HomeMy WebLinkAboutEA 15-04; Calavera Hills Community Park; Administrative Permits (ADMIN) (2)PLANNING DEPARTMENT
APPLICATION FORM FOR
EARLY ASSESSMENT BY THE SPECIAL PROJECTS TEAM
THIS SECTION FOR PLANNING DEPARTMENT USE ONLY
PROJECT (EA) #; Q ^ DATE SUBMITTED: g , . {<^ PLANNER: j^gUxJ)
PROJECTPROPONENT/DEPT CONTACT^
SIGNATURE: Kasia Trojano^ska, Park Planer, Parks
& Recreation Department muii
DEPUTY PUBLIC WORKS DIRECTOR
SIGNATURE:
Please type your responses in the boxes provided below. The form may be expanded to accommodate as much information
as you choose to provide.
PROJECT NAME/TITLE:
Calavera HiUs Community Park: Community Gardens, Gateway Improvements & Picldeball Courts
Have you submitted any previous early assessment applications for this project with Planning staff? If so, please attach a
copy of the original request and the Planning Department's response.
No
Is the project part of an approved CIP budget or a fliture CIP budget? If so, please provide the CIP Project #.
Calavera Hills Community Park:
Community Gardens - not a CIP project
Gateway Improvements - CIP # 46011
Pickleball Courts - future CIP for fiscal year 2015/2016, no CIP number assigned yet
List any previous and/or anticipated future Planning Commission or City Council actions (e.g., pennit approvals, activity
authorizations, etc.) related to tliis project.
These projects were included in the Parks & Recreation Department's Needs Assessment and Comprehensive Action
Plan which was accepted by the City Council on December 17, 2013 and both are included within that document's
list of "Short Term Action Items (0-3 years)".
List any previously certified environmental documents (e.g., EIRs, Negative Declarations).
N/A
List any technical studies that have been prepared or that you anticipate will be prepared (e.g., biology, archeology, traffic,
noise, etc.).
Parks and Recreation Need Assessment and Comprehensive Action Plan
Geotechnical Report by Ninyo & Moore
Land Development Engineering Review
Is the project on City property? If not, has property owner authorization or an easement been secured?
Project is on the City's property
Identify the project location. Include specific parcel numbers if possible.
Project is located in the NE Quadrant, at the intersection of the Carlsbad Village Drive and Glasgow Dr; Gateway
Improvements and Pickleball Courts project on parcel number APN 1671013500; Community Gardens on parcel
number APN 1671010700
if \ Identify the project schedule. List critical and desired milestones including dates in the development review and construction
process (e.g., public hearing dates, grant application submittal deadlines, public workshops, construction phasing, etc.).
Schedule for the Calavera Hills Community Park Gateway Improvements is attached [Exhibit 4]
Early Assessment For City Projects - Revised 1/3/11 Page 2 of4
DESCRIPTION OF PROPOSAL - Describe the project ui as much detail as possible. Use as much space as needed. Attach
additional sheets (drawings, etc.) if necessary. Be sure to identify, if applicable, estimated quantities of grading (including
import/export), construction staging areas on and offsite, areas of sensitive vegetation, unique construction teclinologies,
proposed facility technologies and byproducts, and any public art component. If preliminary or conceptual plans or exhibits
are available, please include two sets with this transmittal.
Calavera Hills Community Park Community Gardens
The community garden is located at the south end of Calavera Hills Community Park in north east Carlsbad,
utilizing a small passive area of lawn that previously saw little use at the park. The lawn was cleared for the new
gardens that includes 26 planter beds for communal use and residents, who can lease to grow their own fruits,
flowers and vegetables. Decomposed granite or wood chip pathways separate the beds, and some planter beds are
handicapped-accessible. The new garden also include irrigation, composting bins, benches, and a group picnic area
for gardening classes and other small gatherings. [Exhibit 1].
Calavera Hills Community Park Pickleball Courts
After reviewing several of the city's parks, staff identified a feasible location for the addition of pickleball courts at
Calavera Hills Community Park, Specifically, the location is an underutilized area north of the existing lighted tennis
courts and community center, and south of the existing multi-use sports field. Staff worked in conjunction with a
consulting landscape architecture firm to create a proposed concept plan of the area, which includes: six lighted
regulation-size pickleball courts, walltways, spectator seating, and perimeter landscaping [Exhibit 2].
