Loading...
HomeMy WebLinkAboutCUP 265x2; Stagecoach Park; Conditional Use Permit (CUP)MCUP & CUP ANNUAL REVIEW SHEET INSTRUCTIONS 1. COMPLETE PROJECT INFORMATION BELOW AND PRINT COPY. 2. DOWNLOAD (DMS) RESOLUTIONS AND REVIEW ALL CONDITIONS AND APPROVED PLANS (COORDINATE WITH OTHER DEPARTMENTS). 3. REVIEW CODE COMPLAINT HISTORY (CODE ENFORCEMENT, POLICE, FIRE, ETC.). 4. CONTACT APPLICANT (OR OWNER) AND SCHEDULE AN APPOINTMENT FOR THE REVIEW. 5. COMPLETE REVIEW INFORMATION SECTION DURING REVIEW. 6. HAVE PRINCIPAL PLANNER REVIEW AND SIGN. 7. PLACE COMPLETED REVIEW SHEET IN ADMIN IN-BOX FOR PROJECT FILE (ADMIN WILL FILE). PROJECT CASE NAME: Stagecoach Park CASE NUMBER(S): CUP 265 X& APPROVING RESO NO(S). 4974 INFORMATION PLANNER COMPLETING REVIEW: Scott Donnell PROJECT HISTORY Does project have a code complaint history? |~~| Yes [X] No If yes, check those that apply and explain below. f~~l Code Enforcement [ [ Police [~~[ Fire Prevention Comments (include corrective actions taken and date compliance obtained): The city originally approved CUP 265 on 6/12/85 (Reso 2452) for 5 years. On 7/9/90, Reso 3060 for CUP 265x1 was retroactively passed for a ten year extension. On 7/16/03, Reso 5438 was retroactively passed for CUP 265x2 and included no expiration. H/ADMIN/TEMPLATE/MCUPANNUALREVIEWSHEET O3/O9 REVIEW INFORMATION Has the permit expired? [~1 Yes Date of review: July, August 2010 Name: City of Carlsbad No Permit expires: No expiration If other, state title: "CURRENT APPLICANT INFORMATION: Name: City of Carlsbad Contact name (if different): see below Address: Applicant 1X1 Owner I I Other Phone: Mailing (if different): E-mail:(optional) "CURRENT OWNER INFORMATION: Name: City of Carlsbad Phone: Contact information: Kyle Lancaster, Parks and Recreation Department, 799 Pine Avenue, Carlsbad, CA 92008, 434.2941. - Mailing (if different): E-mail: kyle.lancaster@carlsbadca.gov (optional) Does project comply with conditions of resolution(s) and approved plans? IX] Yes [ 1 No If no, list below the condition(s) and/or plan aspects the project is not in compliance with per resolution number or exhibit. Comments: Original resolution 2452 has conditions 17 to 19 that still require consideration. They regarding outdoor lighting, ball field hours of use, and a minimum buffer strip between ball fields and riparian vegetation. Kyle Lancaster indicates hours of use and lighting orientation/timing have remained the same over the last several years and he sees no issue with continuing to comply with these conditions. Regarding the requirement for a 50' buffer strip between the riparian area and ball fields, while it is difficult to tell the extent of riparian vegetation in 1985, it is likely its area has increased with development and increased runoff. Kyle indicates the ball fields have not been moved over the past several years and a ring road establishes a buffer between the fields and vegetation. Review of aerials over past several years shows the edge of the ball fields could easily meet the 50' buffer. Riparian vegetation seems to be about 100 to 130 feet wide. There are no conditions of concern from Resolution 3060. Conditions 5 and 6 of Reso 5438 regard submittal and approval of a SWMP and installation of stormwater BMPs within certain time frames. Land Development Engineering in the attached memo indicates these conditions are effectively satisfied. Corrective action(s) to be taken: None. Date pi completed follow-up review and confirmed project compliance:Me./ Planner Signature Principal Planner Signature * Applicant and owner information must be updated for annual review to be complete. H/ADMIN/TEMPLATE O3/O9 FILE CO! Scott Donnell From: Jeremy Riddle Sent: Wednesday, August 18, 2010 9:12 AM To: Scott Donnell Cc: Glen Van Peski Subject: Stagecoach Park CUP 265x2 Scott- In regards to conditions 5 and 6 of PC Resolution 5438 (a CUP extension for Stagecoach Park), these conditions are effectively satisfied as they are no longer required based on the City's current Standard Urban Stormwater Management Plan (SUSMP). Per the SUSMP, existing/established projects (i.e.: no development proposed) are not subject to Priority Development Project requirements. Therefore preparation of a SWMP and installation of permanent treatment BMP's are not required for this project. Please contact me if you have any questions. Thanks. CARLSBAD Jeremy Riddle Associate Engineer Land Development Engineering City of Carlsbad www.carlsbadca.gov P: 760-602-2737 F: 760-602-1052 jeremy. riddle@carlsbadca.Rov