Loading...
HomeMy WebLinkAboutCT 97-15; Lohf Property; Tentative Map (CT) (5)December 15, 1998 TO: PRINCIPAL CIVIL ENGINEER FROM: Associate Planner ENVIRONMENTAL REVIEW FOR POINSETTIA LANE - LOHF TO EL CAMINO REAL REACH Please find attached an Environmental Impact Assessment Form, Mitigated Negative Declaration and Mitigation Monitoring Program for the proposed extension of Poinsettia Lane from El Camino Real to the Lohf Subdivision (CT 97-15) project boundary. This environmental review must proceed prior to setting the final alignment of Poinsettia Lane through this area and prior to a final map for the Lohf Subdivision. The potential environmental impacts for the Poinsettia Lane extension would involve a removal of 0.87 acres of southern maritime chaparral, potential archeological and paleontological reconnaissance, and fugitive dust control. According to preliminary discussions with the wildlife agencies, the removal of 0.87 acres of habitat could be mitigated by the preservation of the existing habitat on the Lohf property (a total of 5.5 acres) since the road improvements are tied to the project. The applicant's representative, Jack Henthorn and Associates, has stated that the applicant, Scot Sandstrom of Western Pacific Housing, is requesting that the City be the applicant for this environmental review. I informed the applicant's representative that the decision on that issue rested with the Engineering Department, since all of this will likely be covered by a reimbursement agreement associated with Bridge and Thoroughfare District No. 2. Could you please process this request through the proper channels in the Engineering Department? If you agree with the applicant's request, then the appropriate action would be to sign the highlighted blank, accepting the mitigation measures. If you do not agree, you may either contact the applicant directly or provide me with a memo describing your disagreement that I could forward to the applicant. Please feel free to contact me if you have any questions. Thank you for your consideration. MICHAEL GRIIvr Attachment December 2, 1998 TO: PLANNING COMMISSION FROM: Planning Department SUBJECT: ZC 97-06/LCPA 97-08/CT 97-15/HDP 97-16/CDP 97-39 - LOHF SUBDIVISION Staff is recommending the following revisions to Planning Commission Resolution No. 4427 for CT97-15: Insert as condition # 46 the following and renumber the subsequent conditions. 46. This project is within the proposed boundary of the Aviara Parkway - Poinsettia Lane Bridge and Thoroughfare Fee District. This project is required to pay a fair share contribution towards the construction of Poinsettia Lane in accordance with the proposed fee program (delete the rest of the condition) Revise condition # 56 as follows: 56. Plans, specifications, and supporting documents for all public improvements shall be prepared to the satisfaction of the City Engineer. In accordance with City Standards, the developer shall install, or agree to install and secure with appropriate security as provided by law, improvements shown on the tentative map and the following improvements: ON-SITE IMPROVEMENTS: A. Poinsettia Lane full width (as a 102' major arterial) within the boundary of this subdivision. Improvements to include but not be limited to grading and drainage improvements, A.C. paving & base, curb, gutter & sidewalk, public utilities, median hardscape, irrigation, and landscaping within this arterial roadway. B. Dove Lane ( as a 60' collector street) from it's existing terminus west of the shopping center, to the intersection of "D" Street. Improvements include but are not limited to grading, curb, gutter & sidewalk, A.C. paving & base, irrigation, landscaping and public utilities within this roadway. C. Mimosa Drive (as a 60' local street) from it's existing terminus to the intersection of "B" Street. Improvements include but are not limited to grading, curb, gutter & sidewalk, A.C. paving & base, irrigation, landscaping and public utilities within this roadway. D. Sewer, Water and Storm Drains onsite and offsite to serve this subdivision and stubbed to serve the adjacent properties as required and as shown on the tentative map. E. Design & construct the two points of "Future Access" as 60' wide local streets across lot 75 and across lot 76 as shown on the tentative map. Improvements may include but are not limited to grading, curb, gutter & sidewalk, A.C. paving & base, irrigation, landscaping and public utilities within this roadway. The construction of ZC 97-06/LCPA 97-08/CT gHDP 97-16/CDP 97-39 - LOHF December 2, 1998 Page 2 "Future Access" across lot 75 may be limited to grading and drainage, depending on adjacent land use. F. Check Dams downstream of drainage outlets across lot 76 and/or off site (2 areas) as shown on the tentative map and as required downstream to control erosive velocity of drainage. Location and design of these check dams to be determined in final design of this project, subject to the approval of the City Engineer. OFF-SITE IMPROVEMENTS: A. The center portion of Poinsettia Lane, a 102' wide major arterial being two 18 foot wide lanes east of the boundary of this subdivision to El Camino Real. The off site improvement of Poinsettia Lane shall include but not be limited to full width grading, transitions, AC berms, drainage facilities, and median curbs as identified in the Aviara Parkway - Poinsettia Lane Bridge and Thoroughfare District Number 2. B. Temporary transition and driveway access from Poinsettia Lane to the adjacent property (APN 215-050-57, Saska) to the satisfaction of the City Engineer. C. Transition and driveway access from street "A" to the adjacent property (APN 215- 050-58, Steiner) as shown on the tentative map and to the satisfaction of the City Engineer. D. Offsite transitions and/or reconstruction may be required for Dove Lane, Mimosa Drive, and Poinsettia Lane at El Camino Real to provide a smooth transition to the satisfaction of the City Engineer. REIMBURSEMENT AGREEMENTS: The developer may enter into a reimbursement agreement with the City for right of way dedication and for required improvements to Poinsettia Lane as identified in the Aviara Parkway - Poinsettia Lane Bridge And Thoroughfare District Number 2. If the agreement is entered into, it must be approved prior to dedication of right of way and prior to the beginning of construction. A list of the above improvements shall be placed on an additional map sheet on the final map per the provisions of Sections 66434.2 of the Subdivision Map Act. Improvements listed above shall be constructed within 18 months of approval of the secured improvement agreement or such other time as provided in said agreement. The construction and grading of Poinsettia Lane may follow a timeline separate from the remainder of the project. The timeline is dependent on off-site right of way acquisition and environmental mitigation as required by the affected agencies and the City. An advanced grading permit may be permitted if it includes grading for Poinsettia Lane per condition number 56. Insert as condition #52 the following and renumber the subsequent conditions. Prior to approval of a Site Development Plarrfor thrs project, the developer shall determine an appropriate alignment of a third access using the proposed Poinsettia Lane, in accordance with the certified EIR for the Zone 20 Specific Plan and as modified by updated environmental review. ZC 97-06/LCPA 97-08/CT 9lHDP 97-16/CDP 97-39 - LOHF December 2, 1998 Page3 Replace conditions #54B, and replace with the following: Construction traffic shall be prohibited from using Mimosa Drive. CITY OF CARLSBAD ENGINEERING DEPARTMENT LAND USE REVIEW December 2, 1998 TO: Associate Planner - Mike Grim FROM: Associate Engineer - Land Development Section VIA: Principal Civil Engineer - Land Development Section CT97-15/CDP97-39/HDP97-16: LOHF PROPERTY REVISIONS AND AMENDMENTS TO CONDITIONS OF APPROVAL Engineering Department staff has discussed the conditions of approval with the City Attorney and would like to make the following revisions or amendments to the draft conditions of approval. Insert as condition # 46 the following and renumber the subsequent conditions. 46. This project is within the proposed boundary of the Aviara Parkway • Poinsettia Lane Bridge and Thoroughfare Fee District. This project is required to pay a fair share contribution towards the construction of Poinsettia Lane in accordance with the proposed fee program ..... (delete the rest of the condition) Revise condition # 56 as follows: 56. Plans, specifications, and supporting documents for all public improvements shall be prepared to the satisfaction of the City Engineer. In accordance with City Standards, the developer shall install, or agree to install and secure with appropriate security as provided by law, improvements shown on the tentative map and the following improvements: ON-SITE IMPROVEMENTS: A. Poinsettia Lane full width (as a 102' major arterial) within the boundary of this subdivision. Improvements to include but not be limited to grading and drainage improvements, A.C. paving & base, curb, gutter & sidewalk, public utilities, median hardscape, irrigation, and landscaping within this arterial roadway. B. Dove Lane ( as a 60' collector street) from it's existing terminus west of the shopping center, to the intersection of "D" Street. Improvements include but are not limited to grading, curb, gutter & sidewalk, A.C. paving & base, irrigation, landscaping and public utilities within this roadway. C. Mimosa Drive (as a 60' local street) from it's existing terminus to the intersection of "B" Street. Improvements include but are not limited to grading, curb, gutter & sidewalk, A.C. paving & base, irrigation, landscaping and public utilities within this roadway. 1 D. Sewer, Water and Storm Drains onsite and off site to serve this subdivision and stubbed to serve the adjacent properties as required and as shown on the tentative map. E. Design & construct the two points of "Future Access" as 60' wide local streets across lot 75 and across lot 76 as shown on the tentative map. Improvements may include but are not limited to grading, curb, gutter & sidewalk, A.C. paving & base, irrigation, landscaping and public utilities within this roadway. The construction of "Future Access" across lot 75 may be limited to grading and drainage, depending on adjacent land use. F. Check Dams downstream of drainage outlets across lot 76 and/or off site (2 areas) as shown on the tentative map and as required downstream to control erosive velocity of drainage. Location and design of these check dams to be determined in final design of this project, subject to the approval of the City Engineer. OFF-SITE IMPROVEMENTS: A. The center portion of Poinsettia Lane, a 102' wide major arterial being two 18 foot wide lanes east of the boundary of this subdivision to El Camino Real. The offsite improvement of Poinsettia Lane shall include but not be limited to full width grading, transitions, AC berms, drainage facilities, and median curbs as identified in the Aviara Parkway - Poinsettia Lane Bridge and Thoroughfare District Number 2. B. Temporary transition and driveway access from Poinsettia Lane to the adjacent property (APN 215-050-57, Saska) to the satisfaction of the City Engineer. C. Transition and driveway access from street "A" to the adjacent property (APN 215- 050-58, Steiner) as shown on the tentative map and to the satisfaction of the City Engineer. D. Offsite transitions and/or reconstruction may be required for Dove Lane, Mimosa Drive, and Poinsettia Lane at El Camino Real to provide a smooth transition to the satisfaction of the City Engineer. REIMBURSEMENT AGREEMENTS: The developer may enter into a reimbursement agreement with the City for right of way dedication and for required improvements to Poinsettia Lane as identified in the Aviara Parkway - Poinsettia Lane Bridge And Thoroughfare District Number 2. If the agreement is entered into, it must be approved prior to dedication of right of way and prior to the beginning of construction. A list of the above improvements shall be placed on an additional map sheet on the final map per the provisions of Sections 66434.2 of the Subdivision Map Act. Improvements listed above shall be constructed within 18 months of approval of the secured improvement agreement or such other time as provided in said agreement. The construction and grading of Poinsettia Lane may follow a timeline separate from the remainder of the project. The timeline is dependent on off-site right of way acquisition and environmental mitigation as required by the affected agencies and the City. An advanced grading permit may be permitted if it includes grading for Poinsettia Lane per condition number 56. Insert as condition #52 the following and renumber the subsequent conditions. Prior to approval of a Site Development Plan for this project, the developer shall determine an appropriate alignment of a third access using the proposed Poinsettia Lane, in accordance with the certified EIR for the Zone 20 Specific Plan and as modified by updated environmental review. Replace conditions #54B, and replace with the following: Construction traffic shall be prohibited from using Mimosa Drive. C O J fff - <B I"O CM i_ Oo to 0) 'E CB 3 111 V^ 30 November 1998 3 -O CVJ * O) ,C ^3 § E The Planning Commission g | CITY OF CARLSBAD I o 1200 Carlsbad Village Drive ~ j? Carlsbad, California 92008 SI1 *!. re: LOHF Project hearing | g (CT 97-15 / HDP 97-16 / CDP 97-39 / ZC 97-06 / LCPA 97-08) ffl O |.l Dear Members of the Planning Commission: t> °E o We are the Architects / Engineers / Land Planners for the KEVANE property, § 5 located directly to the west of the LOHF project, and are processing CT 98-04 / °. HDP 98 - 02 / CDP 98 - 09 in the City of Carlsbad. We began initial evaluations 3 of the land parcel over four years ago, and primarily waited until Ambrosia Lane I was completed last year to provide the necessary access to our parcel of land. I We submitted our formal applications earlier this year and are nearly complete * with the additional documentation that City Staff has requested to process our §" project, including addressing issues that relate to our common property | boundary with LOHF._« I* We are in full support of Westen Pacific Housing's request to develop the | LOHF project, presumming the matters discussed herein are appropriately |> resolved; these issues have been concurrently addressed to resolve ^ circulation and environmental concerns in Zone 21. The issues are summarized as follows: 1. ACCESS - The note on their Tentative Map (see attachment A) allows | the completion of the connecting street. We have agreed £ with WPH to reimburse for our fair share costs of the short | segment of street to effect this access and create an improved internal circulation between the properties. ^ City Staff has assured us that all environmental o> clearances for this connection can be supported. = 2. HYDROLOGY - Their site location is incorrectly shown on the Map of IP Isopluvials (see attachment B) in their preliminary report. [| The incorrect rainfall amount was then used to calculate o runoff intensities which are now artificially increased «, by 30%. (9•o 3. BIOLOGY- City Staff has assured us that this will be corrected during final design and will not affect the ability of other owners to develop their lands (as the drainage basin is constrained at the School Site wier to the south). Their Biology survey and documentation (see attachment C) incorrectly shows an Ag4 designation (sensitive Manzanita) and SMC (sensitive southern maritime chaparral) at the point of our common access road, and continue to call the habitat SMC when our evaluations recognize the habitat to be non-sensitive Chemise Chaparral: 3.1 - the Ag4 WERE NOT FOUND in this location; 3.2 - the Manzanita on our property is a non-sensitive species (Zacaenses), verified by the Natural History Museum in San Diego & Washington DC, and corraborated by recent finds nearby at El Camino Real at Alga Rd by Tom Huffman, noted Biologist, to occur below 300 meters above sea level; 3.3 - pursuant to the City of Carlsbad's own guidelines for habitat determination, this habitat at the common property line is Chemise Chaparral, not Sothern Maritime Chaparral; 3.4 - allowing a habitat to be incorrectly overciassified for expediancy sets a dangerous negative precedent for other property owners to deal with. City Staff has assured us that this minor discrepancy can be resolved before the final maps are approved. 