HomeMy WebLinkAboutCT 98-17; Hadley Property; Tentative Map (CT)NOTICE OF COMPLETION
’ /q&&L --fz, s‘c: /J 3-4. y- fc’p
Mail to: State Clearinghouse, 1400 Tenth SiXet, Room 12 1, Sacramento, CA 958 I4 - (9 16) 445-Ofi3
Project Title: Hadlev Property - CT 98-17
Lead Agency: GIN 0 CAIUSBAD Contact Person: Va
Street Address: 2075 I .IS PAT MAS DRIVF Phone:
nLvnch .444
(760) 438-l 161. ext 7
City: CARLSBAD Zip: 92009 County: SAN DIEGO COUNTY
- ----- ------------------------------------------------------------- ---- PROJECT LOCATION;
County: San Dieeo City/Nearest Community: Carlsbad
Cross Streets: Black rail Rd and Poinsw Total Acres: 14.7
ASSeSSOT’S Parcel No. 215080-19-OQ Section: _ Twp _ Range: _ Base:
Within 2 Miles: State Hwy #: U Waterways: Pacific Ocean - Battquitos Lwon
Airports: McCLELLAN/PALOMAR Railways: NCTD Schools: 1
---- ---- --------------------------------------------------------------- DOCUMENT TYPE:
CEQA: 0 NOP Supplement/Subsequent NEPA: 0 NOI OTHER 0 Joint Document
ii
Early Cons E EIR (Prior SCH No.) Cl EA 0 Final Document
Neg Dee 0 Other: Draft EIS Other: 0 0
[7 Draft EIR 0 FONSI
LOCAL ACTION TYPE:
0 General Plan Update 0 Specific Plan
0 General Plan Amendment 0 Master Plan
General Plan Element 0 Planned Unit Development
Community Plan 0 Site Plan
1x1 Rezone 0 Annexation
0 Prezone m Local Coastal Program Amen.
0 Use Permit m Coastal Permit
[xl Land Division, Tract Map @ Other: Hillside Dev. Permit
DEVELOPMENT TYPE:
E
Residential: Units 3
Office: Sq. Ft
Acres 14.7
Acres Employees
Water Facilities:
Transportation:
Type MGD
Tw
0 Commercial: Sq. Ft. Acres Employees C] Mining: Mineral
i
Industrial: Sq. Ft. Acres Employees 0 Power: Type Watts
Educational: 0 Waste Treatment: Twe
0 Recreational: /J Hazardous Water: Tw
0 Other:
-__-_--_--_-----------------a---- PROJECT ISSUES DISCUSSED IN DOCUMENT:
Aesthetic/Visual
Agricultural Land
Air Quality
Archaeological/Historical FY Coastal Zone 0 Drainage/Absorption
Economic/Jobs : Ftscal Cl
Flood Plain/Flooding
Forest Land/Fire Hazard
Geological/Seismic
Minerals
Noise
Population/Hsg. Balance
Public Services/Facilities
Recreation/Parks
---------------------
Schools/Universities
Septic Systems
Sewer Capacity
Soil Erosion/Compaction/Grading
Solid Waste
Toxic/Hazardous
Traffic/Circulation
Vegetation
Water Quality
H,O Supply/Ground Hz0
Wetland/Riparian
Wildlife
Growth Inducing
Land Use
Cumulative Effect
Other:
Present Land Use/Zoning/General Plan Use
Vacant fallow field Limited Control (only agricultural uses permitted) / Residential Low-Medium Density
Project Description:
Proposed Local Coastal Program Amendment and Zone Change to change the land use designation from Limited Control
(L-C) to One-Family Residential, 7,500 square foot lot size minimum (R-1-7,500), with a Qualified Overlay Zone(-Q),
on a 14.7 acre parcel of land. Also proposed is a Tentative tract map to create 38 residential lots and one open space lot,
a Hillside Development Permit, and a Coastal Development Permit.
NOTE: Clearinghouse will assign identification numbers for all new projects. If a SCH number already exists for a project (i.e., from a Notice of
Preparation or previous draft document) please till it in. Revised October I989
Cityofy m - 0 B-0.
MITIGATEDRATION
Project Address/Location: The project site is located adjacent and east of Black Rail Road and 1200
feet south of future Poinsettia Lane, Carlsbad, California, and is
identified by Assessors Parcel Number 2 15080- 19-00.
Project Description: Proposed Local Coastal Program Amendment and Zone Change to
change the land use designation from Limited Control (L-C) to One-
Family Residential, 7,500 square foot lot size minimum (R-1-7,500),
with a Qualified Overlay Zone(-Q), on a 14.7 acre parcel of land. Also
proposed is a Tentative tract map to create 38 residential lots and one
5.45 acre open space lot, a Hillside Development Permit, and a Coastal
Development Permit.
The City of Carlsbad has conducted an environmental review of the above described project
pursuant to the Guidelines for Implementation of the California Environmental Quality Act and
the Environmental Protection Ordinance of the City of Carlsbad. As a result of said review, the
initial study (EIA Part 2) identified potentially significant effects on the environment, but (1)
revisions in the project plans or proposals made by, or agreed to by, the applicant before the
proposed negative declaration and initial study are released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effect on the environment
would occur, and (2) there is no substantial evidence in light of the whole record before the City
that the project “as revised” may have a significant effect on the environment. Therefore, a
Mitigated Negative Declaration is hereby issued for the subject project. Justification for this
action is on file in the Planning Department.
A copy of the Mitigated Negative Declaration with supportive documents is on file in the
Planning Department, 2075 Las Palmas Drive, Carlsbad, California 92009. Comments from the
public are invited. Please submit comments in writing to the Planning Department within 30
days of date of issuance. If you have any questions, please call Van Lynch in the Planning
Department at (760) 438-l 161, extension 4447.
DATED: APRIL 1,1999
CASE NO: ZC 98-lO/ LCPA 98-07/ CT 98-17/ HDP 98-19/ CDP 98-74
CASE NAME: HADLEY PROPERTY
PUBLISH DATE: APRIL 1,1999
2075 La Palmas Dr. l Carlsbad, CA 92009-1576 l (760) 438-l 161 - FAX (760) 438-0894
;
:
.
i
i
i
:
!
t
t
:
,
:
;
:
I
i
E
;
;
I
E
:
f
i
i
:
.
c
;
:
4
:
i
>
.
*
:
i
:
;
.-
ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART II
(TO BE COMPLETED BY THE PLANNING DEPARTMENT)
CASE NO: ZC 98-lo&CPA 98-07/CT 9817/HDP 98-19/GDP 98-74
DATE: March 24. 1999
BACKGROUND
1. CASE NAME: Hadlev Pronertv
2. APPLICANT: Snectrum Communities, L.L.C.
3. ADDRESS AND PHONE NUMBER OF APPLICANT: 15375 Barranca Parkwav, Suite B-21 1 I
h-vine CA 92618 (949) 753-8400
4. DATE EIA FORM PART I SUBMITTED: October 16.1998
5. PROJECT DESCRIPTION: Pronosed Local Coastal Program Amendment and Zone Change to
change the land use designation from Limited Control (L-C) to One-Familv Residential, 7.500
sauare foot lot size minimum (R-1-7.500). with a Oualified Overlay Zone(-0). on a 14.7 acre
parcel of land. Also DroDosed is a Tentative tract man to create 38 residential lots and one onen
snace lot. a Hillside Develonment Permit, and a Coastal Development Permit. The nroiect site is
located adiacent and east of Black Rail Road and 1200 feet south of future Poinsettia Lane and is
identified bv Assessors Parcel Number 2 15-080-l 9-00.
