Loading...
HomeMy WebLinkAboutCUP 00-46B; Pacific Bell Harding Street Building Addition; Conditional Use Permit (CUP) (4)-. PACIFIC BELL CORPORATE REAL ESTATE Design and Construction 3880 Murphy Canyon 200 San Diego, CA 92123 (858) 492-5525 mxlivsh@Dacbell.com April 3, 2001 RE: Pacific Bell Building Addition 3368 Harding Street RECEIVED Carlsbad PB3 0 3 2001 Anne Hysong Planner City of Carlsbad CITY OF CARLSBAD PLANNING DEPT. Dear Anne, The purpose for this letter is to clarify the Pacific Bell position regarding the building height and lot coverage. The telecommunication industry standards dictate interior building elevations to be at 16’-0” above finished floor. This is required to provide a clearance space for the telephone equipment, telephone equipment cabling, overhead unistrut structure, water sprinkler system, and air conditioning ductwork. As a result of this requirement, the new proposed two story building addition will have a height of approximately 35’. With the new two story building addition (ten year plan), the proposed lot coverage will be 478, leaving Pacific Bell with a capability to expand up to the allowable 60% to meet future demand for telecommunications services within the City of Carlsbad. A single story addition without adding a second floor would not meet the growth demand. If you have any questions, please contact me at (858) 492-5525 or Robert Royce at (619) 233-6777, ext. 125. Senior Project Manager cc: Robert Royce, JWDA