4. TRAFFIC -Although their traffic study does not address the Kevane parcel and its potential relief of traffic flow to or from the two adjacent properties, City Staff has been providing direction to us on this issue. -2- We have been making a consistent good-faith effort to work with Western Pacific Housing and will continue to do so as we both process our project plans through the City of Carlsbad. As the concern over our conflicting biological studies appears to be the major remaining unresolved issue, we look forward to City Staff to mediate the differences to our mutual satisfaction in the next two weeks. We wish Western Pacific Housing continued success in the development of their project, and we thank the Planning Commission for hearing our concerns. Very Sincerely Yours, Robert F. Kevane Applicant / Property Owner David Lee Soanes, President Principal Architect / Golf Course Architect / Landscape Architect / Land Planner DAVID LEE SOANES, LTD., a California Corporation DLS:ces attachments -3- PROPOSED IRREVOCAB OFFER OF DEDICATION POTENTIAL FUTURE AC OPPORTUNITY BY OTHE FLEXIBLE f J' SQUAR, BASKETS ' »w /K / K/H r- ^(~n\\\ / / ,- \\ i r—^ ^-X^i^jfe HUNSAKER -& ASSOCIATES SAN DIEGO. INC. PLANNING ENGINEERING SURVEYING IRVINE LAS VEGAS RIVERSIDE SAN DIEGO HYDROLOGY STUDY for LOHF Property in the City of Carlsbad Prepared for: Western Pacific Housing W.O. 1751-13 March 11, 1998 Revised May.11, 1998 Revised July 31, 1998 DAVE HAMMAR |ACK HILL LEX WILLIMAN 10179 Huennekens St. Suite 200 S.in Diego, CA 92121 (619) 558-4500 PH (619) 558-1414 FX www.hunsaker.com lnl'o@HunsakerSD,com David A. Hammar, R.C.E. President Hunsaker & Associates San Diego, Inc. DH:k* rnmiwdWpcservertccxriispndneVt75ni99aui85.doc wo 1751-13 07O1/98 couinr OF SAN DIEGO DEPARTMENT OF SANITATION FLOOD CONTROL 100-YEAR 6-HOU{l PRECIPITATION HIU ISOPLUVIALS PRECiFlTATSOn IN OF 100-YEAR 6-HOUR EMTHS OF AN IJiCII NATIONAL OCEANIC AND AT:OS1>IIEHIC ADMINISTRATION UROLOGY. NATIONAL WEATHER SERVICESPECIAL STUDIES DRANCII. OFFICE OF II I I i sI ************************* fie ************************ * *~* *******************. RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT 1985,1981 HYDROLOGY MANUAL (c) Copyright 1982-93 Advanced Engineering Software (aes) Ver. 1.5A Release Date: 7/10/93 License ID 1239 Analysis prepared by: HUNSAKER & ASSOCIATES Irvine, Inc. Planning * Engineering * Surveying Three Hughes * Irvine , California 92718 * (714) 538-1010 •*************************** DESCRIPTION OF STUDY ************************** |(* LOHF PROPERTY IN THE CITY OF CARLSBAD * |* 100-YEAR STORM ' * fr WO#1751-13 - * |- ************************************************************************** I FILE NAME: H:\AES92\1751\13\Q100X.DAT I TIME/DATE OF STUDY: 16:13 7/27/1998 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: 1985 SAN DIEGO MANUAL CRITERIA USER SPECIFIED STORM EVENT(YEAR) = 100.00 6-HOUR DURATION PRECIPITATION (INCHES) = £3.500 SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00s SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = .90 - SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED NOTE: CONSIDER ALL CONFLUENCE STREAM COMBINATIONS FOR ALL DOWNSTREAM ANALYSES 1 FLOW PROCESS FROM NODE 200.00 TO NODE 201.00 IS CODE = 21 r >»»RATIONAL METHOD INITIAL SUBAREA ANALYSIS<«« I SOIL CLASSIFICATION IS "D" RURAL DEVELOPMENT RUNOFF COEFFICIENT = .4500 NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION WITH 10 -MINUTES ADDED = 13 . 45 (MINUTES) INITIAL SUBAREA FLOW-LENGTH = 620.00 UPSTREAM ELEVATION = 307.00 DOWNSTREAM ELEVATION = 275.00 ELEVATION DIFFERENCE = 32.00 100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 4.870 SUBAREA RUNOFF (CFS) =2.19' TOTAL AREA (ACRES) = 1.00 TOTAL RUNOFF (CFS) = 2.19 \ FLOW PROCESS FROM NODE 201.00 TO NODE 202.00 IS CODE = 6 >»»COMPUTE STREETFLOW TRAVELTIME THRU SUBAREA<«« ' m f **************************************************** *TWf ******************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT 1985,1981 HYDROLOGY MANUAL (c) Copyright 1982-93 Advanced Engineering Software (aes) | Ver. 1.5A Release Date: 7/10/93 License ID 1239 i Analysis prepared by: I I! HUNSAKER & ASSOCIATES | Irvine, Inc. ;'•, Planning * Engineering * Surveying f Three Hughes * Irvine , California 92718 * (714) 538-1010 j'1* ************************* DESCRIPTION OF STUDY ************************** U.LOHF PROPERTY * jilOO-YEAR STORM-DEVELOPED CONDITIONS-SOUTHERLY BASIN * W0#1751-13 *!************************************************************************** ! FILE NAME: H:\AES92\1751\13\Q.DAT t TIME/DATE OF STUDY: 16:40 7/27/1998 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: 1985 SAN DIEGO MANUAL CRITERIA -rt*/Ai t^USER SPECIFIED STORM EVENT(YEAR) = 100.00 \ 6-HOUR DURATION PRECIPITATION (INCHES) = f^. 5QQ J . '" *%,• SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = .90 SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED (NOTE: CONSIDER ALL CONFLUENCE STREAM COMBINATIONS FOR ALL DOWNSTREAM ANALYSES ********************************************* * * **************************! FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 7 »»>USER SPECIFIED HYDROLOGY INFORMATION AT NODE<«« jUSER-SPECIFIED VALUES ARE'AS FOLLOWS: 4TC(MIN) = 16.62- RAIN INTENSITY(INCH/HOUR) = 4.25 | TOTAL AREA (ACRES > = 16.90 TOTAL RUNOFF (CFS) .= 39.11 |FLOW PROCESS FROM NODE 11.00 TO NODE 12.00 IS CODE = 9 |>»»COMPUTE "V" GUTTER FLOW TRAVELTIME THRU SUBAREA<«« SfUPSTREAM NODE ELEVATION = 234.00I.POWNSTREAM NODE ELEVATION = ISS.BO ^CHANNEL LENGTH THRU SUBAREA(FEET) =800.00 I"V" GUTTER WIDTH(FEET) = 8.00 GUTTER HIKE(FEET) = .800 IPAVEMENT LIP(FEET) = .010 MANNING'S N = .0400 fPAVEMENT CROSSFALL(DECIMAL NOTATION) = .20000 ^ I ^'MAXIMUM DEPTH (FEET) = 10.00 Vegetation Types: SMC SMX ORF EW DH Southern Maritime Chaparral Southern Mixed Chaparral Coast Live Oak Riparian Forest Eucalyptus Woodland Disturbed Habitat Sensitive Animal Species: CAGN California gnatcatcher Sensitive Plant Species: Ag Arctostaphylos glandulosa Cd Comarostaphylis diversifolia Qa Quercus agrifolia Qd Quercus dumoss NOTE: Numbers indicate individual plant counts at that location. 200 Scale In Feet Dove Lane - Biological Resources Report & Impact Analysis Biological Resources Map 12/07/?8 MON 17:18 FAX 760 431 7842 WESTERN PACIFIC StateJAtater Resources Contr ^^ John P. Caffrey, Chairman Board Peter M. Rooney Secretary for Environmental Prelection Division of Water Quality, Storm Water Unit 901 P Street • Sacramento, California 95814- (916) 657-0919 FAX (916) 657-101 1 Mailing Address: P.O. Box 1977 • Sacramento, California- 95812-1977 Internet Address: http://wwiv,swreb.ca.gov November 18, 1998 SCOT SANDSTROM LAMCO HOUSING INC 2385 CAMINO VTDA ROBLE STE 107 CARLSBAD, CA 92009 RECEIPT OF YOUR NOTICE OF INTENT The State Water Resources Control Board (Stete Water Board) has received and processed your NOTICE OF INTENT TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY. Accordingly, you are required to comply with the permit requirements. Your WDID identification number is: 9 37S31010S. Please use this number in any future communications regarding this permit. SITE DESCRIPTION OWNER: LAMCO HOUSING INC DEVELOPER; LAMCO HOUSING INC COUNTY: SAN DIEGO SITE ADDRESS; 11262 EL CAMINO REAL SAN DIEGO, CA 92130 COMMENCEMENT DATE: EST. COMPLETION DATE: When construction is complete or ownership has been transferred, dischargers are required to notify the Regional Water Board by submitting a Notice of Termination (NOT). All State and local requirements must be met in accordance with Special Provision No. 7 of the General Permit. I have enclosed a NOT for your future use. If you do not notify the State Water Board that construction activity has been completed you will continue .0 be invoiced for the annual fee each October. If you have any questions regarding permit requirements, please contact your Regional Water Board at (619) 467-2972. Sincerely, Audrey Shimizu Storm Water Unit Division of Water Quality Enclosure California Enyifflnjttental Protection Agency ifji*<? Recvcled Pantr — -^^ City of Carlsbad Planning Department November 10, 1998 Mr. Scot Sandstrom Western Pacific Housing 2385 Camino Vida Roble #107 Carlsbad, ca 92009 SUBJECT: ZC 97-06 /LCPA 97-08 /CT 97-15 /HDP 97-16 /CDP 97-39 LOHF SUBDIVISION The preliminary staff report for the above referenced project will be available for you to pick up on Friday, November 13, 1998, after 8:00 a.m. This preliminary report will be discussed by staff at the Development Coordinating Committee (DCC) meeting which will be held on November 23, 1998. A twenty (20) minute appointment has been set aside for you at 12:00 a.m. If you have any questions concerning your project you should attend the DCC meeting. If you need additional information concerning this matter, please contact your Planner, Mike Grim, extension 4499 . CITY OF CARLSBAD GARY E. WAYNE Assistant Planning Director GEW:MG:EH c: File Copy Attn.: Melissa Allen Jack Henthorn & Associates 5375 Avenida Encinas, Ste. D Carlsbad, CA 92008 2075 La Palmas Dr. • Carlsbad, CA 92OO9-1576 • (76O) 438-1161 • FAX (760) 438-0894 ^ ^ ,City of Carlsbad Planning Departlrient October 22, 1998 Mr. Scot Sandstrom Western Pacific Housing for LAMCO Housing, Inc. 2385 Camino Vida Roble, Suite 107 Carlsbad, CA 92009 SUBJECT: ZC 97-06/LCPA 97-08/CT 97-15/HDP 97-16/CDP 97-39 - LOHF SUBDIVISION Your application has been tentatively scheduled for a hearing by the Planning Commission on December 2, 1998. However, for this to occur, you must submit the additional items listed below. If the required items are not received by November 11, 1998, your project will be rescheduled for a later hearing. In the event the scheduled hearing date is the last available date for the City to comply with the Permit Streamlining Act, and the required items listed below have not been submitted, the project will be scheduled for denial. 1. Please submit the following plans: A) Ten (10) copies of your site plans, constraints maps and landscape plans on 24" x 36" sheets of paper, stapled in complete sets folded into 81/2' x 11" size. B) One 81/2" x 11" copy of your reduced site plan, building elevation and floor plans. These copies must be of a quality which is photographically reproducible. Only essential data should be included on plans. 2. As required by Section 65091 of the California Government Code, please submit the following information needed for noticing and sign the enclosed form: A) 600' Owners List - a typewritten list of names and addresses of all property owners within a 600 foot radius of the subject property, including the applicant and/or owner. The list shall include the San Diego County Assessor's parcel number from the latest equalized assessment rolls. B) 100' Occupant List - (Coastal Development Permits Only) a typewritten list of names and addresses of all occupants within a 100 2075 Las Palmas Dr. • Carlsbad, CA 92009-1576 • (760) 438-1161 • FAX (760) 438-O894 ZC 97-06/LCPA 97-08/C October 22, 1998 PAGE 2 -15/HDP 97-16/CDP 97-39 - LOHF SUBDIVISION foot radius of the subject property, including the applicant and/or owner. C) Mailing Labels - two (2) separate sets of mailing labels of the property owners within a 600 foot radius and occupants within a 100 foot radius of the subject property. The list must be typed in all CAPITAL LETTERS, left justified, void of any punctuation. For any address other than a single family residence, an apartment or suite number must be included but the Apartment, Suite and/or Building Number must NOT appear in the street address line. DO NOT type assessor's parcel number on labels. DO NOT provide addressed envelopes - PROVIDE LABELS ONLY. Acceptable fonts are: Arial 11 pt, Arial Rounded MT Bold 9 pt, Courier 14 pt, Courier New 11 pt, and MS Line Draw 11 pt. Sample labels are as follows: UNACCEPTABLE Mrs. Jane Smith 123 Magnolia Ave., Apt #3 Carlsbad, CA 92008 UNACCEPTABLE Mrs. Jane Smith 123 Magnolia Ave. Apt. #3 Carlsbad, CA 92008 ACCEPTABLE MRS JANE SMITH APT 3 123 MAGNOLIA AVE CARLSBAD CA 92008 C) D) Radius Map - a map to scale, not less than 1" = 200', showing all lots entirely and partially within 600 feet of the exterior boundaries of the subject property. Each of these lots should be consecutively numbered and correspond with the property owner's list. The scale of the map may be reduced to a scale acceptable to the Planning Director if the required scale is impractical. Fee - a fee (check payable to the City of Carlsbad) shall be paid for covering the cost of mailing notices. Such fee shall equal the current postage rate times the total number of labels. Cash and credit cards are also accepted. Sincerely, MICHAEL GRIM Associate Planner MG:mh c:Jack Henthorn & Associates I HEREBY CERTIFY THAT THE PROPERTY OWNERS LIST AND LABELS SUBMITTED TO THE CITY OF CARLSBAD ON THIS DATE REPRESENT THE LATEST AVAILABLE INFORMATION FROM THE EQUALIZED ASSESSOR'S ROLES. APPLICATION NAME AND NUMBER APPLICANT OR APPLICANT'S REPRESENTATIVE BY: DATE: RECEIVED BY DATE: CITY OF CARLSBAD ENGINEERING DEPARTMENT LAND USE REVIEW October 13 1998 TO: Associate Planner - Mike Grim FROM: Associate Engineer - Land Development Section VIA: Principal Civil Engineer - Land Development Section CT 97 -15 / CDP 97 - 39 / HDP 97 -16 / LCPA 97 - 08 / ZC 97 - 06 : LOHF PROPERTY PROJECT APPROVAL AND CONDITIONS TRANSMITTAL Engineering Department staff has completed the review of the above-referenced project and are recommending: X That the project be approved subject to the conditions as listed on the attached sheet. That the project be denied for the following reasons: LAND DEVELOPMENT SECTION Project Report PROJECT ID: CT 97 -15 / CDP 97 - 39 / HDP 97 -16 / LCPA 97 - 08 / ZC 97 - 06 : PROJECT NAME: LOHF PROPERTY LOCATION: West of El Camino Real and split on both sides of Poinsettia Lane. The site is also west of the terminus of Dove Lane (City Library under construction) and north of the terminus of Mimosa Drive. Both Mimosa and Dove Lane will be extended through this subdivision. BRIEF DESCRIPTION: This is a Subdivision to develop 73 single family lots and 3 open space / coastal deed restricted lots on 36.7 acres of land. ENGINEERING ISSUES AND DISCUSSION: TRAFFIC AND CIRCULATION: Projected Average Daily Traffic (ADT): 730 ADT Comment: Poinsettia Lane, the extension of Dove Lane and the extension of Mimosa Drive is conditioned to be constructed concurrent with development. This project will also provide for adjacent extensions of local streets in the future to improve the circulation network in this area. SEWER: Sewer District: Carlsbad Municipal Water DistrictSewer EDU's Required: 73 EDU's WATER: Water District: Carlsbad Municipal Water District GPD Required: 220gpd/edux 73edu's= 16060GPD Comment: No major water issues are associated with this project. SOILS & GRADING: Quantities: Cut: 260,000 cy Fill: 260,000 cy Export / Import: -0- cy Permit required: Yes Off-site approval required: Yes Hillside grading requirements met: Yes Preliminary Geotechnical investigation performed by: Pacific Soils Engineering, Inc. Dated June 25,1998. An updated Soils and Geotechnical Report will be required as part of the grading plan process. Comment: The proposed balanced grading of 260,000 cubic yards includes Poinsettia Lane, onsite. Additional grading will be required for the construction offsite, of Poinsettia Lane to El Camino Real. DRAINAGE AND EROSION CONTROL: Drainage basin: D Preliminary hydrology study performed by: Hunsaker & Associates Erosion Potential: Moderate Comment: There are no major drainage issues associated with this project. LAND TITLE: Conflicts with existing easement: No Easements dedication required: Yes Site boundary coincides with land title: Yes Comment: No major land title issues are associated with this project. IMPROVEMENTS: Off-site improvements: Yes Poinsettia Lane, as conditioned must be completed to connect to El Camino Real. The extension of Dove Lane,and Mimosa is also conditioned as part of and included in the design of this project. Standard variance required: No Comment: A reimbursement agreement is available for offsite improvements to Poinsettia Lane offsite, as identified in the Aviara Parkway - Poinsettia Lane Bridge and Thoroughfare District No. 2 CT 97 -15 / CDP 97 - 39 / HDP 97 -16 / LCPA 97-08 / ZC 97 - 06 LOHF PROPERTY ENGINEERING CONDITIONS OF APPROVAL General 42. NOTE: Unless specifically stated in the condition, all of the following engineering conditions upon the approval of this proposed major subdivision must be met prior to approval of a final map. 38. Prior to issuance of any building permit, the developer shall comply with the requirements of the City's anti-graffiti program for wall treatments if and when such a program is formerly established by the City. 39. There shall be one final subdivision map recorded for this project. 43. The developer shall provide an acceptable means for maintaining the private easements within the subdivision and all the private: streets, sidewalks, street lights, storm drain facilities and sewer facilities located therein and to distribute the costs of such maintenance in an equitable manner among the owners of the properties within the subdivision. Adequate provision for such maintenance shall be included with the CC&Rs subject to the approval of the City Engineer. 44. All concrete terrace drains shall be maintained by the homeowner's association (if on commonly owned property) or the individual property owner (if on an individually owned lot). An appropriately worded statement clearly identifying the responsibility shall be placed in the CC&Rs (if maintained by the Association) and on the Final Map. 45. The developer shall defend, indemnify and hold harmless the City and its agents, officers, and employees from any claim, action or proceeding against the City or its agents, officers, or employees to attack, set aside, void or null an approval of the City, the Planning Commission or City Engineer which has been brought against the City within the time period provided for by Section 66499.37 of the Subdivision Map Act. 46. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, the developer shall submit to and receive approval from the City Engineer for the proposed haul route. The developer shall comply with all conditions and requirements the City Engineer may impose with regards to the hauling operation. 