Loading...
HomeMy WebLinkAboutEA 12-04; Santa Fe II Reservoir Improvements; Administrative Permits (ADMIN)PLANNING DEPARTMENT W W APPLICATION FORM FOR EARLY ASSESSMENT BY THE SPECIAL PROJECTS TEAM THIS SECTION FOR PLANNING DEPARTMENT USE ONLY PROJECT (EA) #: ^/^{^.-g^ | DATE SUBMITTED: PLANNER; p^y^ PROJECT PROPONENT/DEPT QONTACT SIGNATURE: DEPUTY PUBLIC WORKS DIRECTOR SIGNATURE Please type your responses in the boxes provided beiow. The form may be expanded to accommodate as much information as you choose to provide. PROJECT NAME/TITLE: Santa Fe II Reservoir Improvements Have you submitted any previous early assessment applications for this project with Planning staff? If so, please attach a copy of the original request and the Planning Department's response.No Is the project part of an approved CIP budget or a future CIP budget? If so, please provide the CIP Project #. Yes, 5031 List any previous and/or anticipated future Planning Commission or City Council actions (e.g., permit approvals, activity authorizations, etc.) related to this project. Authorization to advertise for bids. Award of construction contract List any previously certified environmental documents (e.g., EIRs, Negative Declarations). None List any technical studies that have been prepared or that you anticipate will be prepared (e.g., biology, archeology, traffic, noise, etc.).Geotechnical Is the project on City property? If not, has property owner authorization or an easement been secured? Yes Early Assessment For City Projects - Revised 1/3/11 RECEIVED APR 2 0 2012 CITY OF CARLSBAD PLANNING DIVISION Page 2 of 3 j^mtic parcel numbers if possible. Identify the project location. Include sponiic parcel numbers if possible. The Santa Fe II tank is located in the City of San Marcos. Access to the site is obtained by proceeding south along White Sands Drive from San Marcos Boulevard to Coast Avenue. To reach the tank site from Coast Avenue vehicles proceed north along an unpaved road. Identify the project schedule. List critical and desired milestones including dates in the development review and construction process (e.g., public hearing dates, grant application submittal deadlines, public workshops, construction phasing, etc.). Final Design complete June. 2012, Construction October 2012 - January 2013. DESCRIPTION OF PROPOSAL - Describe the project in as much detail as possible. Use as much space as needed. Attach additional sheets (drawings, etc.) if necessary. Be sure to identify, if applicable, estimated quantities of grading (including import/export), construction staging areas on and offsite, areas of sensitive vegetation, unique construction technologies, proposed facility technologies and byproducts, and any public art component. If preliminary or conceptual plans or exhibits are available, please include two sets with this transmittal. The Santa Fe II Tank is a circular pre-stressed concrete tank constructed by CMWD in 1986. The tank is 220' diameter, 32' tall and has a storage capacity of 9.0 million gallons. The east side of the tank is buried to the roof line. On the northwest face, the tank is placed behind two levels of concrete crib wall with the upper 15-feet of the tank wall exposed. The existing drainage system has failed and has allowed water to flow over the face of the existing crib walls, which now has extensive erosion. This project will remove the upper crib wall, repair the lower crib wall, and reconstruct the drainage system around the tank. In addition the security fence needs to be replaced, proposed using miniature mesh "Secure Guard" for replacement to prevent climbing and reduce potential for cutting the fence material. These smaller openings minimize the possibility of climbing, prevent objects from being passed through, and make it more difficult to manually cut. See attached drawings. Early Assessment For City Projects - Revised 1/3/11 Page 3 of 3 CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.qov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results ofthe questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Section 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. SECTION 1 NEW DEVELOPMENT Does your project meet one or more of the following criteria: YES NO 1. Housina subdivisions of 10 or more dwellina units. condominium and apartments Examples: single family homes, multi-family homes, Commercial - areater than 1-acre. Anv development other than heavy industry or residential. Examples: hospitals; laboratories and other medical facilities; educational Institutions; recreational facilities; municipal facilities; commercial nurseries; multi-apartment buildings; car wash facilities; mini-malls and other business complexes; shopping malls; hotels; office buildings; public warehouses; automotive dealerships; airfields; and other light industrial facilities. 