Loading...
HomeMy WebLinkAboutPD 06-21; MAGELLAN AVIATION HANGARS; Planned Unit Development - Non-Residential (PUD)CARLSBAD - ENGINEERING DEPAR||^NT APPLICATION W ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: V\<\^c^^)a/^ l\^I^cS\'nn Y^Ur^^^r DATE: PROJECT DESCRIPTION: PROJECT ADDRESS: ^oU Pa\om/^r K<ii^oi)~ Tu/^kr] Ch ^ZoTi LOT NO(S).: " MAP NO.: 823 APN(S).: ^/Co . -^^ NUMBER OF LOTS: 1-NUMBER OF ACRES: \\ . MILES OF TRAILS: OWNER: ^rjF P^\o»vn^r LLC Mailing Address: \^^^ Ave fht. <;Uf<. Phone Number: '\oo B~t- Fax Number: E-Mail: I certify that I am the legal owner and that all the above information is true and correct to the best of my l<nowledge. Signature: Date: APPLICANT: Mailing Address: Phone Number: Fax Number: E-Mail: (^.i kK«-./>,'I , Signature: Date: 4-/ I S/c?'^ CIVIL ENGINEER: X^^^.X Ur^h^k^rJ^i' FIRM: .^^./^ X -IT.h.U^r L,' ^ Pg Mailing Address: 17.7?^ Vf^ r=^\,-ysc. SOILS ENGINEER: .-\...Sa/gJl . Ve^ei FIRM: g g^o n " -r Phone Number: :^^o^ Fax Number: ^ST^- 35'P-^-7^<: E-Mail: ^cVf^.A >"T^^ ^PO-r^;} ^ State Registration Number: Zj.^ ^ ? '3 Mailing Address: Phone Number: Fax Number: E-Mail: State Registration Number: ADDITIONAL COMMENTS: IMPROVEMENT VALUATION 1. What water district is the proposed project located in? (check one) ^^Carisbad Municipal Water District Qoiivenhain Qvallecitos 2. If in the Carlsbad (Municipal Water District, what is the totai cost estimate, including the 15% S'/A' contingency fee, for water and reclaimed water improvements, sewer (for Carisbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (ifappllcable)? $ cut cy fill cy GRADING QUANTITIES — ^/h remedial cy import cy export, cy SEE REVERSE SIDE H /DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check Revised 05/01/07 CITY OF CARLSBAD - ENGINEERING DEPARTMENT APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. APPLICATION FOR ( ^ all that apply) FOR CITY USE ONLY APPLICATION FOR ( ^ all that apply) PROJECT I.D. DRAWING NUMBER DEPOSIT/FEES PAID COMMENTS • Adjustment Plat (ADJ) Q Certificate pf Compliance (CE) Dedication of Easement (PR) Type: Dedication of Easement (PR) Type: Type: Type: []] Encroachment Permit (PR) • Final Map (FM) • Grading Plancheck (DWG) Improvement Plancheck (DWG) • Parcel Map (PM) ^ Quitclaim of Easement (PR) Type: W ATCM^- ^ Quitclaim of Easement (PR) Type: W ATCM^- Type: Type: Reversion to Acreage (RA) [] Street Vacation (STV) Q Tentative Parcei Map (MS) [] Certificate of Correction (CCOR) Q Covenant of Easement (PR) Substantial Conformance Exhibit (SCE) Q Trails [3<mile []> mile • Other APPLICA CEPTED BY: RECEIVED APR 1 5 2008 ENGINEERING DEPARTMENr DATE STAMP APPLICATON RECEIVED H:/DEVEL0PMENT SERVICES/MASTERS/Applicalion for Engineering Plan Check Page 2 Revised 05/01/07 An employee-owned company PROJECT REVIEW COMPLETION The following project has been reviewed and is recommended for approval: Project Name: Magellan Aviation Hangars Project No.: PD 06-21 Document No.: PR 08-19, Waterline Easement Vacation: Exhibits A & B DECLARATION OF PROJECT REVIEW I hereby declare that I have reviewed these documents in conformance with Section 6731.2 of the Business and Professions Code and certify that these documents are found to be in substantial compliance with applicable codes and standards. Review of these documents does not relieve the Land Surveyor or Engineer in "responsible charge of work" of their responsibilities with state and local ordinances. Signed C Charles R. St. John, RCE 57649 Expiration Date: 12/31/09 Date LJP'^' OS H:\Piiblic Work>\()S2C.nrlsbail\6:082l Carlsbad Dev Review\92, Masellan Aviation Hangar, PD ()6-2l\Ouitclaim\PR 08-19 PROJECT COMPl.FTION (kx- 9275 Sky Park Court • Suite 200 • San Diego, California 92123-4386 • Telephone 858.874.1810 • Fax 858.514.1001 • www.pbsj.com PBS^ An employee-owned company PROJECT REVIEW COMPLETION The following project has been reviewed and is recommended for approval: Project Name: Magellan Aviation Hangars Project No.: PD 06-21 Document No.: PR 07-125, Waterline Easement Vacation: Exhibits A & B DECLARATION OF PROJECT REVIEW I hereby declare that I have reviewed these documents in conformance with Section 6731.2 of the Business and