Loading...
HomeMy WebLinkAboutCUP 99-30; Cannon Court; Conditional Use Permit (CUP) (8)ENGINEERING, INC. CONSTRUCTION TESTING & ENGINEERING, INC. SAN DIEGO, CA 2414 Vineyard Ave. Suite G Escondido, CA 92029 (7W) 746-4955 (760) 746-9806 FAX RIVERSIDE, CA 490 E. Princeland Ct Suite 7 Corona, CA 91719 (909) 371-1890 (909) 371-2168 FAX VENTURA, CA 1645 Pacific Ave. Suite 105 Oxnard, CA 93033 (661) 486-6475 (661) 486-9016 FAX TRACY, CA 242W. Larch Suite F Tracy, CA 95376 (209) 839-2890 LANCASTER, CA 42156 10th St. W. UnitK Lancaster, CA 93534 (661) 726-9676 December 10, 1999 (209) 839-2895 FAX (661) 726-9676 FAX CTEJobNo. 10-3715 Mr. John Buza West Development, Inc. P O Box 676066 Rancho Sante Fe, Ca 92067 Subject: Limited Phase n Environmental Site Assessment Proposed Cannon Court Development APN 223-051-12 Cannon Court, Carlsbad, Califomia Mr. Buza: At your request, we have performed a limited Phase n Environmental Site Assessment (ESA) at the referenced site. Specifically, we collected near-surface soil samples for analysis at an environmental testing laboratory to evaluate the possibility that these soils contain agricultural chemicals. The use of agricultural chemicals at this site was previously identified in a Phase I ESA prepared in 1998 by Converse Consultants. Figure 1 shows the general location of the site. Soil Sampling and Analysis During the course of our geotechnical investigation at this site, we collected soil samples for environmental analysis from each of our seven geotechnical borings. The samples for environmental laboratory analysis were collected at approximately two to three feet below grade (fbg). Figure 2 shows the approximate locations of our borings. Boring logs are appended to this report. Since the samples were intended to screen for the potential presence of agricultural chemicals the samples were composited before delivery to the State of Califomia- certified Pacific Treatment Analytical Services, Inc. (PTAS) laboratory. Three soil samples were sent to the PTAS laboratory. The samples were designated as follows: B-l, B-4; B-2, B-3; and, B-5, B-6, B-7. These designations were intended to clarify the borings from which each composite sample came. Appropriate protocols (outlined in the San Diego County, Department of Environmental Health manual) were followed to ensure the integrity of the samples. Additionally, all GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION Limited Phase II Environmental Site Assessment APN 223-051-12 Proposed Cannon Court Development, Carlsbad, Califomia December 13, 1999 Page 2 CTE Job No. 10-3715 samples were retained in an iced cooler immediately following their collection and were delivered under chain-of-custody protocol. Each sample was analyzed for: chlorinated herbicides (using EPA Method 8150) and organochlorine pesticides (using EPA Method 8081). Copies of the complete laboratory reports (including QA/QC data and chain-of-custody) are appended to this report. Laboratorv Results Presented on the Table below are the results of the laboratory testing. Listed are the constituents detected in each of the analyzed samples and their concentrations. If a constituent is not detected it is not listed on the table. For a complete list of the tested constituents please see that attached laboratory reports. If "none" appears in the constituents column this indicates that no constituents were detected at the laboratory detection limits used per the recognized laboratory protocol. For additional quality control a duplicate sample was