Calavera Hills Community Park Gateway Improvements
When Calavera Hills Community Park was constructed, the future Fire Station #3 was sited adjacently, on the lot at
the southwest corner of Carlsbad Village Drive and Glasgow Drive. That lot remained vacant throughout the
subsequent years, and Fire Station #3 was recently re-sited to the lot on the southwest corner of Trailblazer and Wind
Trail ways, adjacently to the future Robertson Ranch Community Park.
With Fire Station #3 re-sited, the vacant lot became available for the creation of an entryway to Calavera Hills
Community Park. Staff worked in conjunction with a consulting landscape architecture firm to create a proposed
concept plan of the entryway, which includes: a looped walkway with exercise stations, a covered picnic area,
enhanced seating, monuments signs, decorative lighting, passive turf, and perimeter landscaping. [Exhibit 3],
The proposed projects would not change or delete any project condition, feature, facilify or amenity that is considered
essential to design, quality, safety and function of the Calavera Hills Community Park. The proposed pickleball courts
represent an upgrade in the recreational features provided at the park and the proposed park entry project improves
upon the park's compatibility with the surrounding neighborhood by transforming an empty, vacant lot into a
decorative and inviting improvement.
Although the addition of the 0.52-acre site for the park gateway project would change the boundary of the 16.8-acre
park (a 3.1% increase), the improvement would not add a new land use to the master park site plan. Our
understanding is that per C.M.C. 21,42.140.100 c, this land addition can be approved administratively by the City
Planner because it does not increase the maximum anticipated site area by more than twenty percent of what was
anticipated on the master park site plan.
The proposed improvements do not involve the addition of a new land use in that both of the projects are consistent
with the variety of uses that would be found in an active community park. The proposed improvements will comply
with the applicable development standards of the Carlsbad Municipal Code for the Open Space Zone; will not result
in any significant environmental impact and/or require additional mitigation; and will not result in any health, safety
or welfare impacts.
There were no major issues or controversies associated with the original Calavera Hills Community Park project
which would be exacerbated with the proposed projects. These projects are features that are desired by the
community, they fulfil the needs identified in the department's recent Needs Assessment and Action Plan, and both
projects are included in the list of "Short Term Action Items (0-3 years)". Lastly, both of these projects are in
alignment with the community value of "Access to recreation and active, healthy lifestyles" and likewise, are in
alignment with the department's vision "To strengthen community connectivity through world class offerings and
exceptional customer service."
Early Assessment For City Projects - Revised 1/3/11 Page 3 of 4
nity Paik Gateway Improvement)
Duration Start
Kiclc-off Meeting 1 day
Survey 5 days
80% Construction Documents 8 wks
Landscape Architect 8 wks
Hardscape Plans
Irrigation System
Planting Design
Shade and Site Furnishing
Gvil Engineering
Existing Conditions Plan
Grading and Drainage Pla
Erosion Control Plan/ SWI
Site Electrical 8 wks
Exterior Lighting Design
Title 24 Compliance
Load Calculation
Single Line Diagrams
Board Schedules
Specifications and Cost Estir
80% Submittal 1 day
City Review 2 wks
100% Final Plans 4 wks
Construction Documents
Specifications
Cost Estimate
_J00% Submittal l day
City Review 2 wks
'Bidding and Award Phase 45 days
Construction Admin Phase 6 mons
RFI Responses
Wed 12/10/l.Wed 12/10/1-
Monl2/15/l.Frl 12/19/14
Fri 12/19/14 Thu 2/12/15
Frl 12/19/14 Thu 2/12/15
8 wks Fri 12/19/14 Thu 2/12/15
Fri 12/19/14 Thu 2/12/15
Frl 2/13/15 Fri 2/13/15
Mon 2/16/15 Fri 2/27/15
Mon 3/2/15 Fri 3/27/15
Tue 3/31/15 Tue 3/31/15 :
Wed 4/1/15 Tue 4/14/15
Wed 4/15/15 Tue 6/16/15 :
Tue 6/16/15 Tue 12/1/15
jmber iJanuary i February •••lircn iApril iMay June July August September
.i2/7 12/1412/2n2/28_.l/4.. 1/11.1/18 1/2S 2/1 2/8 , 2/15; 2/22 3/1 , 3/8 . 3/15,3/22 . 3/29 4/5 4/12 ,4/1914/26 . 5/3 ^5/10 5/17, 5/24 5/31 6/7 6/14 6/21 6/28 7/5 7/12 7/19,7/26 .8/2 ,8/9 8/16, 8/23 ;8/30^ 9/6 9/13
October
9/20 9/27.10/4 10/11.10/1810/25
November
11/1 11/8.11/1511/2211/29
Project: Calavera Hills Parfc Projec
Date: Fn 4/17/15
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup i
Manual Summary '
Slart-onfy I
Finlsh-o
Deadlint
Prog res:
Yamada
and
CALAVERA HILLS COMMUNITY PARK
PROPOSED PICKLEBALL COURTS CONCEPT PLAN
FEBRUARY 11,2015
C City of
Carlsbad
CARLSBAD VILLAGE no
UNDSCAPE BOULDERS
WITH ROUNDED-EDGES IN WARM
EARTHTONE COLORS. HAND-SELECTED AND
PLACED IN THE FIELD. SIZES RANGE FROM
5-FT. DIAMETER DOWN TO 2.S-FT. DIAMETER.
