Loading...
HomeMy WebLinkAboutEA 2016-0003; CMWD PHASE III RECYCLED WATER; Administrative Permits (ADMIN)EARLY ASSESSMENT Development Services C City of FOR CITY PROJECTS Planning Division 1635 Faraday Avenue Carlsbad P-15 (760) 602-4610 www.carlsbadca.gov WHAT is an Early Assessment? It is an early, informal review of your city project by the Planning Division prior to a formal application submittal. The Early Assessment, or "EA," review is required for all city projects. WHAT you need to provide: •Application form (signed by the project engineer and individual authorizing submittal of the Early Assessment, such as the deputy city engineer or a division/department head); •Two (2) sets of your site plan and/or other exhibits (folded to 81/2 x 11) with sufficient detail to allow staff to adequately review your proposed project; •Completed storm water standards questionnaire Form E-34 (see below for more information). •Any other information that you think will contribute to staff's understanding of your proposal. About the storm water form: The storm water standards questionnaire (Form E-34) to complete is available from the Development Application Forms and Handouts page of the city's website at http://www.carlsbadca.qov/business/buildino/permittinq-process/Paaes/Enaineerina Applications.aspx.Since storm water requirements are location and project-specific, please complete the form for each project proposed and for each project location proposed.For projects covering large areas,such as a pavement overlay or sidewalk replacement, it may be appropriate to fill out only one form. For guidance on storm water or if you have questions about the form and its applicability,please contact Jeremy Riddle, Associate Civil Engineer,in Land Development Engineering at Jeremv.riddleacarlsbadca.qov or extension 2737. WHERE to submit: Please submit your application at the Planning Division Development Services Counter. HOW your application will be processed: After a submittal is made, your application will be sent to the Land Development engineer and Special Projects planner assigned to review it.Depending on the project, the planner may request additional plans for review by additional departments, such as Police or Fire. The planner will prepare a written response to your submittal (in memo form), incorporating comments from all reviewing departments.You should receive this memo within thirty days after the date you submitted the application.The response memo will address (at a minimum) the following: •General Plan, Zoning, and Coastal Zone information; •Anticipated permit, processing, and CEQA requirements; •Storm water requirements or comments; •Identification of any major project issues based upon the Early Assessment submittal; and •Contact information for the planner and engineer and any other persons who reviewed your project. The Early Assessment does not represent an in-depth analysis of your project.The completeness and accuracy of your submittals will dictate the quality of your project's Early Assessment response.Additional issues of concern may be raised after your permit application package is formally submitted and processed for a more specific and detailed review.Also,additional and/or different issues of concern may arise with the passage of time and changing circumstances. regulations, etc.Therefore, the issues and requirements identified in the Early Assessment response memo might change if there is a long lead time between the Early Assessment response •and the submittal of a formal project application. The Planning Division will retain the Early Assessment.If you submit a formal application in the future, it likely will be assigned to the same planner who processed your Early Assessment. P-15 Page 1 of 3 Revised 09/11 epuf-Dto\i— 0005 Application Form For EARLY ASSESSMENT BY THE SPECIAL PROJECTS TEAM 17 THIS SECTION FOR PL.* NNING OIVISIO US ONLY PROJECT_ (EA) #:epOvio Itts5 DATE SUBMITTED:irt (to PLANNER:zeta PROJECT NAME/TITLE: CMWD Phase Ill Recycled Water Project Segment 9 P JCT P PONENT/DEPT. CONTACT SIGNATURE:AUTHORIZED SIGNATU LEAkr.d'.Aftt.least p.our reiponses in the boxes provided below.The form ay be expanded to accommodate as much information as you choose to provide. Have you submitted any previous early assessment applications for this project with Planning staff?If so, please attach a copy of the original request and the Planning Division's response. No. Is the project part of an approved CIP budget or a future CIP budget?If so, please provide the CIP Project #. Yes, Project No. 5208. Recycled Water Phase Ill -Pipelines List any previous and/or anticipated future Planning Commission or City Council actions (e.g., permit approvals, activity authorizations, etc.) related to this project. The Board of Directors of the Carlsbad Municipal Water District (CMWD) approved the Phase III Recycled Water Project on November 27, 2012. In the near future, staff will ask the Board of Directors of the CMWD to approve plans and specifications to advertise for bids. List any previously certified environmental documents (e.g., EIRs, Negative Declarations). The Mitigated Negative Declaration (MND) for the Phase Ill Recycled Water Project (EIA-12-02) was adopted by the Board of Directors of the CMWD on November 27, 2012.This project was also included previously at the program level in the City of Carlsbad Sewer Master Plan and Carlsbad Municipal Water District Water and Recycled Water Master Plan Update Environmental Impact Report, certified in October 2012. State Water Resources Control Board Notice of Determination and CEQA-Plus Findings pursuant to the CWSRF application filed on December 11, 2014. The CEQA for the Phase Ill Recycled Water Program can be found here for reference: •J:\Utilities Department\Phase Ill Recycled Water Program List any technical studies that have been prepared or that you anticipate will be prepared (e.g., biology, archeology, traffic, noise, etc.). A biological resources technical letter report prepared as part of the MND. An air quality technical letter, biological resources technical letter, and cultural resources technical reports were prepared as part of the CEQA-Plus Environmental Checklist. Is the project on City property? If not, has property owner authorization or an easement been secured? The Project will be within existing right-of-way and easement. P-15 Page 2 of 3 Revised 09/11 11111•••••=11.4 Identify the project location.Include specific parcel numbers if possible. Expansion Segment 9 extends along Avenida Encinas to the Poinsettia Village shopping center and the Lake Shore Garden mobile home park, as shown in the attached figure. Segment 9 also extends along Navigator Circle and Ponto Drive. Identify the project schedule.List critical and desired milestones including dates in the development review and construction process (e.g.,public hearing dates,grant application submittal deadlines,public workshops,construction phasing, etc.). Advertise to Bid: February 2017 Bids Received and Reviewed: April 2017 Construction Contract Awarded: May/June 2017 Notice to Proceed: June 2017 Construction Completion: May 2018 DESCRIPTION OF PROPOSAL —Describe the project in as much detail as possible.Use as much space as needed. Attach additional sheets (drawings, etc.) if necessary.Be sure to identify,if applicable, estimated quantities of grading (including import/export),construction staging areas on and offsite,areas of sensitive vegetation,unique construction technologies, proposed facility technologies and byproducts, and any public art component. If preliminary or conceptual plans or exhibits are available, please include