SUMMARY OF ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The summary of environmental factors checked below would be potentially affected by this project,
involving at least one impact that is a “Potentially Significant Impact,” or “Potentially Significant Impact
Unless Mitigation Incorporated” as indicated by the checklist on the following pages.
q Land Use and Planning I8 Transportation/Circulation cl Public Services
El Population and Housing txl Biological Resources El Utilities & Service Systems
0 Geological Problems cl Energy & Mineral Resources cl Aesthetics
El Water lxl Hazards Ix1 Cultural Resources
H Air Quality cl Noise III Recreation
I8 Mandatory Findings of Significance
1 Rev. 03128196
DETERMINATION. -
(To be completed by the Lead Agency)
q
q
q
lzl
q
I find that the proposed project COULD NOT have a significant effect on the
environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because the mitigation
measures described on an attached sheet have been added to the project. A NEGATIVE
DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have significant effect(s) on the environment, but at
least one potentially significant effect 1) has been adequately analyzed in an earlier
document pursuant to applicable legal standards, and 2) has been addressed by mitigation
measures based on the earlier analysis as described on attached sheets. An Mitigated
Negative Declaration is required, but it must analyze only the effects that remain to be
addressed.
I find that although the proposed project could have a significant effect on the
environment, there WILL NOT be a significant effect in this case because all potentially
significant effects (a) have been analyzed adequately in an earlier Master Environmental
Impact Review (MEIR 93-01) pursuant to applicable standards and (b) have been voided
or mitigated pursuant to that earlier Master Environmental Review (MEIR 93-01)
including revisions or mitigation measures that are imposed upon the proposed project.
Therefore, a Notice of Prior Compliance has been prepared.
7
Planner $&nature
3 -w- 99
Date
s/z9 /VI
Planning Direct‘otJs Si& ure Date
2 Rev. 03/28/96
ENVIRONMENTAL IMPACTS -
STATE CEQA GUIDELINES, Chapter 3, Article 5, Section 15063 requires that the City
conduct an Environmental Impact Assessment to determine if a project may have a significant
effect on the environment. The Environmental Impact Assessment appears in the following
pages in the form of a checklist. This checklist identifies any physical, biological and human
factors that might be impacted by the proposed project and provides the City with information to
use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative
Declaration, or to rely on a previously approved EIR or Negative Declaration.
A brief explanation is required for all answers except “No Impact” answers that are
adequately supported by an information source cited in the parentheses following each
question. A “No Impact” answer is adequately supported if the referenced information
sources show that the impact simply does not apply to projects like the one involved. A
“No Impact” answer should be explained when there is no source document to refer to, or
it is based on project-specific factors as well as general standards.
“Less Than Significant Impact” applies where there is supporting evidence that the
potential impact is not adversely significant, and the impact does not exceed adopted
general standards and policies.
“Potentially Significant Unless Mitigation Incorporated” applies where the incorporation
of mitigation measures has reduced an effect from “Potentially Significant Impact” to a
“Less Than Significant Impact.” The developer must agree to the mitigation, and the
City must describe the mitigation measures, and briefly explain how they reduce the
effect to a less than significant level.
“Potentially Significant Impact” is appropriate if there is substantial evidence that an
effect is significant.
Based on an “EIA-Part II”, if a proposed project could have a potentially significant
effect on the environment, but &I potentially significant effects (a) have been analyzed
adequately in an earlier EIR or Mitigated Negative Declaration pursuant to applicable
standards and (b) have been avoided or mitigated pursuant to that earlier EIR or Mitigated
Negative Declaration, including revisions or mitigation measures that are imposed upon
the proposed project, and none of the circumstances requiring a supplement to or
supplemental EIR are present and all the mitigation measures required by the prior
environmental document have been incorporated into this project, then no additional
environmental document is required (Prior Compliance).
When “Potentially Significant Impact” is checked the project is not necessarily required
to prepare an EIR if the significant effect has been analyzed adequately in an earlier EIR
pursuant to applicable standards and the effect will be mitigated, or a “Statement of
Overriding Considerations” has been made pursuant to that earlier EIR.
A Negative Declaration may be prepared if the City perceives no substantial evidence that
the project or any of its aspects may cause a significant effect on the environment.
3 Rev. 03/28/96
0 If there are one or more potentially significant effects, the City may avoid preparing an
EIR if there are mitigation measures to clearly reduce impacts to less than significant, and
those mitigation measures are agreed to by the developer prior to public review. In this
case, the appropriate “Potentially Significant Impact Unless Mitigation Incorporated”
may be checked and a Mitigated Negative Declaration may be prepared.
a An EIR must be prepared if “Potentially Significant Impact” is checked, and including
but not limited to the following circumstances: (1) the potentially significant effect has
not been discussed or mitigated in an Earlier EIR pursuant to applicable standards, and
the developer does not agree to mitigation measures that reduce the impact to less than
significant; (2) a “Statement of Overriding Considerations” for the significant impact has
not been made pursuant to an earlier EIR; (3) proposed mitigation measures do not reduce
the impact to less than significant, or; (4) through the E&Part II analysis it is not
possible to determine the level of significance for a potentially adverse effect, or
determine the effectiveness of a mitigation measure in reducing a potentially significant
effect to below a level of significance.
A discussion of potential impacts and the proposed mitigation measures appears at the end of the
form under DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention
should be given to discussing mitigation for impacts which would otherwise be determined
significant.
Rev. 03/28/96
Issues (and Supporting Information Sources).
I.
a>
b)
c>
4
4
II.
a>
b)
c)
III.
4
b)
c)
4
e)
f,
g)
h)
9
IV.
LAND USE AND PLANNING. Would the proposal:.
Conflict with general plan designation or zoning?
(Source #l(s): (#l:Pgs 5.6-l - 5.6-18; #2: Pgs III-74 - III
- 87)
Conflict with applicable environmental plans or
policies adopted by agencies with jurisdiction over the
project? (#l:Pgs 5.6-l - 5.6-18; #2: Pgs III-74 - III -87)
Be incompatible with existing land use in the vicinity?