OUTDOOR FITNESS EQUIPMENT CLUSTERS
FOUR COMPAa GROUPS OF COMPLEMENTARY
CONDITIONING EVENTS, SET IN A FIELD OF
POURED-IN-PLACE RESILIENT SURFACING. THE
CLUSTERING OF EQUIPMENT PROVIDES
OPPORTUNITIES TO SOCIALIZE WITH OTHERS
WHILE WORKING OUT, AS COMPARED TO
SOLITARY STATIONS SET ALONG THE PATH.
RESILIENT SURFACING WILL BE IN A WARM
EARTHTONE COLOR TO COMPLIMENT OTHER
COLORS IN PROJEa. CONCRETE BANDS SURROUND
THE PERIMETERS OF EACH RESILIENT SURFACING
AREA THAT ARE EXPOSED TO ADJACENT
TURF/LANDSCAPE (TYP).
PICNIC TABLES
ADA COMPLIANT PRECAST
CONCRETE TABLES (4 TOTAL),
INTEGRAL COLOR CONCRETE IN
WARM EARTHONE COLOR, SET4-FT.
APART ON ALL SIDES FOR
ADEQUATE CLEARANCES.
NEW BRISBANE BOX STREET TREES
TO MATCH EXISITING TO THE WEST.
PARK MONUMENT SIGN
I SIGNIFICANT FEATURE WITH ENHANCED
LANDSCAPING AND NIGHT LIGHTING.
ENHANCED INTEGRAL COLOR
CONCRETE PAVING 'B'
IN WARM EARTHTONE COLOR,
OUTSIDE BANDS IN SAME
MONOLITHIC POUR BUT WITH
DIFFERENT TEXTURE (TYP).
ENHANCED INTEGRAL COLOR
CONCRETE PAVING 'A'
IN WARM EARTHTONE COLOR
(TYP).
o
o
VEHICULAR AND PEDESTRIAN
ENTRY ON EAST SIDE
ALLOWS CITY TO SERVICE
PICNIC AREA AND SHADE
STRUaURES. SECURED WITH
REMOVABLE BOLLARDS.
^^^1 CONCRETE B,',.'v:3/r.-0>/; ( JRB
M IN NATURAL GRAY COLOR AND
9-IN. WIDTH (TYP).
TENSILE FABRIC SHADE STRUaURES
IN BRIGHT COLORS OVER OUTDOOR
FITNESS EQUIPMENT (TYP).
ACCESSIBLE PATH-OF-TRAVEL
CONNECTS TO EXISTING PAVING TO THE SOUTH.
'A
STREET TREES
NEW STREET TREES ALON
GLASGOW DR.
PARK BENCH
WITH ADJACENT ACCESSIBLE SPACE
ON CONCRETE PAD.
10' 5' 0 10' 20' 30'
QfSiAPmc SCALE I". l0'-0"
Wimmer
Yamada
Pniinhnw
CALAVERA HILLS COMMUNITY PARK
NORTHEAST LOT ENHANCEMENTS
CONCEPT'C 09-25-14
City of
Carlsbad