Loading...
HomeMy WebLinkAboutCUP 154D; Pacific Bell; Conditional Use Permit (CUP) (10)TO: Van Lynch, Associate Planner FROM: David Rick, Assistant Engineer DATE: June 2,2000 CUP 154D: PACIFIC BELL- CAMINO VlDA ROBLE COMPLETENESS & ISSUES REVIEW Engineering Department staff has completed a review of the above-referenced project for application completeness. The application and plans submitted for this proposed project are currently incomplete and unsuitable for further review due to the following incomplete items: 1. A Preliminary Title Report dated within the last 6 months. The following issues need to be resolved prior to next submittal: 1. 2. 3. 4. A grading permit will be required. The processing time for a grading permit is approximately 3 months. The grading permit will need to be issued &the grading will need to be completed before a building permit can be issued. In addition, the Conditional Use Permit Amendment will need to be approved before the grading plan check process can begin. This site will need to be upgraded to comply with the National Pollutant Discharge Elimination System. Show how the surface runoff within the parking lot will be filtered for pollutants (oil, rubber, brake dust, etc.) before exiting the property. One possible method would be to replace the concrete swale located at the west side of the property with a grass-vegetated swale. Such a design would filter surface pollutants from the rear portion of the parking lot. Filtration of the front portion of the parking lot needs to be addressed as well. The existing design of cobblestone rock and ivy is insufficient for filtration. Also, the storm drain note on the plan would only apply to inlets of which there are none. A 5 foot wide sidewalk will need to be installed. Please show the proposed 5 foot wide sidewalk on the grading plan. At least 48 inches of sidewalk clearance must be maintained so the fire hydrant will probably need to be relocated. Please note that that the sidewalk installation and the 5 foot street dedication shown on the grading plan will need to be completed before the building permit can be issued. The processing time for the easement dedication will take approximately 3 months. Processing of this easement dedication may begin prior to processing of a Conditional Use Permit Amendment. Unless the entrance gate is to be removed, show the gate and keypad on the plan. Provide a turn around for vehicles waiting at the gate. Vehicles entering the site should not be required to back onto Camino Vida Roble in the event that the gate does not open. 5. A water easement must be recorded over the new location for the fire hydrant and water main. Show the existing and proposed location of the water easement and water main. A construction change will also be required to alter the water improvement plans (DWG 348- 9). The project will be conditioned accordingly. 6. Add the Average Daily Trips generate by the proposed use on the site plan. 7. Provide additional TW and FL elevations along the wall located along the west end of the property. 8. Is a trash receptacle located on site? If so, where is it located? Circulation for the trash truck must be provided such the truck can exit the site in a forward position. If you or the applicant has any questions, please either see or contact me at extension (760) 602-2781. DAVID RICK Development Services Division