Loading...
HomeMy WebLinkAboutCT 99-08; Spyglass II; Tentative Map (CT) (67)DATE: TO: CITY OF CARLSBAD REQUEST FOR CONDITIONS 9-7-99 FINAL REVISED PLANS INCLUDED ENGINEERING DEPARTMENT - FRANK JIMENO *FIRE DEPARTMENT - MIKE SMITH *CARLSBAD WATER DISTRICT FROM: Planning Department *QCTttW»<w nw^Kr**Odâ„¢. PROJECT TITLE: SPYGLASS APPLICANT:JOHN WISMER - LANDIS INDUSTRIES PROPOSAL:19 LOT SFD SUBDIVISION REQUEST FOR CONDITIONS ON APPLICATION NO. _CT 99-08_ NOTE: Please use this number on all correspondence. VAN LYNCHPlease submit written conditions to _ Planner in the Planning Department, 2075 Las Palmas Drive, by 9-27-99 the Project (If you have "No Conditions", please so state.) If not received by the date indicated, it will be assumed that you have no conditions and the proposal has your endorsement as submitted. If you have any questions, please contact the Project Planner at 438- 1161, extension _4447 _ . Time is of the essence, since the staff report preparation has begun. THANK YOU COMMENTS: L r.&Ri si MUNICIPAL WATb..^.j 3/31/99 The following comments apply to Spyglass II CT 99-09: 1. We have made several redlined comments on Sheet 2. 2. The existing sewer pipeline shown on the property adjacent to El Camino Real does not exist and shall be deleted. 3. The sewer pipelines shown on the plans for the tract are acceptable. However, the plans shall show the existing sewer lateral for the building located on the north side of Carlsbad Village Drive, and also show the existing 8-inch diameter VCP crossing El Camino Real. 4. The water pipeline alignment in the tract is acceptable. It shall connect to the existing 8-inch diameter pipeline on the south side of the tract in Appian Road. 5. The water connection at Carlsbad Village Drive and Avenida De Anita shall be deleted because it is in a different pressure zone from what is required for the subject tract. 6. The water pipeline for the tract shall be installed in Carlsbad Village Drive to the existing water pipeline in Appian Road east of the tract. An offsite water pipeline is required. 7. The plans shall show the existing 16-inch diameter DIP in El Camino Real. 8. The plans shall show the existing 10-inch diameter ACP in El Camino Real as abandoned. 9. Any onsite irrigation for the open space lots shall be designed to use recycled water in conformance with District standards.