analyzed at random. These results are also shown on the Table below. ENVIRON TABLE MENTAL LABORATORY ANALYSES Sample Designation Detected Chlorinated Herbicides and Concentrations Detected (in |ig/kg) Detected Organochlorine Pesticides and Concentrations Detected (in fxg/kg) B-l, B-4 None Toxaphene (4,540) B-l, B-4 (duplicate) None Not analyzed B-2, B-3 None Toxaphene (6,620) B-5, B-6, B-7 None Toxaphene (22,200) Interpretation and Recommendations The only constituent detected, during the selected analyses, was toxaphene. Toxaphene is also known as chlorinated camphene. It is an amber, waxy solid that decomposes with prolonged exposure to sunlight. Per the NIOSH Guide to Chemical Hazards, the exposure limits are 0.5mg/m^. These levels are several orders of magnitude greater than the expected concentrations to be encountered during constmction at this site. We anticipate that grading activities (mixing and blending of the soil) will further reduce the detected concentrations of toxaphene. Additionally, we anticipate that once constmction is complete and the project is covered with asphalt and concrete pavements that exposure of workers or customers is not expected to be a concem. Once grading is complete, we recommend that additional soil samples be collected and analyzed to determine their concentrations of toxaphene. K additional actions are F:\10-3715\Rpt_Umited Phase H ESA.doc Limited Phase n Environmental Site Assessment APN 223-051-12 Proposed Cannon Court Development, Carlsbad, Califomia December 13, 1999 Page 3 CTE Job No. 10-3715 required, they can be implemented at that time. Examples of additional actions would include thicker concrete slabs or the placement of vapor barriers. If you have any questions regarding our findings or recommendations, please do not hesitate to contact this office. The opportunity to be of service is appreciated. Respectfully submitted, CONSTRUCTION TESTING & ENGINEERING, INC. Rodney D. Ballard, GE #2173 Geotechnical Engineering Manager an Goodmacher, REA#6043 gistered Environmental Assessor F:\10-3715\Rpt_Umited Phase 0 ES.A.doc \ ^^ A 1/4 1320 12 1 MILES , CONST RUCTION TESTING & ENGFNEERING, INC. GEOTEfHNTC . A::D CONSTR LCTION ENOrNEERINO TESTING AND INSPECTION :4M.1N:' :.-AVE\UE STEG ESCONDIDO C.^ 1)2029 1760) 746-li>S5 2640 5280 FEET SOllRCF. THOMAS BROTHERS MAPS 1996 SAN DIEGO EDITION SITE INDEX MAP PROPO.SED CANNON COURT DEVELOPiMENT C ANNON COURT CA-iiLSBAD, CALIFORNIA CTE JOB NO: 10-3715 SCALE DATE: 12/99 AS SHOWN fldlM: . \\F:\PROJECTS\ 10-3715\INDEXMAP CNV Q < O Z o < RAILROAD TRACKS z o < U • z o u o .J u < li a. < O < < u a a z < o z ee: -< a. V3 U o: H U 3 ai t- t« a u o 0. O 06 Cu b O u z • 3 o ^ z u ae H3 WGRAPHICS I\PROJECTS\I0-3509\E,XPLORE MAP CVS < u CO ^CONSTRUCTION TESTING & ENGINEERING, INC, OEOTECHNICAL AND CONSJRUCTION ENGINEERING TESTINO AND INSPECTION :J U VINE YARD AVENU E. SUITE C ESCONDIDOCA 'I ;n J') i 7M11 46.49 ! 3 EKOWtRlKOJNC PROJECT: CTE JOB NO. LOGGED BY: Cannon Court 10-37150 DU DRILLER: West Hazmat DRILL METHOD: 8" HollowStem Auger SAMPLE METHOD Drive SHEET: 1 of I DRILLING DATE: 11/1/99 ELEVATION: •5s i CQ 0 c >. O D BORING: B-l DESCRIPTION Laboi^toiy Tests -0-Gravel, concrete chunks, leaves at surface TOPSOIL/DISTURBED SOIL: 5- 40- 45- 20- 25- 110/6' 25 25 25 17 17 25 50/6" I 35 50/6" OUATERNARTY TERRACE DEPOSITS SM Very dense, dry, brown, silty fine SAND SM Dense, moist, orange to brown, silty SAND 106.7 5.2 SM Very dense, moist, orange tan, with some dark mineral grains, silty fine SAND with decreasing