Loading...
HomeMy WebLinkAboutHDP 96-11; Scott Residence; Hillside Development Permit (HDP) (2)k .- PACIFIC SOILS ENOINEERING, INC. 7715 CONVO; COURT. SAN DIEGO. CALIFORNIA 9211 1 TELEPHONE: (619) 560-1713. FAX: (619) 560-0380 MR. JIM SCOTT P. 0. Box 1443 Rancho Santa Fe, CA. 92067 Attention: Subject: References: September 19, 1996 Work Order 400203 Mr. Jim Scott, Owner Review of Foundation Plans for Lot 1 (APN 21 5-240-46), in the City of Carlsbad, CA. See Appendix Gentlemen: As per your request, this letter presents Pacific Soils Engineering, Inc.'s (PSE's) review of the foundation plans (sheets 1 and 2 of 9) dated August 20, 1996 as prepared by Carothers Drafting and Construction for Lot 1 (APN 21 5-240-46): located in the City of Carlsbad, California. The foundations generally conform to the recommendations of reference report no. 2 with the exception of the under-slab moisture barrier. The moisture barrier should be a 10-mil polyvinyl membrane instead of a 6-mil as shown on the plans. The 10-mil polyvinyl should also be installed at the mid-height of the four (4) inches of clean sand. PSE also recommends that the proposed foundation systems conform to the most cur- rent edition of the Uniform Building Code. CORPORATE HEADQUARTERS TEL: (714) 220-0770 TEL: (213) 325-7272 or 775-6771 FAX: (714) 220-9589 LOS ANGELES COUNTY RIVERSIDE COUNTY SOUTH ORANGE COUNlY FAX: (714) 220-9589 FAX: (909) 676- 1879 FAX. (714) 730-5191 TEL: (909) 676-8195 EL: (714) 730-2122 ~~ .. Work Order 400203 September 19, 1996 If you have any questions, Page 2 pl'ease contact the Respectfully submitted, PACIFIC SOILS ENGINEERING, INC. BY * * QMqLdd DOUGldb DUNHAM, RCE 47238 Reviewed by: W / HN A. HAN ON, Vice President .. Dist: (2) Addressee DD/JAC/JAH: kr/OO03 PACIFIC molLm ~NQINCERINQ. INC. Work Order 400203 September 19, 1996 - APPENDIX REFERENCES 1. Pacific Soils Engineering, Inc., 1996, Geotechnical Update Report for Parcels 1 , 2 , 3 and 4 of Minor Subdivision 740 of Parcel Map 15678, City of Carlsbad, CA., dated August 15, 1996 (Work Order 400203). 2. Pacific Soils Engineering, Inc., 1989, Project Grading Report for Parcel 2 of Par- cel Map 13158, Northwest end of Altiva Place, City of Carlsbad, CA., dated No- vember 21, 1989 (Work Order 400203). 3. Pacific Soils Engineering, Inc., 1989, Preliminary Geotechnical Study, Parcel 2 of Parcel Map 13158, Northwest end of Altiva Place, City of Carlsbad, CA., dated October 28, 1989 (Work Order 400203) PACIFIC SOILS ENQINEERINO, INC. 3 -