Loading...
HomeMy WebLinkAboutEA 16-04; PAR Widening at PDN; Administrative Permits (ADMIN)Application Form For EARLY ASSESSMENT BY THE SPECIAL PROJECTS TEAM THIS SECTION FOR PLANNING DIVISION USE ONLY PROJECT (EA) #: IE:?A I <o-0 l} J DATE SUBMITTED: .I e,li'O.!t t.n I PLANNER: I "D~sul. PROJECT NAME/TITLE: , Palomar Airport Road Widening at Paseo Del Norte PROJECT PROPONENT/DEPT. CONTACT SIGNATURE: AUTHORIZED SIGNATURE: Daniel Zimny, Assistant Engineer--Public Works _});o.JW~ /]~M~~ JMi.AJJJi f-11-J Please type your responses m the boxes prov1ded below. The form may be expanded to accommodate as much information as you choose to provide~. v Have you submitted any previous 'early assessment applications for this project with Planning staff? If so, please attach a copy of the original requeJst and the Planning Division's response. No Is the project part of an approved CIP budget or a future CIP budget? If so, please provide the CIP Project#. Yes, two separate CIP projects are included in this project: 6043 -Palomar Airport Road and Paseo Del Norte Left Turn Lane Extension 6044 -Palomar Airport Road and Paseo Del Norte Right Turn Lane Addition List any previous and/or anticipab:!d future Planning Commission or City Council actions (e.g., permit approvals, activity authorizations, etc.) related to this project. Authorization to Bid Award of Contract Notice of Completion List any previously certified environmental documents (e.g., EIRs, Negative Declarations). None List any technical studies that havu been prepared or that you anticipate will be prepared (e.g., biology, archeology, traffic, noise, etc.). A traffic impact study for the Carlsbad Paseo Retail and Restaurant project (CUP 07-03/CDP 07-07) was submitted in 2008 and assesses the need to extend thB left turn lanes to provide adequate storage. Analysis provided support for the traffic impact fee that is conditioned to pay '13% fair share for the construction of the project. Is the project on City property? If not, has property owner authorization or an easement been secured? 6043-Left turn lane extensions will be contained with city owned Palomar airport road 6044-Additional ROW has been secured for the right turn lane addition. Grant Deed of Easement Doc# 1999-0565676 *Project will encroach CAL TRANS ROW and an encroachment permit will be acquired Identify the project location. Include specific parcel numbers if possible. East Bound Palomar Airport Road between 1-5 and Paseo Del Norte along APN's 2110501400 and 2110500100 P-15 Page 2 of3 Revised 09/11 ~~,~------------------------------------------------------------------------------·--~ ~ .o..!t-:-) ~ «~,',~ ¥'CITY 0 F CARLSBAD WHAT is an Early Assessment? EARLY ASSESSMENT FOR CITY PROJECTS P-15 Development Service~~ Planning Division 1635 Faraday Avenue {760) 602-4610 www.carlsbadca.gov It is an early, informal review of your city project by the Planning Division prior to a formal application submittal. The Early Assessment, or "EA," review is required for all city projects. WHAT you need to provide: • Application form (signed by the project engineer and individual authorizing submittal of the Early Assessment, such as the deputy city engineer or a division/department head); • Two (2) sets of your site plan and/or other exhibits (folded to 8% x 11) with sufficient detail to allow staff to adequately review your proposed project; • Completed storm water standards questionnaire Form E-34 (see below for more information). • Any other information that you think will contribute to staff's understanding of your proposal. About the storm water form: The storm water standards questionnaire (Form E-34) to complete is available from the Development Application Forms and Handouts page of the city's website at http://www.carlsbadca.gov/business/building/permitting-process/Pages/Engineering Applications.aspx. Since storm water requirements are location and project-specific, please complete the form for each project proposed and for each project location proposed. For projects covering large areas, such as a pavement overlay or sidewalk replacement, it may be appropriate to fill out only one form. For guidance on storm water or if you have questions about the form and its applicability, please contact Jeremy Riddle, Associate Civil Engineer, in Land Development Engineering at Jeremy.riddle@carlsbadca.gov or extension 2737. WHERE to submit: Please submit your application at the Planning Division Development Services Counter. HOW your application will be processed: After a submittal is made, your application will be sent to the Land Development engineer and Special Projects planner assigned to review it. Depending on the project, the planner may request additional plans for review by additional departments, such as Police or Fire. The planner will prepare a written response to your submittal (in memo form), incorporating comments from all reviewing departments. You should receive this memo within thirty days after the date you submitted the application. The response memo will address (at a minimum) the following: • General Plan, Zoning, and Coastal Zone information; • Anticipated permit, processing, and CEQA requirements; • Storm water requirements or comments; • Identification of any major project issues based upon the Early Assessment submittal; and • Contact information for the planner and engineer and any other persons who reviewed your project. The Early Assessment does not represent an in-depth analysis of your project. The completeness and accuracy of your submittals will dictate the quality of your project's Early Assessment response. Additional issues of concern may be raised after your permit application package is formally submitted and processed for a more specific and detailed review. Also. additional and/or different issues of concern may arise with the passage of time and changing circumstances. regulations. etc. Therefore. the issues and requirements identified in the Early Assessment response memo might change if there is a long lead time between the Early Assessment response and the submittal of a formal project application. The Planning Division will retain the Early Assessment. If you submit a formal application in the future, it likely will be assigned to the same planner who processed your Early Assessment. P-15 Page 1 of 3 Revised 09/11 Identify the project schedule. List critical and desired milestones including dates in the development review and construction process (e.g., publiic hearing dates, grant application submittal deadlines, public workshops, construction phasing, etc.). Project o'esign-June 2016 thru December 2016 CAL TRANS