two sets with this transmittal. Carlsbad Municipal Water District (CMWD) provides potable water and recycled water within a portion of the City of Carlsbad. CMWD's service area covers most of the City's boundary.The CMWD has been providing recycled water to the city since 1991. The pipeline projects described herein are components of the Phase III Recycled Water Project considered within the Capital Improvement Program (CIP) identified in the 2012 RWMP to expand recycled water service to the northwest quadrant of the CMWD service area. The Phase III Recycled Water Project includes the installation of new pipelines, conversion of existing potable water facilities to recycled water use, and retrofitting landscape irrigation water systems to use recycled water and provide supply to proposed land development projects. Expansion Segment 9 consists of 4,800 feet of 6-inch to 8-inch diameter pipeline with an ultimate system demand of 91 afy. This segment would be a part of Zone 318, expanding the recycled water system south to the San Pacifico Homeowners Association and various existing landscape irrigation and potential development areas. A portion of this alignment extends Zone 318 south along Avenida Encinas to the Poinsettia Village shopping center and the Lake Shore Garden mobile home park. P-15 Page 3 of 3 Revised 09/11 STORM WATER STANDARDS Development Services 4C City of QUESTIONNAIRE Land Development Engineering Carlsbad E-34 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov INSTRUCTIONS: To address post-development pollutants that may be generated from development projects,the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual).To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,discretionary permits and/or construction permits).The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project.Depending on the outcome,your project will either be subject to 'STANDARD PROJECT'requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts.City staff has responsibility for making the final assessment after submission of the development application.If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete.In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application.Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: CMWD Phase III Recycled Water Project Segment 9 PROJECT ID: CIP Project 5208 ADDRESS: Navigator Cir, Ponto Dr & Avenida Encinas, south of Poinsettia APN: n/a The project is (check one): [og New Development Redevelopment The total proposed disturbed area is:Z-CC)ft2 ()acres rttp....„--) The total proposed newly created and/or replaced impervious area is:°ft2 (0 )acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID n/a SWQMP #:n/a Then,go to Step 1 and follow the instructions.When completed,sign the form at the end and submit this with your application to the city. E-34 Page 1 of 4 REV 02/16 STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then go to Step 5,mark the third box stating "my project is not a 'development project'and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): The project will make routine pipeline improvements by installing a new recycled water pipeline within the existing easement and right of way. Existing pavement will be trenched and replaced in kind. No additional impervious surface will be created. If you answered "no" to the above question, the project is a 'development project'. go to Step 2. STEP 2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1.Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a)Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; b)Designed and constructed to be hydraulically disconnected from paved streets or roads; c)Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2.Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? 3.Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5,mark the second box stating "my project is EXEMPT from PDP ..." and complete applicant information. Discussion to justify exemption (e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3. E-34 Page 2 of 4 REV 02/16 STEP 3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS. To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO 1.Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site?This includes commercial,industrial,residential,mixed-use, and public development projects on public or private land. 2.Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface?This includes commercial,industrial,residential,mixed-use,and public development projects on public or private land. 3.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant?A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4.Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project?A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street,road,highway freeway or driveway?A street,road,highway,freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7.Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site,and discharges directly to an Environmentally Sensitive Area (ESA)?"Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8.Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop?An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541,7532-7534,or 7536-7539. 9.Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)?This category includes RGO's that meet the following criteria:(a)5,000 square feet or more or (b)a project Average Daily Traffic (ADT)of 100 or more vehicles per day. 10.Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11.Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2)increases impervious surface on the property by more than 10%?(CMC 21.203.040) If you answered "yes" to one or more of the above questions, your project is a PDP.If your project is a redevelopment project,go to step 4.If your project is a new project, go to step 5,check the first box stating "My project is a PDP ..." and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.'Go to step 5,check the second box stating "My project is a 'STANDARD PROJECT'..." and complete applicant information. E-34 Page 3 of 4 REV 02/16 .... STEP 4 11 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50%of the surface area of the previously existing development?Complete the percent impervious calculation below: Existing impervious area (A)=sq. ft.El El Total proposed newly created or replaced impervious area (B)=sq. ft. Percent impervious area created or replaced (B/A)*100 =°A If you answered "yes",the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development.Go to step 5,check the first box stating "My project is a PDP ..." and complete applicant information. If you answered "no," the structural BMP's required for PDP apply to the entire development.Go to step 5,check the check the first box stating "My project is a PDP ..." and complete applicant information. STEP 5 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION El My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual.I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual.As part of these requirements,I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note:For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. Z My Project is NOT a 'development project'and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Title:Applicant Name:Lindsay Leahy Associate Engineer, CMWD Applicant Signature:A ..4.--(Ai Date:1424110 IF include*Environmentally Sensitiv.-as but are not limite to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by e State Water Resources Cont of Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994)and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Only YES NO City Concurrence:0 0 By: Date: Project ID: E-34 Page 4 of 4 REV 02/16