Loading...
HomeMy WebLinkAboutEIA 08-01; LA GOLONDRINA - EL FUERTE HDD SEWER EXTENSIONS; Environmental Impact Assessment (EIA)CITY OF CARLSBAD USE REVIEW APPLICATION . (FOR DEPT USE ONLY) (FOR DEPT USE ONLY) LI Administrative Permit [I Administrative Vaflanóe LIII Coastal Development Permit LI Conditional Use Permit LI Condominium Permit Environmental Impact Assessment LI General Plan Amendment LII Habitat Management Plan Permit LIII Hillside Development Permit fl Local Coastal Program Amendment [II] Master Plan [1 Minor Conditional Use Permit LII Non-Residential Planned Development 2) ASSESSOR PARCEL NO(S).: 21 S 3) PROJECT NAME: L, LI Planned Development Permit LI Planned Industrial Permit LI Planning Commission Determination LI Precise Development Plan [I] Redevelopment Permit cE --v1 fl Site Development Plan [I] Special Use Permit LI Specific Plan LI Tentative RaFsel Map Obtain from Engineering Department LI Tentative Tract Map LI Variance LI Zone Change LI List other applications not -4)C 222-(,2---2 5) OWNER NAME (Print or Type) Li 6) APPLICANT NAME (Print or Type) ,iy tC&, MAILINO ADDRESS /4 S Ft44 £ (7c0) Coz 276 MAILING ADDRESS /& gç E4 (7cc>jo2-gx 3 CITY AND STATE ZIP TELEPHONE CITY AND STATE ZIP TELEPHONE C . (AS ,97hrc6) cs'.cccfse.i0Ac. EMAIL ADDRESS: EMAIL ADDRESS: I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE INFORMATION J6 ,tRVE AND CORRECT TO THE BEST OF MY KN 9GE T / OV S'I I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORREcTTO SIDE MY KNO.tEDGE. SIGNATURE DATE' SIGNATURE 2 DATE NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLICATIONS BE FILED, MUST BE SUBMITTED PRIOR TO 3:30 P.M. A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION BE FILED, MUST BE SUBMITTED PRIOR TO 4:00 P.M. Form 14 Rev 03108 RAGE 1 OF 4 . 7) BRIEF LEGAL DESCRIPTION 8 LOCATION OF PROJECT: ON THE - _ SIDE OFJ - - -- (NORTH, SOUTH, EAST, WEST) (NAME OF STREET) - - BETWEEN I AND I - (NAME OF STREET) - (NAME-OF STREET) - - 9) IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING COMMISSIONERS, DESIGN:REVIEW-ROARD-MEMBERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE. 10) NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTICE OF RESTRICTION BEING RECORDED ON THE TITLE TO HIS PROPERTY IF CONDITIONED FOR THE RESTRICTIONS RUN WITHTHE LAND AND BINDANY SUCCESSORS IN INTEREST. C,4PROPERTY ER SIGNATURE - FOR CITY USE ONLY DATE STAMP APPLICATION RECEIVED RECEIVED BY; - Form 14 Rev. 03/08 PAGE 2 OF 4 • CONSTRUCTION PLANS FOR LA GOLONDRINA AND EL FUERTE STREET CITY OF OCEANSIDE HDD SEWER EXTENSION l 7 PACIFIC OCEAN "le PROJECT LOCATION VICINITY MAP NO SCALE 11!!~ PROJECT IS LOCAlED 'MlHIN ASSESSORS PARCEL NUMBER(S) XXX lHE CALIFORNIA COORDINA 1E INDEX OF lHIS PROJECT IS N ______ E _____ _ SOURCE OF TOPOGRAPHY TOPOGRAPHY SHOWN ON lHESE PLANS WAS GENERA lED BY ll!Jll.EK. MElHODS FROM INFORMATION GATHERED ON lQC!X, 2007 BY DIJ.ll.EK.. TOPOGRAPHY SHOWN HEREON CONFORMS TO NATIONAL MAP ACCURACY STANDARDS. DECLARATION OF RESPONSIBLE CHARGE I HEREBY DECLARE lHAT I AM lHE ENGINEER Of WORK FOR lHIS PROJECT, lHAT I HAVE EXERCISED RESPONSIBlE CHARGE OVER lHE DESIGN OF lHE PROJECT AS DEANED IN SECTION 6703 Of lHE BUSINESS AND PROFESSIONS CODE, AND lHAT lHE DESIGN IS CONSISTENT Yl1lH CURRENT STANDARDS. I UNDERSTAND lHAT lHE CHECK Of PRo..ECT DRA'MNGS AND SPECIFICATIONS BY lHE CITY Of CARLSBAD DOES NOT RELJE\'E ME AS ENGINEER