fines. MD SM Very dense, moist, light brown to tan, silty fine SAND, with trace ro x gravel in top 6" of sampler Very dense, moist to wet, orange to tan, GRAVEL with coarse sand and trace silt in bottom 6 " WA GS TotalDepth: 16 feet No refusal Water table at approximately 16 feet Boning Backfilled with soil cuttings FIGURE:! ^^CONSTRUCTION TESTING & ENGINEERING, INC. GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTINO ANO INSPECTION 24 I 4 V INE Y ARD AV ENIU E SUITE a ESCONDIDOCA 9 2 0 2 9 ('60 ) 7 46 .4 9 5 5 H-<:iNEE»0.".:jNC PROJECT: CTE JOB NO: LOGGED BY: Cannon Court 10-3715G DU DRILLER: West Hazmat DRILL METHOD: 8" HollowStem Auger SAMPLE METHOD Drive SHEET: I DRILLING DATE: ELEVATION: of I lt/I/99 o V5 vi (J yi BORING: B-2 DESCRIPTION Laboratory Tests Gravel, leaves, debris on surtace TOPSOIL/DISTURBED SOIL: 9 9 ? ? OUATERNARTY TERRACE DEPOSITS •5- 40- 45- -20- 55- 7 56 / 45 50 50 50 25 30 40 z 35 50/6" SM Very dense, moist, brown, silty fine SAND 120.6 6.0 SM Very dense, moist, orange to light brown, silty SAND SM .Very dense, moist, orange to tan, silty SAND 115.2 11.5 SM I Very dense, wet, light gray to light tan, silty SAND with jmica. Mediimi to coarse grained sand, decreased fmes. Total depth: 17 feet No refusal Water table at approximately 16 to 16.5 feet below grade. Borring Backfllled with soil cuttings MD WA MD FIGURE: ^CONSTRUCTION TESTING & ENGINEERING, INC. GEOTECHNICAL AND CONSTRUCTION ENOINEERING TESTING AND INSPECTION 2414 VINEYARD AVENUE. SUITE 0 ESCONDIDO CA 92029 (700) 746.4953 ENCINEERING.INI: PROJECT: CTE JOB NO: LOGGED BY: Cannon Court 10-3715G DU DRILLER: West Hazmat DRILL METHOD: 8" HollowStem Auger SAMPLE METHOD Drive SHEET: I DRILLING DATE: ELEVATION: of 1 11/1/99 yi yi U a cs 5 BORING: B-3 DESCRIPTION Laboratory Tests - ^ Gravel at surface TOPSOIL/DISTURBED SOIL: -5- 40- 45- _ _ -20- 55- 7 47 30 22 17 14 16 21 30 OUATERNARTY TERRACE DEPOSITS SM 116.0 5.3 Very dense, moist to dry, dark brown, silty fine SAND Composite Sample EPA 8150, 8081 SM ! Dense, moist, orange to light tan, silty SAND MD SP-SM; j Medium dense, moist, light gray to white, medium to fine SAND : occasional iron staining WA SM Very dense, moist, light gray to white,silty SAND with gravel Increased moisture I Total depth: 16.5 feet No refusal jNo groundwater Boring Backfilled with soil cuttings WA,GS ' I FIGURE:! ^^.CONSTRUCTION TESTING & ENGINEERING, INC, OEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION 24 I 4 V INE YARD AV EMU E. SUITE G ESCONDIDOCA 9 2 n 2 9 (7 (.0 I 7 46 .49 i 5 E>"GINEERING,rNC PROJECT: CTE JOB NO: LOGGED BY: Cannon Court 10-3715G DU DRILLER: West Hazmat DRILL METHOD: 8" HollowStem Auger SA.MPLE METHOD Drive SHEET: I of 1 DRILLING DATE: 11/1/99 ELEVATION: Q Q o .c P y? yi yi BORING: B-4 DESCRIPTION Laboratory Tests •0-Gravel and debns on surtace 9 9 9 — 60/6" -5' 25 27 37 45-1 27 40 50 -20- I 1 25 OUATERNARTY TERRACE DEPOSTIS SM Very dense, dry, dark brown, silty fine SAND SM i Very dense, moist, orange to brown, silty SAND 117.2 SM , j Ver}'dense, moist, brown, siity SAND MAX SM I ! Very dense, moist, dark reddish brown to orange, silty SAND with Imica^^ediimUo^coa^ MD,DS jTotal depth 11.5 feet 'No refusal •No groundwater I Borring Backfllled with soil cuttings FIGURE: ^^.CONSTRUCTION TESTING & ENGINEERING, INC, GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTINO AND INSPECTION 24 14 Vf'.EYARD AVENUE. SUITE G ESCONDIDOCA 9 2 9 2 9 (760 i 7 46 .4 9 3 5 PROJECT: CTE JOB NO: LOGGED BY: Cannon Court 10-3715G DU DRILLER: West Hazmat DRILL METHOD: 