48. The developer shall install sight distance corridors at all street intersections in accordance with Engineering Standards and shall record the following statement on the non - mapping sheet of the Final Map (and in the CC&Rs). Lots 12, 33, 34, 56 & 57 shall record specific sight distance deed restrictions to maintain and keep clear the sight distance corridors shown on the tentative map and also identified on the final map for this project: "No structure, fence, wall, tree, shrub, sign, or other object over 30 inches above the street level may be placed or permitted to encroach within the area identified as a sight distance corridor in accordance with City Standard Public Street- Design Criteria, Section 8.B.3. The underlying property owner shall maintain this condition." Fees/Agreements 50. The developer shall pay all current fees and deposits required. 51. The owner of the subject property shall execute an agreement holding the City harmless regarding drainage across the adjacent property. 56. Prior to approval of any grading or building permits for this project, the owner shall give written consent to the annexation of the area shown within the boundaries of the subdivision plan into the existing City of Carlsbad Street Lighting and Landscaping District No. 1 on a form provided by the City. 57. This project is within the proposed boundary of the Aviara Parkway - Poinsettia Lane Bridge and Thoroughfare Fee District. This project is required to pay a fair share contribution towards the construction of Poinsettia Lane in accordance with the proposed fee program. If the fee district has not been formed prior to issuance of building permits for the project, the owner shall pay a fee based on the Average Daily Trips generated by the project and shall enter into an agreement with the City not to oppose the formation of a fee district and to pay the projects fair share contribution towards the construction of Poinsettia Lane in accordance with the future adopted fee program. Grading 58. Based upon a review of the proposed grading and the grading quantities shown on the tentative map, a grading permit for this project is required, (the developer must submit and receive approval for grading plans in accordance with city codes and standards prior to issuance of a building permit for the project.) 59. Prior to the issuance of a grading permit or building permit, whichever occurs first, the developer shall submit proof that a Notice of Intention has been submitted to the State 4 Water Resources Control Board. 61. No grading for private improvements shall occur outside the limits of the subdivision unless a grading or slope easement or agreement is obtained from the owners of the affected properties and recorded. If the developer is unable to obtain the grading or slope easement, or agreement, no grading permit will be issued. In that case the developer must either amend the tentative map or modify the plans so grading will not occur outside the project site in a manner which substantially conforms to the approved tentative map as determined by the City Engineer and Planning Director. Dedications/Improvements 63. Additional drainage easements may be required. Drainage structures shall be provided or installed prior to or concurrent with any grading or building permit as may be required by the City Engineer. 64. The owner shall make an offer of dedication to the City for all public streets and easements required by these conditions or shown on the tentative map. The offer shall be made by a certificate on the final map for this project. All land so offered shall be granted to the City free and clear of all liens and encumbrances and without cost to the City. Streets that are already public are not required to be rededicated. 65. Poinsettia Lane shall be dedicated by the owner along the project frontage based on a center line to right-of-way width of 51 feet as shown on the tentative map and in conformance with City of Carlsbad Standards. ##. The future 60' wide access (including construction and slope rights) across lot 76 shall be irrevocably offered for dedication as shown on the tentative map. The specific location shall be approved by the City Engineer. ##. The future 60' wide access (including construction and slope rights) across lot 75 shall be irrevocably offered for dedication as shown on the tentative map. The specific location shall be approved by the City Engineer. 66. Prior to issuance of building permits, the developer shall underground all existing overhead utilities within the subdivision boundary. 67. Direct access rights for all lots abutting Poinsettia Lane shall be waived on the final map. Access rights for all lots that have frontage on two streets shall waive access as required and shown on the tentative map. 70. The developer shall comply with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The developer shall provide best management practices as referenced in the "California Storm Water Best Management Practices Handbook" to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer. Said plans shall include but not be limited to notifying prospective owners and tenants of the following: A. All owners and tenants shall coordinate efforts to establish or work with established disposal programs to remove and properly dispose of toxic and hazardous waste products. B. Toxic chemicals or hydrocarbon compounds such as gasoline, motor oil, antifreeze, solvents, paints, paint thinners, wood preservatives, and other such fluids shall not be discharged into any street, public or private, or into storm drain or storm water conveyance systems. Use and disposal of pesticides, fungicides, herbicides, insecticides, fertilizers and other such chemical treatments shall meet Federal, State, County and City requirements as prescribed in their<>respective containers. C. Best Management Practices shall be used to eliminate or reduce surface pollutants when planning any changes to the landscaping and surface improvements. 71. Plans, specifications, and supporting documents for all public improvements shall be prepared to the satisfaction of the City Engineer. In accordance with City Standards, the developer shall install, or agree to install and secure with appropriate security as provided by law, improvements shown on the tentative map and the following improvements: A. Poinsettia Lane full width (102' major arterial) within the boundary of this subdivision. A reimbursement agreement between the developer and the City may be entered into for the work identified in the Aviara Parkway - Poinsettia Lane Bridge and Thoroughfare District. The reimbursement agreement shall be approved prior to design and construction of this arterial. B. Poinsettia Lane (2) 18 foot wide lanes (the center portion of a 102' major arterial) east of the boundary of this subdivision to El Camino Real. The offsite improvement of Poinsettia Lane shall include full width grading, transitions, AC berms, drainage facilities, median curbs, etc. as identified in the Aviara Parkway - Poinsettia Lane Bridge and Thoroughfare District. As mentioned above, a reimbursement agreement between the developer and the City may be entered into for the work identified in the Aviara Parkway - Poinsettia Lane Bridge and Thoroughfare District. The reimbursement agreement shall be approved prior to design and construction of this arterial. C. Dove Lane ( 60' collector street) from it's existing terminus to the intersection of "D" Street. Offsite transitions or reconstruction may be required to provide a smooth transition / connection. D. Mimosa Drive (60' local street) from it's existing terminus to "B" Street. Offsite transitions or reconstruction may be required to provide a smooth transition. E. Sewer, Water and Storm Drains offsite to serve this subdivision as required and as shown on the tentative map. F. Flexible Check Dams across lot 76 and off site (2 areas) as shown on the tentative map and as required downstream to control erosive velocity of drainage. G. Temporary access to the adjacent property (APN 215-050-58) from "A" street, as shown on the tentative map. H. Temporary access from Poinsettia Lane to the adjacent property (APN 215-050-57) as required per final design of Poinsettia Lane improvement plans. A list of the above improvements shall be placed on an additional map sheet on the final map per the provisions of Sections 66434.2 of the Subdivision Map Act. Improvements listed above shall be constructed within 18 months of approval of the secured improvement agreement or such other time as provided in said agreement. 77. Drainage outfall end treatments for any drainage outlets where a direct access road for maintenance purposes is not provided, shall be designed and incorporated into the grading/improvement plans for the project. These end treatments shall be designed so as to prevent vegetation growth from obstructing the pipe outfall. Designs could consist of a modified outlet headwall consisting of an extended concrete spillway section with longitudinal curbing and/or radially designed rip-rap, or other means deemed appropriate, as a method of preventing vegetation growth directly in front of the pipe outlet, to the satisfaction of the Community Services Director and the City Engineer. Final Map Notes 78. Note(s) to the following effect(s) shall be placed on the final map as non-mapping data: 78.D. No structure, fence, wall, tree, shrub, sign, or other object over 30 inches above the street level may be placed or permited to encroach within the area identified as a sight distance corridor in accordance with City Standard Public Street-Design Criteria, Section 8.B.3. The underlying property owner shall maintain this condition. ##. This subdivision has provided for 3 different points of access to adjacent properties. The adjacent properties could develop and access provided via a public street as irrevocably offered and shown on this recorded map. Code Reminder The project is subject to all applicable provisions of local ordinances, including but not limited to the following: 79. The developer shall exercise special care during the construction phase of this project to prevent offsite siltation. Planting and erosion control shall be provided in accordance with the Carlsbad Municipal Code and the City Engineer. 80. Some improvements shown on the tentative map and/or required by these conditions are located offsite on property which neither the City nor the owner has sufficient title or interest to permit the improvements to be made without acquisition of title or interest. The developer shall conform to Section 20.16.095 of the Carlsbad Municipal Code. 34. The tentative map approval shall expire thirty - six (36) months from the date of the resolution containing the final decision for tentative map approval. CARLSBAD MUNICIPAL lTER DISTRICT 5950 El Camino Real, Cartload, Ca 92008 LETTER OF TRANSMITTAL: ngineering Department Tel. No. (619) 438-3367 TO:cy-Date: Attention: STATUS; D Preliminary D Use D Resubmit D File D Revised D Comment D Approved D Approval TRANSMITTAL; D Improvement Plans (Sheet of D Corrections D Additions D Omissio: D Remarks r:\ Sheets) D Easement Plat and Description and/or Tract Map D Original Mylars (Sheet of Sheets) D Cost Estimate PROCESS AS FOLLOWS; D Return P.C. and Set of Prints D Submit Tract Map/Plat & Description D Submit Soils Report D Submit Title Report (6 Mo. Max. Age) D Submit Cost Estimate D Submit Eee Amount of $ D Obtain Fire Marshal's Signature D Submit Orig. Mylars for Dist. Approval D Submit digital file of Keymap on 31/2 Disk hi AutoCad Rel 12/13 or DXF format D Submit Set/s of Approved I.P. 's D Submit digital file of all drawings on 3 1/2 Disk of AutoCad Rel 12/13 or DXF Format REMARKS; I CC: Engineering Technician Pacific Housing 2385 Camino Vida Roble. Suite 107 Carlsbad, California 92009 760.929.1600 Fax 760.929.1601 September 18, 1998 Mr. Mike Grimm, Associate Planner City of Carlsbad - Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009 Re: Request to expedite Zone Change (ZC 97-06) and Local Coastal Program Amendment (97-08) applications Dear Mike, In follow up to our last meeting I am requesting that you proceed with the processing of the Zone Change and Local Coastal Program Amendment portions of our application relative to the Lohf property. By moving these applications forward while the other related applications are processing, we will expedite the overall time line associated with the westerly extension of Poinsettia Lane. If you have any questions, please contact me at your convenience. Sincerely, WESTERN PACIFIC HOUSING if Development Sep 22 98 02:12p David Lee Soanes 619 5O2 1226 2 •» Michael Grim, Senior Planner 15 September 1998 | § City Of Carlsbad, Planning Department hardcopy via US Mail | « 2075 Las Palmas Drive fax to: (760) 438 - 0894 * | Carlsbad, CA 92009 * "5 3 «8 §, re: LOHF(CT-15) Environmental Documentation as £ S'~- | Dear Michael: E t |§ We are the Architect / Land Planner / Civil Engineer for Robert Kevane, the «| Land Owner & Applicant for development of a 20-acre parcel of land (CT 98-04) 11 directly west of the LOHF property (CT 97-15). if 15 In our review of the land development potential for our project (The Oaks, see § s Don Neu), and pursuant to direction by City Staff regarding access to adjacent » parcels, we have examined closely the best possible locations for such access i and have prepared our plan to incorporate same into the circulation pattern. £ 5 To best address the physical location and design of the connecting streets, we 6 conducted Biological analyses, topographic investigations and engineering § studies including several on-site tours of the properties in question. In our review | of the LOHF project environmental constraints document we put particular ri emphasis on attention to detail the common property boundary and the habitats f that traverse this property line. IV_c f We have reached agreement with US Fish & Wildlife and CA Fish & Game as to 1 the plant communities on the Kevane property and DO NOT HAVE any ^ Southern Maritime Chaparral on the property. The plant community on our i western facing slopes has been determined to be non-sensitive Chemise I Chaparral. Further, one key component of Southern Maritime Chaparral is •o Ceonothus Verrucosus which DOES NOT EXIST in any of the boundary areas * immediately adjacent to the common property line. Since the plant community | remains consistent as you cross the boundary to the LOHF property, this leads | us to believe that the LOHF constraints map is inaccurate and should be f revised to reflect the correct habitats (see attached exhibit herewith). a TJ Our Biologists additionally re-examined these focus areas by specific field *• investigations, including the small pocket of SMC as shown on the LOHF .E exhibit's westerly boundary and DID NOT FIND the sensitive Arctostaphylos ~ Glandulosa Crassifolia (sensitive Manzanita). The 4 referenced 0Ag4" are the ® Arctostaphylos Glandulosa Zacaensis (common Manzanita), the « non-sensitive variety that would not interfere with our street connection plans. (!) o>JS ;o 1•o 9ep 22 98 02:12p David Lee Soanes 619 5O2 1226 p.2 These items should be reconciled in the LOHF environmental documentation and corrected before final certification. Please refer to the attached exhibits for clarification. Should you require any additional information from us regarding this matter, please feel free to call us, or our Principal Biologist, Elyssa Robertson at REG (phone #619 -442 -3913). Thank you for allowing us the opportunity to bring this matter to your attention. Very Sincerely Yours, David Lee Soanes, Principal Architect / Landscape Architect / Land Planner David Lee Soanes, Ltd. cc: Robert Kevane, Applicant Clyde Wtekham Elyssa Robertson, Principal Biologist, REG Sep 22 98 02:13p David Lee Soanes 619 5O2 1226 P.3 Vegetation Types: SMC Southern Maritime Chaparral SMX Southern Mixed Chaparral ORF Coast Live Oak Riparian Forest EW Eucalyptus Woodland DH Disturbed Habitat Sensitive Animal Species: CAGN California gnatcatcher Sensitive Plant Species: Ag Arctostaphylos glandulosa Cd Comarostaphyiis diversllolla Qa Quercus agrifolia Qd Quercus dumose NOTE: Numbers Indicate Individual plant counts at that location. 200 Scots In Feet Dove Lane • Biological Resources Report & Impact Analysis Biological Resources Map FIGURE Sep 22 98 02:13p David Lee Soanes r.^My^f "f / •^j( I I nut- 619 5O2 1226 p.4 Sep 22 98 02:13p David Lee Soanes 619 5O2 1226 .5 Hunsoker & Associates, 1998 PAVOREAL COMMUNITY ASSOCIATION % G.R.G. Management, Inc. P.O.Box 1186 Carlsbad, CA 92018-1186 Ph. 760-720-0900 Fax 760-720-0085 September4, 1998 Mr. Mike Grim % City of Carlsbad Planning Dept. Community Development Building 2075 Las Palmas Dr. Carlsbad, CA 92009-1576 RE: Mimosa Drive Street Expansion Dear Mr. Grim: Pursuant to our discussion, please find attached an alternate drawing to the plan submitted by developer Western Pacific Housing. This alternate drawing depicts an emergency access gate in lieu of expanding Mimosa Drive. Your time and attention to this matter is appreciated. If there is anything I can do to assist you, please advise. Sincerely, Don Holmes, Sr. President DH:dl CC: Mr. Clyde Wickham, Engineering Dept. Board of Directors EXIST. 12" ACP WATER ^x-' EXIST. 