Encroachment Permit-January 2017 thru February 2017 Prepare Bid Package-February 2017 Bid Project-March 2017 thru May 2017 Award Project-June 2017 thru July 2017 Construct Project-August 2017 thru October 2017 DESCRIPTION OF PROPOSAL-DE~scribe the project in as much detail as possible. Use as much space as needed. Attach additional sheets (drawings, etc.) if necessary. Be sure to identify, if applicable, estimated quantities of grading (including import/export), construction staging areas on and offsite, areas of sensitive vegetation, unique construction technologies, proposed facility technologies and byproducts, and any public art component. If preliminary or conceptual plans or exhibits are available, please include two sets with this transmittal. The project is located on East Bound Palomar Airport Road between 1-5 and the intersection with Paseo Del Norte. Two circulation system street projects included in the approved CIP budget will be addressed with this project: CIP# 6043 will lengthen the twin left turn lanes from East Bound Palomar Airport Road to North Bound Paseo Del Norte. This portion of the project is in result Ito the traffic impacts from the Carlsbad Paseo Retail and Restaurant project (CUP 07- 03/CDP 07-07). A Traffic Impact Study for this development was submitted in 2008 and determined the existing turn pocket length would not provide adequate capacity to support the development. A traffic impact fee was collected as result of the study and is conditioned to pay a 13% fair share contribution for the construction of this component of the overall project. To mitigate the impacts of the Paseo development the proposed design includes a 50' extension of the left twin turn pocket in addition to a 120' transitional taper. An existing CAL TRANS overhead sign will be relocated as a result of the extension. An encroachment permit from CAL TRANS and coordination with their signage and signal division is included the project scope. CIP # 6044 creates a dedicated right turn lane from East Bound Palomar Airport Road to South Bound Paseo Del Norte. A Grant Deed of Easement Doc# 1999-0565676 provided the adequate ROW to support a 120' long taper transition to a 230' long full lane turn pocket. The proposed 11' wide turn pocket provides the available space for a 6' wide bike lane through this segment. However, the proposed bike lane is subject to change should either planning or traffic departments find this designated space more appropriate for sidewalk widening in accordance with the city's mobility element. Signal modification, utility and signage relocation, sidewalk modification, and ADA curb ramp upgrades are also included in this portion of the project. P-15 Page 3 of3 Revised 09/11 City of Carlsbad STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire n3present an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT NAME: Palomar Airport Road Widening at Paseo Del Norte PROJECT ID: 6043 and 6044 ADDRESS: East Bound Palomar Airport Road Between 15 and Paseo Del Norte APN: 2110501400 and 2110500100 The project is (check one): D New Development 1Z1 Redevelopment The total proposed disturbed area is: ~._78_7_o __ ft2 ( 0.18 ) acres The total proposed newly created and/or replaced impervious area is: 7870 ) acres If your project is covered by an approved MP as part of a larger deve1nni'Y'IQint project, provide the project ID and the SWQMP # of the larger development project: Project ID __________ . _______ SWQMP #: ----------------- Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. E-34 Page 1 of 4 REV 02/16 To determine your project is a "development project", please answer the following question: Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? YES NO D If you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; 0 b) Designed and constructed to be hydraulically disconnected from paved streets or roads; c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets uidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? D D If you a to one or more the above , provide ustification below, then go to Step 5, marl< the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): 3. E-34 Page 2 of4 REV 02/16 To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): 1. Is your project a new developmEmt that creates 10,000 square feet or more of impervious surfaces collectively over the entire projec:t site? This includes commercial, industrial, residential, mixed-use, and on or land. 2. Is your project a redevelopment proJect creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public nrr>tClf'ir<> on or te land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification code 581 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entirE~ project site and supports a hillside development project? A hillside n"''1""'rmment includes ment on natural that is or reater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the of and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the to the ESA e. not with flows from * 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair shop is a facility that is categorizHd in any one of the following Standard Industrial Classification (SIC} codes: 501 5014 5541 or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following ctiteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic of 100 or more vehicles 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pa Ocean and (1) creates 2,500 square impervious surface or (2) increases impervious surface on the property by more than 21.203 YES NO D , fll fll D Ill D D D D D If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box statin "M is a 'STANDARD PROJECT' ... " and com licant information. E-34 Page 3 of4 REV02/16 Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = 29•600 sq. ft. Ill D Total proposed newly created or replaced impervious area (B)= 7870 sq. ft. Percent impervious area created or replaced (B/A)*1 00 = 26·6 % If you answered , the structu MPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 5, check the check the first box "M is a PDP ... " and com information. Ill My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36'' and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT stormwater requirements apply. D My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box City of Carlsbad -Public Works Department Applicant Name: Daniel Zimny Applicant Title: Assistant Engineer Applicant Signatu-re-:----~-----~-....,(-----:o------Date: __ f;.;__/_l<ii'_. f_z_· _o_\_6_, ____ _ * Environmentally i include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Only YES NO City Concurrence:, D D By: Date: Project ID: E-34 Page 4 of4 REV02/16