HomeMy WebLinkAboutCT 99-10; Buerger; Tentative Map (CT) (39)CITY OF CARLSBAD
ENGINEERING DEPARTMENT
LAND USE REVIEW
DECEMBER 26,2000
TO: SENIOR PLANNER - Anne Hysong
FRQWI: Associate Engineer - Land Development Section
VIA: Principal Civil Engineer- Land Development Section
CT 99-10, CDP 99-17, HDP 99-08, LCPA 99-03, ZC 99-05: BUERGER
PROJECT REPORT AND CONDITIONS TRANSMITTAL
Engineering Department staff has completed the review of the above-referenced project and are
recommending:
X That the project be approved subject to the conditions as listed on the attached sheet.
That the project be denied for the following reasons:
X The following is a final Land Development Section project report for inclusion in the staff
report for this project.
LAND DEVELOPMENT SECTION
Project Report
PROJECT ID: CT 99- 10, CDP 99- 17, HDP 99-08, LCPA 99-03, ZC 99-05:
PROJECT NAME: BUERGER
LOCATION: East side of Black Rail Road, north of Aviara Parkway, south of Poinsettia Lane
BRIEF DESCRIPTION : A 13 unit subdivision consisting of 12 Single Family lots and 1 open
space lot.
ENGINEERING ISSUES AND DISCUSSION:
TRAFFIC AND CIRCULATION:
Projected Average Daily Traffic (ADT): 120 - based on 10 trips per unit.
A Traffic study was not required because of the small size and infill location.
1
SEWER:
Sewer District: City of Carlsbad
Sewer EDU's Required: 12 EDU's required
(1) edu/dwelling x 12 dwellings = 12 EDU's
Comment: Sewer facilities exist in Black Rail Road. The developer will extend the
sewer main through this subdivision as part of the required onsite improvements.
WATER:
Water District: Carlsbad Municipal Water District
GPD Required: 220 gpd/edu x 12edu's = 2420 GPD
Comment: No major water issues are associated with this proposed project.
SOILS & GRADING:
Quantities:
Cut: 10,000 cyFill: 15,400 cy Import: 5,400 cy
Permit required: Yes
Off-site approval required: Yes
Hillside grading requirements met: Yes
Comment: This subdivision is south of and adjacent to an undeveloped parcel with a
similar grading condition and topography. The project has proposed an
interim design of this boundary condition, which includes side slopes and a
drainage swale that should be either removed, shared, or less in slope height
when both parcels are developed. Because the final design of the adjacent
parcel is uncertain at this time, a condition has been placed on this project to
reserve a 15' grading easement to allow for a lesser impact and an
opportunity to improve the interim condition. A note is also to be placed on
the final map to advise potential homeowners of this condition.
DRAINAGE AND EROSION CONTROL:
Drainage basin: D
Erosion Potential: Low
Comment: There are no major drainage issues associated with this project.
LAND TITLE:
Conflicts with existing easement: None
Easements dedication required: "A" Street and "B" Street will be dedicated as public
Streets and will connect neighborhoods to the north and south.
Site boundary coincides with land title: Yes
2
Comment: No major land title issues are associated with this project.
IMPROVEMENTS:
Off-site improvements: None
Standard variance required: None
Comment: No major improvement issues are associated with this proposed project.
6. NOTE: Unless specifically stated in the condition, all of the following
conditions, upon the approval of this proposed tentative map,
must be met prior to approval of a final map, building permit or
grading permit whichever occurs first.
General
7. Prior to hauling dirt or construction materials to or from any proposed construction site
within this project, Developer shall apply for and obtain approval from, the City Engineer
for the proposed haul route.
8. Prior to issuance of any building permit, Developer shall comply with the requirements of
the City's anti-graffiti program for wall treatments if and when such a program is formally
established by the City.
10. Developer shall and does hereby agree to indemnify, protect, defend and hold harmless
the City of Carlsbad, its Council members, agents, officers, and representatives, from
and against any and all liabilities, losses, damages, demands, claim and costs, including
court costs and attorney's fees incurred by the City arising, directly or indirectly, from (a)
City's approval and issuance of this tentative parcel map, (b) City's approval or issuance
of any permit or action, whether discretionary or non-discretionary, in connection with the
use contemplated herein, including an action filed within the time period specified in
Government Code Section 66499.37 and (c) Developer's installation and operation of
the facility permitted hereby, including without limitation, any and all liabilities arising from
the emission by the facility of electromagnetic fields or other energy waves or emissions.