8" HollowStem Auger SAMPLE METHOD Drive SHEET: I of 2 DRILLING DATE: 11/1/99 ELEVATION: Q ca Q 5 >< •= S o CO o S >, y5 yi yi BORING: B-5 DESCRIPTION Laboratory Tests -0-l all grasses, some gravel and debris on surface TOPSOIL/DISTURBED SOIL: 45-i H- 20- rr- ^5H 34 38 40 30 40 40 10 15 20 SM SM SM SP OUATERN./^RTY TERRACE DEPOSTIS Very dense, moist, dark brown, silty fine SAND SM 'Very dense, moist, orange to brown, silty SAND Grades to light brown light tan, silty SAND SM ' ,Ver>-dense, moist, orange to tan, silty SAND I Verv dense, moist, light gray, silty SAND •Very dense, moist,orange to white-tan, mottled coarse SAND AL CH )Hard , moist, gray-orange mottled, CLAY FIGURE:! JT^^.CONSTRUCTION TESTING & ENGINEERING, INC, GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION 24 I 4 VINE V ^RD AV E'NUE. SUITE 0 ESCONDIDOCA 9 2 0 2 9 (7 6,n 46 .4 9 5 3 ENOINEERIKfilNi: PROJECT: Cannon Court CTEJOBNO: 10-3715G LOGGED BY: DU DRILLER: West Hazmat DRILL METHOD: 8" HollowStem Auger SAMPLE METHOD Drive SHEET: 2 of 2 DRILLING DATE: 11/1/99 ELEVATION: CQ Q CJ yi BORING: B-5 DESCRIPTION Laboratory Tests -2^ Z Hard , moist, gray-orange mottled, CLAT" 30 50/6" CH SM Very dense, mioist, light gray with occasional orange, silty i>ANU decreased fmes I-30-20 40 50 SP ; ; No recovery 'Very dense, light gray to white, raedium to coarse SAND r 0 20 70/6" 108.5 5.3 SM uo- 45H - -50- 45 60/6" 35 60/6" ' SP-SM I ' Very dense, moist, light tan to gray with orange, silty SAND Cuttings are wet at about 38 feet I Very dense, wet, white-gray with orange staining medium to coarse 1 > with silt. SM I Very dense, wet, light gray, silty SAND 'Total depth: 46 feet No refusal i Groundwater at about 38 feet ' Borring Backfilled with soil cuttings MD WA WA FIGURE:! #rl*CO^'STRUCTION TESTING & ENGINEERING, INC. OEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION 24 I 4 VINE Y ARD AV%NL E. SUITE G ESCONDIDOCA 9 2 0 2 9 17 60) 746-4953 ENOINCTUhOINC PROJECT: CTE JOB NO: LOGGED BY: Cannon Court 10-3715G DU DRILLER: West Hazmat DRILL METHOD: 8" HollowStem Auger SAMPLE .METHOD Drive SHEET: 1 DRILLING DATE: ELEVATION: of 1 11/1/99 Q a 5 CQ Q o 2 o yi BORING: B-6 Laboratory Tests DESCRIPTION -0-I'all grasses, some grave! and debris on surface 9 9 9 9 9 OUATERNARTY TERRACE DEPOSTIS 87/6" -5- AO- J 21 42 50 I I I 1 I [2S- 34 50/6" SM Very dense, dry, orange brown, silty SAND with minor organic root SM SM Very dense, moist, orange to brown, silty SAND (Grades to tan, siltv- S.\ND ( SM ! Very dense, moist, orange brown, silty SAND DS SM i 'Grades to light brown to tan. silty SAND with minor gravel I SP/SM [Grades to silty, medium to coarse SAND 96.0 ' 7.8 i SM •Very dense, moist, light gray to white, silty SAND MD Total depth 21 feet iNo refusal No groundwater Borring Backfilled with soil cuttings ( t FIGURE:! ^^CONSTRUCTION TESTING & ENGINEERING, INC. UEOTE HNiCAL AND CONSTRUCTION ENCINEERING TESTING AND INSPECTION V IN E Y ARD AVt N UE. SU ITE G ESCONDIDOCA 9 2 0 2 9 i 7 6(11 7 4(,. 4,) 5 5 ENOINFERING.r*: PROJECT: CTE JOB NO: LOGGED BY: Cannon Court 10-3715G DU DRILLER: West Hazmat SHEET: I of I DRILL METHOD: 8" HollowStem Auger DRILLING DATE: 11/1/99 SAMPLE METHOD Drive ELEVATION: ca BORING: B-7 DESCRIPTION Laboratory Tests t ail grasses, some gravel, and debris on surface 9 9 9 •? 