HomeMy WebLinkAboutCUP 154C; Pacific Bell Expansion; Conditional Use Permit (CUP) (13)May 16, 1996 -- TO: TERESA WOODS, ASSOCIATE PLANNER FROM: Associate Engineer Quon PROJECT ISSUES STATEMENT PAC BELL CENTRAL OFFICE, CUP 154C The Engineering Department has completed its review of the resubmitted project application for completeness and/or engineering issues. The project application is now or was previously found complete for the purpose of continued engineering review. The project application does contain some engineering issues or concerns which remain to be resolved by the applicant. All engineering issues should be fully resolved or addressed prior to resubmitting the project for our review. The outstanding engineering issues or concerns are as follows: 1. The layout of the parking area in the vicinity of the existing concrete gutter that is shown on the site plan does not match the layout of the landscaping plan. To meet pollutant mitigation requirements, we suggest directing runoff from the existing concrete gutter to flow through a landscape area, such as a parking island, rather than retrofitting a dirt swale in the brow ditch. Please see the checkprint for details. 2. Please note the removal and replacement of the driveway apron fronting Camino Vida Roble. 3. The proposed gate should be located so that in the event the gate is closed, vehicles have an area to turnaround as opposed to backing out on to Camino Vida Roble. Attached is a redlined check print set of the project. Please forward this plan set to the applicant for corrections and changes as noted. The applicant must return this plan set with the corrected plans to assist us in our continued review. If you have questions regarding any of the comments above, please contact me at extension 4380. KENNETH W. QUON Associate Engineer c: Bob Wojcik, Principal Civil Engineer