HomeMy WebLinkAboutCUP 154A; Pacific Bell Vehicles Unlimited; Conditional Use Permit (CUP) (13)MAY 17, 1994, REVISED JUNE 20,1994*
TO: ASSOCIATE PLANNER, Teresa Woods
FROM: ASSOCIATE ENGINEER, Jim Davis
VIA PRINCIPAL CIVIL ENGINEER FOR LAND USE
CUP 154A, PACIFIC BELL/VEHICLES UNLIMITED
We have reviewed the project and can recommend approval under the following conditions:
v
Withii 90 days of the approval of this CUP Amendment, the applicant shall obtain
approval from the City Engineer of a Best Management Practices Plan to reduce
pollutants from the drainage and meet the needs of the National Pollution Discharge
Elimination System (NPDES) permit, to the satisfaction of the City Engineer.The
plan shall include but not be limited to providing measures to contain and control
any spill of materials considered hazardous, provide measures to keep the site swept
and clean of such hazardous materials and notify the County Hazardous Materials
Disposal Unit when a spill occurs. All materials removed as a result of these
operations shall be disposed of in a lawful and approved manner for disposing of
hazardous materials.
All vehicles shall be loaded and unloaded in a safe and lawful manner. No loading or unloading of vehicles in the public street will be permitted except from normal
parallel parking positions and done without blocking a travel lane unless a traffic
control plan has been approved and a right-of-way permit has been issued.
Upon discontinuing the operations permitted by this Conditional Use Permit, the
applicant shall test the site and soils for contamination with hazardous materials and
if contamination is found,restore the site as may be required by the property owners
and the county health authorities using approved methods standard to the industry
of hazardous waste disposal.