1. Developer shall provide to the City Engineer, an acceptable means, CC&R's or/and other
recorded document, for maintaining the private easements within the subdivision and all
the private improvements located therein and to distribute the costs of such maintenance
in an equitable manner among the owners of the properties within the subdivision.
12. Prior to occupancy, Developer shall install rain gutters to convey roof drainage to an
approved drainage course or street to the satisfaction of the City Engineer.
13. There shall be one Final Map recorded for this project.
16. Developer shall install sight distance corridors at all street intersections in accordance
with Engineering Standards.
Fees/Agreements
18. Developer shall cause property owner to execute and submit to the City Engineer for
recordation the City's standard form Drainage Hold Harmless Agreement regarding
drainage across the adjacent property.
19. Developer shall cause property owner to execute, record and submit a recorded copy to
the City Engineer, a deed restriction on the property which relates to the proposed cross
lot drainage as shown on the tentative map. The deed restriction document shall be in a
form acceptable to the City Engineer and shall:
A. Clearly delineate the limits of the drainage course;
B. State that the drainage course is to be maintained in perpetuity by the underlying
property owner; and
C. State that all future use of the property along the drainage course will not restrict,
impede, divert or otherwise alter drainage flows in a manner that will result in
damage to the underlying and adjacent properties or the creation of a public
nuisance.
20. Developer shall cause property owner to apply for and obtain reapportionment of the
assessments imposed on the subject project in accordance with law governing the
associated Poinsettia Lane Bridge and Thourofare District, or the assessments must be
paid in full. Developer shall pay all associated costs of said reapportionment. The
application shall be submitted to the City Engineer with the application for the final map.
New condition for B&TD...
The City of Carlsbad is presently considering action to reform Bridge and
Thoroughfare District No. 2 (B&TD#2) to finance cost increases incurred
and/or estimated to complete the design and construction of Aviara
Parkway and Poinsettia Lane within the boundaries of the district. Prior to
approval of a final map or issuance of a building permit on the project site,
whichever occurs first, the property owner shall enter into an agreement
with the City whereby the owner/developer agrees not to oppose the
reformation of B&TD#2 and further agrees to pay their project's fair share
contribution for the B&TD#2 facilities in accordance with the fee schedule
as may be adopted by the City Council upon reformation of B&TD#2. In the
event building permits are issued in advance of the reformation of the
district, the owner/developer shall post a cash deposit with the City in the
amount of the proposed fee as estimated in the latest revision to the
B&TD#2 Fee Study Report available at the time of building permit issuance.
22. Prior to approval of any grading or building permits for this project, Developer shall cause
Owner to give written consent to the City Engineer to the annexation of the area shown
within the boundaries of the subdivision into the existing City of Carlsbad Street Lighting
and Landscaping District No. 1, on a form provided by the City Engineer.
23. The subject property is within the boundaries of Assessment District No. 88-1 (Alga
Road). Upon the subdivision of land within the district boundaries, Owner may pass
through assessments to subsequent owners only if the owner has executed a Special
Assessment District Pass-through Authorization Agreement. Said Agreement contains
provision regarding notice to potential buyers of the amount of the assessment and other
provisions and requires Owner to have each buyer receive and execute a Notice of
4
Assessment and an Option Agreement. In the event that Owner does not execute the
Authorization Agreement, the assessment on the subject property must be paid off in full
by Owner prior to final map approval.
Grading
24. Prior to the issuance of a grading permit or building permit, whichever occurs first,
Developer shall submit to the City Engineer proof that a Notice of Intention for the start of
work has been submitted to the State Water Resources Control Board.
26. This project requires off site grading. No grading for private improvements shall occur
outside the limits of this approval unless Developer obtains, records and submits a
recorded copy to the City Engineer a grading or slope easement or agreement from the
owners of the affected properties. If Developer is unable to obtain the grading or slope
easement, or agreement, no grading permit will be issued. In that case Developer must
either apply for and obtain an amendment of this approval or modify the plans so grading
will not occur outside the project and apply for and obtain a finding of substantial
conformance from both the City Engineer and Planning Director.
27. Based upon a review of the proposed grading and the grading quantities shown on the
tentative map, a grading permit for this project is required. Developer shall apply for and
obtain a grading permit from the City Engineer (prior to issuance of a building permit for
the project.)