8" PVC SEWER EX/sr. ;s" /?CP STORM DRAIN «H- PREPARED BY: HUNSAKER & ASSOCIATES SAN INC TENTATIVE 1 LOHF PR Tack Henthorn & Associate^ 5375 Avenida Encinas, Suite D Carlsbad, CA 92008 (760) 438-4090 Fax (760) 438-0981 LETTER OF TRANSMITTAL To: Mike Grim Of: City of Carlsbad RECEIVED Planning Department 2075 Las Palmas Drive AU6 J 2 J99g Carlsbad CA 92009-1576 Phone: 438-1161 Fax: From: Melissa K. Allen Date: 8/12/98 Time: 3:00 p.m. RE: Lohf Property - 5th Review Submittal CT 97-15/CDP 97-39/HDP 97-16/LCPA 97-08/ZC 97-06 FORWARDED BY: 0 HAND DELIVERY D U.S. MAIL D FAX D COURIER D PRINTER D PICK-UP Copies Pgs/Shts Description 2 1 Transmittal 2 2 DeSaska Driveway Access Exhibit w/Profile, prepared by Hunsaker & Assoc., dated 8/6/98 2 1 Kevane Property - Future Access Exhibit on 24" x 36" plan 2 ~ Biological Resources Report & Impact Analysis, Poinsettia Lane Alignment Within Zone 21, Dudek & Assoc. 8/10/98 2 - Hydrology Study for Lohf Property, by Hunsaker & Associates, revised 7/31/98 2 - Preliminary Geotechnical Study, Lohf Property, by Pacific Soils Engineering, Inc., dated 6/25/98 1 4 City Engineering Plan-Check Set w/Comments on TM, 3rd Submittal 3 4 Tentative Map, Hunsaker & Associates, 8/12/98, revised to address issues 3 3 Hillside Development Permit/Constraints Map, revised to address issues 3 — Landscape Plans, Gillespie Design Group, 8/12/98, revised to address issues COMMENTS: Please give me a call if you have any questions or need additional information. Thank you. Copies to: File Scot Sandstrom, Western Pacific Housing Lex Williman/John Klein, Hunsaker & Associates 0ck Henthorn & 5375 Avenida Encinas, Suite D Carlsbad, California 92008 (760) 438-4090 August 12, 1998 Fax (760) 438-0981 Mike Grim City of Carlsbad " Planning Department 2075 Las Palmas Drive . Carlsbad, CA 92009-1576 Subject:Lohf Property, CT 97-15/ZC 97-06/LCPA 97-08/CDP 97-39/HDP 97-16 - 5th TM Issues Submittal Dear Mike: The last submittal for the Lohf Property responded to the Planning Department's issues letter dated June 25, 1998. A memo was then received from the Engineering Department dated July 6, 1998. This submittal responds to any remaining issues identified in the letters. The following items/issues are addressed by the modified plans and materials enclosed with this submittal package: Engineering: 1. • Revised exhibits are included with this submittal that show a compromise solution for the driveway access to the DeSaska parcel as discussed between the City and adjacent property owners in a meeting on 8/7/98. A Driveway Profile exhibit was added to show .the detail of the vertical alignment with Poinsettia Lane. • The potential offsite grading necessary for the proposed Steiner driveway access is shown on both the Tentative Map and Driveway Access Exhibit and the utilities in "A" Street have been extended to the property boundary to serve the parcel. The abutting lots on the Lohf site are designed to accommodate adjacent grades and drainage. • The engineer of the adjacent "Kevane" project (The Oaks at Batiquitos) was recently contacted and he confirmed that the enclosed alignment exhibit from their plans is current and that the proposed dedications as shown on the Lohf plans are in compliance with their proposed project design. The proposed dedications accommodate potential future street accesses for the adjacent parcels based on City engineering standards and policies. It is understood, that the specific environmental feasibility of the adjacent property's project design will be determined concurrent with the processing of their tentative map. • The tentative map was revised to amend the proposed phasing plan and additional phasing notes were added to the cover sheet of the TM. The access, grading and utilities necessary for each phase are staged accordingly, beginning in Phase 1 with the construction of Dove Lane and the product models and ending in Phase 4 with the construction of Poinsettia Lane onsite, together with all abutting units. • The completion of Dove Lane and Mimosa Drive in the early project phases provides for compliance with the City's cul de sac standards and postpones the need for Poinsettia Lane onsite until the final phase. The . construction of Poinsettia Lane offsite to El Camino Real is not a part of this project as proposed. The applicant has, however, agreed to be conditioned to construct Poinsettia Lane offsite to the east with reimbursement from Bridge and Thoroughfare District #2. • The Poinsettia Lane Alignment profile on sheet 4 of the TM was revised to extend the profile to include Poinsettia Lane offsite from the existing Cassia Road intersection, through the site, to El Camino Real. Additional information was also included on the plan and profile to show compliance with City design standards and compatibility with existing improvements. • The sewer and water lines within "A" Street were extended on the TM to serve the Steiner parcel. The only public facilities to be located within the alignment of Poinsettia Lane onsite are potable and reclaimed water lines. When the comments are received from CMWD, the location of these proposed improvements will be included on the map. •' , • -I- 2. The proposed facilities and service connections onsite are shown. Services are/will be extended or looped as needed. We are still awaiting comments from CMWD regarding the current need and size of pipes required in this area. Plans were sent over, then routed to CMWD from the City, several weeks back, for their comments. 3. The end treatment of the proposed drainage storm drain system is shown. , Hunsaker & Associates completed an addendum to the Hydrology Report to further assess the drainage conditions in the native open space areas and mitigations required to minimize the flow of drainage into the area. 4. The applicant proposes to include language referencing the future addition of roof, landscape, or yard area drains within the project CC&R's. .For example, if an owner proposes exotic landscaping or if they propose modifications to the lot drainage as designed, then there will be certain criteria applying to roof drains, etc. Planning: 1. The planting locations of the 10 Coast Live oaks proposed as mitigation for the 1 Coast Live oak to be removed, were modified on the enclosed landscape plans after additional input from the project biologist. They were moved from within the southwestern native open space area (Lot 76) to primarily within the open space area in the northwestern corner of the site (Lot 75) as this is a more disturbed area that would benefit most from the mitigation. 2. The slopes along the southwestern portion of the site within lots 1 7 to 20 were modified so as to not exceed a maximum of 40' slopes, consistent with the City's recently modified Hillside Ordinance (though it has not received Coastal Commission authorization). A bench/drain is identified to provide a setback from onsite slopes adjacent to the existing slopes on the Plaza Paseo Real property. 3. Notes were added to the Constraints map to define the total dual criteria acreage onsite and the proposed area of encroachment. The total impact does.not exceed 10% as provided for in the City's LCP, Mello II Segment. Grading was pulled out of a minor portion of southern mixed chaparral in the northwesterly portion of the site to comply with the 10% encroachment limitation. 4. An updated, detailed soils and geotechnical analysis performed by Pacific Soils is included for your reference and use in project review. 5. The Biological Resource Study and Impact Analysis performed by Dudek & Associates for the offsite alignment of Poinsettia Lane is included with this submittal for your reference. We anticipate that this submittal will provide engineering with sufficient background, information and detail to determine the application is deemed complete as submitted. If you need. any additional information at this time, please do not hesitate to call. Thank you. Sincerely, Melissa K. Allen encl. cc: File . Clyde Wickham, City of Carlsbad, Engineering Department Lex Williman, Hunsaker & Associates Scot Sandstrom, Western Pacific Housing, Director of Forward Planning C:\WINWORD\Lohf\Letters\City 5th Issues Submittal ltr.doc -2- ARLSBAD ^ -x X: \\\ ^V V'WV'X//^ \ \ ', \ T\/v W\\ \Vx5 \\ UA\ \ 1 N TURNAROUND T5>HTATlVe> MAP 76 P=241.3 FF=241.8 P=240.7 FF=241.2 •fr- [ \ 41. J p ° =—H CO UD ru m DtnCO85 Fftto COo ® Tlf CJ >^>- OJ P=265.0 FF=265.5FF=263.6 UD m%j s° n n 3m ino Carlsbad Municipal Water District 5950 El Camino Real, Carlsbad, CA 92008-8893 Engineering: (760) 438-3367 Administration: (760) 438-2722 FAX: 431-1601 |U, Planning Department City of Carlsbad 2075 Las Palmas Drive Carlsbad, California 92009 TO: FROM: {> y--rr CMWD SUBJECT: ie District is responding to your request for conditions on the subject project dated \\ry IW&. In response to your inquiry of <kiW?T Z*9 , \^ the District has reviewed the subject project. Based on our review of the project, we have the following conditions regarding potable water, recycled water and sewer systems: 1. The Developer shall be responsible for all fees, deposits and charges which will be collected before and/or at the time of issuance of the building permit. The San Diego County Water Authority capacity charge will be collected at issuance of application for any meter installation. 2. The Developer shall provide detailed information to the District Engineer regarding water demand, irrigation demand, fire flow demand in gallons per minute, and projected sewer flow in million gallons per day. 3. The entire potable water system, recycled water system and sewer system shall be evaluated in detail by Developer and District Engineer to insure that adequate capacity, pressure and flow demands can be met. 4. All District pipelines, pump stations, pressure reducing stations and appurtenances required for this project by the District shall be within public right- of-way or within easements granted to the District or the City of Carlsbad "Serving Carlsbad for over 40 years" Page two Planning Department "ate: 5. Sequentially, the Developer's Engineer shall do the following: A. Meet with the City Fire Marshal and establish the fire protection requirements. B. Prepare and submit a colored recycled water use area map and submit this map to the Planning Department for processing and approval by the District Engineer. C. Prior to the preparation of sewer, water and recycled water improvement plans, the Developer shall submit preliminary system layouts to the District Engineer for review, comment and approval. 6. The following note shall be placed on the final map. 'This project is approved upon the expressed condition that building permits will not be issued for development of the subject property unless the District serving the development has adequate water and sewer capacity available at the time development is to occur, and that such water and sewer capacity will continue to be available until time of occupancy." 7. All potable water and recycled water meters shall be placed within public right of way. 8. The following items shall apply if checked: Q^No more than 19 homes shall be served on a single potable water distribution pipeline. For those locations with more than 19 homes, a looped potable water pipeline system shall be designed. D A public fire flow system shall be required for this industrial or commercial development, and it shall be constructed as a looped pipeline system. If you have any questions, please contact the undersigned. Ribhard Goedert Engineering Technician RG-.sjs ~^^r City of Carlsbad Planning Department June 25, 1998 Mr. Scot Sandstrom Western Pacific Housing Suite 107 2385 Camino Vida Roble Carlsbad CA 92009 SUBJECT: CT 97-15/ZC 97-06/LCPA 97-08/CDP 97-39/HDP 97-16 - LOHF PROPERTY The Planning Department and Engineering Departments have reviewed the resubmittal of your Tentative Tract Map, Zone Change, Local Coastal Program Amendment, Coastal Development Permit and Hillside Development Permit, application no. CT 97-15/ZC 97- 06/LCPA 97-08/CDP 97-39/HDP 97-16, as to the remaining issues of concern. Some issues remain. These issues, listed below, must be resolved prior to scheduling the project for public hearing. In addition, the City may request, in the course of processing the application, that you clarify, amplify, correct, or otherwise, supplement the basic information required for the application. Please contact your staff planner, Michael Grim, at (760) 438-1161, extension 4499, if you have any questions or wish to set up a meeting to discuss the application. Sinc_erely, MICHAEL J. HOLZMILLER Planning Director MJH:MG:mh Attachments Gary Wayne Dennis Turner Clyde Wickham File Copy Melissa Allen, Jack Henthorn and Associates 2075 La Palmas Dr. • Carlsbad, CA 92009-1576 • (760) 438-1161 • FAX (760) 438-0894 ISSUES OF CONCERN No. CT 97-1 5/ZC 97-06/LCPA 97-08/CDP 97-39/HDP 97-16 - LOHF PROPERTY Planning: 1. The proposed Zone Change from Limited Control (L-C) to One Family Residential with a Qualified Development Overlay (R-1-Q) is not appropriate for the natural open space areas. As stated in the previous issues letter, dated April 6, 1998, the native habitat should be zoned Open Space (O-S), similar to the rezoning completed in conjunction with the Pavoreal subdivision. Please submit a Zone Change exhibit reflecting these changes. 2. The Planning Department received your "Request to Purchase' Off-site Affordable Housing Credits", dated May 12, 1998. Please be advised that any off-site affordable housing concept must be reviewed and approved by the Combined Project Review Committee and the Housing Commission prior to taking the project to the Planning Commission and City Council. 3. According to the revised biological report, the extent of habitat was verified but not staked or flagged in the field. Verifiable fencing and flagging must be installed and certified by a licensed surveyor or civil engineer prior to issuance of any clearing or grading permits. While these areas were verified, the delineation of these areas was deleted from the tentative map and not shown on the landscape plans. It appears that, on the tentative map, the habitat boundary line is still faintly drawn but not labeled. This information is important in evaluating direct and indirect habitat impacts, including, but not limited to, fire suppression. Please delineate this verified habitat boundary on the site plan and landscape plan. The proposed mitigation for removal of the mature oak tree at 10:1 is acceptable, however an attempt to relocate the oak tree would be preferred. In either case, the proposed planting area within the native habitat should be identified in the environmental review and on the landscape plans. According to the revised biological report, the biological reconnaissance surveys conducted in August, 1 997 were adequate to identify the location and extent of all sensitive plant species and evaluate any potential impacts to those plants, to the California gnatcatcher and to the Quino checkerspot butterfly. Considering the recent rains and that several sensitive species have been more prevalent within Carlsbad, updated spring surveys are necessary. These surveys should focus on all sensitive plant species with special attention to brodiaea and thornmint. No discussion regarding potential off-site impacts of infrastructure was included in the environmental documents. Of particular concern is the proposed drainage structure along the southern edge of the development that drains into the Southern maritime chaparral area. According to the Hydrology Report, the 100-year storm runoff would total 14.4 cubic feet per second and a velocity of 30 feet per second before dissipation. Please review the impacts of this drainage on the surrounding habitat, with special attention to the existence of highly-erosive soils and compliance with the NPDES requirements for storm water runoff quality. 4. As stated in the previous issues letter, dated April 6, 1998, the project is located in the Coastal Zone and is therefore subject to the provisions of the old Hillside Development Ordinance. According to Section 21.95.060(j)(1), the maximum height for any cut or fill slope is 30 feet. The project proposes slopes up to 45 feet tall, which are unacceptable. In addition, any slope adjacent to the existing slopes on the Plaza Paseo Real property must be setback, using a bench similar to that for the adjacent Pavoreal property. 5. The proposed fire suppression plan, as shown on the landscape plan, is mostly acceptable in that it reduces future development impacts on the residential pads while minimizing habitat alteration for fire suppression thinning. The exact delineation is not clear, however, given the fading of the underlying topography and manufactured slopes. Please enhance the landscape plan to clearly show the proposed underlying topography and extent of development, as well as the fire suppression zones. 