Loading...
HomeMy WebLinkAboutCUP 03-15; Twin D Recycled Water Pump Station; Conditional Use Permit (CUP)CITY OF CARLSBAD LAND USE REVIEW OR: (CHECK BOXES) (FOR DgPARTMEN USE ONLY) D Trmit - 2nd Administrative Variance Coastal Development Permit Conditional Use Permit Condominium Permit Environmental Impact Assessment General Plan Amendment Hillside Development Permit Local Coastal Plan Amendment Master Plan Non-Residential Planned Development I j Planned Development Permit Planned Industrial Permit Planning Commission Determination D D I I Precise Development Plan I I Redevelopment Permit [__J Site Development Plan I I Special Use Permit I I Specific Plan I I Tentative Parcel Map Obtain from Engineering Departir | I Tentative Tract Map I I Variance ( I Zone Change I I List other applications not specified (FOR DEPARTMENT USE ONLY) 2) 3) 4) ASSESSOR PARCEL NO{S).: PROJECT NAME: 215-080-05 and 215-080-23 Twin "D" Recycled Hater Pump Station BRfEF DESCRIPTION OF PROJECT:A pump station for the conveyance of recycled water (public facility) 5) OWNER NAME (Print or Type) Carlsbad Municipal Water Di Contact: William E. Plummer MAILING ADDRESS 1635 Faraday Avenue CITY AND STATE ZIP Carlsbad, CA 92008 strict TELEPHONE (760) 602-2768 1 CERTIFY THAT 1 AM THE LEGAL OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. SIGNATURE DATE 6) APPLICANT NAME (Print or Type) Carlsbad Municipal WaterrUlstrictJ;:; •' Contact: William E. Plummer MMilS A! iiiss ." . , - - • :>' •• :-" ' ' :? W t • •> ^ f .- . 1635 Faraday Avenue CITY AND STATE ZIP TELEPHONE Carlsbad, CA 92008 (760) 602-2768 1 CERTIFY THAT 1 AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. SIGNATURE DATE 7) BRIEF LEGAL DESCRIPTION Book 215 Page 8 Parcels 005 and 023 NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLICATIONS BE FILED. MUST BE SUBMITTED PRIOR TO 3:30 P.M. A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION BE FILED, MUST BE SUBMITTED PRIOR TO 4:00 P.M. Form 16 PAGE 1 OF 2 c 8)LOCATION OF PROJECT: ON THE BETWEEN East (NORTH, SOUTH, EAST, WEST) STREET ADDRESS SIDEOE Black Rail Road (NAME OF STREET) Aviara Parkway AND (NAME OF STREET) Poinsettia Lane 9) LOCAL FACILITIES MANAGEMENT ZONE 10) PROPOSED NUMBER OF LOTS 20 1 3) TYPE OF SUBDIVISION 1 6) PERCENTAGE OF PROPOSED PROJECT IN OPEN SPACE 19) GROSS SITE ACREAGE 22) EXISTING ZONING 11} NUMBER OF EXISTING RESIDENTIAL UNITS 14} PROPOSED IND OFFICE/ SQUARE FOOTAGE 17) PROPOSED INCREASE IN ADT 20) EXISTING GENERAL PLAN 23) PROPOSED ZONING (NAME OF STREET) 12) PROPOSED NUMBER "OF RESIDENTIAL UNITS 15) PROPOSED COMM SQUARE FOOTAGE 18) PROPOSED SEWER USAGE IN EDU 21) PROPOSED GENERAL PLAN DESIGNATION 0 RLM 24) IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING COMMISSIONERS, DESIGN REVIEW BOARD MEMBERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE SIGNATURE FOR CITY USE ONLY FEE COMPUTATION APPLICATION TYPE TOTAL FEE REQUIRED RECEIVED MAT 122003 "^i-^g-V CltY OF CARLSBAD RLANN1NG DEPT. DATE STAMP APPLICATION RECEIVED RECEIVED BY: DATE FEE PAID RECEIPT NO. Form 16 PAGE 2 OF MEMORANDUM July 10, 2003 TO: SENIOR PLANNER - ERIC MUNOZ FROM: Associate Engineer - Land Development CUP 03-15, CDP 03-23: TWIN D RECYCLED WATER PUMP STATION The Engineering Department has completed its review of the above referenced project. The following are the conditions for the project. ENGINEERING CONDITIONS General 7. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, Contractor shall apply for and obtain approval from, the City Engineer for the proposed haul route. Dedications/Improvements 34. Developer shall install public improvements shown on the site plan and the following improvements including, but not limited to paving, base, sidewalks, curbs and gutters, grading, clearing and grubbing, sewer, water, storm drain system, fire hydrants, street lights, retaining walls and reclaimed water, to City Standards to the satisfaction of the City Engineer. Black Rail Road to collector street standards 40. Developer shall comply with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit, latest version. Developer shall provide improvements constructed pursuant to best management practices as referenced in the "California Storm Water Best Management Practices Handbook" to reduce surface pollutants to an acceptable level prior to discharge from the site. Plans for such improvements shall be submitted to and subject to the approval of the City Engineer. Said plans shall include but not be limited to notifying prospective owners and tenants of the following: A. All owners and tenants shall coordinate efforts to establish or work with established disposal programs to remove and properly dispose of toxic and hazardous waste products. B. Toxic chemicals or hydrocarbon compounds such as gasoline, motor oil, antifreeze, solvents, paints, paint thinners, wood preservatives, and other such fluids shall not be discharged into any street, public or private, or into storm drain or storm water conveyance systems. Use and disposal of pesticides, fungicides, herbicides, insecticides, fertilizers and other such chemical treatments shall meet Federal, State, County and City requirements as prescribed in their respective containers. C. Best Management Practices shall be used to eliminate or reduce surface pollutants when planning any changes to the landscaping and surface improvements. 41. Prior to issuance of a Building Permit, developer shall submit and receive approval from the City of Carlsbad Engineering Department of a Storm Water Management Plan (SWMP). This project is required to capture and reduce pollutants to a level of insignificance. The organization and content of the SWMP shall be prepared in accordance with the guidelines as established by the San Diego Region of the California Regional Water Quality Control Board and as modified by the City of Carlsbad. The SWMP shall address the anticipated pollutants of concern associated with the project and shall suggest the type(s) of post-construction (source and structural) Best Management Practices (BMP) required to avoid contact with storm water of filter pollutants of concern. 42. Prior to occupancy, Developer shall implement the necessary BMP measures required to capture and filter the anticipated pollutants of concern associated with the project in accordance with the City-approved SWMP, the latest California NPDES permit requirements, and the City of Carlsbad Standard Urban Stormwater Management Plan. Code Reminder The project is subject to all applicable provisions of local ordinances, including but not limited to the following 49. Contractor shall exercise special care during the construction phase of this project to prevent offsite siltation. Planting and erosion control shall be provided in accordance with Carlsbad Municipal Code Chapter 15.16 (the Grading Ordinance) to the satisfaction of the City Engineer.