Of WORK, Of MY RESPONSIBILITIES FOR PRCU:CT DESIGN. ARM: DUDEK o!c ASSOCIAlES. INC. ADDRESS, 605 3RD SlREET CllY, ST.: ENCINITAS CA 92024 m.EPHONE· (760) 942-5147 BY:-------------DATE: ______ _ RUSSELI. BERGHOl.2 R.C.E. ND.: 59395 REGISTRATION EXPIRATION DATE: 12-31-07 PROJECT LOCATION MARCH 2008 • CITY OF CARLSBAD CARLSBAD, CALIFORNIA CITY COUNCIL CLAUDE A. "BUD" LEWIS -MAYOR ANN KULCHIN -MAYOR PRO TEM MA TT HALL -COUNCIL MEMBER MARK PACKARD -COUNCIL MEMBER JULIE NYGAARD -COUNCIL MEMBER RAYMOND R. PATCHETT CITY MANAGER GLENNPRUIM PUBLIC WORKS DIRECTOR ~ BENCH MARK DESCRIPTION: LOCATION: RECORDED: KEY MAP GRAPHIC SCALE L-=· j' SCALE: 1" -200' NOTE: CONTRACTOR SHALL LOCATE ALL EXISTING UTILITY VALVE BOXES, MANHOLES, VAULTS, SEWER CLEANOUTS, STORM DRAIN GRA 'TES, INLETS ANO SURVEY MONUMENT BOXES ANO PROlECT-IN-PLACE. ~ lo I ~ ~ II i:='.' i C ~ ELEVATION: __________ DATUM: ___ _ -~ ,s -,; ·" INDEX OF SHEETS BASIS OF BEARING SHEET NO. 2 3 4 5 6 7 TITLE lllt£ SHEET GENERAL NOlES AND WORK TO BE DONE ABBREVIATIONS AND LEGEND SEWER LINE A PLAN AND PROflLE STA o+oo TO 6+00 SEWER LINE A PLAN AND PROflLE STA 6+00 TO 12+00 SEWER LINE A PLAN AND PROflLE STA 12+00 TO 18+00 SEWER LINE A PLAN AND PROflLE STA 18+00 TO 19+43 XXX PRELIMINARY DESIGN DATE: MARCH 2008 NOT FOR CONSTRUCTION DUDEK Ou<kk & Assoc:i:atu, Inc. 605 Third Street EncM\itu, CA 9202◄ 760.9<f2.51◄7 Fu 760,632.0164 0 I~ I~ "' CITY Of CARLSBAD FIRE DEPARlMENT IIEQURDEl1S "AS BUil T" NO.~ F./1.(S)_r.fl.OW __ GJ>,11. OUT ~_r.ll(si1 -------- -------------~ IIJ)f;, -.m '!ES/NO. •• r.n.ow_GJ>.11. p,E, ___ EXP. ---DATE i ~ CARI.SBAD MUNICIPAL. WATER DISTRICT F'f!E WAl!lHAl DATE 0,.W,t,.HM.ISEJI DATE DEl'U1Y a,y EIQl!IR R.C.E. JJOBI ~-8/YJ/08 RE','IEVIEI) BY: u ~ C SHEET CITY OF CARISBAD SHEETS ii. INSPEC10R DA TE ~: I I I I I I I I ~ ENGINEERING DEPARTMENT ~ ~ llllP~~O~~I~ AND EL FUERTE ST. HOD SEWER EXTENSION TITLE SHEET. VICINITY MAP, KEY MAP 1 APPROVED: DAVlD ,., HAUSER ----1 r--+1-ra-------+-r.-.TE--+1-.nAL-llf--·•-lE +L--1 .... 11;;r~11 PE ~Mfil~.6/JO/Oll~A~~~ NO. 01\tER ....,,.,.._ QTY ,.,..,.(HAI. _RVWD BY: . . XXX . XXX DATE I NTW.. 04QNCER OF WORK REVISION DESCRIPTION CMWD ____ _ VIA: . S 1-7 I EARLY ASSESSMENT APPLICATION DATE: ~htiJot, NO.: EA t(C 05 (Sbbmitfal bate to Planning) (Planning Department Tracking Number) TO: PLANNING DEPARTMENT - SPECIAL PROJECTS DIVISION FROM: Mark Biskup (Requesting Department Contact) Any early consultation or previous early assessment applications with Planning staff? If so, please attach a copy of the original request and the Planning Departments response.Project now to include La Costa Meadows Sewer Extension. previous Early Assessment Application is attached. What is the project title? La Golandrina Sewer and La Costa Meadows Sewer Extensions Is the project part of an approved CIP budget? Yes Is the project part of a future CIP budget?_________________________________ List previous related Planning Commission or City Council actions.__________________________________ List any anticipated future related Planning Commission or City Council actions. Approval to Advertise. Approval to Award Construction Contract List any previously certified environmental documents (i.e. EIRs, Negative Declarations)._______________ What technical studies have been prepared (i.e. biology, archeology, traffic, noise, eta)? What technical studies will be prepared (i.e. biology, archeology, traffic, noise, etc.)