9 . OUATERNARTY TERRACE DEPOSTIS 2 100/6" SM Very dense, dry. brown, silty SAND -5- h- - rl5- - J ! SM Very dense, moist, orange, silty SAND SM I Very dense, moist, dark brown, silty SAND, with clay. WA SM Grades to tan, silty SAND 95.2 3.8 SP Very dense, moist, white to light gray with orange blotches, coarse SAND MD jTotal depth 16 feet 'No refusal No groundwater • Borring Backfilled with soil cuttings FIGURE:! Pacific Treatment 4340 Viewridge Avenue, Suite A • San Diego, CA 92123 Analytical Services, Inc. (858) 560-7717 (858) 560-7763^ Aiwlytical Cheniistry Laboratory November 11,1999 Constmction Testing & Engineering, Inc. Atto: Jay Lynch 2414 Vineyard Avenue, Suite G Escondido, California 92029 Project Name/No.: None Laboratory Log No.: 2123-99 Date Received: 11/02/99 Sample Matrix: Three soil samples PONo.: 10-0245 Please find the following enclosures for the above referenced project identified: 1) Analytical Report 2) QA/QC Report 3) Chain of Custody Form .Certificate of Analysis.. Samples were analyzed pursuant to client request utilizing EPA or other ELAP approved methodologies. Date of extraction, date of analysis, detection limits and dilution factor are reported for each compoimd analyzed. All samples were analyzed within the method required holding time fi'om sample collection. Data for each analytical method was evaluated by assessing the following QA/QC functions, as appUcable to the methodology: • Quality Control Standard • Surrogate Percent Recovery • Laboratory Control Sample (LCS) percent recoveries for all analyses • Matrix Spike Recovery/Matrix Spike Duplicate Recovery (MSR & MSDR) and/or • Relative Percent Difference (RPD fi-om MSR & MSDR) I certify that this data report is in compliance both technically andfor completeness. Release of the data contained in this hardcopy data report has been authorized by the following signature. anis Columbo ice President/Laboratory Director Water • Soil • Waste • Wastewater • Marine Sediment & lissues • Elutriate Anal)rses That Produce Results! ANALYSIS RESULTS - EPA 8150 CHLORINATED HERBICIDES CLIENT: CONSTRUCTION TESTING & ENGINEERING PROJECT NAME/No.: NONE PTAS LOG #: METHOD BLANK SAMPLE ID: N/A DILUTION FACTOR: 1 DATE SAMPLED: N/A DATE RECEIVED: N/A DATE EXTRACTED: 11/05/99 DATE ANALYZED: 11/09/99 MATRIX: SOLID SAMPLE V0L7WT.: 50 G ANALYTE REPORTING LIMITS RESULTS PPB (UG/KG) PPB (UG/KG) 2,4-D 24 ND 2,4-DB 18.2 ND 2.4.5-T 40 ND 2,4,5-TP (SILVEX) 3.4 ND DALAPON 116 ND DICAMBA 5.4 ND DICHLOROPROP 13 ND DINOSEB 1.4 ND MCPA 4980 ND MCPP 3840 ND SECOND COLUMN CONFIRMATION PERFORMED ON ALL DETECTED ANALYTES. ND = ANALYTE NOT DETECTED AT OR ABOVE THE INDICATED REPORTING LIMH" REPORTING LIMITS AND RESULTS HAVE BEEN ADJUSTED ACCORDINGLY TO ACCOUNT FOR DILUTION FACTOR. PTAS DCN 300-010 (Rev 4«9) Pacific Treatment Analytical Services, Inc. 4340 viewidge AW.. suite A • san Diego, CA 92123 (858) 560-7717 FAX (BSB) 560-7733 ANALYSIS RESULTS - EPA 8150 CHLORINATED HERBICIDES CLIENT: CONSTRUCTION TESTING & ENGINEERING PROJECT NAME/No.: NONE PTAS LOG #: 2123-99-1 SAMPLED): B-l,B-4 DILUTION FACTOR: 1 DATE SAMPLED: 11/01/99 DATE RECEIVED: 11/02/99 DATE EXTRACTED: 11/05/99 DATE ANALYZED: 11/09/99 MATRIX: SOIL SAMPLE VOLJWI.: 50 G ANALYTE REPORTING LIMITS RESULTS PPB (UG/KG) PPB (UG/KG) 2,4-D 24 ND 2,4-DB 18.2 ND 2.4.5-T 40 ND 2,4,5-TP (SILVEX) 3.4 ND DALAPON 116 ND DICAMBA 5.4 ND DICHLOROPROP 13 ND DINOSEB 1.4 ND MCPA 4980 ND MCPP 3840 ND SECOND COLUMN CONHRMATION PERFORMED ON ALL DETECTED ANALYTES. ND = ANALYTE NOT DETECTED AT OR ABOVE THE INDICATED REPORTING LIMTT REPORTING LIMITS AND RESULTS HAVE BEEN ADJUSTED ACCORDINGLY TO ACCOUNT FOR DILUTION FACTOR. : H ^ PTAS IX:N 300-010 (R(r/4»9) ^" Ifi^ Pacific Treatment Analytical Services, Inc. 4340 vie«|ds^ Ave., SUIB A • Sai