TO: TERESA WOODS, ASSOCIATE PLANNER
FROM: Associate Engineer Quon
PROJECT ISSUES STATEMENT
PAC BELL CENTRAL OFFICE, CUP 154C
The Engineering Department has completed its review of the resubmitted project application for
completeness and/or engineering issues. The project application is now or was previously found
complete for the purpose of continued engineering review. The project application does contain
some engineering issues or concerns which remain to be resolved by the applicant. All
engineering issues should be fully resolved or addressed prior to resubmitting the project for our
review. The outstanding engineering issues or concerns are as follows:
1. The layout of the parking area in the vicinity of the existing concrete gutter that is shown
on the site plan does not match the layout of the landscaping plan. To meet pollutant
mitigation requirements, we suggest directing runoff from the existing concrete gutter to
flow through a landscape area, such as a parking island, rather than retrofitting a dirt
swale in the brow ditch. Please see the checkprint for details.
2. Please note the removal and replacement of the driveway apron fronting Camino Vida
Roble.
3. The proposed gate should be located so that in the event the gate is closed, vehicles
have an area to turnaround as opposed to backing out on to Camino Vida Roble.
Attached is a redlined check print set of the project. Please forward this plan set to the applicant
for corrections and changes as noted. The applicant must return this plan set with the corrected
plans to assist us in our continued review. If you have questions regarding any of the comments
above, please contact me at extension 4380.
KENNETH W. QUON
Associate Engineer
c: Bob Wojcik, Principal Civil Engineer