3. Heavv Industrial I Industry areater than 1 acre. Examples: manufacturing plants, food processing plants, metal working facilities, printing plants, and fleet storage areas (bus, truck, etc.). Automotive repair shoo. A facility categorized in any one of Standard Industrial Classification (SIC) codes 5013, 5014, 5541, 7532-7534, and 7536-7539 Restaurants. Any facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (SIC code 5812), where the land area for development is greater than 5,000 square feet. Restaurants where land development is less than 5,000 square feet shall meet all SUSMP requirements except for structural treatment BMP and numeric sizing criteria requirements and hydromodification requirements. E-34 Page 1 of 3 REV 1/14/11 r^ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov SECTION 2 SIGNIFICANT REDEVELOPMENT INSTRUCTIONS: Complete tfie questions below regarding your project YES NO 1. Project results in the disturbance of 1-acre or more of land and is considered a Pollutant-generating Development Project *? INSTRUCTIONS: If you answered NO, please proceed to question 2. If you answered YES, then you ARE a significant redevelopment and you ARE subject to PRIORITY DEVELOPMENT PROJECT requirements. Please check the "meets PRIORITY DEVELOPMENT PROJECT requirements" box in Section 3 below. / 2. Is the project redeveloping an existing priority project type? (Priority projects are defined in Section 1) INSTRUCTIONS: If you answered YES, please proceed to question 3. If you answered NO, then you ARE NOT a significant redevelopment and your project is subject to STANDARD STORMWATER REQUIREMENTS. Please check the "does not meet PDP requirements" box in Section 3 below. 3. Is the work limited to trenching and resurfacing associated with utility work; resurfacing and reconfiguring surface parking lots and existing roadways; new sidewalk; bike lane on existing road and/or routine maintenance of damaged pavement such as pothole repair? Resurfacing/reconfiguring parking lots is where the work does not expose underlying soil during construction. INSTRUCTIONS: If you answered NO, then proceed to question 4. If you answered YES, then you ARE NOT a significant redevelopment and your project is subject to STANDARD STORMWATER REQUIREMENTS. Please check the "does not meet PDP requirements" box in Section 3 below. 4. Will your redevelopment project create, replace, or add at least 5,000 square feet of impervious surfaces on existing developed property or will your project be located within 200 feet of the Pacific Ocean and (1) create 2500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? Replacement of existing impen/ious surfaces includes any activity that is not part of routine maintenance where impervious material(s) are removed, exposing underlying soil dunng construction. INSTRUCTIONS: If you answered YES, you ARE a significant redevelopment, and you ARE subject to PRIORITY DEVELOPMENT PROJECT requirements. Please check the "meets PRIORITY DEVELOPMENT PROJECT requirements" box in Section 3 below. Review SUSMP to find out if SUSMP requirements apply to your project envelope or the entire project site. If you answered NO, then you ARE NOT a significant redevelopment and your project is subject to STANDARD STORMWATER REQUIREMENTS. Please check the "does not meet PDP requirements" box in Section 3 below. •for definition see Footnote 4 on page 2 SECTIONS QUESTIONNAIRE RESULTS My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box This Box for City Use Only Address; Assessor's Parcel Number(s): Applicant Name: ' 2><.-;o/ m Applicant Title: Date: / i/zo/f City Concurrence: YES NO By: Project ID: E-34 Page 3 of 3 REV 1/14/11 ^ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov 6. Hillside development. Any development that creates more than 5,000 square feet of impen/ious surface and is located in an area with known erosive soil conditions, where the development will grade on any natural slope that is twenty-five percent (25%) or greater. 7. Environmentallv Sensitive Area (ESA)\ All develooment located within or directiv adiacent^ to or discharoinq directly' to an ESA (where discharges from the development or redevelopment will enter receiving waters within the ESA), which either creates 2,500 square feet or more of impen/ious surface on a proposed project site or increases the area of imperviousness of a proposed project site 10% or more of its naturally occurring condition. 8. Parkina lot. Area of 5.000 sauare feet or more, or with 15 or more parkinq spaces, and potentlallv exposed to urban runoff >/ 9. Streets, roads, hiahwavs. and freewavs. Anv oaved surface that is 5.000 square feet or areater used for the transportation of automobiles, trucks, motorcycles, and other vehicles 10. Retail Gasoline Outlets. Sen/ina more than 100 vehicles oer dav and greater than 5,000 sauare feet 11. Coastal Develooment Zone. Anv oroiect located within 200 feet of the Pacific Ocean and (1) creates more than 2500 square feet of impervious surface or (2) increases impervious surface on property by more than 10%. 