Loading...
HomeMy WebLinkAboutEIA 91-04; ECR TAMARACK TRAFFIC SIGNAL; Environmental Impact Report (EIR)4 1 CITY OF CARLSBAD LAND USE REVIEW APPLICATION FOR PAGE 1 OF 2 1) APPLICATIONS APPLIED FOR: (CHECK BOXES) (FOR DEPT rT O Master Plan O Specific Plan O Precise Development Plan C] Tentative Tract Map O Planned Development Permit O Non-Residential Planned Development O Condominium Permit C] Special Use Permit C] Redevelopment Permit C] Tentative Parcel Map C] Administrative Variance 0 General Plan Amendment C] Local Coastal Plan Amendment C] Site Development Plan C] Zone Change C] Conditional Use Permit C] Hillside Development Permit Environmental Impact Assessment C] Variance C] Planned Industrial Permit C] Coastal Development Permit Planning Commission Determination C] List any other applications not specificed (FOR DEPT USE ONLY) 2) LOCATION OF PROJECT: ON THE North J SIDE OF Tamarack Avenue (NORTH, SOUTH EAST, WEST) (NAME OF STREET) at JE1 Camino Real AND (NAME OF STREET) (NAME OF STREET) 3) BRIEF LEGAL DESCRIPTION: I right-of-way at the intersection n-F El Camino Real and Tamarack Avenue 4) ASSESSOR PARCEL NO(S). 208-05-59 (in adjacent Street ROW) 5) LOCAL FACILITIES I 2 J 6) EXISTING GENERAL PLAN I RM J 7) PROPOSED GENERAL PLAN I RM I MANAGEMENT ZONE DESIGNATION DESIGNATION 8) EXISTING ZONING I P-C 9) PROPOSED ZONING J P-c 10) GROSS SITE N/A ACREAGE 11) PROPOSED NUMBER OF 12) PROPOSED NUMBER 13) TYPE OF SUBDIVISION RESIDENTIAL UNITS N/A OF LOTS (RESIDENTIAL COMMERCIAL INDUSTRIAL) 14) NUMBER OF EXISTING RESIDENTIAL UNITS None 15) PROPOSED INDUSTRIAL F N/A 116) PROPOSED COMMERCIAL OFFICE/SQUARE FOOTAGE SQUARE FOOTAGE NOTE A PROPOSED PRQIECF REQUiRING THAT MULTWtE APPU=ONS BE PILED MLT BE SUB&gr= PRIOR TO 3:30 P.M. A PROPOSED PROJECT REQUaMW THAT ONLY ONE Appucxnw BE pflE bMT BE SU8hffTTED PRIOR TO 4:00 PAL FRM00016 8/90 S w CITY OF CARLSBAD W LAND USE REVIEW APPLICATION FORM PAGE 2 OF 17) PERCENTAGE OF PROPOSED PROJECT IN OPEN SPACE a 7 18) PROPOSED SEWER USAGE IN EQUIVALENT DWELLING UNITS a 19) PROPOSED INCREASE IN AVERAGE DAILY TRAFFIC j 20) PROJECT NAME: Traffic Signal Modification at ECR & Tamarack 21) BRIEF DESCRIPTION OF PROJECT: Remove an existing free right turn lane from Tamarack Avenue at ECR and upgrade traffic signal system to include prnt.r.td left turn phasing. 22) IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING COMMISSIONERS, DESIGN REV1EW BOARD MEMBERS, OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERV THAT F THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE SIGNATURE 23) OWNER 24) APPLICANT NAME (PRINT OR TYPE) NAME (PRINT OR TYPE) City of Carlsbad Gary Kellison MAILING ADDRESS MAILING ADDRESS 2075 Las Palmas Dr. CITY AND STATE ZIP TELEPHONE CITY AND STATE ZIP TELEPHONE (LSlCJ C4 7z-ooy CERTIFY THAT I AM THE LEGAL OWNER I CERTIFY THAT I AM THE LEGAL OWNER'S REPRESENTATIVE AND AND THAT ALL THE ABOVE INFORMATION THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE IS TRUE AND CORRECT TO THE BEST OF BEST OF MY KNOWLEDGE. MY KNOWLEDGE. SIGNATURE DATE SIGNATURE DATE 3 '7 FOR CITY USE ONLY f' if FEE COMPUTATION: APPLICATION TYPE FEE REQUIRED 1:!\R 2 1P rio 'p\r 3 .l DATE STAMP APPLICATION RECEIVED RECEIVED BY: TOTAL FEE REQUIRED DATE FEE PAID RECEIPT NO. [ t 4---% . 0 March 25, 1991 1. TO: ROBERT GREEN, PRINCIPAL PLANNER FROM: Gary Kellison, Associate Engineer EL CAMINO REAL/TAMARACK AVENUE INTERSECTION MODIFICATION: PROJECT NO. 3363 Attached is a completed Part 1 of the EIA form for this project. A copy of preliminary plans accompanied the memo that scheduled a design presentation meeting for the project. Please assign a planner to the project to expedite the CEQA review process and schedule the project for a General Plan Consistency finding by the Planning Commission. I believe that a class 2 exemption (replacement or reconstruction of existing facilities) can be justified under CEQA. Please let me know if additional information is needed for Planning to make this determination. GARY KELLISON Project Manager GK:jkb C: Municipal Projects Manager Principal Civil Engineer, Dan Clark Attachment ot