisle may cause incoming traffic to wait in the street. This is at both entrances from ECR. 7. Parking in front of the "Anchor Retail Tenant1 is not supported. This aisle should remain clear for fire and emergency access. La Costa Plaza Retail Center August 11, 1992 Page 3 - 8. As acknowledged in the proposal the site is partially in the 100 year flood plain. All development will have to conform CMC Chapter 21.110, the Floodplain Management Regulations. A. The filing of an SUP is required. B. Certifications by a professional engineer will be required. C. A HEC 1 and 2 analysis will be required to show the pre- and post- development water surface elevations during the 100 year flood event D. Any grading or construction that may effect the back-water elevations upstream will have to be carefully reviewed. E. Site drainage will need close attention. The northeast portion of the site is presently a low point with an existing drainage inlet that conducts drainage to the San Marcos Creek. This inlet will be inundated during the 100 year flood event. The inlet will probably not accept drainage during this inundation. 9. Full median construction in El Camino Real will be required. Please contact me at (619) 438-1161, extension 4455 if you have any questions. Sincerely, JEFF GIBSON Associate Planner JG:km c: File Copy TO; JEFF GIBSON JULY 30, 1992 FROM Jim Davis VIA LAND USE PRINCIPAL ENGINEER (Authorized verbally by RJW 7-31-92) PRELIMINARY REVIEW APN 216-124-1,2 & 3 LA COSTA PLAZA 1. A review of traffic circulation on La Costa Ave and ECR will be needed. The review will need to be made in sufficient depth to produce a detailed striping plan and determine how much additional right-of-way will be needed. At this time some of the needs may be: A. 88 foot right-of-way width, going easterly from the main entrance on La Costa Ave. (2-12 ft. through lanes each direction , 1-10 ft. left turn lane, 2-5 ft. bike lanes and 2-10 ft. parkway & sidewalk lanes. B. Dual left turn lanes from LCA going West to ECR going South. C. A free right turn lane from LC-west to ECR-north. D. LCA may need to be realigned to flatten the horizontal curve at the easterly end of the site. C. A traffic signal may be needed on LCA at the entrance to the site which also aligns with the entrance to the southerly shopping center. D. In lieu of the traffic signal a median may be needed. E. Additional widening of LCA near the intersection with ECR for the needed lanes. The length of the widening will have to be determined from the traffic review. F. Traffic signal modifications may needed at LCA and ECR. 2. The site access locations are in question at this time. Some of these questions follow: A. The most easterly access as shown on this preliminary site plan from LCA will not be supported by engineering. B. The access (from ECR) that is the first one northerly of LCA needs to be relocated farther North of LCA. 3. The internal access to the Leucadia County Water District Facility presents potential conflicts. 4. Backing out from parking spaces into the main aisle coming from LCA cannot be supported. 5. Truck turns into or out of the "service drive" will not work. 6. Traffic conflicts between the "service drive" and the main aisle may cause incoming traffic to wait in the street. This is at both entrances from ECR. 7. Parking in front of the "Anchor Retail Tenant" is not supported. This aisle should remain clear for fire and emergency access. 8. As acknowledged in the proposal the site is partially in the 100 year flood plain. All development will have to conform CMC Chapter 21.110, the Floodplain Management Regulations. A. The filing of an SUP is required. B. Certifications by a professional engineer will be required. C. A HEC 1 and 2 analysis will be required to show the pre- and post- development water surface elevations during the 100 year flood event. D. Any grading or construction that may effect the back-water elevations upstream will have to be carefully reviewed. E. Site drainage will need close attention. The northeast portion of the site is presently a low point with an existing drainage inlet that conducts drainage to the San Marcos Creek. This inlet will be inundated during the 100 year flood event. The inlet will probably not accept drainage during this inundation. 9. Full median construction in El Camino Real will be required. ALLEGIS Development Services, Inc. 427 "C" Street, Suite 210 San Diego, CA 92101 (619)238-5466 FAX (619) 232-0703 July 24, 1992 Mr. Van W. Lynch City of Carlsbad Community Development 2075 Las Palmas Drive Carlsbad, California 92009-1576 RE: La Costa Shopping Center Dear Van: Consistent with your recent meeting with Kip Howard of this company and your recommendation during that meeting, enclosed please find the preliminary review application for the La Costa Shopping Center, and the appropriate accompanying documents. The enclosures, in addition to the application, are as follows: 1. Two (2) copies of the conceptual site plan 2. Our check in the amount of $100.00 3. Exhibit A, which is the project description We would appreciate it if you would submit this preliminary review application and its attachments for review by the Planning Department staff and Engineering Department staff at their next regularly scheduled staff meeting, which will be Friday, July 30, 1992. If you have any questions concerning the enclosed information, or need anything else in order to submit this application and documentation for review, please give me a call. Sincerely, JEVELOPxIviENT SERVICES, INC. irdoc| Project Administration Enclosures