? Will be acquired as determined necessary. Is the project on City property? If not has property owner authorization or an easement been secured? Identify the project schedule. List critical, and desired milestone, dates in the development review and construction process (i.e. hearing dates, grant application submittal deadlines, public workshops, construction phasing, etc.). until adiacent, future development would allow flow to go into Carlsbad's collection H:admin\counter\EarlyAssessmentFrm Date July 5, 2006 l- TO: MARK BISKUP, ASSOCIATE ENGINEER VIA: Principal Planner Chris DeCerbo FROM: Senior Planner Elaine Blackburn t,13 SUBJECT: LA GOLANDRINA SEWER AND LA COSTA MEADOWS SEWER EXTENSIONS -EA 06-05 Planning staff has reviewed the proposed revised project and offers the following comments: 1. As you know from your previous Early Consultation on a project in this area, the overall site contains protected sensitive habitat. It appears that no City discretionary permits would be required for either the abandonment of the lift station or for the construction of the new line(s) with the possible exception of a Habitat Management Plan (HMP) Permit as discussed below. 2. Preparation of an environmental review document for the project would be required. You have stated that the construction of the line can be accomplished through directional drilling, resulting in no impacts to habitat. It is unclear whether there would be a need for any staging areas for the project. If you can implement the entire project with no environmental impacts (including impacts from staging areas), the project will probably need only a Negative Declaration. (The directional drilling methodology would need to be described in the environmental review as a "project design feature", and would not be "mitigation".) If the project does involve any staging area impacts to sensitive habitat, then you might need to prepare a Mitigated Negative Declaration and might need to process an HMP Permit . c: Chris DeCerbo File Copy Data Entry Planning Aide . . 1, DATE: May4, 2004 TO: MARK BISICUP, ASSOCIATE ENGINEER VIA: Principal Planner, Don Rideout FROM: Senior Planner, Elaine Blackburn SUBJECT: EARLY CONSULT - LA GOLAN))IW4A SEWER EXTENSION It is our understanding that the proposed project includes the abandonment of the existing temporary lift station and the construction of a new sewer line to connect to existing City facilities. We have the following comments: 1. The overall site (for all three alternatives A, B, and C) contains protected sensitive habitat. Consequently, Planning staff believes Alternative A would be the best alternative. It is the shortest (thus, least impacting). The project would require preparation of a Mitigated Negative Declaration. 2. You should also plan on incorporating microtunneling and/or any other impact- reducing construction methods. These would be part of the mitigation measures. 