(#l:Pgs 5.6-l - 5.6-18; #2: Pgs III -74 - III -87)
Affect agricultural resources or operations (e.g. impacts
to soils or farmlands, or impacts from incompatible
land uses)? (#l: Pgs 5.6-l - 5.6-18; #2: Pgs III-74 - III -
87) Disrupt or divide the physical arrangement of an
established community (including a low-income or
minority community)? (#l:Pgs 5.6-l - 5.6-18; #2: III -
74 - III -87)
POPULATION AND HOUSING. Would the proposal:
Cumulatively exceed official regional or local
population projections? (#l:Pgs 5.5-l - 5.5-6; #2: IV-l)
Induce substantial growth in an area either directly or
indirectly (e.g. through projects in an undeveloped area
or extension of major infrastructure)? (#l:Pgs 5.5-l -
5.5-6; #2: IV-l)
Displace existing housing, especially affordable
housing? (#l:Pgs 5.5-l - 5.5-6)
GEOLOGIC PROBLEMS. Would the proposal result
in or expose people to potential impacts involving:
Fault rupture? (#l:Pgs 5.1-1 - 5.1-15; #2: Pgs III-112 -
111-118; #4)
Seismic ground shaking? (#l:Pgs 5.1-1 - 5.1-15; #2:
Pgs III-1 12 - III-I 18; #4)
Seismic ground failure, including liquefaction?
((#l:Pgs 5.1-1 - 5.1.15; #2: Pgs III-112 - 111-118; #4)
Seiche, tsunami, or volcanic hazard? (#l :Pgs 5. l- 1 -
5.1-15;#2: Pgs 111-l 12 - 111-118; #4)
Landslides or mudflows? (#l:Pgs 5.1-1 - 5.1-15; #2:
Pgs 111-l 12 - 111-l 18; #4)
Erosion, changes in topography or unstable soil
conditions from excavation, grading, or fill? (#l :Pgs
5.1-l - 5.1-15; #2: Pgs III-112 - III -118; ##4)
Subsidence of the land? (#l:Pgs 5.1-1 - 5.1-15; #2: Pgs
111-l 12 - 111-l 18; ##4)
Expansive soils? (#l:Pgs 5.1-1 - 5.1-15; #2: Pgs III-112
- III -118; #4)
Unique geologic or physical features? (#l :Pgs 5. l-l -
5.1-15; #2:Pgs III -112 - III -118; #4)
WATER. Would the proposal result in:
Potentially Significant
impact
0
q
Cl
Ll
cl
0
cl
q
cl
cl
q
0
q
cl
cl
cl
0
Potentially
Significant Unless
Mitigation Incorporated
lzl
0
0,
0
III
0
cl
El
El
0
cl
0
cl
El
Cl
cl
cl
Less Than Significant
Impact
El
q
El
III
cl
cl
0
cl
q
0
cl
q
q
q
q
q
0
No Impact
IXI
lxl
151
lxl
lzl
lxl
Ix1
lz.l
El
IXI
lzl
151
lxl
lxl
IXI
IXI
ISI
5 Rev. 03128196
Issues (and Supporting Info&on Sources).
a)
b)
c>
4
e)
f)
8)
h)
0
v.
4
b)
c)
4
VI.
4
b)
c)
4
e)
f,
g)
Changes in absorption rates, drainage patterns, or the
rate and amount of surface runoff7 (#l:Pgs 5.2-l - 5.2-
11; #6)
Exposure of people or property to water related hazards
such as flooding? ((#l:Pgs 5.2-l - 5.2-11; #6)
Discharge into surface waters or other alteration of
surface water quality (e.g. temperature, dissolved
oxygen or turbidity)? ((#l:Pgs 5.2-l - 5.2-l 1; #6)
Changes in the amount of surface water in any water
body? ((#l:Pgs 5.2-l - 5.2-l 1; #6)
Changes in currents, or the course or direction of water
movements? ((#l:Pgs 5.2-l - 5.2-11; #6)
Changes in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations or
through substantial loss of groundwater recharge
capability? ((#l:Pgs 5.2-l - 5.2-l 1; #6)
Altered direction or rate of flow of groundwater?
((#l:Pgs 5.2-l - 5.2-l 1; #6)
Impacts to grotmdwater quality? ((#l :Pgs 5.2-1 - 5. 2-
11; #6)
Substantial reduction in the amount of groundwater
otherwise available for public water supplies? (# 1 :Pgs
5.2-l - 5.2-l 1)
Potentially
Significant Impact
cl
Cl
0
q
cl
cl
Potentially Significant
Unless Mitigation Incorporated q
AIR QUALITY. Would the proposal:
Violate any air quality standard or contribute to an
existing or projected air quality violation? (#l:Pgs 5.3-
1 - 5.3-12; #2: Pgs 28-36)
Expose sensitive receptors to pollutants? (#l:Pgs 5.3-l
- 5.3-12; #2: Pgs 28-36)
Alter air movement, moisture, or temperature, or cause
any change in climate? (#l:Pgs 5.3-l - 5.3-12; #2: Pgs
28-36)
Create objectionable odors? (#l:Pgs 5.3-l - 5.3-12; #2:
Pgs 28-36)
TRANSPORTATION/CIRCULATION. Would the
proposal result in:
Increased vehicle trips or traffic congestion? (#l:Pgs
5.7-l - 5.7.22; #2: Pgs III-58 - 111-69)
Hazards to safety from design features (e.g. sharp
curves or dangerous intersections) or incompatible uses
(e.g. farm equipment)? (#l:Pgs 5.7-l - 5.7.22; #2: Pgs
III-58 - 111-69)
Inadequate emergency access or access to nearby uses?
(#l:Pgs 5.7-l - 5.7.22; #2: Pgs III-58 - 111-69)
Insufficient parking capacity on-site or off-site?
(#l:Pgs 5.7-l - 5.7.22; #2: Pgs III-58 - 111-69)
Hazards or barriers for pedestrians or bicyclists?
(#l:Pgs 5.7-l - 5.7.22; #2: Pgs III-58 - 111-69)
Conflicts with adopted policies supporting alternative
transportation (e.g. bus turnouts, bicycle racks)?
(#l:Pgs 5.7-l - 5.7.22; #2: Pgs III-58 - 111-69)
Rail, waterborne or air traffic impacts? (#l:Pgs 5.7-l -
5.7.22; #2: Pgs III-58 - 111-69)
0
Cl
cl
lzl
q
El
El
Ix1
q
q
cl
cl
0
q
El
0
cl
cl
cl
0
a
q
El
q
0
0
0
cl
q
El
I7
0
q
Less Than Significant
Impact
q
0
cl
q
q
q
0
cl
cl
0
q
El
0
El
cl
q
cl
0
0
cl
lxl
Ix]
El
lxl
lxl
lzl
Ix1
IZJ
lxl
0
Ix1
lxl
txl
q
lxl
El
IXI
ixl
lxl
IXI
6 Rev. 03128196
No
Impact
Issues (and Supporting Information Sources).
VII. BIOLOGICAL RESOURCES. Would the proposal
result in impacts to:
a) Endangered, threatened or rare species or their habitats
(including but not limited to plants, fish, insects,
animals, and birds)? (#l:Pgs 5.4-l - 5.4-24; #2: Pgs
III-37 - 111-57; #3)
b) Locally designated species (e.g. heritage trees)?