Professions Code and certify that these documents are found to be in substantial compliance with applicable codes and standards. Review of these documents does not relieve the Land Surveyor or Engineer in "responsible charge of work" of their responsibilities with state and local ordinances. Signed dUj.. tl. Charles R. St. John, RCE 57649 Expiration Date: 12/31/09 Date H:\Public Works«82 Carlsbad\6:0821 Carlsbad Dev RevicwW2. Magellan Aviation Hangar. PD06-21\Qiiitclaini\PR 07-125 PROJtCT COMPLtllON.doc 9275 Sky Park Court • Suite 200 • San Diego, California 92123-4386 • Telephone 858.874.1810 • Fax 858.514.1001 • www.pbsj.com CITY OF CARLSBAD SUBMITTAL CHECKLIST QUITCLAIM P^, V^^^/€Q jLs^ City Project Name Magellan Aviation Hangars City Project No. PD 06-21 City Drawing No. PR 07-125 B. THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMnTAL: City Project Engineer David Rick 1. Transmittal letter from the Engineer or Surveyor of Work listing all the Items being submitted (Distribution: Original to Planchecker, copy to File). 2. Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). 3. All previous checkprints of Legal Description, Plat, and Preliminary Title Report (Distribution: Planchecker) 4. Two (2) sets of Preliminary Title Report (Distribution: 1 Planchecker, 1 File). 5. Three (3) sets of typewritten Legal Description of the Easement to be quitclaimed and corrected as necessary (Distribution: 2 Planchecker, 1 File). 6. Three (3) sets of Plat corrected as necessary (Distribution: 2 Planchecker, 1 File). 7. ADDITIONAL ITEMS/INFORMATION REQUIRED: SUBMITTAL COMPLETE. CHECKED BY DATE COMMENTS OWING ITEMS MUST BE SUBMITTED BEFORE CITY ENGINEER WIU RECOMMEND APPROVAL HE QUITCLAIM FOR CITY COUNCIL ACTION: [xZje. I N/A I 7 ransmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Otjgtnal to Plancheckgprcopy to F^lgV-^ Cogy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker)^ "^ll previous checkprints of Legal Description, Plat, and Preliminary Tide Report (Distribution: Plandjecker). Two (2) sets of updated Preliminary Title Report (dated within 30 days of submittal) (Distribution: 1 Planchecker, 1 File). JThree (3) sets of the corrected typewritten Legal Description corrected as necessary, signed and sealed by the Engineer or Surveyor of Woric (Distribution: 2 Plancheckgr, 1 File). Three (3) sets of Plat corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribiitton: ADDITIONAL ITEMS/INFORMATION REQUIRED: SUBMITTAL COMPLETE. CHECKED Vf^ DATE H:/DEVELOPMENT SERVICES/MASTERS/Quitdaim Submittal Checklisf Revised 1/14/02 CITY OF CARLSBAD SUBMITTAL CHECKLIST QUITCLAIM 4 ix^io '^ City Project Name Magellan Aviation Hangars City Project No. PD 06-21 City Drawing No. PR 08-19 B. THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL: City Project Engineer David Rick 1. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). 2. Copy of previous transmittal letter from the City and Planchecker's mari<ed checklist (Distribution: Planchecker). 3. All previous checkprints of Legal Desaiption, Plat, and Preliminary Title Report (Distribution: Planchecker) 4. Two (2) sets of Preliminary Title Report (Distribution: 1 Planchecker, 1 File). 5. Three (3) sets of typewritten Legal Desaiption of the Easement to be quitclaimed and corrected as necessary (Distribution: 2 Planchecker, 1 File). 6. Three (3) sets of Plat corrected as necsssary (Distribution: 2 Planchecker, 1 File). 7. ADDmONAL ITEMS/INFORMATION REQUIRED: SUBMITTAL COMPLETE. CHECKED BY DATE COMMENTS FgULOWING ITEMS MUST BE SUBMITTED BEFORE OTY ENGINEER WILL RECOMMEND APPROVAL E QUITCLAIM FOR CITY COUNCIL ACTION: Transmittal letter from the Engineer or Surveyor of Work listing ail the items being submitted (Distribution: Original to Planchedserrcopy tope). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Plancheckgj). All previous checkprints of Legal Description, Plat, and Preliminary Title Report (Distribution: Planchecket); TVvb (2) sets of updated Preliminary Title Report (dated within 30 days of submittal) (Distribution: 1 Planchecker, 1 File).