Loading...
HomeMy WebLinkAboutCUP 149; Brown Trucking; Conditional Use Permit (CUP) (12)- rz. . ENVIRONMENTAL IMPACT ASSESSMENT FORM . -‘7L’g Receipt No. EIA NO. L//r7 i Date: January 25, 1978 Name of Applicant: Brown Truckizzg Address: P, 0. BOX 6w, (3 701 Hasmar) Carlsbad, California 92Q08 Dtrinf t Appl ied For: Office wailer Czse Nos.: -- QACKGROUND IN FORMAT I CN 1. Give a brief description of the proposed activity (attach any preliminary development plans). Permit for mobile offibe 2. Describe the activity area, incJuding distinguishing natural and manmade characteristics;. also provide precise slope analysis when appropriate. 3. Describe energy conservation measures incorporated into the design and/or operation of the project. N/A .. - ..4 ENVIRONMENTAL -- IMPACT ASSESSMENT FORM 11. Environmental Impact Analysis Answer.the following questions by placing a check in the appropriate 1. .. 2. 3. 4. 5. 6. 7. .. 8. 9. 10. 11. 12. 13. 1 5. space. Could the project significantly change present land uses in the vicinity of the activity? Could the activity affect the u.se of a recreational area, or ares. of important aesthetic value? . Could the activity affect the functioning of an established community or neighborhood? Could the activity result in the displacement of community .residents? Are any of the natural or man-made features in the activity area unique, that is, not’found in other parts of the County, State, or nation? Could the activity significantly affect a historical or archae’ogical site or its setting? Could the activity significantly affect the potential use, extraction, or conservation of a scarce natural res- ource? Does the’ actidty area serve as a habitat, food source nesting place, source of water, etc. for.rare or endangered wildlife or. fish species? Could the activity significantly affect fish, wildlife or plant life? Are there any rare or endangered plant species in the activity area? Could the activity change existing features of any. of the city’s lagoons, bays, or tidelands? Could the activity change existing features of any of the City’s beaches? Could the‘ activity result in the erosion or elimination Could the activity serve to encourage developnicnt of .presently undeveloped areas or intensify developmeht of a1 ready devel oped areas? . of .agricultura7 lands? .\ .. 0 No - Yes - x -. x .. x - x. x 2’. x * x .. x - x -- ‘X -- .x -- 16. 17. 18. 19. 20. 21. , 22. 23. 24. 25. 26. .27. .^ \ - No Yes - .. - 15.. Will- the actitity require a variance from established environmental X standards (air, water, noise, etc)? -- Will the activity require of a permit by any. local, agency? Will the activity require use permit by the City? Will the activit-y involve certification, authorization or issuance. . State or Federal environmental control , X -- issuance of a variance or conditional a the application, use, or disposal of potentially hazardous materials? ch Will the activity involve construction of facilities in a flood q.11 ai n? Wi.17 the activity involve construction of facilities on a slope of 25 percent or greater? -- Will the activity involve construction of facilities in the area of an active fault? Could the activity result in the generation of significant amounts of noise? Could the activity result in the generation of significant Will the actj!Jity involve the burning of brush, trees, or other materials? . Could the activity result in a significant change in the amounts of dust? -- r uality of any portion of the region's air or water resources? ?Should note surface, ground water, off-shore). - there be Significant change to existing land form? - indicate estimated grading to be done in cubic yards. R/A percentage of alteration to the present land form. L maximum height of cut or fill slopes. the activity result in substantial increases in the use of utilities, . N/A sewers, drains or streets? - 111. State of No Siqnificant Environmental Effects If you have answered yes to one or more of the questions in Section I1 but you think the activity will have no significant environmental effects, indicate your reasons bel ow: . .* x - X X I X X X X X - L - .I .. .. IV: Comments or Elaborations to Any of the Questions in Section 11. (If additional space is needed for answering any questions, attach additional sheets as may be needed.) (Pers5n conipl eti ng report) / 2<-7$ Conclusions (To be completed by the- Planning Director). in the appropriate box. Place a check ( ) Further information is required. ( ) It has been determined that the project will not have significant environmental effects. ( ) You. must submit a preliminary environmental should make an appointment with the P1annit;g Director to discuss further processing of your project, in accordance with Chapter 19.04 of the Municipal Code. impact staternent by the following date . ( ) You . DATE REC E I V ED :. .. BY: Planning Director, or, I .. Revised 7./3/74 * FORM PLANNING 40 . ,