HomeMy WebLinkAboutEIA 08-01; LA GOLONDRINA - EL FUERTE HDD SEWER EXTENSIONS; Environmental Impact Assessment (EIA)CITY OF CARLSBAD
USE REVIEW APPLICATION
.
(FOR DEPT USE ONLY) (FOR DEPT USE ONLY)
LI Administrative Permit
[I Administrative Vaflanóe
LIII Coastal Development Permit
LI Conditional Use Permit
LI Condominium Permit
Environmental Impact Assessment
LI General Plan Amendment
LII Habitat Management Plan Permit
LIII Hillside Development Permit
fl Local Coastal Program Amendment
[II] Master Plan
[1 Minor Conditional Use Permit
LII Non-Residential Planned Development
2) ASSESSOR PARCEL NO(S).: 21 S
3) PROJECT NAME: L,
LI Planned Development Permit
LI Planned Industrial Permit
LI Planning Commission
Determination
LI Precise Development Plan
[I] Redevelopment Permit
cE --v1 fl Site Development Plan
[I] Special Use Permit
LI Specific Plan
LI Tentative RaFsel Map
Obtain from Engineering Department
LI Tentative Tract Map
LI Variance
LI Zone Change
LI List other applications not
-4)C 222-(,2---2
5) OWNER NAME (Print or Type)
Li
6) APPLICANT NAME (Print or Type)
,iy tC&,
MAILINO ADDRESS
/4 S Ft44 £ (7c0) Coz 276
MAILING ADDRESS
/& gç E4 (7cc>jo2-gx 3
CITY AND STATE ZIP TELEPHONE CITY AND STATE ZIP TELEPHONE
C . (AS ,97hrc6) cs'.cccfse.i0Ac.
EMAIL ADDRESS: EMAIL ADDRESS:
I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE
INFORMATION J6 ,tRVE AND CORRECT TO THE BEST OF MY
KN 9GE T / OV
S'I
I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE
OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND
CORREcTTO SIDE MY KNO.tEDGE.
SIGNATURE DATE' SIGNATURE 2 DATE
NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLICATIONS BE FILED, MUST BE SUBMITTED PRIOR TO 3:30 P.M.
A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION BE FILED, MUST BE SUBMITTED PRIOR TO 4:00 P.M.
Form 14 Rev 03108 RAGE 1 OF 4
.
7) BRIEF LEGAL DESCRIPTION
8 LOCATION OF PROJECT:
ON THE - _ SIDE OFJ - - --
(NORTH, SOUTH, EAST, WEST) (NAME OF STREET) - -
BETWEEN I AND I
- (NAME OF STREET) - (NAME-OF STREET) - -
9) IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY
STAFF, PLANNING COMMISSIONERS, DESIGN:REVIEW-ROARD-MEMBERS OR CITY COUNCIL MEMBERS TO
INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO
ENTRY FOR THIS PURPOSE.
10) NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTICE OF
RESTRICTION BEING RECORDED ON THE TITLE TO HIS PROPERTY IF CONDITIONED FOR THE
RESTRICTIONS RUN WITHTHE LAND AND BINDANY SUCCESSORS IN INTEREST.
C,4PROPERTY ER SIGNATURE -
FOR CITY USE ONLY
DATE STAMP APPLICATION RECEIVED
RECEIVED BY; -
Form 14 Rev. 03/08 PAGE 2 OF 4
•
CONSTRUCTION PLANS FOR
LA GOLONDRINA AND EL FUERTE STREET
CITY OF OCEANSIDE HDD SEWER EXTENSION
l
7
PACIFIC
OCEAN
"le
PROJECT LOCATION
VICINITY MAP
NO SCALE
11!!~ PROJECT IS LOCAlED 'MlHIN ASSESSORS PARCEL NUMBER(S)
XXX
lHE CALIFORNIA COORDINA 1E INDEX OF lHIS PROJECT IS N ______ E _____ _
SOURCE OF TOPOGRAPHY
TOPOGRAPHY SHOWN ON lHESE PLANS WAS GENERA lED BY ll!Jll.EK.
MElHODS FROM INFORMATION GATHERED ON lQC!X, 2007 BY DIJ.ll.EK..