(#l:Pgs 5.4-l - 5.4-24; #2: Pgs III-37 - III-57; #3)
c) Locally designated natural communities (e.g. oak
forest, coastal habitat, etc.)? (#l:Pgs 5.4-l - 5.4-24; #2:
Pgs III-37 - 111-57; #3)
d) Wetland habitat (e.g. marsh, riparian and vernal pool)?
(#l:Pgs 5.4-l - 5.4-24; #2: Pgs III-37 - III-58; #3)
e) Wildlife dispersal or migration corridors? (#l:Pgs 5.4-l
- 5.4-24; #2: Pgs III-37 - 111-57; #3)
VIII. ENERGY AND MINERAL RESOURCES. Would the
proposal?
a) Conflict with adopted energy conservation plans?
(#l:Pgs 5.12.1-1 - 5.12.1-5 & 5.13-1 - 5.13-9)
b) Use non-renewable resources in a wasteful and
inefficient manner? (#l:Pgs 5.12.1-1 -5.12.1-5 & 5.13-
1 - 5.13-9)
c) Result in the loss of availability of a known mineral
resource that would be of future value to the region and
the residents of the State? (#l:Pgs 5.12.1-1 - 5.12.1-5
& 5.13-1 - 5.13-9)
IX. HAZARDS. Would the proposal involve:
a) A risk of accidental explosion or release of hazardous
substances (including, but not limited to: oil, pesticides,
chemicals or radiation)? (#l:Pgs 5.10.1-l - 5.10.1-5)
b) Possible interference with an emergency response plan
or emergency evacuation plan? (#l :Pgs 5.10. l- 1 -
5.10.1-5)
c) The creation of any health hazard or potential health
hazards? (#l:Pgs 5.10.1-l - 5.10.1-5; #2: Pgs III-97 -
III- 105; #5)
d) Exposure of people to existing sources of potential
health hazards? (#l:Pgs 5.10.1-l - 5.10.1-5; #2: Pgs
III-97 - 111-l 05; #5)
e) Increase fire hazard in areas with flammable brush,
grass, or trees? (#l:Pgs 5.10.1-l - 5.10.1-5)
x. NOISE. Would the proposal result in:
a) Increases in existing noise levels? (#l:Pgs 5.9-l - 5.9-
15; #2: Pgs III-88 - 111-96)
b) Exposure of people to severe noise levels? (#l :Pgs 5.9-
1 - 5.9-15; #2: Pgs III-88 - 111-96)
Potentially Potentially Less Than No Significant Significak Significant Impact Impact Unless Impact Mitigation
Incorporated
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
ixl
q
lxl
q
Kl
q
q
q
q
q
Ix1
lxl
q
q
q
q q
q lxl
q cl
q lxl
q q
q IXI
q lxl
q IXI
q Ix1
q El
q q
q cl
q Ix)
q Ix1
q II4
XI. PUBLIC SERVICES. Would the proposal have an
effect upon, or result in a need for new or altered
government services in any of the following areas:
7 Rev. 03/28/96
Issues (and Supporting Inforrna%n Sources).
4
b)
c>
d)
4
XII.
a)
b)
c>
4
e)
f-l
EC)
XIII.
4
b)
c)
XIV.
4
b)
c)
4
e)
xv.
4
b)
Fire protection? (#l:Pgs 5.12.5-1 - 5.12.5-6)
Police protection? (#l:Pgs 5.12.6-1 - 5.12.6-4)
Schools? (#l:Pgs 5.12.7.1 - 5.12.7-5)
Maintenance of public facilities, including roads? (#I,
pgs 5.12.1-1 - 5.12.8-7)
Other governmental services? (#l:Pgs 5.12.1-l -
5.12.8-7)
UTILITIES AND SERVICES SYSTEMS. Would the
proposal result in a need for new systems or supplies,
or substantial alterations to the following utilities:
Power or natural gas? (#l:Pgs 5.12.1-1 - 5.12.1-5 &
5.13-1 - 5.13-9)
Communications systems? (#l; pgs 5.12.1-1 - 5.12.8-7)
Local or regional water treatment or distribution
facilities? (#l:Pgs 5.12.2-1 - 5.12.3-7)
Sewer or septic tanks? (#l:Pgs 5.12.3-1 - 5.12.3-7)
Storm water drainage? (#l:Pg 5.2-8)
Solid waste disposal? (#l:Pgs 5.12.4-1 - 5.12.4-3)
Local or regional water supplies? (#l:Pgs 5.12.2-1 -
5.12.3-7)
AESTHETICS. Would the proposal:
Affect a scenic or vista or scenic highway? (#l:Pgs
5.11-l - 5.11-5; #2: Pgs III-119 - 111-151)
Have a demonstrate negative aesthetic effect? (#l:Pgs
5.11-1 - 5.11-5; #2: Pgs III-119 - 111-151)
Create light or glare? (#l:Pgs 5.11-1 - 5.11-5; #2: Pgs
111-l 19 - 111-151)
CULTURAL RESOURCES. Would the proposal:
Disturb paleontological resources? (#l:Pgs 5.8-l - 5.8-
10; #2: Pgs III-106 - 111-107)
Disturb archaeological resources? (#l:Pgs 5.8-l - 5.8-
10; #2: Pgs III-70 - 111-73, #7, #8)
Affect historical resources? (#l:Pgs 5.8-l - 5.8-10; #2:
Pgs III-70 - 111-73)
Have the potential to cause a physical change which
would affect unique ethnic cultural values? (#l:Pgs
5.8-l - 5.8-10; #2: Pgs III-70 - 111-73)
Restrict existing religious or sacred uses within the
potential impact area? (#l:Pgs 5.8-l - 5.8-10; #2: Pgs
III-70 - 111-73)
RECREATIONAL. Would the proposal:
Increase the demand for neighborhood or regional
parks or other recreational facilities? (#l:Pgs 5.12.8-1 -
5.12.8-7)
Affect existing recreational opportunities? (# 1 :Pgs
5.12.8-l - 5.12.8-7)
8
Potentially
Significant Impact
cl q q q
q
q
q q
q 0. q q
q
q
q
17
q
q
q
q
q
q
Potentially
Significant Unless
Mitigation Incorporated q 0 q q
q
q
q q
q q 0 q
q
q
0
IXI
El
q
q
q
q
q
Less Than Significant
Impact
n q q q
q
cl
q q
q q q q
q
q
q
El
q
q
q
q
q
q
No
Impact
(x1
El
Is1
IXI
lxl
Ix1
lxl
ISI
El
lxl
ISI
ixI
lxl
IXI
Ix1
0
q
El
lxl
lxl
El
IXI
Rev. 03128196
Issues (and Supporting Information Sources).
XVI. MANDATORY FINDINGS OF SIGNIFICANCE.
a) Does the project have the potential to degrade the
quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or
wildlife population to drop below self-sustaining levels,
threaten to eliminate a plant or animal community,
reduce the number or restrict the range of a rare or
endangered plant or animal or eliminate important
examples of the major periods of California history or
prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable?
