Loading...
HomeMy WebLinkAboutCT 99-08; Spyglass II; Tentative Map (CT) (71)November 1,1999 TO: VAN LYNCH From: William Plummer, Deputy City Engineer SUBJECT: SPYGLASS II, CT 99-08, CMWD NO. 89-C-310 The followings conditions shall apply to the subject project: 1. The water and sewer pipelines shown on the Sheet 2 exhibit map are acceptable. 2. The water pipeline at the intersection with "proposed" Apian Way and Carlsbad Village Drive shall be extended easterly in Carlsbad Village Drive to existing Apian Road, and connected to the existing water pipeline at that location. The proposed water pipeline shall not be connected to the existing water pipeline at the intersection of the "proposed" Apian Way and Carlsbad Village Drive. 3. A 30' wide sewer easement dedicated to the City of Carlsbad is required for the sewer pipeline planned to extend from the "proposed" Apian Road west to El Camino Real. 4. The irrigation system for the landscaping in open space lots "A" and "B" shall be designed to use recycled water in conformance with CMWD standards and requirements. Sincerely, s4tyy William E. Plummer