Loading...
HomeMy WebLinkAboutCT 99-17; Carlsbad Research Center Lot 12; Tentative Map (CT) (29)PUBLIC WORKS LAND DEVELOPMENT SECTION MEMORANDUM November 2, 1999 TO: VAN LYNCH, ASSOCIATE PLANNER FROM: Jeremy Riddle, John Powell & Associates- !. SUBJECT: CT 99-17, PUD 99-07, SUP 99-06: CARSLBAD RESEARCH CENTER LOT 12 SECOND ENGINEERING ISSUES STATEMENT Engineering Department staff has completed a second review of the above-referenced subject. Prior to staff making a determination on the proposed project, the following engineering issues of concern still must be resolved or adequately addressed by the applicant: es 1. Provide calculations which verify that the existing onsite 18" storm drain is capable of collecting and conveying the anticipated storm flows from the development. This flow is identified as 27.3 cfs per the preliminary hydrology study. Identify capacity of the existing 18" pipe (private) and the immediate downstream reach (public) in Priestly Drive to ensure the system will function properly. Revise the tentative map to include any upgrades required to accommodate the flows. If you have any questions, please call me at telephone (760) 438-1161, extension 4385. JEREMY RIDDLE John Powell & Associates Attachment c: Bob Wojcik, Deputy City Engineer