12. More than 1-acre of disturbance. Proiect results in the disturbance of 1-acre or more of land and is considered a Pollutant-generating Development Project". 1 Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); w/ater bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments): areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. 2 "Directly adjacent" means situated vwthin 200 feet of the Environmentally Sensitive Area. 3 "Discharging directly to" means outflow from a drainage conveyance system that is composed entirely of flows from the subject development or redevelopment site, and not commingled with flow from adjacent lands. 4 Pollutant-generating Development Projects are those projects that generate pollutants at levels greater than bacl<ground levels. In general, these Include all projects that contribute to an exceedance to an Impaired water body or which create new Impervious surfaces greater than 5000 square feet and/or Introduce new landscaping areas that require routine use of fertilizers and pesticides. In most cases linear pathway projects that are for infrequent vehicle use, such as emergency or maintenance access, or for pedestrian or bicycle use, are not considered Pollutant-generating Development Projects if they are built with pervious surfaces or if they sheet flow to sun'ounding pervious surfaces. INSTRUCTIONS:: Section 1 Results: If you answered YES to ANY of the questions above, your project is subject to Priority Development Project requirements. Skip Section 2 and please proceed to Section 3. Checl< the "meets PRIORITY DEVELOPMENT PROJECT requirements" box in Section 3. Additional storm water requirements will apply per the SUSMP. If you answered NO to ALL ofthe questions above, then please proceed to Section 2 and follow the instructions. E-34 Page 2 of 3 REV 1/14/11 NOTICE OF EXEMPTION ^ a FILE To: SD County Clerk . Attn: Jennifer Samuela Mail Stop A-33 1600 Pacific Highway San Diego, CA 92101 From: CITY OF CARLSBAD Planning Division 1635 Faraday Avenue Carlsbad, CA 92008 Subject: Filing of this Notice of Exemption is in compliance with Section 21152b of the Public Resources Code (Califomia Environmentar Quality Act). Project Number and Title: EA 12-04 - Santa Fe II Reservoir Improvements Project Location - Specific: Island Drive (APN: 222-690-06) Project Location - City: San Marcos Project Location - County: San Diego Description of Project: To make repairs to the existing drainage svstem which caused erosion around the Santa Fe II water tank and to the existing crib wall on the north and northwest sides of tank. Name of Public Agency Approving Project: Citv of Carlsbad Name of Person or Agency Carrying Out Project: Citv of Carlsbad Name of Applicant: Dave Ahles. Senior Engineer Applicant's Address: 1635 Faradav Avenue. Carlsbad. CA 92008-7314 Applicant's Telephone Number: 760-602-2748 Exempt Status: (CiteclcOne) • Ministerial (Section 21080(b)(1); 15268); • Declared Emergency (Section 21080(b)(3); 15269(a)); • Emergency Project (Section 21080(b)(4); 15269 (b)(c)); ^ Categorical Exemption - State type and section nimiber: 15301(b) - Repair and maintenance of existing facilities. • Statutory Exemptions - State code number: • General rule (Section 15061 (b)(3)) Reasons why project is exempt: Rehabilitation of existing facilities. Lead Agency Contact Person: Pam Drew, Associate Planner Telephone: (760) 602-4644 DON NEU, City Planner Date received for filing at OPR: Date Revised 04/12 <Ac,.c. ^ ^ RLE COPY ^ CARLSBAD Memorandum June 18, 2012 To: Dave Ahles, Senior Engineer From: Pam Drew, Associate Planner Via \p^MDave De Cordova, Principal Planner Re: EA 12-04 - SANTA FE It RESERVOIR IMPROVEMENTS Thank you for submitting an Early Assessment for repairs to the existing drainage system which caused erosion around the tank and to the existing crib wall on the north and northwest sides of the Santa Fe II water tank located on Island Drive within the City of San Marcos. The repairs to the 220-foot diameter, 32-foot high water storage tank include: 1) removing the upper crib wall; 2) removing 2,000 cubic yards (CY) of soil and filling 500 CY of soil; 3) repairing the lower crib wall; 4) reconstructing the drainage system around the tank, including repaving the area; and 5) hydro- seeding disturbed areas. In addition to the repair work the existing perimeter chain link security fence and gates are proposed to be replaced with fencing and gates that are constructed with miniature mesh "Secure Guard" material. The mesh material has smaller openings which minimize the possibility of climbing, prevents objects from being passed through the openings and makes it more difficult to manually cut. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of an Early Assessment is to provide you with direction and comments on the overall concept of your project. This Earlv Assessment does not represent an in-depth analvsis of vour proiect. It is intended to give vou feedback on critical issues based upon the information provided in vour submittal. This review is based upon the plans, policies, and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans, policies, and standards mav be in effect and additional issues of concern mav be raised through a more specific and detailed review. Planning; General 1. The project will not need any permits from the City of Carlsbad. Please contact the City of San Marcos for any necessary permit application forms and processing information at (760) 744- 1050 ext. 3233. 2. The project is exempt from environmental review per CEQA Guidelines Section 15301(b), concerning repair and maintenance of existing facilities. If requested by you, the Planning Division will record a Notice of Exemption with the County of San Diego for this project. To do so, your staff planner will need a check for $50 made payable to the San Diego County Clerk for the hiing fee with the County. Community & Economic Development 1635 Faraday Ave. I Carlsbad, CA 92008 I 760-602-2710 I 760-602-8560 fax EA 12-04 - SANTA FE II RESERVOIR IMPROVEMENTS June 18, 2012 Page 2 Land Development Engineering: 3. The project must comply with the City of San Marcos' storm water pollution regulations and permits. Please contact the City of San Marcos for any necessary permit application forms and processing information. 4. See redlined comments on attached plan. If you would like to schedule a meeting to discuss this letter with your staff planner, please contact Pam Drew, Associate Planner at ext. 4644, or your staff engineer, David Rick, Associate Engineer at ext. 2781. DD:PD:bd c: Don Neu, City Planner Bill Plummer, Deputy City Engineer Scott Donnell, Senior Planner David Rick, Associate Engineer File Copy Data Entry Attachment ^i^*i^ <£wb- CITY OF ^ CARLSBAD Memorandum May 2, 2012 To: Pam Drew, Project Planner From: , David Rick, Project Engineer Via; /M>Glen Van Peski, Engineering Manager Re: EA 12-04 SANTA FE II RESERVOIR COMPLETENESS AND ISSUES REVIEW Land Development Engineering has completed a review ofthe above-referenced project for completeness and engineering issues of concern. All items needed for engineering review are provided for determining the application as complete. Engineering issues which need to be considered or resolved: 1. Since the property is located within the city of San Marcos, the city of San Marcos has jurisdiction over storm water pollution regulations and permits. Therefore, have the applicant contact the city of San Marcos for any necessary permit application forms and processing information. 2. See minor redlined comments on attached plan. If you or the applicant has any questions, please either see or contact me at 602-2781. DAVID RICK Associate Engineer Land Development Engineering Attachment: redlined plans Community & Economic Development 1635 Faraday Ave. I Carlsbad, CA 92008 I 760-602-2710 I 760-602-8560 fax I www.carlsbadca.gov -Q- PLANNING SYSTEMS DM LAND USE/COASTAL PLANNING LANDSCAPE ARCHITECTURE • LA3900 POLICY AND PROCESSING ENVIRONMENTAL MITIGATION June 5, 2012 Mr. David Ahles CITY OF CARLSBAD Engineering/Public Works Department 1635 Faraday Ave. Carlsbad, CA 92008 RE: RESULTS OF BIOLOGICAL FIELD SURVEY SANTA FE WATER TANK II Dear Mr. Ahles: At your request, Planning Systems' biologists have conducted a field survey of the property around the existing Santa Fe Water Tank II, located on a hilltop approximately 400-feet north of Coast Avenue, within the city boundary of the City of San Marcos, Califomia, in an area adjacent to the city of Carlsbad. A Vicinity Map is shown on the attached exhibit. This property, including the water tank reservoir is owned by the City of Carlsbad. The area surveyed surrounds the water tank varying in width from only 10-feet in width from the water tank at its narrowest point on the southeast, to its widest point on the northwest side at approximately 40-feet in width. Much of the water tank is sunken below the surface of the immediately-surrounding soil. Only about 20- vertical feet of the top portion of the tank is visible from the surface. The purpose of this report is to observe the vegetation growing within the study area (shown on attached exhibit) and to determine whether sensitive vegetation habitats or sensitive plants occur within this area. Background Study Area. The subject study area is relatively flat on the south and east sides, and slopes mildly to steeply along the north and west sides. In these locations, two crib-type retaining walls serve to hold soil against the lower sections of the water tank, presumably to minimize the visibility of the tank from these steeper sides. Portions of these crib walls appear to be in a state of disrepair and contain visibly unstable soil. The proposed project involves the removal, repair and/or replacement of these crib walls, and other localized improvements. Vicinity. The project vicinity is dominated by urban residential development, with adjacent overhead electrical transmission towers and lines along the south and west side of the water tank site. The site is a portion of an island of open space surrounded by single family homes. Small patches of native vegetation, including coastal sage scrub and disturbed chaparral and chamise habitats are present in the steeply sloping areas to the north of the site. The study area is located within the hydrologic unit of the Encina Creek Watershed, approximately four (4) miles upstream from the Pacific Ocean. Regionally, the Encina Creek and its tributaries drain about 9 square miles from the foothills of San Marcos, into and through the central portion of Carlsbad, where it ultimately discharges into the Pacific Ocean at Carlsbad State Beach. 