HomeMy WebLinkAboutCT 98-21; Seaview; Tentative Map (CT) (20)COMMENTS
Date: April 29. 1999
Planning Department
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, California 92009
TO: Barbara Kennedy
FROM: Kelly Efimoff CMWD NO. 99-C.524
SUBJECT: Seaview CT 98-21
APN 167 070 04 Seaview Way between Chestnut and Bedford
The District is providing comments on the subject project dated April 12. 1999. The
District has reviewed the subject project, based on our review of the project, we have
the following comments regarding potable water, recycled water and sewer systems:
1. Sequentially, the Developer's Engineer should do the following:
A. Meet with the City Fire Marshal and establish the fire protection
requirements.
B. Prepare and submit a colored recycled water use area map and
submit this map to the Planning Department for processing and
approval by the District Engineer.
C. Prior to the preparation of sewer, water and recycled water
improvement plans, the Developer shall submit preliminary system
layouts to the District Engineer for review, comment and approval.
2. The Developer will be expected to provide detailed information to the District
Engineer regarding water demand, irrigation demand, fire flow demand in gallons
Page 2 w
Planning Department
Date: April 29, 1999
per minute, and projected sewer flow in million gallons per day at the time of
first formal plan check submittal.
3. The entire potable water system, recycled water system and sewer system shall
be evaluated in detail by Developer and District Engineer to insure that adequate
capacity, pressure and flow demands can be met. The Developer/Developer's
Engineer shall meet with the District Engineer or his representative for a
preliminary review of potable water, recycled water and sewer facility
requirements. See Comment No. 1, above.
4. All District pipelines, pump stations, pressure reducing stations and
appurtenances required for this project by the District shall be within public right-
of-way or within easements granted to the District or the City of Carlsbad.
5. All potable water and recycled water meters shall be placed within public right of
way.
6. The Developer will be responsible for replacement of the 10-inch water
main connecting Seaview Way and Bedford Road. The details regarding
this replacement include new easements and rerouting to avoid structures.
The Developer will contact the District to discuss acceptable alternatives
for this relocation.
7. The Developer will contact the District to discuss sewer depth and
alignments. This discussion shall necessarily include specific information
regarding pad elevations with regard to existing sewer connections in
Seaview Way.
If you have any questions, please contact the undersigned.
Kelly Efimoff
Associate Engineer
KJE:kje