oiego. CA ^123 (8S8) 560-7717 FAX (858) 560-7763 ANALYSIS RESULTS - EPA 8150 CHLORINATED HERBICIDES CLIENT: CONSTRUCTION TESTING & ENGINEERING PROJECT NAME/No.: NONE PTAS LOG #: 2123-99-2 SAMPLE ID: B-2, B-3 DILUTION FACT(»: 1 DATE SAMPLED: 11/01/99 DATE RECEIVED: 11/02/99 DATE EXTRACTED: 11/05/99 DATE ANALYZED: 11/09/99 MATRIX: SOIL SAMPLE V0L7WT.: 50 G ANALYTE REPORTING LIMITS RESULTS PPB (UG/KG) PPB (UG/KG) 2,4-D 24 ND 2,4-DB 18.2 ND 2,4.5-T 40 : ND 2,4,5-TP (SILVEX) - 3.4 ND DALAPON 116 ND DICAMBA 5.4 ND DICHLOROPROP 13 ND DINOSEB 1.4 ND MCPA 4980 ND MCPP 3840 ND SECOND COLUMN CONFIRMATION PERFORMED ON ALL DETECTED ANALYTES. ND = ANALYTE NOT DETECTED AT OR ABOVE THE INDICATED REPORTING LIMTT REPORTING LIMTTS AND RESULTS HAVE BEEN ADJUSTED ACCORDINGLY TO ACCOUNT FOR DILUTION FACTOR. "; i^' " • - ' • '. ;it'PTASDCN300-010(Rev4«9) • t^ific Trea^glent Analytltaf Services, Inc. 4340 viewidg^ Ave:, suite A • san Diego, CA 92123 (BSQ 560-7717 FAX (SS^ 560-7763 ANALYSIS RESULTS - EPA 8150 CHLORINATED HERBICIDES CLIENT: CONSTRUCTION TESTING & ENGINEERING PROJECT NAME/No.: NONE PTAS LOG #: 2123-99-3 SAMPLE©: B-5,B-6,B-7 DILUTION FACTOR: 1 DATE SAMPLED: 11/01/99 DATE RECEIVED: 11/02/99 DATE EXTRACTED: 11/05/99 DATE ANALYZED: 11/09/99 MATRIX: SOIL SAMPLE VOLiWT.: 50 G ANALYTE REPORTING LIMirS RESULTS PPB (UG/KG) PPB (UG/KG) 2,4-D 24 ND 2,4-DB 18.2 ND 2,4,5-T 40 ND 2,4.5-TP (SILVEX) 3.4 ND DALAPON 116 ND DICAMBA 5.4 ND DICHLOROPROP 13 ND DINOSEB 1.4 ND MCPA 4980 ND MCPP 3840 ND SECOND COLUMN CONFIRMATION PERFORMED ON ALL DETECTED ANALYTES. ND = ANALYTE NOT DETECTED AT OR ABOVE THE INDICATED REPORTING LIMTT REPORTING LIMTTS AND RESULTS HAVE BEEN ADJUSTED ACCORDINGLY TO ACCOUNT FOR DILUTION FACTOR. ' • PTAS IX::N 300-010 (Rev 4/99) Pacific Treatment Analytical Services, Inc. 4340 Ave., Su«e A • San oiegt^ CA 92123 (858) 560-7717 FAX (SSS) 560-7763 ANALYSIS RESULTS - EPA 8150 CHLORINATED HERBICIDES CLIENT: CONSTRUCTION TESTING & ENGINEERING PROJECT NAME/No.: NONE PTAS LOG #: 2123-99-1 (DUPLICATE) SAMPLE ID: B-l, &4 (DUPLICATE) DILUTION FACTOR: 1 DATE SAMPLED: 11/01/99 DATE RECEIVED: 11/02/99 DATE EXTRACTED: 11/05/99 DATE ANALYZED: 11/09/99 MATRIX: SOIL SAMPLE VOL./WT.: SOG ANALYTE REPORTING LIMITS RESULTS PPB (UG/KG) PPB (UG/KG) 2,4-D 24 ND 2,4-DB 18.2 ND 2,4,5-T 40 ND 2,4,5-TP (SILVEX) 3.4 ND DALAPON 116 ND DICAMBA 5.4 ND DICHLOROPROP 13 ND DINOSEB 1.4 ND MCPA 4980 ND MCPP 3840 ND SECOND COLUMN CONFIRMATION PERFORMED ON ALL DETECTED ANALYTES. ND = ANALYTE NOT DETECTED AT OR ABOA^ THE INDICATED REPORTINQ UMTT REPORTING LIMITS AND RESULTS HAVE BEEN ADJUSTED ACCORDINGLY TO ACCOUNT FOR DILUTION FACTOR. ff^ • T PTAS bdN3i0O-O10 (Rev 4/99) Pacific Treatmkri Analytical Inc. 4340 Vlewntge AW:. suite A • San Diego, CA 92123 (858) 560-7717 FAX (858) 560-7763 ANALYSIS RESULTS - EPA 8081 ORGANOCHLORINE PESTICIDES CLIENT: CONSTRUCTION TESTING & ENGINEERING PROJECT NAME/No.: NONE PTAS LOG #: METHOD BLANK SAMPLE ID: N/A DILUTION FACTOR: 1 DATE SAMPLED: N/A DATE RECEIVED: N/A DATE EXTRACTED: 11/04/99 DATE ANALYZED: 11/06/99 MATRIX: SOLID SAMPLE V0L7WT.: 30 G ANALYTE REPORTING LIMITS RESULTS PPB (UG/KG) PPB (UG/KG) ALDRIN 2 ND ALPHA-BHC 2 ND BETA-BHC 2 ND GAMMA-BHC (LINDANE) 2 ND DELTA-BHC 2 ND CHLORDANE 20 ND 4,4 DDD 2 ND 4,4 DDE 2 ND 4,4 DDT 2 ND DIELDRIN 2 ND ENDOSULFAN I 2 ND ENDOSULFAN II 2 ND ENDOSULFAN/SULFATE 2 ND ENDRIN 2 ND ENDRIN ALDEHYDE 2 ND HEPTACHLOR 2 ND HEPTACHLOR EPOXIDE 2 ND METHOXYCHLOR 20 ND TOXAPHENE 25 ND ND = ANALYTE NOT DETECTED AT OR ABOVE THE INDICATED REPORTING LIMIT REPORTING LIMITS