(“Cumulatively considerable” means that the
incremental effects of a project are considerable when
viewed in connection with the effects of past projects,
the effects of other current projects, and the effects of
probable future projects)?
c) Does the project have environmental effects which will
cause the substantial adverse effects on human beings,
either directly or>indirectly?
Potentially Significant
Impact
q
w
q
Potentially Less Than No Significant Significant Impact Unless Impact
Mitigation
Incorporated
lxl q q
q El q
lxl q q
XVII. EARLIER ANALYSES.
Earlier analysis of this proposed single family residential project has been completed through
the General Plan Update (GPA 94-01) and related Master Environmental Impact Report (MEIR
93-01). The MEIR is cited as source #l in the preceding checklist. This proposal is consistent
with the applicable portions of the General Plan and is considered a project that was described in
MEIR 93-01 as within its scope. All feasible mitigation measures identified in MEIR 93-01
which are appropriate to the project have been incorporated into this project.
The project site is located in an area which is subject to the requirements of the Zone 20 Specific
Plan approved by the City Council in 1994. A program EIR was certified for the Zone 20
Specific Plan. The Zone 20 Program EIR identified, analyzed, and recommended mitigation to
reduce potentially significant impacts to insignificant levels. The Zone 20 Program EIR (PEIR)
analyzed potential impacts to agriculture, air quality, biology, circulation, land use, noise,
pesticide residue, paleontology, public facilities financing, soils/geology, and visual aesthetics
that could result from the development of the Specific Plan area. The Program EIR is intended to
be used in the review of subsequent projects within Zone 20. The project incorporates the
required Zone 20 Program EIR mitigation measures, and through the analysis of the required
additional biological, geotechnical, hydrology, and noise analysis a determination has been made
that no additional significant impacts beyond those identified and mitigated by the Program EIR
will result from this project. The following environmental evaluation briefly explains the basis
for this determination along with identifying the source documents which support the
environmental determination. The Zone 20 Program EIR and additional technical studies are
cited as source documents for this environmental evaluation.
Rev. 03128196
-
DISCUSSION OF ENVIRONMENTAL EVALUATION
I. PROJECT DESCRIPTION/ENVIRONMENTAL SETTING
The project site is 14.7 acres in size and is located on the east side of Black Rail Road and 1,200
feet south of future Poinsettia Lane. The project consist of 38 single-family lots with a minimum
lot area of 7,500 square feet and a 5.45 acre open space lot. The site contains southern mixed
chaparral, southern coast live oak riparian forest, and disturbed or agricultural habitats. The
topography onsite consists of flat terrain in the western portion that slopes relatively steeply into
a canyon in the eastern portion of the property. Elevations range from a low in the canyon in the
eastern portion of approximately 290 feet above mean sea level (AMSL) to the highest point in
the western portion of approximately 375 feet AMSL.
The entire 14.7 site is designated as Residential Low-Medium Density (RLM O-4 DU/AC) on the
General Plan Land Use Map. The project site is zoned Limited Control (L-C). A zone change and
local coastal program amendment are proposed to designate the site as One-Family Residential,
7,500 square foot minimum lot size, Qualified Development Overlay Zone (R-l-Q) to
correspond to the existing general plan land use designations. An irrevocable offer of dedication
will be required over the open space lot. In addition to approval of the tentative map application,
a hillside development permit and coastal development permit are being requested.
II. ENVIRONMENTAL ANALYSIS
A. Environmental Impact Discussion
V. a) Air Quality
The implementation of projects that are consistent with and included in the updated 1994 General
Plan will result in increased gas and electric power consumption and vehicle miles traveled.
These subsequently result in increases in the emission of carbon monoxide, reactive organic
gases, oxides of nitrogen and sulfur, and suspended particulates. These aerosols are the major
contributors to air pollution in the City as well as in the San Diego Air Basin. Since the San
Diego Air Basin is a “non-attainment basin”, any additional air emissions are considered
cumulatively significant: therefore, continued development to buildout as proposed in the
updated General Plan will have cumulative significant impacts on the air quality of the region.
To lessen or minimize the impact on air quality associated with General Plan buildout, a variety
of mitigation measures are recommended in the Final Master EIR. These include: 1) provisions
for roadway and intersection improvements prior to or concurrent with development; 2)
measures to reduce vehicle trips through the implementation of Congestion and Transportation
Demand Management; 3) provisions to encourage alternative modes of transportation including
mass transit services; 4) conditions to promote energy efficient building and site design; and 5)
participation in regional growth management strategies when adopted. The applicable and
appropriate General Plan air quality mitigation measures have either been incorporated into the
design of the project or are included as conditions of project approval.
Operation-related emissions are considered cumulatively significant because the project is
located within a “non-attainment basin”, therefore, the “Initial Study” checklist is marked
10 Rev. 03/28/96
“Potentially Significant Impact”. This project is consistent with the General Plan, therefore, the
preparation of an EIR is not required because the certification of Final Master EIR 93-01, by City
Council Resolution No. 94-246, included a “Statement Of Overriding Considerations” for air
quality impacts. This “Statement Of Overriding Considerations” applies to all projects within
the scope of the General Plan’s Final Master EIR, including this project, therefore, no further
environmental review of air quality impacts is required. This document is available at the
Planning Department.
VI. a) Transportation/Circulation
The implementation of projects that fall within the scope of and are included in the updated 1994
General Plan will result in increased traffic volumes. Roadway segments will be adequate to
accommodate buildout traffic; however, 12 full and 2 partial intersections will be severely
impacted by regional through-traffic over which the City has no jurisdictional control. These
generally include all freeway interchange areas and major intersections along Carlsbad
Boulevard. Even with the implementation of roadway improvements, a number of intersections
are projected to fail the City’s adopted Growth Management performance standards at buildout.
To lessen or minimize the impact on circulation associated with General Plan buildout, numerous
mitigation measures have been recommended in the Final Master EIR. These include measures
to ensure the provision of circulation facilities concurrent with need; 2) provisions to develop
alternative modes of transportation such as trails, bicycle routes, additional sidewalks, pedestrian
linkages, and commuter rail systems; and 3) participation in regional circulation strategies when
adopted. The diversion of regional through-traffic from a failing Interstate or State Highway
onto City streets creates impacts that are not within the jurisdiction of the City to control. The
applicable and appropriate General Plan circulation mitigation measures have either been
incorporated into the design of the project or are included as conditions of project approval. The
project will generate 380 average daily trips. Conditions of project approval will include
constructing a portion of Black Rail Road along the project frontage.
Regional related circulation impacts are considered cumulatively significant because of the
failure of intersections at buildout of the General Plan due to regional through-traffic, therefore,
the “Initial Study” checklist is marked “Potentially Significant Impact”. This project is
consistent with the General Plan, therefore, the preparation of an EIR is not required because the
recent certification of Final Master EIR 93-01, by City Council Resolution No. 94-246, included
a “Statement Of Overriding Considerations” for circulation impacts. This “Statement Of
Overriding Considerations” applies to all projects that fall within the scope of the General Plan’s
Master EIR, including this project, therefore, no further environmental review of circulation
impacts is required.
