Loading...
HomeMy WebLinkAboutCT 99-11; Rancho Carrillo Village L; Tentative Map (CT) (31)CONDITIONS Date: December 7.1999 Planning Department City of Carlsbad 2075 Las Palmas Drive Carlsbad, California 92009 TO: Van Lynch FROM: Kelly Weaver CMWD NO. 97-543 SUBJECT: Rancho Carrillo Village "L" CT 99-11/CP 99-08/MPA 139(1) The District is responding to your request for comments on the subject project dated November 29. 1999. Based on our review of the project, we have the following conditions regarding potable water, recycled water and sewer systems: 1. All potable water and recycled water services and meters shall be placed at a location approved by the Deputy City Engineer - Utilities and shown on public improvement plans. 2. Sewer laterals and cleanouts shall be placed at a location approved by the Deputy City Engineer - Utilities and shown on public improvement plans. 3. All public water improvements shall be designed and constructed substantially as shown on the Tentative Map 99-11 to the satisfaction of the Deputy City Engineer - Utilities and shown on public improvement plans. 4. All public sewer improvements shall be designed and constructed substantially as shown on the Tentative Map 99-11 to the satisfaction of the Deputy City Engineer - Utilities and shown on public improvement plans. Water Conditions of Approval Page 2 of 2 December?, 1999 5. All public facilities required for this project shall be within public right-of-way or within minimum 20' wide easements granted to the District or the City of Carlsbad. At the discretion of the Deputy City Engineer - Utilities, wider easements may be deemed necessary for adequate maintenance, access and/or joint utility purposes, as appropriate. 6. Landscape and irrigation plans shall be designed for use of recycled water and submitted to the Deputy City Engineer - Utilities for review, comment and approval. If you have any questions, please contact the undersigned. Kelly Weaver Associate Engineer KJW:kjw