Loading...
HomeMy WebLinkAboutCT 98-14; Thompson/Tabata; Tentative Map (CT) (91)12/01/1999 18:10 7604380981 HENTHORN PAGE 02 Jack Memorandum To: MIKE GRIM, PLANNING FROM: MELISSA K.ALLEN SUBJECT: THOMPSON/TABATA DATE: NOVEMBER 23,1999 Following is a discussion regarding storage within the proposed Thomp Two hundred of the project's 24$ square feet in size. At a 25% ratio lots within the side yards. 74 RV ienthorn & Associates 5375 Avenida Enemas, Suhe D Carlsbad, CA 92008 (760) 438-4090 Fax (760) 438-0981 3 DEPARTMENT POINSETTIA PROPERTIES - RV PARKING the provision of onsite recreational vehicle (RV) parking/ on/Tabata single-family detached residential subdivision. residential lots (80%) are proposed at greater than 7,500 or these lots, 50 RV storage spaces would be required on the marking spaces are proposed within this subdivision. These spaces shall be provided in the loffl side yards, accessible from the street and driveway, with a minimum level area of 200 square feet and a minimum width of 10 feet. The RV storage spaces can be accommodated behind the [front yard setback line and screened from view by a fence, wall, or landscaping. Provisions cq staining these restrictions can be included in the covenants, conditions, and restrictions for the ; The remaining 49 PD lots would r not sufficient in size for even 5 spat yards results in 4,800 square-feet c feet. If all of the planned deve! would result in a total of only 2,840 additional 4,560 sq. ft.) is provid d Ordinance, section 21.45.090(k), situating required RV parking spac4> with slop EU ubdivision. suit in a common area requirement of only 980 square feet, es. The additional 24 spaces provided within the project side storage space, thus resulting in an increase of 3,820 square .ent RV parking were provided in a common area oflfsite, it square feet (142 x 20 sq. ft.). A total of 7,400 square feet (an onsite within the PD lots. The Planned Development tjrovides for more flexibility than the Zone 20 Specific Plan in in the residential lots. Based on the proposed provisiom of seventy-four RV parking spaces, which exceed the requirements for 7,500 square-foodand larger lots and the Planned Development square footage requirements, it is requested that fine RV parking requirements be satisfied as shown within the residential lots as designated on the Site Development Plan submitted October 17, 1999. k Page 1 of 1 12/01/1999 18:10 7604380981 HENTHORN PAGE 01 THORN & ASSOClAQs OF TRANSMITTAL To: Mike Grim Of: City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 92009 Phone: 760-438-1161 Fax: 760-438-0894 Date: 12/1/99 RE: Thompson/Tabata Poin FORWARDED BY: Q HAND DELIVERY D U.S. MAIL From: Melissa K. Allen Of: Jack Henthom & Associates 5375 Avenida Encinas, Suite D Carlsbad, CA 92008 Phone: (760) 438-4090 Fax: (760) 438-0981 Time: 5:14 PM ettia Properties Project, CT 98-14 Kl FAX D COURIER Q PRINTER Q PICK-UP Pages/ Description Copies 1 Transmittal 1 RV Parking Justification M ;mo COMMENTS: Sent FYl/use in analyzing project cor planned development subdivisions. Thank you, Melissa © Copies to: File pliance with the recreational vehicle standards and intent within 'lease call if you have any questions or would like to discuss. k