1530 FARADAY AVENUE • SUITE 100 • CARLSBAD, CA 92008 • (760) 931-0780 • FAX (760) 931-5744 • info@planningsystems.net Mr. David Ahles June 5, 2012 Page 2 Survev Methods. The biological investigation perfonned for this project included a general biological survey of the study area for plants only. Fieldwork was conducted on May 24, 2012 using a 2010 aerial photograph of the area. The entire project area was fraversed on foot. Off- site areas were also visually inspected from the property. Identified vegetation resources were surveyed visually and documented. The vegetation types were classified according to the Holland (1986) and Oberbauer (2005) classification systems, in accordance with the requirements of the Guidelines for Biological Studies categories. City of Carlsbad Planning Department, 9/30/08. A list of detectable flora species was recorded in a field notebook. Plant identifications were determined through direct observation. Vegetation Communities The subject property presently contains two primary vegetation communities; Disturbed Lands and Annual (non-native) Grasslands. Disturbed Lands. Vegetation communities within the study area are Disturbed Lands on the north and west, and Annual (non-native) Grasslands on the south and east. Plant species observed within the Disturbed Lands are Bull thistle {Cirsium vulgare). Castor bean (Ricinus communis). Black mustard (Brassica nigra), Ausfralian Saltbush (Atriplex semibaccata R.), White-stem Filaree (Erodium moschatum), Tree tobacco (Nicotiana glauca). Yellow Wood-sorrel (Oxalis corniculata), Califomia juniper (Juniperus californica). Telegraph weed (Heterotlieca grandiflora). Common groundsel (Senecio vulgaris L.) and Dwarf nettle (Urtica dioica). Also identified in the Disturbed Lands were a number of domestic urban plantings, including Eucalyptus gum (Eucalyptus species). Avocado (Persea americana). Boxwood (Buxt4X sempirvirens), Brazilian pepper tree (Scfiinus terebintiiifolius) and Wattle (Acacia species). The only native plants identified within the subject area were a number [approximately 15] individuals of Coyote Brush (Bacciiaris salicifolia) and several [six observed] individuals of Coastal Deerweed (Lotus scoparius). These isolated individual native plants were not considered to constitute a native or sensitive community. Annual (non-native) Grasslands. Annual (non-native) Grasslands identified within the study area included; Bermuda grass (Cynodon dactylon), Ripgut grass (Bromus diandrus), Tumbleweed (Amarantiius albus L.), Australian brass-buttons (Dienandra fasciculata). Short-pod mustard (Lepidium nitidum), Cheeseweed (Malva parviflora), and Slender wild oat (Avena barbata). None of these plants are considered native or sensitive. Conclusions This field Biological Survey concludes that; (a) no native habitats occur within the study area, and (b) no sensitive plants occur within the study area. Further, this survey concludes that no wetlands or riparian habitat or area otherwise jurisdictional delineation to the U.S. Army Corps of Engineers, Califomia Department of Fish and Game, and Califomia Coastal Commission occurs within or near the study area. 5onta Fe Water Tank II Biological Field Survey Page 2 Mr. David Ahles June 5, 2012 Page 3 It is the conclusion of Planning Systems' biologists that the work proposed within the study area will not result in any significant biological impacts to vegetation. Please let me know if you need any additional information on the above survey results. Sincerely, Paul J. Klukas Director of Planning Supporting Documentation Beauchamp, R. M. 1986. A Flora of San Diego Countv. Califomia. Sweetwater Press, National City, Califomia. City of Carlsbad Planning Department, Guidelines for Biological Studies. 9/30/08. Hickman, J. C. 1993. The Jepson Manual. Higher Plants of Califomia. University of Califomia Press, Berkeley, Califomia. Holland, Robert F. 1986. "Preliminary Vegetative Plant Communities of Califomia." Department of Fish and Game, Natural Heritage Section. Santa Fe Water Tank II Biological Field Survey Page 3 VICINITY MAP - Notto Scale June 4, 2012 Santa Fe Water Tank II City of Carlsbad NORTH SCALE: 1"= 160' PLANNING SYSTEMS LAND USE/COASTAL PLANNING LANDSCAPE ARCHITECTURE POUCY AND PROCESSING ENVIRONMENTAL MmOATION