The City has received its annual Growth Management Traffic Monitoring Report. The Report
has recorded an unanticipated intersection “level of service” (LOS) failure at Palomar Airport
Road (PAR) and El Camino Real (ECR) during both the a.m. and p.m. peak hours. This
potentially creates a changed circumstance negating reliance on previous environmental
documentation. Pursuant to $15162 of the CEQA Guidelines a lead agency must prepare a
“Subsequent” environmental documentation if substantial evidence (i.e., the recorded
intersection failure) determines that a changed circumstance exists. However, case law has
interpreted this section of the CEQA Guidelines to not require the preparation of a “Subsequent
EIR” if mitigation measures are adopted which reduce the identified impacts to a level of
insignificance.
11 Rev. 03/28/96
A mitigation measure hasxeen identified which, if implemented, ~$1 bring the peak hours LOS
into the acceptable range. The mitigation measure involves construction of two dual right turn
lanes-northbound to eastbound and westbound to northbound. This project has been
conditioned to pay its fair share of the intersection “short-term improvements” thereby,
guaranteeing mitigation to a level of insignificance.
VII. a,c.&d) Biological Resources
The Zone 20 Program EIR identified the mitigation requirement that future site specific
biological survey studies that focus on the impacts created by individual subsequent development
projects be prepared. The additional biological studies are required to consider the baseline data
and biological open space recommendations of the Zone 20 Program EIR and provide more
detailed and current resource surveys. The site specific biological survey is required to identify
mitigation for any project specific impacts.
A report titled, “Biological Resources Report and Impact Analysis for the Hadley Property, City
of Carlsbad, San Diego County, California,” dated September 21, 1998 by Dudek & Associates
has been prepared for the project.
The biology report for the Hadley property determined that implementation of the project would
result in the direct loss of 10.12 acres, including impacts to the following habitat types:
W 0.0 acre of coastal sage scrub - less than significant
W 0.32 acre of southern maritime chaparral - significant
n 9.8 acres of agricultural land - less than significant
In general, the proposed plan results in the preservation of 4.58 acres (31 percent of project), 3.7
acres of which are native habitats, in natural open space, including 100 percent of coast live oak
riparian forest, and 92 percent (3.68 acres) of southern maritime chaparral. The location and
configuration of the open space land is conducive to long-term viability as it is a single, large,
concentrated block of habitat adjacent to off-site natural habitat. No impacts would occur to
sensitive animal species.
Indirect impacts may result in the reduction of the carrying capacity of the native habitats,
however, the patch of habitat onsite is connected to additional habitat offsite. These indirect
impacts are considered less than significant.
The following onsite impacts associated with implementation of the proposed development plan
are considered significant: 4 Loss of 0.32 acre of southern maritime chaparral.
Although the project results in the loss of 0.32 acre of southern maritime chaparral, the project
contributes to the preservation of resources and the ultimate development of the subregional
preserve system by contributing open space, a total of 4.58 acres of predominately native
habitats.
The Hadley property is located within Core Area 6 of the Carlsbad Draft I-IMP which has been
designated for 50 to 60 percent preservation by the MHCP and is subject to the project level
conservation requirements outlined within the Carlsbad HMP. On a overall project-level basis,
12 Rev. 03/28/96
the property is proposed to receive 31 percent preservation, with the native habitats onsite
proposed to receive approximately 92 percent preservation which far exceeds the goals set by the
MHCP. The proposed project meets the project-level conservation requirements outlined by the
Draft Carlsbad HMP: the project does not preclude the functioning of preserve linkages due to
the preserve design; over 50 percent of the southern maritime chaparral is preserved; there is no
net loss of the coast live oak riparian forest habitat or coastal sage scrub; the project has been
designed to avoid and minimize impacts to sensitive habitats and species. Thus, the proposed
project is consistent with the Draft Carlsbad HMP.
Mitigation Measures
The project design mitigates direct impacts to southern maritime chaparral and the sensitive plant
species that occur within this habitat. Included in the project design is the granting of an
irrevocable offer of dedication to the City of Carlsbad or an acceptable entity for an open
space/conservation easement over Lot Number 39 of the tentative map. This covers over 92
percent (3.68 acres) of the southern maritime chaparral on the Hadley property. This is greater
than the 2: 1 mitigation ratio that is typically required by the resource agencies for the impact of
southern maritime chaparral. The open space easement also includes the preservation of 100
percent of the wart-stemmed ceanothus, and Nuttall’s scrub oak occurring onsite. In addition,
the following mitigation measures will be implemented:
To mitigate potential disturbances to the California gnatcatcher, the grading operations within
100 feet of the proposed open space area will be restricted during the gnatcatcher breeding
season, or from February 15 to August 30 each year, unless it can be shown through field
reconnaissance by a certified biologist that no gnatcatchers are present on the property for two
months prior to the start of grading.
The Developer shall establish a homeowner’s association and corresponding covenants,
conditions and restrictions. Said CC&Rs shall be submitted to and approved by the Planning
Director prior to final map approval. Prior to issuance of a building permit the Developer shall
provide the Planning Department with a recorded copy of the official CC&Rs that have been
approved by the Department of Real Estate and the Planning Director. At a minimum, the
CC&Rs shall contain the following provision:
A. The CC&Rs shall include provisions specifying maintenance responsibility for
Open Space Lot 39. The CC&Rs shall stipulate that within the boundaries of the
HOA open space easement, structures or any other thing not shown on the
approved tentative map or landscape plans shall be prohibited.
The Developer shall dedicate to the Homeowner’s Association on the final map, an open space
maintenance easement over Lot 39 identified on the tentative map to enable maintenance
activities within the easement area including but not limited to, landscaping and irrigation
in accordance with the approved tentative map and landscape plans, removal of debris and
trash, minimal fire suppression thinning, and erosion prevention and remediation. A note
to this effect shall be placed on the non-mapping data sheet of the final map.
Removal of native vegetation and development of Open Space Lot 39, including but not limited
to fences, walls, decks, storage buildings, pools, spas, stairways and landscaping, other than that
approved as part of the grading plan, improvement plans, landscape plan, etc. as shown on the
project exhibits, is specifically prohibited, except upon written order of the Carlsbad Fire
Department for fire prevention purposes, or upon written approval of the Planning Director,
13
A_,
based upon a request f%m the Homeowners Association accompanied by a report from a
qualified arboristiotanist indicating the need to remove specified trees and/or plants because of
disease or impending danger to adjacent habitable dwelling units. For areas containing native
vegetation the report required to accompany the request shall be prepared by a qualified
biologist.
IX. c) and d) Hazards
Agricultural chemicals have previously been used on the site according to the Zone 20 Program
EIR. Because of this prior use there is the potential for soil contamination resulting from the
varying degrees of degradation, prevalence in the environment, and toxicity of the agricultural
chemicals which may have been used. The following mitigation measures shall be implemented
to lessen this potential impact to a level of less than significant as required by the Zone 20
Program EIR:
1) Prior to approval of the final map or grading plan a detailed soils testing and analysis
report shall be prepared by a registered soils engineer, and submitted to the City Planning
and Engineering Departments as well as the County Department of Environmental Health
for review and approval. This report shall evaluate the potential for soil contamination
on-site due to historic use, handling, or storage of restricted agricultural chemicals. The
report shall also identify a range of possible mitigation measures to remediate any
potentially significant public health impacts if hazardous chemicals are detected at high
concentrations in the soil. Such mitigation measures shall include, at a minimum:
A. Remove any contaminated soils and haul to a State-certified landfill.
B. Cap the area of soil contamination with materials appropriate for the
containment of the specific type of chemical, taking into account its rate of
absorption and toxicity level.