6. The project site is located in the Mello II segment of the City's Local Coastal Program and is subject to those provisions regarding development of steep slopes with native habitat (also known as dual-criteria slopes). The project proposes development in several areas with dual-criteria slopes. In accordance with Policy 4- 3(b) of the Mello II segment, please provide proof that removal of the proposed development on the dual-criteria slopes would preclude any reasonable use of the property. Please also provide a tabulation of the total slope area of dual-criteria slopes and the amount of proposed encroachment into these slopes. Engineering: 1. The previous correspondences address access top adjacent properties as a completeness item. It remains as a major issue from an engineering standpoint that is critical to the design of this project. The adjacent access proposed has neither been approved nor denied. Staff has met with Ms. Steiner and the Saska's regarding their access; they are not satisfied with the current proposal. Access to the Saska's property should be located near station 208 + 30 which appears to be at grade with Poinsettia Lane. The driveway location would still be located on or across Ms. Steiner's property and would require an easement or right- of-way to use. (It appears that this is where the Saska's would like the access). Access to Ms. Steiner's property should be modified to use the temporary cul-de-sac at the subdivision boundary rather than the setback situation proposed. Offsite grading is anticipated and should be shown to accommodate her access. The adjacent lots (52 & 53) should be complete and require no future modification of grade or drainage. The proposed buffer/drain (City Standard GS 14) is acceptable. It is suggested that you raise the proposed grades of lots 50 through 55 to meet the existing terrain of your neighbor. For both Ms. Steiner and the Saska's, show utility relocation or extension as required. Please also show the utilities and services included in the alignment of Poinsettia lane. There is no comment regarding access to the Kevane property at this time. There is a biological resource study underway on the property in conjunction with the proposed subdivision (CT 98-04) and the results will likely determine areas of development and access. 2. The temporary cul-de-sac "A" street should extend to the subdivision boundary. There should be no future grading or improvements required to extend the street. Sewer, water and public utilities can also be extended to the subdivision boundary in all areas. 3. The Traffic Engineer submitted a report to discuss the impacts of this project on surrounding roadways. The report was silent on the connection to Mimosa Drive. Staff anticipates a substantial amount of public discussion on this connection and consider the connection a benefit to the adjacent subdivision. The connection was anticipated and dedicated when the subdivision was created. Figure No. 1 of the report show no connection and figure 2 shows the connection. Tables 1, 2, 4 and figures 3 and 4 should also be revised. Staff's concerns have been relayed to Bill Darnell directly and we understand that corrections or an addendum to the report are being prepared. 4. Please provide utility information: sewer, water and proposed or existing service connections. Extend or loop these services to the subdivision boundary as required. Check with CMWD for design and facility routing information. 5. Please show the terminus or end treatment of the proposed drainage system. Indicate other drainage systems proposed (e.g. energy dissipaters and off-site check dams). Consider downstream capacity problems and erosion protection. The Soils Engineer states that the terrain is "characterized by a fairly highly erosion potential" adjacent and downstream of this site in three places: * East of Dove Lane and "D" Street; * Lot 77 and west through View Point open space lot; and » Southwest of "B" Street. 6. The proposed drainage pattern will require special approval from the City Engineer. Typically, we see a letter of support from the Soils Engineer and the inclusion of rear and side yard drains where positive drainage is restricted. The Soils Engineer states that he supported the design but made no mention about roof, landscape or yard area drains as a future addition. The Engineer said the soils are highly erosive and that he had limited control over future uses or deviations. Staff believes that if the approved deviations were identified (included in the CC&Rs) then the chance of failure or loss of control would be reduced. 7. The applicant should be aware of the City's position to develop Poinsettia Lane concurrent with development of this project. A "future improvement" condition will not be supported. 8. The proposed phasing plan needs additional work. Access, grading, sewer, water, utilities and proposed models should be addressed. CITY OF CARLSBAD REVIEW AND COMMENT MEMO DAT! JUNE 29, 1998 REVISED PLAN j i TO ENGINEERING DEPARTMENT ^ ^ ^^ "POLICE DEPARTMENT - J. SASWAY f^pGiSii^rii | •FIRE DEPARTMENT-MIKE SMITH «••<*-- *'iv- •BUILDING DEPARTMENT - PAT KELLEY .-.— ir-y•COMMUNITY SERVICES - MARK STEYAERT ,, ( •COMMUNITY SERVICES - VIRGINIA McCOY 1§ k fea^ fc3 L3 * CARLSBAD MUNICIPAL WATER DISTRICT LANDSCAPE PLANCHECK CONSULTANT - LARRY BLACK CARLSBAD UNIFIED SCHOOL DISTRICT •NORTH COUNTY TRANSIT DISTRICT - Planning Department SAN' DIEGO GAS AND ELECTRIC - BICH TRAN (Memo Only)ii •ALWAYS SENT EXHIBITS \ FROM: Planning Department \; „-,-.. REQUEST FOR REVIEW AND COMMENT ON APPLICATION NO CT 97-015 NOTE: Please use this number on all correspondence. PROJECT TITLE: LOHF PROPERTY APPLICANT: WESTERN PACIFIC PROPERTY PROPOSAL SF PET RES SUED ON 36.67 ACRES Please review and submit written comments and/or conditions to: MICHAEL GRIM the Project Planner in the Planning Department. 2075 Las Palmas Drive, by JULY 13. 1998 . If not received by that date, it will be assumed that you have no comment and the proposal has your endorsement as submitted If you have any questions, please contact M. GRIM at 438-1161. extension THANK YOU COMMENTS M AN:, A I I ACHLD I-RMOQ20 5/fl PACIFIC SOILS ENGINEERING, INC. 7715 CONVOY COURT. SAN DIEGO. CALIFORNIA 82111 TELEPHONE: (619) 560-1713, FAX: (619) 560-0380 WESTERN PACIFIC HOUSING 2385 Camino Vida Roble - Suite 107 Carlsbad, CA 92009 June 25,1998 Work Order 400596 Attention: Mr. Scot Sandstrom Subject: Geotechnical Opinion Letter on the Erosiveness of the Natural Drainage Area South and West of Lot 17, Lohf Property, in the City of Carlsbad, California References: 1) Update Letter to Preliminary Site Reconnaissance and Response to City of Carlsbad Review, L9hf Property (AKA Dove Street Project), City of Carlsbad, CA, dated May 11,1998 by Pacific Soils Engineering, Inc. (Work Order 400596) 2) Preliminary Site Reconnaissance for the Dove Street Project, City of Carlsbad, CA, dated June 20,1997 by Pacific Soils Engineering, Inc. (Work Order 400596) Gentlemen: This letter presents Pacific Soils Engineering, Inc.'s (PSE's) opinion on the erosiveness of the natural drainage areas south and west of lot 17 on the Lohf property, located in the City of Carlsbad, California. PSE previously addressed the erosiveness of the soils in the subject drainage area in our update letter (reference 1), as a response to the review comment from the City of Carlsbad, California. As a way to reduce the erosion potential of the soils in the natural drainage areas, Hunsaker and Associates proposed a series of flexible check dams (Gabion baskets) be installed in the main flow line of the natural drainage areas. CORPORATE HEADQUARTERS LOS ANGELES COUNTT RIVERSIDE COUNTY SOUTH ORANOE COUNTY TEL: (714) 220-0770 TEL: <Z13) 325-7272 or 775-8771 TEL: (909) 678-8195 TEL: (714) 730-2)22 PAX; (714)220-9589 FAX: (714) 220-8589 FAX: (909) 676-1S79 PAX: (714) 730-5191 PflCiFIC bUIL bNb 6 1 S r1 . ki.3r1 . ki./ --1 Work Order 400596 June 25,1998 Page 2 Since the check dams are designed to reduce the relative velocity of run-off water, it is PSE's opinion that this should also reduce the potential for erosion of the soils in the natural drainage areas. If you have any questions, please contact the undersigned. Respectfully submitted, PACIFIC SOILS ENGINEERING, INC. DUNHAM, RCE 47238 Civil Engineer Engineering Manager Reviewed by: JO Vii {A . HANSON, resident Dist: (2) Addressee (2) Jack Henthom and Associates, Attn: Ms. Melissa Allen OD/JAC/JAH;kr/0003 TOTflL P.03 JAJl HENTHORN & ASSOCIATES 5431 Avenida Encinas • Suite J Carlsbad, California 92008 Fax (760) 438-0981 June 23, 1998 (760)438-4090 Mike Grim City of Carlsbad Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009-1576 Subject:Lohf Property, CT 97-15/ZC 97-06/LCPA 97-08/CDP 97-39/HDP 97-16 - TM Issues Dear Mike: Thank you for your letter dated June 15, 1998 deeming the related Lohf Property applications complete. The following items, which respond to issues identified in the City's letters dated April 6 and June 25, 1998, are addressed by the modified plans and materials enclosed with this submittal package: 1. The previously proposed improved accesses to adjacent properties to the west (215-050-46 & 22) have been deleted from the plan pursuant to your direction in a phone conversation on 6/15/98 due to concerns expressed by the CA Department of Fish and Game and the US Fish and Wildlife Service regarding sensitive habitats located on the adjacent parcels. Irrevocable Offers of Dedication for potential future access are proposed, however, to satisfy the adjacent property owners' concerns in case an access to those properties from the east is ever needed and deemed feasible. The TM was revised to show driveway access, with related offsite grading, to the Steiner parcel off of the extended cul-de-sac at the end of "A" Street. Exhibits are submitted showing two potential driveway access options to the Saska parcel. The precise design will be finalized in conjunction with the construction plans for Poinsettia Ln. offsite, to be prepared by others. 2. The project proposes a grant deed restriction for permanent open space over each of the open space lots (Lots 74, 75 & 76). An Irrevocable Offer to Dedicate (IOD) will be recorded on the open space lots to dedicate the land to the City or such agency designated by the City. The lots will be owned and maintained by the project Home Owners Association until such time as the City and/or other public or conservation agency is willing to accept fee title and maintenance responsibility. This should adequately preserve the natural open space areas such that a rezone is not necessary. The proposed zone for the project of R-1-7500 is consistent with the underlying RLM/RM general plan designations. 3. The Affordable Housing Offsite Credit request is being processed concurrent with the TM. It is understood that this concept must be approved by the Combined Project Review Committee and Housing Commission prior to taking the project to Planning Commission and City Council. 4. A Letter Report prepared by Dudek & Associates is enclosed that responds to the Consistency Analysis of the Dove Lane Project with the City of Carlsbad Habitat Management Plan (HMP), Dec. 1, 1997. The project proposes only .4 acre of impact to any sensitive habitat (southern maritime chaparral) and no impacts to sensitive animal species. The proposed plan results in the preservation in dedicated open space of 100% of oak riparian forest and 93% of southern maritime chaparral onsite. The proposed open space lands are located and configured in large concentrated blocks of habitat linked with offsite natural habitat, which is conducive to their long-term viability. The proposed 7.1 acres of dedicated natural open space also includes the preservation of 100% of the Del Mar manzanita occurring onsite. The project as proposed accomplishes the Conservation Goals and Planning Guidelines established for LFMZ 21 in the latest HMP document. The native brush line was flagged in the field by certified biologists with Dudek & Associates and staked and surveyed by registered land surveyors with Hunsaker & Associates. An exhibit is enclosed for your reference delineating the verified brush boundary with plotting of the proposed site plan. -1- Attempted relocations of mature oak trees often result in unsuccessful survival rates. The planting locations of the 10 Coast Live oaks proposed as mitigation for the 1 Coast Live oak to be removed, are shown within the southwestern native open space area (Lot 76) on the enclosed modified Landscape Plans. A second storm drain outlet was added to the plans to reduce the volume of drainage runoff, at any one point, into the natural open space area in Lot 76. Rip rap was added as end treatment to the proposed headwalls with gabion (rock basket) check dam drainage systems added to dissipate the energy/velocities down each of the drainage-ways and to preserve natural habitats and erosive soils. Letters are enclosed from Hunsaker & Associates and Pacific Soils Engineering responding to the drainage impacts in the southwestern portion of the site. 5. It is assumed that since 1) the applications associated with this project were deemed complete after the new Hillside Development Ordinance was adopted by the Carlsbad City Council; 2) the City has their own LCP authorizations on new projects; and 3) considering the timing of when this project will go to hearing, the project may be reviewed under the new ordinance which allows slopes up to 40' in height (with exceptions for slopes associated with collector and circulation element roadways). A bench was added to break up the longer, southwesterly facing slope behind lots 17 through 20, adjacent to open space Lot 76. No other slopes onsite are of significant height and length to warrant using a bench. 6. The project was designed to accommodate all three fire suppression zones within the proposed development area where ever possible. The exterior line of fire suppression Zone 3 follows the toe of slope and edge of grading/development impact in all places except one very minor encroachment between lots 23 and 39 that may result in minimal plant thinning. 7. Enclosed are two addendum reports (May 21 and June 15, 1998), by Darnell & Associates, to the previous traffic report that address the potential traffic impacts related to the connection with Mimosa Drive. The first of these reports assumes the conditions at buildout, after Poinsettia Lane is fully constructed. The second addendum responds to the short term impacts related to Mimosa Drive prior to Poinsettia Lane being completed. It also specifically analyzes potential circulation impacts associated with the nearby elementary school and proposed park. 8. Existing and proposed utilities and connections necessary to serve the subdivision are shown on the TM, for example the facilities connecting with those located in Dove Lane and Mimosa Drive. A copy of the proposed TM has been sent to CMWD for their comments regarding design and the potential of additional facilities not currently shown. We have also enclosed 5 additional sets of the plan for the City to route to CMWD for their input, pursuant to standard routing procedures. If you need any additional information at this time, please do not hesitate to call. Thank you. Sincerely, Melissa K. Allen encl. cc: File Clyde Wickham, City of Carlsbad, Engineering Department Lex Williman, Hunsaker & Associates Scot Sandstrom, Western Pacific Housing, Director of Forward Planning C:\WINWORD\Lohf\Letters\City 4th Issues Submittal Itr.doc -2- COCD CD CXIin CO O CD CXI c_U- CQJCen Q_Otftin CXIO O inCXI OO .O-\rfPttey^\ii& w&v -y \ 3' L^x i v ^ y^p'''~~ y .-v?\\L'\^w\^^i \\}} • >N ^K^ j/ A^\SN\ '-</:•- '/S/) \N>4 'Avx^v^AV///// > x;// xviifev^\ -•%-••'/—-~lx" /' / ; \\ >^^\s;'/>^\\i /j'/ (..,-c --'\./ ,- ^!\\ r '71.8 •40 SF/ >2H / o-h^tCN A'f /ipe; //6^9'jSf .ni,ni .is L-.-jJ «^* / 7 ]} \^' s=i/' /'*•'--«.-'' ,! / / / 4.v ---A /• t -•-/ / / \ / A- 0£ SP— \\ 11 \,X-> s *,:, S2& w T • -i*>".\^. "^YvV,•& /'•—^, '•J*r89r4§f13"tE—555:9#t*t-l KI\:K\!v;^ 4'-^-7^- '<. -/-^:«T -^TtJPiE -270-x' 50 AC ^0\$tj&$*-&?\ N 42! // v/.<=> ' U ^fc.J^>A ,*=^ SETB^JF^E!-=r ^ -P^ff^r; \.s &» m-pfS2,4... --t'776; ,SF " A?& X ^•l' -248J "P2&4 \ "^7566 SF// l.oPtO -AA^ P251J' 1J14f /' ^ f )l V, '»^5Sl/ |P 00 11!E Bsr W\ ! \V)(v \; ^ •\\\ IA- ;\ \ \ \ \ \ \ • \ ^\\ I M" I. V •\\ ] \ VL cci, ) -m^^ ja-2£? ,^-F . y^-i^ai Memorandum To: Scot Sandstrom CC: Chad Harris From: Lex Williman Date: 06/18/98 Re: Long Term Landscape and Erosion Control Plan Landscape a Revegetation of common natural open space areas will be done under the supervision of a qualified landscape architect or biologist and follow a city approved landscape plan. Long term maintenance will be the responsibility of the proposed home owners association. The maintenance may require yearly monitoring by a qualified biologist a Common decorative landscape areas and fuel modification areas will also be maintained by the proposed HOA on a regular basis. Erosion Control a Short Term - (during construction) maintenance responsibility: Developer • NPDES - Best management practices. Includes sand bagging, silt fences and temporary desilt basins. a Long Term - (project complete) maintenance responsibility: HOA • Revegetation of manufactured or disturbed natural slopes: 1) Usually a 3 year minimum monitoring program with a qualified biologist for revegetated natural areas. Ensure habitat survival rates. 2) If necessary, yearly monitoring for erosion impacts to habitat. Repair as necessary. 3) Installation of energy dissipating drainage headwalls on all outlets to natural areas. 