Loading...
HomeMy WebLinkAboutEA 15-05; Sunny Creek Rip Rap Dissipater Repair; Administrative Permits (ADMIN) (2)DESCRIPTION OF PROPOSAL-Describe the project in as much detail as possible. Use as much space as needed. Attach additional sheets (drawings, etc.) if necessary. Be sure to identify, if applicable, estimated quantities of grading (including import/export), construction staging areas on and offsite, areas of sensitive vegetation, unique construction technologies, proposed facility technologies and byproducts, and any public art component. If preliminary or conceptual plans or exhibits are available, please include two sets with this transmittal. Add riprap to the existing failed rip rap energy dissipater and use streambank bioengineering to repair the failed slope. We are still exploring locations for staging and operations. A pre-app meeting has been set for Tuesday, May 12 at 1:45PM. Early Assessment For City Projects-Revised 1/3111 Page 3 of3