Loading...
HomeMy WebLinkAboutCUP 146B; Church of Jesus Christ - LDS; Conditional Use Permit (CUP) (10)TO: Engineering Technician, Paul Godwin FROM: Assistant Engineer, David Rick DATE: March 27, 2000 Bfl. CUP 146B - CARLSBAD FENCE (1,2,3) CARLSBAD CA STAKE ISSUES REVIEW Engineering Department staff has completed a review of the above-referenced project for completeness and engineering issues of concern. All items needed for engineering review are provided for determining the application as complete. Engineering issues which need to be resolved or adequately addressed prior to staff making a determination on the proposed project are as follows: 1. 2. 3. 4. 5. The entry gate design located from Chestnut Av. must be altered to accommodate turn- around for a passenger vehicle. Please revise plans to show that a vehicle can properly turnaround and exit onto Chestnut Av. in a forward position. Plot turning radii. Provide the church hours of operation and the day(s)/hour(s) that Coast Waste Management picks up refuse. Will all of the gates be opened during the church’s peak operation hours? Show the site topography at the driveway entrance on Monroe Street. The “Project Description” indicates that the entire parking lot will be secured under this plan yet it appears that no gated security will be provided in the parking lot located closest to Monroe Street. Is this statement inaccurate or are you planning to add a gate to secure this section too? Add the Average Daily Traffic to sheet TS-1. Based on estimated generation rates from SANDAG, the ADT equates to 232 trips. If you or the applicant have any questions, please either see or contact me at 602-2781.