Loading...
HomeMy WebLinkAboutCT 98-19; Roesch Property Residential Subdivision; Tentative Map (CT) (35)**t /STANDARD PACIFIC ' HOMESDecember 28, 2000 Anne Hysong, Senior Planner City of Carlsbad Planning Department 1635 Faraday Avenue Carlsbad, CA 92008 RE: Roesch Property/Surfpointe Project Initial Building Permit Submittal Packet Dear Anne: We have submitted the Roesch Property (Surfpointe) construction documents and plot plans to the Building Counter for processing today. The construction plans are consistent with the conceptual plans that were approved by the Planning Commission in October of 1999 with minor modifications made to the construction plans necessitated by the update to the Uniform Building Code (UBC). These modifications relate strictly to structural considerations and emergency ingress and egress with the exception of several minor adjustments that were made due to conflicts with the internal room layouts and to eliminate a potential engineering problems (i.e.: point of leakage between a roof and intersecting wall. Listed below are a couple of examples that are typical of the types of UBC modifications. We strived to keep the front elevations exactly as the Planning Commission approved them on October 9, 1999. However, two of the front elevations were slightly modified to be consistent with the Building Code. For example, one minor change can be seen on the front elevation of the plan 3B. The approved conceptual plans dated 2/22/99, there were three windows above the garage. However, for reasons of emergency ingress and egress, the window configuration was revised to two larger windows. Minor modifications were also made to the side and rear elevations for compliance with the Uniform Building Code related to structural integrity. An example of this can be found on the left elevation of the "plan 1". On the approved conceptual plans, there were three windows shown in the lower left corner. We needed to eliminate the central window to accommodate a shear wall. Another example of structural integrity is that a floor plan configuration dictated a minor-modification in the (side/rear?) elevation of "plan ?". Theconceptualplans show ^Iank7 blank^but due fo^blanklJJhe elevation now shows "Uaftk:FWaiik7biinF>) > "2 San Diego Division 5750 Fleet Street, Suite #200, Carlsbad, CA 92008 TEL (760) 602-6800 FAX (760) 602-6880 The most significant change that we needed to make between the approved conceptual plans and the construction documents can be found on the rear elevation of the plan 2. The roof over the dining/living room was originally approved with a gable roof. The roof type was modified to a hip configuration, which in turn lowered the roofline, by approximately one foot. As a result this created a greater separation between the first and second floor rooflines establishing the opportunity to add additional windows to the second floor that provide natural lighting to the stairwell. This modification was necessary to address a potential leakage problem between the intersection of the gable roof and the second floor wall. Please contact me directly with any questions or concerns that you may have at (760) 602-6814. Thank you Anne. Sincerely, // ^ - -' > " ' Thomas C. Farrar