TOPOGRAPHY SHOWN HEREON CONFORMS TO NATIONAL MAP
ACCURACY STANDARDS.
DECLARATION OF RESPONSIBLE CHARGE
I HEREBY DECLARE lHAT I AM lHE ENGINEER Of WORK FOR lHIS PROJECT,
lHAT I HAVE EXERCISED RESPONSIBlE CHARGE OVER lHE DESIGN OF lHE
PROJECT AS DEANED IN SECTION 6703 Of lHE BUSINESS AND PROFESSIONS
CODE, AND lHAT lHE DESIGN IS CONSISTENT Yl1lH CURRENT STANDARDS.
I UNDERSTAND lHAT lHE CHECK Of PRo..ECT DRA'MNGS AND SPECIFICATIONS
BY lHE CITY Of CARLSBAD DOES NOT RELJE\'E ME AS ENGINEER Of WORK, Of MY RESPONSIBILITIES FOR PRCU:CT DESIGN.
ARM: DUDEK o!c ASSOCIAlES. INC.
ADDRESS, 605 3RD SlREET
CllY, ST.: ENCINITAS CA 92024
m.EPHONE· (760) 942-5147
BY:-------------DATE: ______ _
RUSSELI. BERGHOl.2
R.C.E. ND.: 59395 REGISTRATION EXPIRATION DATE: 12-31-07
PROJECT
LOCATION
MARCH 2008
• CITY OF CARLSBAD
CARLSBAD, CALIFORNIA
CITY COUNCIL
CLAUDE A. "BUD" LEWIS -MAYOR
ANN KULCHIN -MAYOR PRO TEM
MA TT HALL -COUNCIL MEMBER
MARK PACKARD -COUNCIL MEMBER
JULIE NYGAARD -COUNCIL MEMBER
RAYMOND R. PATCHETT
CITY MANAGER
GLENNPRUIM
PUBLIC WORKS DIRECTOR
~
BENCH MARK
DESCRIPTION:
LOCATION:
RECORDED:
KEY MAP
GRAPHIC SCALE L-=· j'
SCALE: 1" -200'
NOTE:
CONTRACTOR SHALL LOCATE ALL EXISTING
UTILITY VALVE BOXES, MANHOLES, VAULTS,
SEWER CLEANOUTS, STORM DRAIN GRA 'TES,
INLETS ANO SURVEY MONUMENT BOXES
ANO PROlECT-IN-PLACE.
~
lo I
~ ~ II
i:='.'
i C ~
ELEVATION: __________ DATUM: ___ _
-~ ,s -,; ·"
INDEX OF SHEETS BASIS OF BEARING
SHEET NO.
2
3
4
5
6
7
TITLE
lllt£ SHEET
GENERAL NOlES AND WORK TO BE DONE
ABBREVIATIONS AND LEGEND
SEWER LINE A PLAN AND PROflLE STA o+oo TO 6+00
SEWER LINE A PLAN AND PROflLE STA 6+00 TO 12+00
SEWER LINE A PLAN AND PROflLE STA 12+00 TO 18+00
SEWER LINE A PLAN AND PROflLE STA 18+00 TO 19+43
XXX
PRELIMINARY DESIGN
DATE: MARCH 2008
NOT FOR CONSTRUCTION
DUDEK
Ou<kk & Assoc:i:atu, Inc.
605 Third Street EncM\itu, CA 9202◄
760.9<f2.51◄7 Fu 760,632.0164
0
I~
I~
"' CITY Of CARLSBAD FIRE DEPARlMENT
IIEQURDEl1S "AS BUil T"
NO.~ F./1.(S)_r.fl.OW __ GJ>,11. OUT ~_r.ll(si1 --------
-------------~ IIJ)f;, -.m '!ES/NO. •• r.n.ow_GJ>.11. p,E, ___ EXP. ---DATE i ~ CARI.SBAD MUNICIPAL. WATER DISTRICT
F'f!E WAl!lHAl DATE
0,.W,t,.HM.ISEJI DATE DEl'U1Y a,y EIQl!IR R.C.E. JJOBI ~-8/YJ/08
RE','IEVIEI) BY: u
~ C
SHEET CITY OF CARISBAD SHEETS ii.