3. No City discretionary permits would be required for either the abandonment of the existing lift station or the construction of the new line. The general area of the project site(s) has General Plan designations of OS (Open Space) and RLM (Residential - Low to Medium Density) and zoning of OS and PC (Planned Community). The proposed activities are allowed in those designations and zoning districts. EB nh c: Terry Smith Don Rideout Elaine Blackburn . . EARLY CONSULTATION FORM DATE: NO.: (Submittal Date to Planning) (Planning Department Tracking Number) TO: PLANNING DEPARTMENT - SPECIAL PROJECTS DIVISION VIA: Department FROM: (Requesting Department Contact) What is the project title? £4 Go4'1f4/g4 5S&E,' SyrEn's' c-ti Is the project part of an approved or future CIP budget? YES List previous, and anticipated future, related City Council List any previously certified environmental documents (i.e. EIRs, Negative Declarations)._______________ What technical studies have been, or will be, prepared (i.e. biology, archeology, traffic, noise, etc.)? Is the project on City property? If not has property owner authorization or an easement been secured? Gi-'1 will sk fze/ioe easen,cJs LZ,%rc 29cessca-cI,. Identify the project schedule. List critical, and desired milestone, dates in the development review and construction process (i.e. hearing dates, grant application submittal deadlines, public workshops, construction phasing, etc.). Q. Cfefls Vtflcoe l. H:admin\counter\ecform . . facilities. Adjacent development has now occurred and the City of Carlsbad must construct facilities per the obligations of the interagency agreements. Identify the project location. Describe the project Provide as much detail as possible, attach additional sheets if necessary. Be sure to identify, if applicable, the public art component, estimated quantities of import/export, construction staging areas on and offsite, areas of sensitive vegetation, unique construction technologies, proposed facility technologies and byproducts. If preliminary or conceptual plans/exhibits are available, please include with this transmittal. (See attached map) The project has been revised to include the La Costa Sewer Extension shown on the attached map. The orolect includes the construction of gravity sewer pipelines and abandonment of temporary lift stations. It is the intension to use directional drilling methods for constructing the pipeline when it is not in the paved right environmental impacts for each of the alternatives. PLANNING DEPARTMENT RESPONSE Permits CEQA Overview Other comments: DATE: (Returned to Requesting Department) FROM: Project Planner H admin\counter\EarlyAssessmentFrm 2 S H Identify the project location. Descdbe the project. Provide as much detail as possible, ãflàch additional sheets if necessary. Be sure to identify, if applicable, the public art component, estimated quantities of import/export, construction staging areas on and offsite, areas of sensitive vegetation, unique construction technologies, proposed facility technologies and-byproducts. If preliminary orconceptual plans/exhibits are available, please-include with-this-transmittal. s/rncevso - -- - -- - 717e Z a c0i0J, scAt SJ47'b-i - &2CS ConS/rctc/rJ ¶/o Zq4)/tgp (oonty - WS, 4Zs",I /crc4/rrY flo,dlgros-c4 ,Von.nc Ab6ilr' - -- I, I t\ - if ,I! I -11 )'R 4b kssc-. ,.noocfs PLANNING DEPARTMENT RESPONSE Permits-Required: CEQA Overview: - - Other comments; - H:admin%counterecform 2 . DATE: EOM:_ (Returned to Requesting-Department) Don Rideout, Principal Planner H:admIncounter\ecform KI \Al TERNA11VE "B" - ,e_,. - N I I 1-INCH = 400F1 - - ViLLAGES OF LA COSTA "THE GREENS VILLAGE 1.8" I -- LA GOLONDRINA LIFT STA OPEN SPACE PREFER ED ALTERNATIVE "A" OPEN S flTh1fl ALTERNATIVES FOR' LA GOLONDRINA SEVER EXTENSION