C. Place the area of soil contamination in an open space easement, with
restrictions on future construction of permanent buildings and human uses.
Fencing and warning signs shall also be installed, where appropriate,
prohibiting potential use of the site.
2) The applicant shall notify, in a manner satisfactory to the City Attorney, all tenants/users
of new development that these areas are subject to dust, pesticides, and odors associated
with adjacent agricultural operations, and that the tenants/users occupy these areas at their
own risk. .
X. b) Noise
All projects located within 500 feet of existing/future Poinsettia Lane or within the
McClellan-Palomar Airport Influence Area are required to analyze the projected noise
impacts. Because the property is approximately 1200 feet south of future Poinsettia Lane
and located south of the McClellan-Palomar Airport Influence Area, a noise study was
not prepared for the project. The property is within a three-mile radius of the airport.
14 Rev. 03/28/96
The following noise mitigation measures are required for the project:
1) Prior to the recordation of the first final tract map or the issuance of building permits,
whichever occurs first, the Developer shall prepare and record a Notice that this property
is subject to overflight, sight and sound of aircraft operating from McClellan-Palomar
Airport, in a form meeting the approval of the Planning Director and the City Attorney
(see Noise Form #2 on file in the Planning Department).
XIV. a) Cultural Resources - Paleontology
According to the Zone 20 Program EIR the geologic formations present within the Zone 20
Specific Plan Area have the potential to contain significant fossils. There is a high potential for
the discovery of fossils during future grading and construction activities. The following
mitigation measures shall be implemented during future grading of the site to reduce potentially
significant impacts on the region’s paleontological resources to an acceptable level:
A. Prior to any grading of the project site, a paleontologist shall be retained to
perform a walkover survey of the site and to review the grading plans to
determine if the proposed grading will impact fossil resources. A copy of the
paleontologist’s report shall be provided to the Planning Director prior to issuance
of a grading permit;
B. A qualified paleontologist shall be retained to perform periodic inspections of the
site and to salvage exposed fossils. Due to the small nature of some of the fossils
present in the geologic strata, it may be necessary to collect matrix samples for
laboratory processing through fine screens. The paleontologist shall make
periodic reports to the Planning Director during the grading process;
C. The paleontologist shall be allowed to divert or direct grading in the area of an
exposed fossil in order to facilitate evaluation and, if necessary, salvage artifacts;
D. All fossils collected shall be donated to a public, non-profit institution with a
research interest in the materials, such as the San Diego Natural History Museum;
E. Any conflicts regarding the role of the paleontologist and the grading activities of
the project shall be resolved by the Planning Director and City Engineer.
b) Cultural Resources - Archaeology
The Zone 20 EIR identifies a portion of a level 3 (potentially significant) cultural resource site on
the property which warrants a preliminary significance evaluation to be conducted by a qualified
archeologist. The test excavations conducted on March 19, 1999 found that the site contains a
limited range of artifacts/ecofacts and is in an area of shallow soils that have been extensively
disturbed by agricultural activities. The site tested has been determined to be not important (as
defined by CEQA). There is a potential for the discovery of artifacts during future grading
activities and the archaeological report recommends the monitoring of the site during grading
activities.
The following mitigation measures shall be implemented ‘prior to future grading of the site to
reduce potentially significant impacts on the archaeological resources to an acceptable level:
15 Rev. 03128196
A. A qualified archaeologist shall be retained to perform inspections of the site during the
clearing and initial stages of grading to review any exposed deposits and to determine
there significance. The archaeologist shall make periodic reports to the Planning Director
during the grading process.
III. EARLIER ANALYSES USED
The following documents were used in the analysis of this project and are on file in the City of
Carlsbad Planning Department located at 2075 Las Palmas Drive, Carlsbad, California, 92009,
(760) 438- 116 1, extension 4447.
1.
2.
3.
4.
5.
6.
7.
8.
“Final Master Environmental Impact Report for the City of Carlsbad General Plan
Update” (MEIR 93-Ol), dated March 1994, City of Carlsbad Planning Department.
“Final Program Environmental Impact Report for the Zone 20 Specific Plan” (EIR 90-
03), dated June 1992, Brian F. Mooney Associates.
“Biological Resources Report and Impact Analysis for the Hadley Property, City of
Carlsbad, San Diego County, California”, dated September 21, 1998, Dudek &
Associates, Inc.
“Geotechnical Reconnaissance, Hadley Property, City of Carlsbad, California” (W. 0.
2541 -A-SC), dated September 10, 1998, GeoSoils, Inc.
“Phase I Environmental Site Assessment, Hadley Property, City of Carlsbad, San Diego
County, California” (W. 0. E2541-SC), dated October 6, 1998, GeoSoils, Inc.
“Hydrology Study for Hadley Property in the City of Carlsbad” (W.O. 2239-01)
September 16, 1998, Hunsaker & Associates, Inc.
“Cultural Resources and Elevation of the Hadley and Carnation Properties in the City of
Carlsbad, San Diego County, California”, December 1998, RMW Paleo Associates.
“Letter Report of Archaeological Test Excavations on CA-SDI-6819”, Carlsbad San
Diego County, California, March 23, 1999, RMW Paleo Associates.
16 Rev. 03/28/96
LIST OF MITIGATING @ASU-RES (IF APPLICABLE\ -
1. The project design mitigates direct impacts to southern maritime chaparral and the
sensitive plant species that occur within this habitat. Included in the project design is the
granting of an irrevocable offer of dedication to the City of Carlsbad or an acceptable
entity for an open space/conservation easement over Lot Number 39 of the tentative map.
This covers over 92 percent (3.68 acres) of the southern maritime chaparral on the Hadley
property. This is greater than the 2:l mitigation ratio that is typically required by the
resource agencies for the impact of southern maritime chaparral. The open space easement also includes the preservation of 100 percent of the wart-stemmed ceanothus,
and Nuttall’s scrub oak occurring onsite.
2. The Hadley project includes in the project design the granting of an irrevocable offer of
dedication for an open space easement over 92 percent (3.68 acres) of the southern
maritime chaparral on the property. The onsite impact to southern maritime chaparral is
0.32 acre. The onsite preservation is greater than the 2:l mitigation ratio that is typically
required by the resource agencies for the impact of southern maritime chaparral. With the
preservation of 3.68 acres onsite, the impact to southern maritime chaparral is fully
mitigated. The open space easement also includes the preservation of 100 percent of the
wart-stemmed ceanothus and Nuttal’s scrub oak.