AND RESULTS HAVE BEEN ADJUSTED ACCORDINGLY TO ACCOUNT FOR DILUTION FACTOR. SURROGATE PARAMETER TCMX ACCEPTANCE CRITERIA 26-146 % RECOVERY 85 0 ? ,"^ '' ^''y 'r PTAS DON 300-078 (Rev 4/99) Pacific TreaUmnt Analytl(0l Services, Inc. 4340 viewK^ Ave., Suite A • San oiego, CA 92123 (8S8) 560-7717 FAX (ase) 560-7763 ANALYSIS RESULTS - EPA 8081 ORGANOCHLORINE PESTICIDES CLIENT: CONSTRUCTION TESTING & ENGINEERING PROJECT NAME/No.: NONE PTAS LOG #: 2123-99-1 SAMPLE ID: B-l, B-4 DILUTION FACTOR: 10 DATE SAMPLED: 11/01/99 DATE REC:EIVED: 11/02/99 DATE EXTRACTED: 11/04/99 DATE ANALYZED: 11/06/99 MATRIX: SOIL SAMPLE VOL./WT.: 30 G ANALYTE REPORTING LIMITS RESULTS PPB (UG/KG) PPB (UG/KG) ALDRIN 20 ND ALPHA-BHC 20 ND BETA-BHC 20 ND GAMMA-BHC (LINDANE) 20 ND DELTA-BHC 20 ND CHLORDANE 200 ND DDD 20 ND DDE 20 ND DDT 20 ND DIELDRIN 20 ND ENDOSULFAN I 20 ND ENDOSULFAN II 20 ND ENDOSULFAN/SULFATE 20 ND ENDRIN 20 ND ENDRIN ALDEHYDE 20 ND HEPTACHLOR 20 ND HEPTACHLOR EPOXIDE 200 ND METHOXYCHLOR 200 ND TOXAPHENE 250 4,540 ND = ANALYTE NOT DETECTED AT OR ABOVE THE INDICATED REPORTING LIMTT REPORTING LIMTTS AND RESULTS HAVE BEEN ADJUSTED ACCORDINGLY TO ACCOUNT FOR DILUTION FACTOR SURROGATE PARAMETER TCMX ACCEPTANCE CRITERIA 26-146 •/. RECOVERY 75 '^•^^W''^':' PTAS DCN 300-078 (Rev 4/99) Pacific Treatment Analytical Services, Inc. 4340 vmrMga^lf Suite A • san Diego, CA 92123 (858) 560-7717 FAX (8S8) 560-77S3 ANALYSIS RESULTS - EPA 8081 ORGANOCHLORINE PESTICIDES CLIENT: CONSTRUCTION TESTING & ENGINEERING PROJECT NAME/No.: NONE PTAS LOG #: 2123-99-2 SAMPLE ID: B-2, B-3 DILUTION FACTOR: 10 DATE SAMPLED: 11/01/99 DATE RECEIVED: 11/02/99 DATE EXTRACTED: 11/04/99 DATE ANALYZED: 11/07/99 MATRIX: SOIL SAMPLE VOL.AVT.: 30 G ANALYTE REPORTING LIMITS RESULTS PPB (UG/KG) PPB (UG/KG) ALDRIN 20 ND ALPHA-BHC 20 ND BETA-BHC 20 ND GAMMA-BHC (LINDANE) 20 ND DELTA-BHC 20 ND CHLORDANE 200 ND DDD 20 ND DDE 20 ND DDT 20 ND DIELDRIN 20 ND ENDOSULFAN I 20 ND ENDOSULFAN n 20 ND ENDOSULFAN/SULFATE 20 ND ENDRIN 20 ND ENDRIN ALDEHYDE 20 ND HEPTACHLOR 20 ND HEPTACHLOR EPOXIDE 200 ND METHOXYCHLOR 200 ND TOXAPHENE 250 6,620 ND = ANALYTE NOT DETECTED AT OR ABOVE THE INDICATED REPORTING LIMIT REPORTING LIMTTS AND RESULTS HAVE BEEN ADJUSTED ACCORDINGLY TO ACCOUNT FOR DILUTION FACTOR. SURROGATE PARAMETER TCMX ACCEPTANCE CRITERIA 26-146 '/. RECOVERY 92 ® ' , ;\ ' PTAS 1X3* 30<M)78 (Rev 4/99) Pacific Treatment Analytical Services, Inc. 4340 viewridge Ave'., SuHe A • San oiego, CA 92123 (8S8) 56O-7717 FAX (858) 560-7763 ANALYSIS RESULTS - EPA 8081 ORGANOCHLORINE PESTICIDES CLIENT: CONSTRUCTION TESTING & ENGINEERING PROJECT NAME/No.: NONE PTAS LOG #: 2123-99-3 SAMPLE ID: B-5, B-6, B-7 DILUTION FACTOR: 50 DATE SAMPLED: 11/01/99 DATE RECEIVED: 11/02/99 DATE EXTRACTED: 11/04/99 DATE ANALYZED: 11/07/99 MATRIX: SOIL SAMPLE VOL./WT.: 30 G ANALYTE REPORTING LIMITS PPB (UG/KG) RESULTS PPB (UG/KG) ALDRIN 100 ND ALPHA-BHC 100 ND BETA-BHC 100 ND GAMMA-BHC (LINDANE) 100 ND DELTA-BHC 100 ND CHLORDANE 1000 ND DDD 100 ND DDE 100 ND DDT 100 ND DIELDRIN 100 ND ENDOSULFAN I 100 ND ENDOSULFAN H 100 ND ENDOSULFAN/SULFATE 100 ND ENDRIN 100 ND ENDRIN ALDEHYDE 100 ND HEPTACHLOR 100 ND HEPTACHLOR EPOXIDE 1000 ND METHOXYCHLOR 1000 ND TOXAPHENE 1250 22,200 ND = ANALYTE NOT DETECTED AT OR ABOVE THE INDICATED REPORTING LIMTT REPORTING LIMTTS AND RESULTS HAVE BEEN ADJUSTED ACCORDINGLY TO ACCOUNT FOR DILUTION FACTOR. SURROGATE PARAMETER TCMX ACCEPTANCE CRITEIUA 26-146 % RECOVERY 59 PTAS DCN 300-078 (Rev 4/99) Pacific Treatment Analytical Services, Inc. 4340 vievimdge Ave., suite