Loading...
HomeMy WebLinkAboutCT 99-02; Poinsettia Properties Planning Area 7; Tentative Map (CT) (18)City of Carlsbad Public Works — Engineering February 19, 1999 Mr. Mike Howes Hofman Planning Associates 5900 Pasteur Court Carlsbad, CA 92008 POINSETTIA PROPERTIES PLANNING AREA 7, CT 99-02/CDP 99-03/CP 99-02 COMPLETENESS REVIEW AND INITIAL ISSUES This letter is a follow-up to the City Planning Department's letter of February 4, 1999. As stated in that letter, the project application has been found to be incomplete. Additionally, the Engineering Department has reviewed the subject project for application completeness and the following items are to also be submitted to complete your application for engineering review: 1. Lot line dimensions and bearings. 2. Layout and striping plan of the RV lot. 3. Location of fire hydrants. Additionally, the Engineering Department made a preliminary review of the project for engineering issues. Engineering issues which need to be resolved or adequately addressed prior to conditioning of the project are as follows: 1. The location of lot lines for each parcel is not evident on the tentative map. Please clearly indicate the location, bearings, and dimension of all lot lines. 2. With regard to storm drain, the Poinsettia Properties Specific Plan calls for this project to connect to the 42748778" storm drain line that runs parallel to the railroad tracks and drains to the south, rather than connect to the existing 'A-7' storm drain. 3. Non-standard improvements, such as the proposed 8' wide median at the project entrance, are not allowed to be located within the public right-of-way. 4. It appears the proposed median at the entrance to the Lanikai Mobile Home Park is not needed, since Carlsbad Boulevard is a divided road in this area. 5. Please refer to the City's engineering standards for gated entrances, especially with regard to turnaround area requirements. 2075 Las Palmas Dr. • Carlsbad, CA 92009-1576 • (760) 438-1161 • FAX (760) 431-5769 6. The easternmost raised median at the project entrance blocks left turn access to the driveways of two units. 7. Several street sections are shown with a slope of 0.62%. Please note the minimum allowed slope of a street is 1%. 8. The designation of the private streets is to be changed from "general access and utility easement" to "public utility and access easement". 9. Provide additional details on the design of the emergency access area such as the type of paving, the location and material of the gate, the location of any driveway apron, and its distance from the Poinsettia Lane/Carlsbad Boulevard intersection. 10. Provide a connection from the sidewalk fronting the project to the existing sidewalk on Poinsettia Lane. 11. A street knuckle is required at each of the 90 degree bends on the streets within the subdivision. Please refer to the City engineering standards for design requirements. 12. Improvements to Carlsbad Boulevard are required with this project and are to include half-width major arterial improvements along the project frontage, including raised median with landscaping. Clearly show on the plans, in plan view, the proposed improvements to Carlsbad Boulevard. 13. Please confirm with the Carlsbad Municipal Water District the proposed location of the sewer connection. 14. Please refer to the comments from the Planning Department regarding discrepancies between the tentative map, site plan, and landscape plans. 15. Add the City assigned project numbers to the upper right corner of the title sheet. Attached is a redlined check print set of the project, which must be returned with the corrected plans to assist us in our continued review. If you have questions regarding any of the comments above, please contact me at (760) 438-1161, extension 4380. VVr KENNETH W. QUON, P.E. Associate Engineer c: Public Works Director Bob Wojcik, Principal Civil Engineer Barbara Kennedy, Assistant Planner