4) Installation of gabion check dam (rock cages) on site along natural drainage areas for erosion control; slows velocity of run off. 5) Existing down stream (off-site adjacent to school) desilt basin to be maintained by the City of Carlsbad. Darnell & ASSOCIATES, INC, TRANSPORTATION PLANNING & TRAFFIC ENGINEERING June 15, 1998 Mr. Scot Sandstrom Western Pacific Housing 2385 Camino Vida Roble, Suite 107 Carlsbad, CA 92009 D&A Ref. No: 970906 Subject: Supplemental Traffic Analysis for Lolif Properly 73 Dwelling Unit Project Dear1 Mr. Sandstrom: In accordance with your request, I have prepared llii.s .supplemental analysis addressing the following questions raised by the homeowners adjacent to the project: 1. What will be the impact of traffic on Mimosa Drive between the project and Aviara Parkway due to traffic to/from the elementary school located at the northeast corner of Aviara Parkway and Ambrosia Lane? 2. What is the impact of traffic from the proposed park located to the west of the project off Poinsettia Lane? 3. What are the short term impacts of the project on Mimosa Drive without Poinsettia Lane constructed between Aviara Parkway and El Camino Real? The following paragraphs discuss each of these items. Impacts of Elementary School on Mimosa Drive The residents of Mimosa Drive are concerned that connection of the project to Mimosa Drive and Poinsettia Lone will attract a significant amount of traffic onto Mimosa Drive. First it should be noted that the street system for the Lolif property is designed to provide a circuitous routing of A Street, B Street, and C Street between Mimosa Drive and Poinsettia Lane. Of the 73 lots proposed for development, 61 lots are located on the southside of Poinsettia Lane. These 61 lots would have the potential of driving elementary school students down Mimosa Drive to Aviara Parkway then travel west on Aviara Parkway to the school. Our experience on similar conditions would indicate that most students that are driven to the school would be driven in conjunction with a parent's trip to work or via carpooling of students, At a worst case, 61 parents' would drive students to school. Our experience on similar situations is that a maximum of 30 parents would drive students to the school. Therefore, it can be concluded that the elementary school 1202 KETTNER BLVD • SUITE 6200 • SAN DIEGO, CA 92101 • PHONE: 619-233-9373 3 HUGHES AVENUE • SUITE 405 » IRVINE, CA 92718 • PHONE: 714-768-2590 FAX: 619-233-4034 Mr, Scot Sandslrom Western Pacific Housing June 15, J998 Page 2 would attract a maximum of 61 vehicles down Mimosa Drive in the morning peak. Return trips in the afternoon would be expected to travel north on Ambrosia Lane to Poinsettia Lane to the project. The use of A, 13 and C Streets lo reach Mimosa Drive Cur resklcnls north of Poinsetlia Lane was evaluated and it was concluded that parents desiring to reach the elementary school would stay on Poinsettia Lane to Ambrosia Lane and then travel south to reach the school. The circuitous routing of A, B and C Streets will help to discourage traffic from using Mimosa Drive as a bypass route. Traffic patterns at the elementary school were observed and determined that the school's one-way circulation system controls traffic flow. Specifically, we identified the narrow entrance drive and limited pedestrian access to cause some of the problems associated with the school, What are the traffic impacts of the proposed park near Ambrosia Lane and Poinsettia Lane on Mimosa Drive? Traffic to/from the proposed park is not expected to create any traffic problems on Mimosa Drive. The park is located close to Ambrosia Lane and Poinsettia Lane. To reach the park, residents of the area south of Aviara Parkway will utilize Aviara Parkway and Ambrosia Lane, The circuitous routing of the project's A, B and C Streets will discourage traffic from using project streets and Mimosa Drive. What are the short term impacts of the proposed project traffic on Mimosa Drive without Poinsettia Lane constructed from Aviara Parkway to El Cainino Real? At this lime, Poinsettia Lane is not proposed for construction between Aviara Parkway and El Camino Real until 2001-2003. During this time, the project will be required to use Dove Lane and Mimosa Drive to gain access to the highway system. To address this impact, project traffic generated in our May 12, 1998 traffic report was reassigned and reanalyzed. Table I was prepared to show the cumulative short term effect of project traffic, project streets, Dove Lane and Mimosa Drive. Review of Table 1 shows that without Poinsettia Lane constructed between Aviara Parkway and El Camino Real project traffic will utilize Mimosa Drive to travel to the west. It is estimated that 511 daily vehicles will be added to existing traffic on Mimosa Drive. For the short term traffic on Mimosa Drive from Aviara Parkway will increase from an estimated 1,000 daily vehicles to 1,411 daily vehicles. Also, it should be noted that approximately 100 vehicles of the existing Mimosa Drive development will utilize project streets to reach the City Library and existing shopping center. Mr. Scot Sanclstrom Western Pacific Housing June 15, 1998 V;V ; Page 3 ' TABLE 1 Summary of Short Term Project Traffic Impacts Without Poinscttia Lnne Roadway Segments Dove Lane K S/O Street D Mimosa Drive >• Project Boundary to Blue Orchard Lane North > Blue Orchard Lane North to Blue Orchard Lane South >• Blue Orchard Lane South to Aviara Parkway Street A >• Poinsettia Ln to B Street Street B > Street A to Street C Street C > Street B to Street D »• Street D to Blue Orchard Ln Daily Traffic Existing ADT _ 300 1000 . „ - Other Development ADT(a) 100(b) 100(a) -lOO(b) . ,100(b) Project ADT 218 511 511 511 .. 120 210 370 511 Total ADT 318 611 811 1411 120 210 370 611 (a) Other development includes the City Library and Shopping Center located on Dove St. (b) The City Library and existing shopping center is expected to attract 100 daily vehicles through the proposed project. This will result in 100 fewer vehicles on Mimosa immediately north of Aviara Parkway. Al such time Poinsettia Lane is constructed between Aviara Parkway and El Camino Real, the critical link of Mimosa Drive immediately north of Aviara Parkway will decrease from 1,411 vehicles to 1,000 vehicles. These levels of traffic can be adequately accommodated on the existing street system. Mr. Scot Sandstrom Western Pacific Housing June 15, 1998 Page 4 Summary > Project traffic oriented to the elementary school at Aviara Parkway and Ambrosia Lane is expected to add a maximum of 61 vehicles to Mimosa Drive. The majority of these trips will be carppolers and/or parents dropping students off on their way to work. >• The proposed park in the vicinity of Poinsettia Lane and Ambrosia Lane is not expected to cause traffic to use Mimosa Drive. In fact, the circuitous routing of project streets will discourage traffic. >• The short term impact of project traffic on Mimosa Drive until such time that Poinsettia Lane is constructed between Aviara Parkway and El Cainino Real will result in 511 daily vehicles being added to Mimosa Drive. This addition will result in an estimated 1,411 vehicles on Mimosa Drive immediately north of Aviara Parkway. Please call me if you have any questions. Sincerely, DARNELL & ASSOCIATES, INC. Bill E. Darnell, P.E. BED/bm 0906loh(.sup/98-06 * *City of Carlsbad Planning Department June 15, 1998 Mr. Scot Sandstrom Western Pacific Housing 2385 Camino Vida Roble, Suite 107 Carlsbad CA 92009 SUBJECT: CT 97-15/ZC 97-06/LCPA 97-08/CDP 97-39/HDP 97-16 - LOHF PROPERTY The items requested from you earlier to make your Tentative Tract Map, Zone Change, Local Coastal Program Amendment, Coastal Development Permit and Hillside Development Permit, application no. CT 97-1 5/ZC 97-06/LCPA 97-08/CDP 97-39/HDP 97-16 complete have been received and reviewed by the Planning Department. It has been determined that the application is now complete for processing. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. Please note that although the application is now considered complete, there may be issues that could be discovered during project review and/or environmental review. Any issues should be resolved prior to scheduling the project for public hearing. In addition, the City may request, in the course of processing the application, that you clarify, amplify, correct, or otherwise, supplement the basic information required for the application. Please contact your staff planner, Michael Grim, at (760) 438-1161, extension 4499, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, MICHAEL J. HOLZMILLER Planning Director MJH: MG:dch Gary Wayne Dennis Turner Clyde Wickham Bobbie Hoder File Copy Data Entry Planning Aide Jack Henthorn, Henthorn & Associates 2075 La Palmas Dr. • Carlsbad, CA 92009-1576 • (760) 438-1161 • FAX (76O) 438-0894 &ASSOCIATES Engineering, Planning, Environmental Sciences and Management Services Corporate Office: 605 Third Street Encinitas, California 92024 760.942.5147 Fax 760.632.0164 A California Corporation 9 June 1998 /£' |\|| <$$ ~$\ 1494-01 ^ X,4;.v;ii::^ $ Mr. Scot Sandstrom Western Pacific Housing 2385 Camino Vida Roble Suite 107 Carlsbad, CA 92009 Re: Consistency Analysis of the Dove Lane Project (Lohf Property) with the City of Carlsbad Habitat Management Plan Dear Mr. Sandstrom: The Dove Lane property is an approximately 36.6-acre parcel situated within Zone 21 of the City of Carlsbad in the western portion of San Diego County, California. The property is located west of El Camino Real, south of Camino Vida Roble, east of the Aviara development and north of Aviara Parkway. The properly is surrounded by agriculture, open space/native habitat and some areas of residential development. Biological surveys of the property were conducted by Dr. Anita Hay worth, Dudek & Associates (DUDEK), in August, 1997, to assess the existing conditions of the biological resources. A biological technical report was prepared in September 1997 and revised 5 May 1998. The report provides a discussion of the general biological character of the site in terms of vegetation, flora, wildlife, and wildlife habitats; analyzes the biological significance of the site in view of federal, state, and local laws and policies; identifies and quantifies biologically constrained and unconstrained lands on the property; quantifies potential impacts of a proposed development scenario; and recommends mitigation measures that would reduce impacts to biological resources below a level that is considered significant. As a part of the review process of the proposed project, the City of Carlsbad has asked that an analysis be prepared of the consistency of the project with the current version of the Habitat Management Plan for Natural Communities in the City of Carlsbad, dated December 1, 1997. DUDEK biologist Anita Hay worth reviewed the Habitat Management Plan (HMP) and analyzed the proposed development project in context of the draft HMP. The Dove Lane property is located within Zone 21 and is within the southern portion of Core Area #6 of the HMP. The HMP Conservation Goals for this Zone include conserving the majority of remaining natural habitats, ensuring a net loss of no more than 10% of coastal sage scrub and southern maritime chaparral, ensuring no net loss of wetland habitats, vernal pools, and oak woodlands within the zone, and conserving narrow endemic plant populations. Additionally the Goals are to conserve habitats in a continuous configuration across the zone to allow for continued east-west connectivity and animal movement between El Camino Real and Linkage Area F. The planning guidelines for this zone include restricting development Mr. Scot Sandstrom 9 June 1998 Re: HMP Consistency Analysis for Dove Lane Pg. 2 to agricultural areas and disturbed habitat, avoid removal of maritime succulent scrub, southern maritime chaparral, and narrow endemic plant populations. The planning guidelines also identify conservation of natural habitats on slopes steeper than 25 %, minimization of removal of coastal sage scrub and southern maritime chaparral, avoidance of impacts to watershed of vernal pools and to oak riparian forest. The guidelines also focus on ensuring continuous habitat connectivity and wildlife movement east-west across the zone with an average habitat width of at least 1,000 feet and a minimum constriction of 500 feet. Mitigation has been identified as creation or enhancement of like habitats within the zone, contiguous with other conserved habitats, to improve east-west connectivity across the zone. Implementation of the proposed Dove Lane project would result in the direct loss of 29.6 acres, most of which is agricultural land, and includes impacts to the following habitat types: 1.2 acre of southern mixed chaparral 0.4 acres of southern maritime chaparral 0.0 acre of southern coast live oak riparian forest 0.5 acre of eucalyptus woodland 27.4 acres of disturbed/developed habitat. Implementation of the proposed project would result in the direct loss of the following sensitive plant species which have been mapped on the project site: No loss of summer holly (Comarostaphylis diversifolid) No loss of Del Mar manzanita (Arctostaphylos glandulosa var. crassifolius) Approximately 1 individual of Nuttall's scrub oak (Quercus dumosd) Approximately 7 percent of ashy spike-moss (Selaginella cinerascens) One individual of coast live oak (Quercus agrifolia). No impacts would occur to sensitive animal species. In general, the proposed plan results in the preservation in dedicated open space of 7.1 acres, including 100 percent (0.4 acre) of oak riparian forest and 93 percent (5.5 acres) of southern maritime chaparral. The location and configuration of the open space lands are conducive to their long-term viability - they are large, concentrated blocks of habitat linked with off site natural habitat. There is no habitat link from the Dove Lane property to Link F or for an east-west connection across El Camino Real, thus there is no impact to habitat connectivity and wildlife movement. The project design mitigates direct impacts to a very small amount (0.4 acre) of southern maritime chaparral by the overall preservation of a large block of the habitat. Included in the project design is the granting of an open space easement over 93 percent (5.5 acres) of the southern maritime chaparral on the Dove Lane property. This is greater than the 2:1 mitigation ratio that is typically required by the resource agencies for the impact of southern Mr. Scot Sandstrom 9 June 1998 Re: BMP Consistency Analysis for Dove Lane Pg. 3 maritime chaparral. The open space easement also includes the preservation of 100 percent (24 individuals) of the Del Mar manzanita occurring onsite. Although the impact to the one isolated coast live oak is not considered significant, it requires mitigation based on input from the local jurisdiction. The mitigation is recommended to be replacement of the one tree at a 10:1 ratio. Thus ten live oaks should be planted within open space areas. Suitable areas are available within the designated open space in the northwest and southwest corners. Currently disturbed or open areas are available and the conditions are suitable for planting of the oaks. Based on the above analysis of the project design, the Dove Lane development is consistent with the goals and planning guidelines of the Draft HMP (December 1, 1997). The project has minimized the impact to southern maritime chaparral, and completely avoided impacts to oak riparian forest and narrow endemic plant species. The open space area is designed to connect with off site native habitat to provide connectivity throughout the zone. If you have any questions regarding this letter, please feel free to contact me or June Collins at (760) 942-5147. Very truly yours, DUDEK & ASSOCIATES, INC. Anita M. Hay worth, Plj Ecologist/Senior ProjecfManager cc: Jack Henthorn, Jack Henthorn & Associates Mike Grimm, City of Carlsbad Darnell & ASSOCIATES, INC, TRANSPORTATION PLANNING & TRAFFIC ENGINEERING May 21, 1998 .Mr.: Scot Sandstrom . . Western Pacific Housing 2385 Camino Vida Roble •Suite 107 Carlsbad, CA 92009 D&A ;RftfV No: 970906 Subject: Impact of 73 Single Family Housing Project on Mimosa Drive Dear Mr. Sandstrom: . , . , In accordance with your request, 1 have identified the project impacts, of connecting the projects C Streset.to Mimosa Drive, .... The proposed project will provide a circuitous circulation system providing a.connector to Dove Lane with access to the Pla-za Real Shopping Center, City Library, and Polpsettia Lane, Traffic to/from the project using Mimosa Drive to reach Aviara Parkway is expected .to be nominal and is expected to only attract traffic oriented to the south and east. Traffic .oriented . to the south on El Carnino Real is 73 vehicles and traffic oriented to the east on Aviara Parkway is 36 vehicles. Review of the site plan and travel routes permits us to .estimate that .: a maximum of 109 vehicles to/from the project might use Mimosa Drive to reach Aviara Parkway. Based on our review Of the site, plan, we estimate that only-the 36 vehicles oriented to Aviara Parkway east of El Camino Real would actually use Mimosa Drive. . Connecting the project street system to Mimosa Drive will allow existing development to south of the.project to access Poinsettia Lane, .Plaza Real Shopping Center and City Library. We . .. estimate 200 vehicles from the existing development will travel north to reach Pomsettia Lane, Plaza Real Shopping Center and/or City Library. .. ' In summary it can be concluded that the proposed project and its connection to Mimosa.Drive will not create a significant traffic impact. • ••. • . >• Project traffic using Mimosa Drive is estimated to be 36 vehicles with a worst case demand of 109 vehicles. '_.......... , ., • • i' 1202 KETTNERBLVD » SUITE 6200 • SAN DIEGO. CA 92.101 • PHONE: fll9-233-.9373 , 3 HUGHES AVENUE-SUITE 405'IRVINE, CA 92718* PHONE: 714-766.