HomeMy WebLinkAboutCUP 154C; Pacific Bell Expansion; Conditional Use Permit (CUP) (37),-
June 24, 1996
TO: TERESA WOODS, ASSOCIATE PLANNER
FROM: Associate Engineer Quon
VIA: Principal Civil Engineer
VIA: Assistant City Engineer
CONDITIONS TRANSMITTAL
PAC BELL CENTRAL OFFICE, CUP 154C
The Engineering Department has completed its review of the subject project. The Engineering
Department is recommending that the project be approved subject to the following conditions:
General
43. Prior to hauling dirt or construction materials to or from any proposed construction site
within this project, the developer shall submit to and receive approval from the City
Engineer for the proposed haul route. The developer shall comply with all conditions
and requirements the City Engineer may impose with regards to the hauling operation.
47. The developer shall pay all current fees and deposits required.
+ Prior to issuance of building permit, the applicant shall obtain a City right-of-way
permit to remove and replace the driveway apron on Camino Vida Roble.
If you have questions regarding any of the comments above, please contact me at extension
4380.
KENNETH W. QUON
Associate Engineer