##. The owner shall grant an irrevocable 15' wide construction, drainage and slope
easement along the north side of this project to accommodate future development.
After completion of the adjacent development along the northern property line, the
easement can be quitclaimed except for that portion to serve the ultimate design
as mutually agreed to between future landowners.
Coastal Conditions
28. If a Grading Permit is required, all grading activities shall be planned in units that can be
completed by October 1st. Grading activities shall be limited to the "dry season", April 1st
to October 1st of each year. Grading activities may be extended to November 15th upon
written approval of the City Engineer, obtained in advance, and only if all erosion control
measures are in place by October 1st.
Dedications/Improvements
30. Developer shall cause Owner to execute a covenant of easement for cross lot drainage
as shown on the tentative map the obligation to execute and record the covenant of
easement shall be shown and recording information called out on the final map.
Developer shall provide City Engineer with proof of recordation prior to issuance of
building permit.
31. Developer shall cause Owner to make an irrevocable offer of dedication to the City
and/or other appropriate entities for all public streets and other easements shown on the
tentative map. The offer shall be made by a certificate on the final map. All land so
offered shall be offered free and clear of all liens and encumbrances and without cost.
Streets that already public are not required to be rededicated.
32. Additional drainage easements may be required. Developer shall dedicate and provide or
install drainage structures, as may be required by the City Engineer, prior to or
concurrent with any grading or building permit.
35. Developer shall cause Owner to waive direct access rights on the final map for all lots
abutting Black Rail Road. Lot 5 shall waive access to Street "A" and lot 11 shall waive
access rights to Street "B".
38. Prior to issuance of building permits, Developer shall underground all existing overhead
utilities along the subdivision boundary. The regional overhead transmission system
is specifically not part of this condition. This condition affects the wooden power
poles and individual overhead electric or telephone or cable TV service runs from
the pre-developed condition.
40. Developer shall comply with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. Developer shall provide improvements constructed
pursuant to best management practices as referenced in the "California Storm Water
Best Management Practices Handbook" to reduce surface pollutants to an acceptable
level prior to discharge to sensitive areas. Plans for such improvements shall be
submitted to and subject to the approval of the City Engineer. Said plans shall include
but not be limited to notifying prospective owners and tenants of the following:
A. All owners and tenants shall coordinate efforts to establish or work with
established disposal programs to remove and properly dispose of toxic and
hazardous waste products.
B. Toxic chemicals or hydrocarbon compounds such as gasoline, motor oil,
antifreeze, solvents, paints, paint thinners, wood preservatives, and other such
fluids shall not be discharged into any street, public or private, or into storm drain
or storm water conveyance systems. Use and disposal of pesticides, fungicides,
herbicides, insecticides, fertilizers and other such chemical treatments shall meet
Federal, State, County and City requirements as prescribed in their respective
containers.
C. Best Management Practices shall be used to eliminate or reduce surface
pollutants when planning any changes to the landscaping and surface
improvements.
Final Mao Notes
46. Developer shall show on Final Map the net developable acres for each parcel.
47. Note(s) to the following effect(s) shall be placed on the map as non-mapping data
A. Building permits will not be issued for development of the subject property unless
the appropriate agency determines that sewer and water facilities are available.
B. No structure, fence, wall, tree, shrub, sign, or other object over 30 inches above
the street level may be placed or permitted to encroach within the area identified
as sight distance corridors.
C. A 15' grading and drainage easement has been established along the north
boundary of lots 1, 2, 4, 6, and lot 7. The intent of this easement is to allow for
adjacent grading to occur and to reduce the slope and drainage impacts from this
project. The grading that is approved as part of the tentative map (CT 99-10) for
this project is considered an interim condition to be improved by the adjacent
development. After completion of the adjacent development along the northern
property line, the easement can be quitclaimed except for that portion to serve the
ultimate design as mutually agreed to between future landowners.
6
Code Reminder
The project is subject to all applicable provisions of local ordinances, including but not limited to
the following:
48. The tentative map shall expire twenty-four (24) months from the date this tentative map
approval becomes final.
49. Developer shall exercise special care during the construction phase of this project to
prevent offsite siltation. Planting and erosion control shall be provided in accordance
with Carlsbad Municipal Code Chapter 15.16 (the Grading Ordinance) to the satisfaction
of the City Engineer.