-25.90 . '.'."' • ' • ' FAX: 619-2,33-4034 • •:' •Mr. Scot Sandstrom .'• Western Pacific 'Housing May 21, 1998' ' . Page 2 . .-:.: . '. .' : Connection of1 Street C to Mimosa Drive is estimated to allow existing residents to travel north to Poinsettia Lane and/or to the Plaza Real •Shopping Center 'and. . the Gity Library, We : estimate 200 vehicles .from existing .residents will vse Mimosa Drive and travel through the project! Please call me. if you have any questions. Sincerely/-. : . DARNELL & ASSOCIATES, INC, Bill E, Darnell, P.E. . . .., •'.'•; BED/ld '••-;'•• .. ." • •'. : ' ', ' "" , '. ' •:• ,v "'" co: .Melissa Allen,. Jack Henthorn and Associates ; . . ' . ;:| HENTHORN & ASSOCIATES 5431 Avenida Enemas • Suite J Carlsbad, California 92008 «-« «-F* Fax (76°) 438-0981RECEIVED (760) 43g-4090 HAY 1 3 1998 13' 1998 CITY OF CARLSBAD PLANNING DEPT. Mike Grim City of Carlsbad Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009- 1576 Subject: Lohf Property, CT 97-15 - Residential TM, Issues Submittal Dear Mike: Enclosed are the following items which respond to issues identified in the City's letter, dated April 6, 1998: • A copy of the Inclusionary Housing "Off-site Credit Request Packet" (consistent with the Inclusionary Housing Ordinance and Policies 57 & 58) is included for your information. This request will be submitted to the Housing and Redevelopment Department for the Combined Project Review Committee. • The biological resources report update includes analysis and recommended mitigation regarding the oak tree located within the proposed development area and addresses the potential for quino checkerspot butterflies onsite. In order to insure accuracy in the vegetation mapping, the site biologist worked closely with a survey crew from Hunsaker & Associates to accurately identify the boundaries of the habitat using GPS. See biological report pages 1 & 2, Section 2.2.1, for additional detail. The Environmental Impact Assessment. Environmental Evaluation discussion was modified to address the updated biological resource analysis and proposed mitigations. Also, a Phase I and II Environmental Site Assessment had been prepared for the site, so the EIA discussion under IX. Hazards was revised. No changes were necessary in the EIA checklist. • The traffic report was updated to address the revised project design; the need for a traffic signal at Poinsettia Lane and Dove Lane; and to include analysis regarding potential buildout traffic volumes. The report determined that based on projected project traffic, a traffic signal would not be warranted at the proposed four way intersection at Poinsettia Lane. The report also found the projected Levels of Service to be sufficient in the surrounding area after project completion, prior to the construction of Poinsettia Lane, and after ultimate buildout of the area. • The soils report was updated with a letter report addendum to address the proposal to allow less than standard positive drainage around the units and to respond to the errosiveness of the soils within the open space lot in the southwestern portion of the site. • The hydrology report update includes a determination of 100-year peak discharges and an analysis of downstream capacity in Dove Lane. It includes an analysis of the "Q" values and velocity of proposed drainage onsite. The east portion of the site will drain to an existing 18" R.C.P. in Dove Lane and the remaining portions of the site will drain to natural canyons south and west of the site. Erosion control measures and/or onsite energy dissipaters will be implemented at these storm drain outlets. The report also analyzed proposed project runoff and capacity downstream down Dove Lane. Based on research of the surrounding area, the report determined that downstream capacity is adequate. -1- • The acoustical analysis report was updated to address the current project design and respond to any necessary changes in required noise wall heights and locations. The new elevations within Poinsettia Lane and on the adjacent lots were analyzed to determine resulting noise impacts and required mitigations. The maximum wall height required is 5.5 feet. The walls will be located adjacent to Poinsettia Lane and wrapped around several lots nearest El Camino Real along the top of slopes. If you need any additional information at this time, please do not hesitate to call. Thank you. Sincerely, Melissa K. Allen encl. cc: File Clyde Wickham, City of Carlsbad, Engineering Department Lex Williman, Hunsaker & Associates Scott Sandstrom, Western Pacific Housing, Director of Forward Planning C:\WINWORD\Lohf\Letters\City 3rd Issues Submittal ltr.doc -2- Pacific Housing 2385 Camino Vida Roble, Suite 107 Carlsbad, California 92009 760.929.1600 Fax 760.929.1601 HAY 1 3 1398 CITY OF CARLSBAD PULING DEFT.May u, 1998 Ms. Deborah K. Fountain Housing and Redevelopment Director City of Carlsbad 2965 Roosevelt Street, Suite B Carlsbad, CA 92008-2389 Subject: Lohf Property - Request to Purchase Off-site Affordable Housing Credits Dear Ms. Fountain: This letter serves as a formal request by Western Pacific Housing to purchase off-site affordable housing credits in the Villa Loma development to satisfy the Lohf Property subdivision's (CT 97-15) inclusionary housing obligations. This request is in compliance with actions previously taken by the City Council: The City's Inclusionary Housing Ordinance (CMC Chapter 21.85) establishes certain requirements under which residential developers must provide housing that is affordable to lower-income households as a condition of project approval and permit issuance. The ordinance provides that "circumstances may arise in which the public interest would be served by allowing some or all of the inclusionary units associated with one project site to be produced at an alternative site or sites." The two inclusionary housing options that are available to a developer are that the developer shall either 1) enter into an agreement with the City to purchase affordable credits from Villa Loma; or 2) participate in an off-site combined inclusionary project within the southwest quadrant and as appropriate, in accordance with the requirements set forth in Chapter 21.85 of the Carlsbad Municipal Code and City Council Policies 57 and 58 dated Septembef 12, 1985. A report has been reviewed by the Housing Commission that projected the inclusionary housing requirements of undeveloped property within the Southwest Quadrant of the City. The report examined whether projected development of the Quadrant could result in a demand for off-site credits exceeding the number of available credits. The analysis showed that there are sufficient excess units to satisfy the potential demand of the Quadrant. In the case of the Lohf project, there are particular circumstances that warrant the provision of the inclusionary units off-site in combination with the existing Villa Loma Apartment project, pursuant to Council Policy 57 criteria. Significant feasibility issues affect the development of this project on-site. Contribution to the existing off-site project versus providing a small low-income apartment complex on-site will result in increased public benefit. We understand this request will be evaluated by a staff Project Review Committee to determine compliance with the criteria defined in Policies 57 and 58. We will then take the Committee's recommendation to the Housing Commission and City Council. Please call if you need additional information or if we may be of any other assistance. Sincerely, Sandsftrom aff of Development 5rnj2acmc Housing ICO Housing, Inc. Enclosure cc: Mr. Jack Henthorn, Jack Henthorn & Associates 2 2385 Camino Vida Roble, Suite 107,Carlsbad, California 92009 760.929.1600 Fax 760.929.1601 LOHF PROPERTY OFF-SITE AND COMBINED INCLUSIONARY HOUSING PROJECT ASSESSMENT WORKSHEET -- BACKGROUND The following background information is provided to assist you in your assessment. 1. Owner/Applicant Information: Applicant's Representative: Western Pacific Housing Jack Henthorn & Associates Attn: Mr. Scot Sandstrom Attn: Mr. Jack Henthorn 2385 Camino Vida Roble 5431 Avenida Encinas Suite 107 Suite J Carlsbad, CA 92009 Carlsbad, CA 92008 760-929-1600 760-438-4090 2. Off-site/Combined Project Name: VILLA LOMA APARTMENTS 3. Description of Project with Inclusionary Housing Obligation: Lohf Property, CT 97-15, is a proposed 77-lot, 73-unit, single family development located on a 36.7-acre parcel with a 10.95-unit affordable housing obligation. 4. On-site Affordable Housing Description: The Lohf Property Affordable Housing project would be an 11-unit multi-family, apartment project on one lot with units ranging from 1 to 3 bedrooms. The units would be in a maximum rent range which is affordable to households earning incomes of 60% of the Area Median Income. To achieve feasibility, the project would require a subsidy of $483,761 (even assuming a fully constructed pad is provided by the developer and unit incomes are based on a 95% occupancy rate factor). 5. Proposed Off-site Project Description: The Villa Loma project is a 344-unit apartment development in which all units are restricted and affordable to households with incomes not exceeding 60% of the San Diego County Median. Villa Loma was developed by La Terraza Associates, with Bridge Housing Corporation as the Managing General Partner. The complex contains 1, 2, 3 & 4 bedroom units. Villa Loma was financed with assistance from the City of Carlsbad'- and the Carlsbad Redevelopment Agency. The assistance was structured in such a way as to create affordable units which would be marketed exclusively by the City to "other developers" in order to satisfy an affordable housing obligation. The Villa Loma Apartment complex is a Combined Project according to the Inclusionary Housing Ordinance, and developers may participate in this as an "off-site" method of satisfying their affordable housing obligation. (This is also an approved site for the Greystone Cove and Ocean Bluff projects.) Participation in Villa Loma Apartments by the applicant would be in the form of a purchase of Affordable Housing Credits (Credits) under terms established by City Council Policies Numbered 57 and 58. If the applicant is afforded the opportunity to purchase Credits, the Lohf Property tentative map would require the purchase of 10.95 Credits to satisfy its inclusionary housing requirement. 6. Description of On-site Project Constraints: Specific constraints exist which would affect an on-site affordable project's feasibility. These include the uneconomical scale of the affordable project and a significant price difference between the affordable rental units and the proposed single-family market units that will be developed in and around this project. LOHF PROJECT OFF-SITE AND COMBINED INCLUSIONARY HOUSING PROJECT ASSESSMENT WORKSHEET -- WORKSHEET 1. Feasibility of the On-site Proposal a. Are there significant feasibility issues due to factors such as project size, site constraints, amount and availability of required subsidy, and competition from multiple projects that make an on-site option impractical? • The on-site affordable project is not of sufficient size to be a viable apartment project. Given the small size of the project and its restricted rental structure, on site management and maintenance will be difficult. • The small scale of the affordable housing project also makes it unlikely that the project will generate interest from funding sources. • The market units in this project would be required to absorb approximately $2,800 per unit so that land value could be contributed by the developer. This figure would rise to over $9,400 per unit if the applicant is required to build the units on site and close the post land development gap of over $480,000. • Based on the estimated restricted rental prices of the affordable units the applicant will be facing an average subsidy requirement of approximately $40,300 per unit, beyond land contributions. This would result in each unit being subsidized with approximately $57,300. b. Will an affordable housing product be difficult to integrate into the proposed market development because of significant price and product type disparity? • Price disparities will be substantial between the low-income rental apartment units restricted at $510- $800 rent and the approved higher-end single-family detached homes which have an estimated base price range of $320,000 to $360,000. • The integration of 11 affordable apartment units, sized at 600 to 1,000 sq. ft., into the single-family subdivision with homes of 2,800 to 3,300 square feet on 7,500 to 25,000 sq. ft. lots will result in major product type disparity on-site. The surrounding area will also be built-out with low density, single- family detached products consistent with the existing RLM land use designation and market demand. The on-site project would, therefore, also result in substantial product disparity with the surrounding region. c. Does the on-site development entity have the capacity to deliver the proposed affordable housing on-site? • The applicant is not experienced in the development of affordable housing. • Affordable housing developers have advised the applicant that it is unlikely that this size of project will generate interest from funding sources. 2. Relative Advantages/Disadvantages of the Off-site Proposal. a. Does the off-site option offer greater feasibility and cost effectiveness than the on-site alternative, particularly regarding potential local public assistance? • Villa Loma is built and has proven its feasibility; no additional assistance is required. • Over 500 affordable units have been recently built or are in process of approvals in the southwest quadrant. It is possible that affordable unit production could outpace market development. • The applicant's participation in Villa Loma would permit the intended recovery of City investment provided to the project through utilizing "excess units". These funds could then be used to provide additional affordable housing. Conversely, the developer's on-site project would create the demand for additional new subsidy. • The small size of the on-site project could result in additional future subsidy requests related to operating costs. b. Does the off-site proposal have location advantages over the on-site alternative, such as proximity to jobs, schools, transportation, services; less impact on other existing developments, etc.? • Villa Loma is a self-contained affordable development in an area designated for higher density residential development such as condominiums and townhomes. • The on-site proposal could be a source of land use conflicts that typically occur when higher density development is permitted adjacent to larger lot single family development. c. Does the off-site option offer a development entity with the capacity to deliver the proposed project? • The Villa Loma project is an existing project, developed and managed by a highly experienced and specialized affordable housing developer. d. Does the off-site option satisfy multiple developer obligations that would be difficult to satisfy with multiple projects? • Villa Loma project was originally established as a Combined Project, specifically to address this purpose. • The proposed on-site project would be one of several projects in the southwest quadrant competing for scarce financial assistance. Villa Loma has already been financed and built and thus, would not be competing for subsidy financing. 