A • san oiego, CA 92123 (sss) 560-7717 FAX (858) 560-7763 QA/QC REPORT METHOD: EPA 8150-SOIL DATE ANALYZED: 11/09/99 QA/QC SAMPLE: PTAS 2123-99-3 ACCEPTABLE LCS, MS/MSD CRITEMA ACCEPTABLE RPD CRITERIA SPIKED ANALYTE LCS % R MS%R MSD % R RPD % % 2,4-D 120 62 46 30 29-164 <30 2,4,5-T 111 72 58 21 43-133 <30 2,4,5-TP(SILVEX) 84 68 51 28 32-130 <30 LCS % R = LABORATORY CONTROL SAMPLE PERCENT RECOVERY MS % R = MATRIX SPIKE PERCENT RECOVERY MSD % R = MATRIX SPKE DUPLICATE PERCENT RECOVERY RPD = RELATIVE PERCENT DIFFERENCE PTAS DCN 3004)10 (Rev 4/99) Pacific Treatment Analytical Services, Inc. 4340 viewridge Ave., suite A • san oiego, CA 92123 (858) 560-7717 FAX (858) 560-7763 if" QA/QC REPORT METHOD: EPA 8081-SOIL DATE ANALYZED: 11/05-06/99 QA/QC SAMPLE: PTAS 2136-99-1 ACCEPTABLE LCS,MS/MSD CRTTEIUA ACCEPTABLE RPD CRITERIA SPIKED ANALYTE LCS % R MS%R MSD % R RPD % % GAMMA-BHC 109 81 94 15 32-127 <30 HEPTACHLOR 106 81 96 17 34-111 <30 ALDRIN 115 88 104 17 42-122 <30 DIELDRIN 107 113 100 12 36-146 <30 ENDRIN 114 84 93 8 30-147 <30 4,4-DDT 95 59 54 9 25-160 <30 LCS % R = LABORATORY CC»JTROL SAMPLE reRCENT RECOVERY MS % R = MATRIX SPIKE PERCENT RECOVERY MSD % R - MATRIX SPIKE DUPUCATE PERCENT RECOVERY RPD " RELATIVE PERCENT DIFFERENCE PTAS DCN 300-078 (Rev 4/99) Pacific Treatment Analytical Services, Inc. 4340 viewridge Ave., suite A • san oiego, CA 92123 (858) 56o-77i7 FAX (858) 560-7763 Pacific Treatment Analytical Services, Inc. 4340 viewridge Avenue, suite A; SahPiego.CA 92123; (619)560-7717 Fax (619) 560-7763 I CHAIN-OF-CUSTODY RECORD PTAS LAB ID IU!££aiM£ STAMP ..^iWEQUESTED ANALYSIS Aifinm: \Ji^-i^4 A-c ed t-4 •0- 1 1 .1 .1 o 1 i i 1 1 1 i s 't 1 1 STIJC Metals (CAC Tide 22) TCLP Metals (RCRA, EPA 1311) | •M i 4 e 3 ./• *J ••.1 n t^iocJj.o^, LA 97.c:>2«^ ed t-4 •0- 1 1 .1 .1 o 1 i i 1 1 1 i s 't 1 1 STIJC Metals (CAC Tide 22) TCLP Metals (RCRA, EPA 1311) | •M i 4 e 3 ./• *J ••.1 n Ann: Phooe: 76?0.-7^, M 1C ed t-4 •0- 1 1 .1 .1 o 1 i i 1 1 1 i s 't 1 1 STIJC Metals (CAC Tide 22) TCLP Metals (RCRA, EPA 1311) | •M i 4 e 3 ./• *J ••.1 n Sanipledby; V.^,.^ , Fax: 7(a(i M^'^^ ') fc'Oo ed t-4 •0- 1 1 .1 .1 o 1 i i 1 1 1 i s 't 1 1 STIJC Metals (CAC Tide 22) TCLP Metals (RCRA, EPA 1311) | •M i 4 e 3 ./• *J ••.1 n BillingAddrcM: f', ' ^ 2 ed t-4 •0- 1 1 .1 .1 o 1 i i 1 1 1 i s 't 1 1 STIJC Metals (CAC Tide 22) TCLP Metals (RCRA, EPA 1311) | •M i 4 e 3 ./• *J ••.1 n ed t-4 •0- 1 1 .1 .1 o 1 i i 1 1 1 i s 't 1 1 STIJC Metals (CAC Tide 22) TCLP Metals (RCRA, EPA 1311) | •M i 4 e 3 ./• *J ••.1 n Prodeet: PO#: . ' '-^ ed t-4 •0- 1 1 .1 .1 o 1 i i 1 1 1 i s 't 1 1 STIJC Metals (CAC Tide 22) TCLP Metals (RCRA, EPA 1311) | •M i 4 e 3 ./• *J ••.1 n ^ Client Sample ID Sample Date Sample Tone Sample Matrix Contat^^)y ?TAS ed t-4 •0- 1 1 .1 .1 o 1 i i 1 1 1 i s 't 1 1 STIJC Metals (CAC Tide 22) TCLP Metals (RCRA, EPA 1311) | •M i 4 e 3 ./• *J ••.1 n ' / ' H'i ' 1 i t 1 / •-;! :fi - 1 B-3 " // /^/t 1 2 / it <•;;> /li- .5 Q 6 /i. / Jl 3 / -4 5 6 1 7 8 9 10 > •Container Types: B-BnssXube^^V-VOi4^ 0°K}lai^JNPIa«tic; O-Other (list) ElE] LDS [QUIS HED BY BCEiyEDB! f\ ' • • Seals Intact: Yes No Yes >Io Signature Signatun J Sample Tonapandun/^ Cold I Wann Print <(xoj;,/'...ry lu^uCConipany * ' -Print . Jt^ <• c ^» /^Company Sample Pwservatioii: Yea No^ /'^jjuj. —^ • Dispcaal: N/C Pid;<y" PTAS(adittiomU^ Aw^ve(additicnalfee) Date Tune Signature Si Turnaround Time: 24hr 4ghr 3day 5day (fonnal) Print Ccnpaiq^ 5t- Ccwpaay Ccmments: Date Time Tims Signature Signatun Frint Company Print Cocnpany Date • TinM • •• Date Time