HomeMy WebLinkAboutCUP 85C; Pilgrim United Church of Christ; Conditional Use Permit (CUP) (8)Date: February 2,1999
Planning Department
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, California 92009
TO: Anne Hvsonn
FROM: Kellv Efimoff CMWD NO. 99-C.503
SUBJECT: Pilgrim Church and Children’s Center CUP 85C
The District is providing comments on the subject project dated January 8, 1999. The
District has reviewed the subject project, based on our review of the project, we have
the following comments regarding potable water, recycled water and sewer systems:
_.I .-
1. The Developer shall provide detailed information to the District Engineer
regarding water demand, irrigation demand, fire flow demand in gallons per
minute, and projected sewer flow in million gallons per day.
The entire potable water system, recycled water system and sewer system shall
be evaluated in detail by Developer and District Engineer to insure that adequate
capacity, pressure and flow demands can be met. The Developer/Developer’s
Engineer shall meet with the District Engineer or his representative for a
preliminary review of potable water, recycled water and sewer facility
requirements. See Comment No. 4, below.
3. All District pipelines, pump stations, pressure reducing stations and
appurtenances required for this project by the District shall be within public right-
of-way or within easements granted to the District or the City of Carlsbad
w
2.
Page 2
Planning Department
Date: December 17, 1998
4. Sequentially, the Developer's Engineer shall do the following:
A. Meet with the City Fire Marshal and establish the fire protection
requirements.
B. Prepare and submit a colored recycled water use area map and submit
this map to the Planning Department for processing and approval by the
District Engineer.
Prior to the preparation of sewer, water and recycled water improvement
plans, the Developer shall submit preliminary system layouts to the District
Engineer for review, comment and approval.
All potable water and recycled water meters shall be placed within public right of
way.
A public fire flow system may be required for this industrial or commercial
development, and it shall be constructed as a looped pipeline system as directed
by the District Engineer to serve fire hydrants and/or meet fire flow requirements.
C.
5.
6.
9. The Developer ' Engineer shall submit all sewer lateral connections to the District
for approval. For this project, sewer lateral connections will be made in Chestnut
If you have any questions, please contact the undersigned.
Kelly Efimoff
Associate Engineer
. KJE:kje