INSPEC10R DA TE ~:
I I I I I I I I ~ ENGINEERING DEPARTMENT ~ ~
llllP~~O~~I~ AND EL FUERTE ST.
HOD SEWER EXTENSION
TITLE SHEET. VICINITY MAP, KEY MAP
1 APPROVED: DAVlD ,., HAUSER ----1 r--+1-ra-------+-r.-.TE--+1-.nAL-llf--·•-lE +L--1 .... 11;;r~11 PE ~Mfil~.6/JO/Oll~A~~~ NO.
01\tER ....,,.,.._ QTY ,.,..,.(HAI. _RVWD BY: . . XXX . XXX
DATE I NTW..
04QNCER OF WORK REVISION DESCRIPTION
CMWD ____ _
VIA:
. S
1-7
I
EARLY ASSESSMENT APPLICATION
DATE: ~htiJot, NO.: EA t(C 05
(Sbbmitfal bate to Planning) (Planning Department Tracking Number)
TO: PLANNING DEPARTMENT - SPECIAL PROJECTS DIVISION
FROM: Mark Biskup
(Requesting Department Contact)
Any early consultation or previous early assessment applications with Planning staff? If so, please
attach a copy of the original request and the Planning Departments response.Project now to include
La Costa Meadows Sewer Extension. previous Early Assessment Application is
attached.
What is the project title? La Golandrina Sewer and La Costa Meadows Sewer Extensions
Is the project part of an approved CIP budget? Yes
Is the project part of a future CIP budget?_________________________________
List previous related Planning Commission or City Council actions.__________________________________
List any anticipated future related Planning Commission or City Council actions. Approval to
Advertise. Approval to Award Construction Contract
List any previously certified environmental documents (i.e. EIRs, Negative Declarations)._______________
What technical studies have been prepared (i.e. biology, archeology, traffic, noise, eta)?
What technical studies will be prepared (i.e. biology, archeology, traffic, noise, etc.)? Will be acquired
as determined necessary.
Is the project on City property? If not has property owner authorization or an easement been secured?
Identify the project schedule. List critical, and desired milestone, dates in the development review and
construction process (i.e. hearing dates, grant application submittal deadlines, public workshops,
construction phasing, etc.).
until adiacent, future development would allow flow to go into Carlsbad's collection
H:admin\counter\EarlyAssessmentFrm
Date July 5, 2006 l-
TO: MARK BISKUP, ASSOCIATE ENGINEER
VIA: Principal Planner Chris DeCerbo
FROM: Senior Planner Elaine Blackburn t,13
SUBJECT: LA GOLANDRINA SEWER AND LA COSTA MEADOWS SEWER
EXTENSIONS -EA 06-05
Planning staff has reviewed the proposed revised project and offers the following comments:
1. As you know from your previous Early Consultation on a project in this area, the overall
site contains protected sensitive habitat. It appears that no City discretionary permits
would be required for either the abandonment of the lift station or for the construction of
the new line(s) with the possible exception of a Habitat Management Plan (HMP) Permit
as discussed below.
2. Preparation of an environmental review document for the project would be required. You
have stated that the construction of the line can be accomplished through directional
drilling, resulting in no impacts to habitat. It is unclear whether there would be a need for
any staging areas for the project. If you can implement the entire project with no
environmental impacts (including impacts from staging areas), the project will probably
need only a Negative Declaration. (The directional drilling methodology would need to
be described in the environmental review as a "project design feature", and would not be
"mitigation".) If the project does involve any staging area impacts to sensitive habitat,
then you might need to prepare a Mitigated Negative Declaration and might need to
process an HMP Permit .
c: Chris DeCerbo
File Copy
Data Entry
Planning Aide
.
.
1,
DATE: May4, 2004
TO: MARK BISICUP, ASSOCIATE ENGINEER
VIA: Principal Planner, Don Rideout
FROM: Senior Planner, Elaine Blackburn
SUBJECT: EARLY CONSULT - LA GOLAN))IW4A SEWER EXTENSION
It is our understanding that the proposed project includes the abandonment of the existing
temporary lift station and the construction of a new sewer line to connect to existing City
facilities. We have the following comments:
1. The overall site (for all three alternatives A, B, and C) contains protected sensitive
habitat. Consequently, Planning staff believes Alternative A would be the best
alternative. It is the shortest (thus, least impacting). The project would require
preparation of a Mitigated Negative Declaration.
