HomeMy WebLinkAboutCUP 190B; Sudan Interior Mission (SIM USA); Conditional Use Permit (CUP) (4)CITY OF CARLSBAD
ENGINEERING DEPARTMENT
LAND USE REVIEW
May 10, 2007
TO: Dan Halverson - Project Planner
FROM: David Rick - Assistant Engineer
COMPLETENESS REVIEW
PROJECT ID: CUP 190(B) SIM USA
The Engineering Department has completed its review of the above referenced project for
compliance with the previously determined issues. The project appears to comply with City
engineering standards and all issues have been addressed. Please add the following conditions
of approval to the approving resolution or letter:
General
1. Property owner shall comply with the City's requirements of the National Pollutant
Discharge Elimination System (NPDES) permit and the City's SUSMP. Property owner
shall provide improvements constructed pursuant to best management practices as
referenced in the "California Storm Water Best Management Practices Handbook" to
reduce surface pollutants to an acceptable level prior to discharge to sensitive areas.
Improvements shall include installing a storm drain inlet filter in the drain inlet on
Sweetbriar Circle prior to the next annual review and to the satisfaction of the City
Engineer. Property owner shall notify prospective owners and tenants of the following:
A. All owners and tenants shall coordinate efforts to establish or work with
established disposal programs to remove and properly dispose of toxic and
hazardous waste products.
B. Toxic chemicals or hydrocarbon compounds such as gasoline, motor oil,
antifreeze, solvents, paints, paint thinners, wood preservatives, and other such
fluids shall not be discharged into any street, public or private, or into storm drain
or storm water conveyance systems. Use and disposal of pesticides, fungicides,
herbicides, insecticides, fertilizers and other such chemical treatments shall meet
Federal, State, County and City requirements as prescribed in their respective
containers.
C. Best Management Practices shall be used to eliminate or reduce surface
pollutants when planning any changes to the landscaping and surface
improvements.
2. Developer shall cause property owner to process, execute and submit an executed copy
to the City Engineer for recordation a City standard Permanent Stormwater Quality Best
Management Practice Maintenance Agreement for the perpetual maintenance of all
H:\LIBRARY\ENG\WPDATA\MISC\COMPREV
treatment control, applicable site design and source control, post-construction
permanent Best Management Practices prior to the next annual review of this
Conditional Use Permit.
3. The property owner shall take measures to stabilize the driveway entrance on
Aviara Parkway to prevent erosion and the movement of debris into the public right-
of-way. Material and application of said material for the driveway shall be
permanent and is subject to the City Engineer's approval.
If you or the applicant has any questions regarding the above, please either see or call me at
extension 2781.
Rick
Assistant Engineer - Development Services Division
H:\LIBRARY\ENG\WPDATA\MISC\COMPREV
PLANNING DEPT
CARLSBAD FIRE DEPARTMENT TRACKING DESK
Fire Prevention Division REC'D:
PROJECT REVIEW REPORT
PROJECT NAME: Sudan Interior Mission
Date: 04/03/07
Project number: CUP 190B
Staff Planner: D. Halverson Engineer:
Project conditions: (Note: The following identifies specific conditions necessary to achieve
Fire Department approval.)
Fire has no comments or conditions regarding this application.
GR
PLANNING DEPT
TRACKING DESK
March 16, 2007
TO: Dan Halverson
Michele Masterson, Management Analyst
Michelle Lenkowski, Senior Office Specialist
FROM: Michael Elliott, City of Carlsbad's Contract Landscape Architect
RE: Landscape Architectural Review - Conceptual Review - 1st Review
SIM USA, CUP 190B
PELA file: 238 - SIM USA - Conl
Owner: SIM USA, c/o George Salloum, Phone: (704) 588-4300
There were no landscape plans provided with this project, therefore no landscape review has
been provided. Grading plans are returned for City use.
c
Memorandum
TO: Dan Halverson - Project Planner
FROM: David Rick - Project Engineer
DATE: April 3, 2007
CUP 1 SOB SIM USA
COMPLETNESS AND ISSUES REVIEW
Engineering Department staff has completed a review of the above-referenced project
for completeness and engineering issues of concern. All items needed for engineering
review are provided for determining the application as complete. Engineering issues
which need to be resolved or adequately addressed prior to staff making a
determination on the proposed project are as follows:
1. Submit a completed storm water requirements applicability checklist. Checklist is
attached.
If you or the applicant has any questions, please either see or contact me at 602-2781.
RICK
Assistant Engineer
Engineering Development Services Division