3. Advancing Housing Goals and Strategy a. Does the off-site proposal advance and/or support City housing goals and policies expressed in the Housing Element, CHAS and Inclusionary Housing Ordinance? General Plan Housing Element and CHAS Goals: • Villa Loma Apartment affordable project is targeted to the highest priority need identified, larger rental units for low income households. • The recovery of the City's investment in the Villa Loma Project through the applicant's participation will provide for additional resources which are needed to further affordable housing development. • Villa Loma provides a large quantity and diversity of affordable housing stock with its 344 units, including a generous supply of different size units to meet various housing needs of the community. Inclusionary Housing Ordinance Policies: • Consistent with the City and public interests to use existing "excess" affordable units before supporting additional new construction. • In conjunction with the combined Villa Loma project, the Lohf property will provide for 15% of the total units for affordable (lower income) residential units. The project also complies with the Inclusionary requirements as contained in the General Plan Housing Element. Growth Management Zone, Ord. No. NS-257 Guidelines: • Villa Loma is coordinated with surrounding properties by providing direct access to a major Circulation Element Roadway, El Camino Real, as well as circulation and pedestrian access to public facilities. LOHF COMPARATIVE PRO FORMA 5/6/98 2:12 PM REVENUE ANALYSIS 1 BEDROOM 2 BEDROOM 3 BEDROOM 95% OCCUPANCY OPERATING COSTS @ 30% NET OPERATING INCOME DEBT SERVICE INCOME (1.2) INCOME SUPPORTED DEBT RENT $510 $621 $800 UNITS 3 6 2 11 REVENUE $1,530 $3,726 $1,600 $6,856 $6,513 ($1,954) $4,559 $3,799 $432,730 LAND DEVELOPMENT COSTS LAND (3 lots) ON SITE IMPS PUBLIC FEES DESIGN/CONSULTANTS IMPROVED SITE COST LAND CARRY 18MO LAND DEVELOPMENT COST UNIT CONSTRUCTION COSTS UNIT SIZE SQUARE FEET (project) STRUCTURE COST $35.00 ON SITE INDIRECTS .10% STRUCT. OVERHEAD .04 MARKETING .02 CONSTRUCTION COSTS LOAN FEES .02 CONST FINANCING SUBTOTAL FINANCING PROJECT COST GAP Developer land contribution NET GAP $204,000 $216,000 $214,060 $50,000 $684,060 $30,600 $714,660 1 BR 2175 $76,125 2BR 5100 $178,500 3BR 2200 $77,000 $405,831 $8,655 $20,292 $28,946 $1,120,491 $687,761 $204,000 $483,761 9475 $331,625 $33,163 $27,362 $13,681 $405,831 $28,946 $1,120,491 $687,761 Pagel LOHF COMPARATIVE PRO FORMA 5/6/98 2:12 PM PER UNIT NET GAP PER UNIT GROSS SUBSIDY $40,313.45 $57,313.45 Page 2 PACIFIC SOILS ENGINEERING, IN 7715 CONVOY COURT, SAN DIEGO, CALIFORNIA 921 TELEPHONE: (619) 560-1713, FAX: (619) 560-038 WESTERN PACIFIC HOUSING 2385 Camino Vida Roble - Suite 107 Carlsbad, CA 92009 ^|OY^^PV' May 11,1998 Work Order 400596 Attention: Mr. Scot Sandstrom, Director of Forward Planning Subject: Update Letter to Preliminary Site Reconnaissance, and Response to City of Carlsbad Review, Lohf Property (AKA Dove Street Project), in the City of Carlsbad, California Reference: Preliminary Site Reconnaissance for the Dove Street Project, City of Carlsbad, CA, dated June 20,1997 by Pacific Soils Engineering, Inc. (Work Order 400596). Gentlemen: In accordance with a request from Jack Henthorn and Associates (attached as Plate 1), this letter presents an update to the preliminary site reconnaissance (reference report) for the Lohf property, located in the City of Carlsbad, California. The purpose of this update letter is to address two issues (items 4 and 6) raised by the City of Carlsbad Engineering Department in a letter dated April 6, 1998 (attached as Plate 2). Response to Item 4 The topsoils overlying the Santiago Formation and the alluvial materials in the natural drainage areas located south and west of the site are generally silty and clayey sands with lessor amounts of clayey silts and silty clays. These soils are generally in a dry to slightly moist state exhibiting a loose/soft to moderately dense/firm consistency. These soils are characterized by a fairly high erosion potential. Variable factors such as: CORPORATE HEADQUARTERS LOS ANGELES COUNTY RIVERSIDE COUNTY SOUTH ORANGE COUNTY TEL: (714) 220-0770 TEL: (213) 325-7272 or 775-6771 TEL: (909) 676-8195 TEL: (714) 730-2122 FAX: (714) 220-9589 FAX: (714) 220-9589 FAX: (909) 676-1879 FAX: (714) 730-5191 Work Order 400596 ^ ^ Page 2 May 11, 1998 1) existing vegetal cover; 2) volume of run-off; 3) velocity of run-off; and 4) relative soil moisture and density all affect the potential for high erosion. These issues are typically mitigated by erosion control measures provided by the design civil as a condition of code compliance or other regulatory requirements. Response to Item 6 PSE has reviewed the proposed typical surface drainage pattern around the structures as shown on Plate 3. The proposed surface drainage pattern provides drainage away from the structure into a swale which transmits water on a one (1) percent minimum drainage gradient towards the front street. The swale is generally located at least five (5) feet from the perimeter of the structure except where a retaining wall has reduced this distance to a minimum of three (3) feet from the structure. This condition is acceptable from a geotechnical viewpoint as long as the swale is constructed per this plan (Plate 3) and maintained during the life of the structure. Deviations from the proposed surface drainage patterns such as site regrading, surface or flatwork improvements, etc., may cause ponding of water around the structure. These conditions are out of the control of this firm and consequently, PSE can not be held responsible for these changes to the physical condition of the property. PACIFIC SOILS ENGINEERING, INC. Work Order 400596 May 11, 1998 Page 3 The opportunity to be of service is appreciated and should you have any questions, please contact the undersigned. Respectfully submitted, PACIFIC , INC. Reviewed by: JOHN A. HANSON, VteeTresident Dist: (2) Addressee (2) Jack Hentorn & Associates, Attn: Ms. Melissa Allen 0001 :KR PACIFIC SOILS ENGINEERING, INC. CT 97-1 5/ZC 97-06/LQM W-08/CDP 97-39/HDP 97-19 - LOHF^Hw cRTY APRIL 6, 1998 W ^ PAGE 4 _ : _ _ thinning of native habitat. Considering that no additional habitat can be lost on site, Zones 1 and 2 must be accommodated within the proposed development area. The City may allow some Zone 3 encroachment into the natural open space, depending upon the existing habitat quality and location of sensitive species. Engineering: Traffic and Circulation,: 1. Considering th« Steiner access issue, the proposed cul de sac should ba graded and extended to the subdivision boundary. A temporary cul de sac from the City Standards is more appropriate and will fit within the standard width proposed. Sewer, Water and utilities can also be extended to the subdivision boundary. 2. The project Traffic Engineer should consider buildout conditions and the ultimate need (warrant analysis) for a traffic signal at Polnsettia Lane and Dove Lane. Sewer and Water:, 3. Please provide utility information, sewer, water and proposed or existing service connections. Check with CMWD for design and facility routing information. On the Hydrology Map label all outlets or basin junctions with "Q" values and velocity of proposed drainage. Please show the terminus or end treatment of the proposed headwalls, inlets, or junction structures. Indicate other drainage systems proposed (energy disslpaters and check dams). Consider downstream capacity r- problems and potential erosion protection. Revise or submit an addendum to the / soils report that addresses the errosivene'ss of the natural terrain south and west of Lrhlssite (lot 17), 5. In the hydrology study consider the run off draining down Dove Lane thru the Shopping Center, the Seaport subdivision and to Batiquitos Lagoon, The proposed increased runoff from tfevelopbtent ss it affects capacity downstream could be an issue and diversion or retention may be required. The proposed drainage pattern will require special approval from the City Engineer, The Soils Report submitted is silent on the less than standard positive drainage away from th« proposed footings. Typically we see a letter of support from the Soils Engineer and the inclusion of rear and side yard drains where positive drainage is restricted. Miscellaneous: 7. The engineer submitted (2) tentative maps and a Poinsettia Lane Alignment plan that are all different than each other. We like the general alignment of Poinsettia Lane but require additional information for access and approved projects mentioned above. The connection to existing Mimosa Dr. is also acceptable as shown on the Poinsettia Lane Alternative "B" plan. PLATE 2 SUBDIVISION, INSTALLATION OF POINSETTIA LANE IMPROVEMENTS rd B'L DEFERRED TO A FUTURE DATE TO COINCIDE WITH ADJACENT OFFSITE EAST AND WEST DEVELOPMENTS. MAJOR ARTERIAL POINSETTIA LANE NOT TO SCALE WATER LATERALS & METER TO BE LOCATED OUTSIDE OF DRIVEWAYS SEWER LATERALS & CLEANOUTS TO BE LOCATED OUTSIDE OF DRIVEWAYS 20' BLDG. SETBACK m 01 <o00 DRAINAGE SWALE PROP. 3' i FROM BLDG. FOR ALL SIDE i SLOPE RETAINING WALLS*SIDEYARD SETBACK 10% OF LOT WIDTH Uj * REQUIRES CITY ENGINEER APPROVAL ** REQUIRES SPECIFIC LOT FOR PAD ELEVA TION TYP. LOT DRAINAGE TYP LATERAL LOCATIONS LOTS 1-73 NOT TO SCALE SIDEYARD SETBACK 10% OF LOT WIDTH REQUIRE DP A/07 J A (ft HENTHORN & ASSOClfltES 5431 Avenida Encinas • Suite J Carlsbad, California 92008 Fax (760) 438-0981 May 1 1998 (760)438-4090 Mr. Mike Grim City of Carlsbad Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009-1576 Subject: Lohf Property, CT 97-15/ZC 97-06/LCPA 97-08/CDP 97-39/HDP 97-19 - City 3rd Submittal Dear Mike: Enclosed is the revised project submittal responding to the City's letter dated April 6, 1998 regarding items deemed necessary to determine the project complete for processing. The enclosed submittal addresses the remaining "completeness" item regarding access to adjacent properties. The project was designed to show feasible access to all adjacent undeveloped properties. Access to the Kevane property and proposed subdivision to the west is accommodated. Access to adjacent undeveloped land from Poinsettia Lane is also shown on the revised Tentative Map. Poinsettia Lane was modified to align the intersection at El Camino Real 100 feet further to south. The northern cul-de-sac in "A" Street was extended and a temporary access driveway added to access the Steiner property. A temporary access driveway is also shown for the Saska property off of proposed Poinsettia Lane. Provisions for access to the parcels to the west are shown. The property to the north is heavily constrained due to environmentally sensitive vegetation. Additional reports will be submitted after review of the revised project design to address project issues. A modified/update to the biological, traffic, soils, hydrology and acoustical reports will be submitted and will include the following: • The biological report update will include analysis and recommended mitigation regarding the oak tree located within the proposed development area and to address Quino Checkerspot butterfly surveys. The Environmental Impact Assessment will also be modified to address the proposed mitigation for the oak tree impacts, as well as, the environmental impacts of offsite improvements. • The update to the traffic report will address the revised project design, as well as, the need for a traffic signal at Poinsettia Lane and Dove Lane. • The update to the soils report will include a letter supporting the proposal to allow less than standard positive drainage around the units. • The update to the hydrology report will include an analysis of the "Q" values and velocity of proposed drainage, as well as, addressing the errosiveness of the natural terrain south and west of this site in the open space area. Additional onsite energy dissipaters and/or check dams can be analyzed to reduce drainage flow velocities. The hydrology addendum will also address proposed project runoff and capacity downstream with regard to run-off down Dove Lane through the existing shopping center and Seaport subdivision to the Batiquitos Lagoon. • The acoustical impact report will be updated to address the current project design and respond to any necessary changes in required noise wall heights and locations and/or any other noise mitigation features. -1- The Inclusionary Housing "off-site credit request package" will be submitted to the Combined Project Review Committee. The city's draft HMP document will be analyzed to determine project compliance. All of the Fire Suppression zones are located within the proposed development area except a small portion of the third zone adjacent to Lot 39. A copy of the City's April 6^ letter is enclosed for your reference. The Engineering Department's plan- check set is not included as it was submitted with the previous submittal. We anticipate working closely with the Planning and Engineering Departments to resolve any outstanding issues with the project. Please call if you have any questions or need any additional information. Thank you. Sincerely, : E. Henthorn encl. cc: File Clyde Wickham, City of Carlsbad, Engineering Department Mr. Scot Sandstrom, Western Pacific Housing Mr. Lex Williman, Hunsaker & Associates Mr. Jack Henthorn, Jack Henthorn & Associates -2- itv of Carlsbad Planning Department March 17, 1998 Mr. Scot Sandstrom Western Pacific Housing Suite 107 2385 Camino Vida Roble Carlsbad CA 92009 SUBJECT: STATUS OF LOHF PROPERTY - CT 97-15/ZC 97-06/LCPA 97- 08/CDP 97-39/HDP 97-16 Dear Scot: The Planning and Engineering Departments have received your submittals in response to application completeness items and issues raised by staff, most recently the submittal received on March 12, 1998. Your incompleteness letter, dated October 16, 1997, states that the City can automatically withdraw an application that has been incomplete for over six months. Since the project involves the alignment of an arterial roadway through sensitive areas and other access issues with adjacent properties, it is understandable that the application has not been deemed complete to date. Staff recognizes your timely efforts in responding to the incompleteness items and issues and it is likely that the most recent submittal will provide the necessary information to deem your application complete. Considering your responsiveness, staff does not intend to automatically withdraw your application at this time. Please feel free to contact me at (760) 438-1161, extension 4499, if you have any questions. Sincerely, MICHAEL GRIl Associate Planner MG:mg File Copy Melissa Allen, Jack Henthorn and Associates 2O75 Las Palmas Dr. • Carlsbad, CA 92OO9-1 576 • (760) 438-1161 • FAX (76O) 438-0894 HENTHORN & ASSOC AES 5431 Avenida Encinas • Suite} Carlsbad, California 92008 Fax (760) 438-0981 March 12, 1998 (760)438-4090 Mr. Mike Grim 1TV f, e ^ ,;;, p, „ ,,, •$City of Carlsbad CITY O, n,,J ,, Planning Department PLANNING DEP1. 2075 Las Palmas Drive Carlsbad, CA 92009-15 76 Subject: Lohf Property, CT 97-15 - City Review Re-Submittal Dear Mike: Enclosed is the revised project submittal responding to the City's letter dated October 16, 1997 regarding items deemed necessary to determine the project complete for processing. Following are the responses to the City's eight listed "completeness" items with corresponding numbers: 1. A preliminary drainage study is provided with hydrology map and calculations. 2. Alignment information is included for Poinsettia Lane. A potential alignment design is shown for Poinsettia Lane as approved previously, as well as the alignment if moved to the south along El Camino Real 100 feet. Horizontal and vertical alignments were included. 3. Mimosa Road is shown extended through to the south to the Pavoreal development pursuant to the City's request. The applicant may, however, propose to offer an alternative with the road closed (yet still providing emergency access) for discussion purposes at the public hearings. 4. A revised plan showing Dove Lane as a collector through to Poinsettia Lane will be submitted shortly, pursuant to discussions between the project and city engineers. 5. Existing and proposed utilities and service lines and connections are shown on the plans. 6. Typical pad elevations were added to the typical lot drainage detail onsheet 1 pursuant to C-3 of the subdivision application package. 7. The distance between all intersections is shown. 8. The required sight distance corridors are shown at all intersections. A copy of the City's letter and the Engineering Department's plan check comments on the plans are attached for reference. We anticipate working closely with planning and engineering to resolve remaining issues in design. Please call if you have any questions or need any additional information. Thank you. Sincerely, Melissa K. Allen encl. cc: File Clyde Wickham, City of Carlsbad, Engineering Department Mr. Scot Sandstrom, Western Pacific Housing C:\WINWORD\OCEANBLF\Letters\City 2nd Submittal Itr.doc -1- JAdiHENTHORN 5431 Avenida Encinas • Suite J Carlsbad, California 92008 Fax (760) 438-0981 (760) 438-4090 February 2, 1998 Mike Grim City of Carlsbad Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009- 1576 Subject: Lohf Property - Revised Site Plan (CT 97-15/ZC 97-06/LCPA 97-08/CDP 97-39/HDP 97-16) Dear Mike: Enclosed is a revised site plan for the Lohf property. The plan was modified with regard to issues identified in the City's letter of October 16, 1997 and subsequent meetings held with the City regarding these issues and their impacts on project design. Some of the design elements provided in this plan include: • Poinsettia Lane shifted to the south about 100 feet to reduce impacts to adjacent parcels (i.e. DeSaska and Steiner properties). See attached Poinsettia Lane - Alignment "B" exhibit. • Eliminated loading of Dove Lane extension to Poinsettia Lane • Both intersections with Poinsettia Lane represent right-in and right-out access only • Dove provides secondary access so Mimosa was eliminated as a through street • A 50' average open space, building setback is proposed adjacent to Poinsettia Lane • This is a standard subdivision with a 7,500 sq. ft. minimum lot size and avg. lot size of 9,450 sq. ft. • The number of units accessed by the internal street system does not exceed cul-de-sac standards • The proposed total site grading is approximately 250,000 cu. yds. cut/fill. The grading for the project design alone is minimal as the majority of grading is associated with the construction of Poinsettia Lane. Recent traffic studies support the proposed project daily trip and peak trip increases in addition to existing traffic levels for the proposed circulation pattern. See attached Traffic Report updates by Darnell and Associates for reference. Please do not hesitate to call if you have questions or need additional information. Sincerely, RECEIVED Melissa K. Allen FEB 0 3 1998 CITY OF CARLSBAD Flle PUNNING DEPT Clyde Wickham, City of Carlsbad, Engineering Department Scot Sandstrom, Western Pacific Housing Lex Williman, Hunsaker & Associates C:\WINWORD\Lohf\Letters\City issues response Itr.doc -1-