2. You should also plan on incorporating microtunneling and/or any other impact-
reducing construction methods. These would be part of the mitigation measures.
3. No City discretionary permits would be required for either the abandonment of the
existing lift station or the construction of the new line. The general area of the
project site(s) has General Plan designations of OS (Open Space) and RLM
(Residential - Low to Medium Density) and zoning of OS and PC (Planned
Community). The proposed activities are allowed in those designations and
zoning districts.
EB nh
c: Terry Smith
Don Rideout
Elaine Blackburn
.
.
EARLY CONSULTATION FORM
DATE: NO.:
(Submittal Date to Planning) (Planning Department Tracking Number)
TO: PLANNING DEPARTMENT - SPECIAL PROJECTS DIVISION
VIA:
Department
FROM:
(Requesting Department Contact)
What is the project title? £4 Go4'1f4/g4 5S&E,' SyrEn's' c-ti
Is the project part of an approved or future CIP budget? YES
List previous, and anticipated future, related City Council
List any previously certified environmental documents (i.e. EIRs, Negative Declarations)._______________
What technical studies have been, or will be, prepared (i.e. biology, archeology, traffic, noise, etc.)?
Is the project on City property? If not has property owner authorization or an easement been secured?
Gi-'1 will sk fze/ioe easen,cJs LZ,%rc 29cessca-cI,.
Identify the project schedule. List critical, and desired milestone, dates in the development review and
construction process (i.e. hearing dates, grant application submittal deadlines, public workshops,
construction phasing, etc.).
Q. Cfefls Vtflcoe l.
H:admin\counter\ecform
. .
facilities. Adjacent development has now occurred and the City of Carlsbad must
construct facilities per the obligations of the interagency agreements.
Identify the project location. Describe the project Provide as much detail as possible, attach additional
sheets if necessary. Be sure to identify, if applicable, the public art component, estimated quantities of
import/export, construction staging areas on and offsite, areas of sensitive vegetation, unique construction
technologies, proposed facility technologies and byproducts. If preliminary or conceptual plans/exhibits are
available, please include with this transmittal.
(See attached map) The project has been revised to include the La Costa Sewer Extension
shown on the attached map. The orolect includes the construction of gravity sewer
pipelines and abandonment of temporary lift stations. It is the intension to use
directional drilling methods for constructing the pipeline when it is not in the paved right
environmental impacts for each of the alternatives.
PLANNING DEPARTMENT RESPONSE
Permits
CEQA Overview
Other comments:
DATE:
(Returned to Requesting Department)
FROM:
Project Planner
H admin\counter\EarlyAssessmentFrm 2
S H
Identify the project location. Descdbe the project. Provide as much detail as possible, ãflàch additional
sheets if necessary. Be sure to identify, if applicable, the public art component, estimated quantities of
import/export, construction staging areas on and offsite, areas of sensitive vegetation, unique construction
technologies, proposed facility technologies and-byproducts. If preliminary orconceptual plans/exhibits are
available, please-include with-this-transmittal.
s/rncevso - -- - -- -
717e Z a c0i0J, scAt SJ47'b-i - &2CS ConS/rctc/rJ ¶/o
Zq4)/tgp (oonty - WS, 4Zs",I /crc4/rrY
flo,dlgros-c4 ,Von.nc Ab6ilr' - --
I, I t\ - if ,I! I -11
)'R 4b kssc-. ,.noocfs
PLANNING DEPARTMENT RESPONSE
Permits-Required:
CEQA Overview: - -
Other comments; -
H:admin%counterecform 2
.
DATE: EOM:_
(Returned to Requesting-Department) Don Rideout, Principal Planner
H:admIncounter\ecform KI
\Al TERNA11VE "B"
- ,e_,. -
N
I I
1-INCH = 400F1
- - ViLLAGES OF LA COSTA
"THE GREENS VILLAGE 1.8" I --
LA GOLONDRINA LIFT STA
OPEN SPACE
PREFER ED
ALTERNATIVE "A"
OPEN
S
flTh1fl
ALTERNATIVES FOR'
LA GOLONDRINA SEVER EXTENSION