HomeMy WebLinkAboutCUP 146B; Church of Jesus Christ - LDS; Conditional Use Permit (CUP)mtid II+ 00
&of m M . l -.,
April 5, 2000
Mr. Bruce Fallon
Coombs Architecture and Planning, Inc.
Ste 205
278 Town Center Parkway
Santee CA 92071
SUBJECT: CUP 146(B) - CHURCH OF JESUS CHRIST-LDS
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning
Department has reviewed your Conditional Use Permit amendment, application no. CUP
146(B), as to its completeness for processing.
The application is complete, as submitted. Although the initial processing of your
application may have already begun, the technical acceptance date is acknowledged by the
date of this communication. The City may, in the course of processing the application,
request that you clarify, amplify, correct, or otherwise, supplement the basic information
required for the application. In addition, you should also be aware that various design
issues may exist. These issues must be addressed before this application can be scheduled
for a hearing. The Planning Department will begin processing your application as of the
date of this communication.
Please contact your staff planner, Paul Godwin, at (760) 602-4625, if you have any
questions or wish to set up a meeting to discuss the application.
Sincerely,
MICHAEL J. HOLZMILLER
Planning Director
MJH:F’G:cs
c: Chris DeCerbo
David Rick
File Copy
Data Entry
Planning Aide
1635 Faraday Avenue - Carlsbad, CA 92008-7314 l (760) 602-4600 l FAX (760) 602-8559
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
No. CUP 146(B)
Planning:
None
Engineering:
None
ISSUES OF CONCERN
Planning:
1.
2.
3.
The original Conditional Use Permit for the church use (CUP 146) has expired but may
be extended retroactively. In order to process an amendment to your Conditional Use
Permit, you must concurrently renew your existing permit. In order to process an
amendment to your Conditional Use Permit, you must first renew your existing permit.
Please contact the Planning Department for processing requirements and fees.
Please provide further explanation regarding the need for gated parking (i.e. past
security problems) and a proposed schedule regarding the days/hours that the gates will
be closed.
The proposed trash enclosure is adjacent to an existing single family residence and will
be visible from Monroe Street. Please provide an alternate location that is not
immediately adjacent to any existing residences and not immediately visible from the
church entrance.
Engineering:
1.
2.
3.
4.
The entry gate design located from Chestnut Av. must be altered to accommodate turn-
around for a passenger vehicle. Please revise plans to show that a vehicle can properly
turnaround and exit onto Chestnut Av. in a forward position. Plot turning radii.
Provide the church hours of operation and the day(s)/hour(s) that Coast Waste
Management picks up refuse. Will all of the gates be opened during the church’s peak
operation hours?
Show the site topography at the driveway entrance on Monroe Street.
The “Project Description” indicates that the entire parking lot will be secured under this
plan yet it appears that no gated security will be provided in the parking lot located
closest to Monroe Street. Is this statement inaccurate or are you planning to add a
,-
gate to secure this section too?
5. Add the Average Daily Traffic to sheet TS-1 . Based on estimated generation rates from
SANDAG, the ADT equates to 232 trips.