3. To mitigate potential disturbances to the California gnatcatcher, the grading operations
within 100 feet of the proposed open space area will be restricted during the gnatcatcher
breeding season, or from February 15 to August 30 each year, unless it can be shown
through field reconnaissance by a certified biologist that no gnatcatchers are present on
the property for two months prior to the start of grading.
4. The Developer shall establish a homeowner’s association and corresponding covenants,
conditions and restrictions. Said CC&Rs shall be submitted to and approved by the
Planning Director prior to final map approval. Prior to issuance of a building permit the
Developer shall provide the Planning Department with a recorded copy of the official
CC&Rs that have been approved by the Department of Real Estate and the Planning
Director. At a minimum, the CC&Rs shall contain the following provision:
a. The CC&Rs shall include provisions specifying maintenance responsibility for
Open Space Lot 39. The CC&Rs shall stipulate that within the boundaries of the
HOA open space easement, structures or any other thing not shown on the
approved tentative map or landscape plans shall be prohibited.
5. The Developer shall dedicate to the Homeowner’s Association on the final map, an
open space maintenance easement over Lot 39 identified on the tentative map to
enable maintenance activities within the easement area including but not limited to,
landscaping and irrigation in accordance with the approved tentative map and
landscape plans, removal of debris and trash, minimal fire suppression thinning,
and erosion prevention and remediation. A note to this effect shall be placed on the
non-mapping data sheet of the final map.
6. Removal of native vegetation and development of Open Space Lot 39, including but not
limited to fences, walls, decks, storage buildings, pools, spas, stairways and landscaping,
other than that approved as part of the grading plan, improvement plans, landscape plan,
etc. as shown on the project exhibits, is specifically prohibited, except upon written order
17 Rev, 03128196
of the Carlsbad Fire Department for fire prevention purposes, or upon written approval of
the Planning Director, based upon a request from the Homeowners Association
accompanied by a report from a qualified arboristiotanist indicating the need to remove
specified trees and/or plants because of disease or impending danger to adjacent habitable
dwelling units. For areas containing native vegetation the report required to accompany
the request shall be prepared by a qualified biologist.
7. Prior to approval of the final map or grading plan a detailed soils testing and analysis
report shall be prepared by a registered soils engineer, and submitted to the City Planning
and Engineering Departments as well as the County Department of Environmental Health
for review and approval. This report shall evaluate the potential for soil contamination
on-site due to historic use, handling, or storage of restricted agricultural chemicals. The
report shall also identify a range of possible mitigation measures to remediate any
potentially significant public health impacts if hazardous chemicals are detected at high
concentrations in the soil. Such mitigation measures shall include, at a minimum:
A. Remove any contaminated soils and haul to a State-certified landfill.
B. Cap the area of soil contamination with materials appropriate for the
containment of the specific type of chemical, taking into account its rate of
absorption and toxicity level.
C. Place the area of soil contamination in an open space easement, with
restrictions on future construction of permanent buildings and human uses.
Fencing and warning signs shall also be installed, where appropriate,
prohibiting potential use of the site.
8. The applicant shall notify, in a manner satisfactory to the City Attorney, all tenants/users
of new development that these areas are subject to dust, pesticides, and odors associated
with adjacent agricultural operations, and that the tenants/users occupy these areas at their
own risk.
9. Prior to the recordation of the first final tract map or the issuance of building permits,
whichever occurs first, the Developer shall prepare and record a Notice that this property
is subject to overflight, sight and sound of aircraft operating from McClellan-Palomar
Airport, in a form meeting the approval of the Planning Director and the City Attorney
(see Noise Form #2 on file in the Planning Department).
A. Prior to any grading of the project site, a paleontologist shall be retained to
perform a walkover survey of the site and to review the grading plans to
determine if the proposed grading will impact fossil resources. A copy of
the paleontologist’s report shall be provided to the Planning Director prior
to issuance of a grading permit;
B. A qualified paleontologist shall be retained to perform periodic inspections
of the site and to salvage exposed fossils. Due to the small nature of some
of the fossils present in the geologic strata, it may be necessary to collect
matrix samples for laboratory processing through fine screens. The
paleontologist shall make periodic reports to the Planning Director during
the grading process;
18 Rev. 03128196
c. - The paleontologist shall be allowed to divert-k direct grading in the area
of an exposed fossil in order to facilitate evaluation and, if necessary,
salvage artifacts;
D. All fossils collected shall be donated to a public, non-profit institution
with a research interest in the materials, such as the San Diego Natural
History Museum;
E. Any conflicts regarding the role of the paleontologist and the grading
activities of the project shall be resolved by the Planning Director and City
Engineer.
10. A qualified archaeologist shall be retained to perform inspections of the site during the
clearing and initial stages of grading to review any exposed deposits and to determine
there significance. The archaeologist shall make periodic reports to the Planning Director
during the grading process.
11. The Developer shall pay his fair share for the “short-term improvements” to the El
Camino Real/ Palomar Airport Road intersection prior to approval of the final map or the
issuance of a grading permit, whichever occurs first. The amount shall be determined by
the methodology ultimately selected by Council, including but not limited to, an increase
in the city-wide traffic impact fee; an increased or new Zone 20 LFMP fee;
the creation of a fee or assessment district; or incorporation into a Mello-Roos taxing
district.
ATTACH MITIGATION MONITORING PROGRAM (IF APPLICABLE)
See attached
APPLICANT CONCURRENCE WITH MITIGATION MEASURES
THIS IS TO CERTIFY THAT I HAVE REVIEWED THE ABOVE MITIGATING MEASURES AND
CONCUR WITH THE ADDITION OF THESE MEASURES TO THE PROJECT.
Date Signature
19 Rev. 03/28/96
L #O C a6ed XSllY33H3 9NI~OlINOlhJ NOIlV9IlIVU lVlN3UUNOtllAN3
L #O Z a6ed :lSll)133H3 9NI~O1INOlAl NOIlV9I1lUU lVlN3WNOtllAN3
\ a--
‘rs2 g . =- CD
‘5 s .cD P
-
P ii $
-
L 40 C aced :lSl1)133H3 ONltlOllNOVU NOIlV9IlIMl lVlN3WNOtllAN3
r
L 40 P aced :lSll)133H3 9NlklOllNOUU N011V0111t4 lVlN3WNOtllhN3
D? B
$
3 4ii s v) -. cr (D
F
3
s. B 1.
2 P) -0
Et
8
F
0
L 40 S a6ed :lSllM3H3 9NltlOllNOlAl NOIlVOIlIUU lVlN3VUNOkllAN3
’ ! . .
. . t : : -
I
1
I
E -. C m P rc. s 3 L r 3
L 40 9 a6ed :lSllM3H3 ~Nl2JOllNOMl NOIlV~llIW lVlN3WNOtlIAN3
T CC 3: D= z!co 9 o ?
L 40 L afjed :lSll)133H3 9NltlOllNOUU NOllV9lllWl lVlNWUNOMAN3
I : I ?$
---...--’ LB
: : + : 8 : “ES :.-. _. rl : : I 8 :
E
ia
i; s 0
.