--' Three (3) sets of the corrected typewritten Legal Description corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: 2 Planchecker, 1 File). Three (3) sets of Plat corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: ADDITIONAL ITEMS/INFORMATION REQUIRED: IN/A I 7 SUBMITTAL COMPLETE. CHECKED BY W COMMENTS - -y-^-COMMENTS - -y-^- / nut To - L Piancheckpr ^ ^-ili^^ H:/DEVELOPMENT SERVICES/MASTERS/Ouitdaim Submittal Checklist Page 2 Revised 1/14/02 CITY OF CARLSBAD SUBMITTAL CHECKLIST QUITCLAIM PD 06-21 City Project Name Magellan Aviation Hangars PR 07-125 City Project Engineer David Rick City Project No. City Drawing No B. THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL I 1 1 Transmittal letter from the Engineer or Surveyor of Work listing all the Items being submitted (Distribution: Original to Planchecker, copy to File). 2. Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). 3. All previous checkprints of Legal Description, Plat, and Preliminary Title Report (Distribution: Planchecker) 4. Two (2) sets of Preliminary Title Report (Distribution: 1 Planchecker, 1 File). 5. Three (3) sets of typewritten Legal Description of the Easement to be quitclaimed and corrected as necessary (Distribution: 2 Planchecker, 1 File). 6. Three (3) sets of Plat corrected as necessary (Distribution: 2 Planchecker, 1 File). 7. ADDITIONAL ITEMS/INFORMATION REQUIRED: SUBMITTAL COMPLETE. CHECKED BY DATE COMMENTS LOWING ITEMS MUST BE SUBMITTED BEFORE CITY ENGINEER WILL RECOMMEND APPROVAL QUITCLAIM FOR CITY COUNCIL ACTION: ransmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Ociginal to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). All previous checkprints of Legal Description, Plat, and Preliminary Title Report (Distribution: Planchecker). wo (2) sets of updated Preliminary Title Report (dated within 30 days of submittal) (Distribution: 1 Planchecker, 1 File). ree (3) sets of the corrected typewritten Legal Description corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: 2 Planchecker, 1 File). Three (3) sets of Plat corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: ADDITIONAL ITEMS/INFORMATION REQUIRED: SUBMITTAL COMPLETE. CHECKED B DATE COMMENTS H:/DEVELOPMENT SERVICES/MASTERS/Quitdaim Submittal Checklist Page 2 Revised 1/14/02 CITY OF CARLSBAD SUBMITTAL CHECKLIST QUITCLAIM City Project Name Magellan Aviation Hangars City Project No. PD 06-21 City Drawing No. PR 08-19 B. THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL: City Project Engineer David Rick • 1- 2. 3. 4. 5. 6. 7. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). All previous checkprints of Legal Description, Plat, and Preliminary Title Report (Distribution: Planchecker) Two (2) sets of Preliminary Title Report (Distribution: 1 Planchecker, 1 File). Three (3) sets of typewritten Legal Description of the Easement to be quitclaimed and corrected as necessary (Distribution: 2 Planchecker, 1 File). Three (3) sets of Plat corrected as necessary (Distribution: 2 Planchecker, 1 File). ADOmONAL ITEMS/INFORMATION REQUIRED: SUBMITTAL COMPLETE. CHECKED BY DATE COMMENTS THE roLLOWING ITEMS MUST BE SUBMITTED BEFORE CITY ENGINEER WILL RECOMMEND APPROVAL OE^IIE QUITCLAIM FOR CITY COUNCIL ACTION: 1. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: ^ Ojjginal to Planchecker, copy to File) XX ^^opy of Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). All previous checkprints of Legal Description, Plat, and Preliminary Title Report (Distribution: Planchecker). o (2) sets of updated Preliminary Title Report (dated within 30 days of submittal) (Distribution: 1 Planchecker, 1 File). hree (3) sets of the corrected typewritten Legal Description corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: 2 Planchecker, 1 File). Three (3) sets of Plat corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: ADDITIONAL ITEMS/INFORMATION REQUIRED: SUBMITTAL COMPLETE. CHECKED BY DATE*^ COMMENTS Hi/DEVELOPMENT SERVICES/MASTERS/Quitdaim Submittal Checklist Page 2 Revised 1/14/02 fo % ^/v^jo i GRADING AND EROSION CONTROL PLAN RESUBMITTAL CHECKLIST - PART C Engineering Dept. • Development Services • 1635 Faraday Ave • Carlsbad CA 92008 • 760-602-2750 THIS SECTION TO BE COMPLETED BY CITY PERSONNEL Project ID PD 06-21 Project Name Magellan Aviation DWG No 447-8B GR W.PLMl±^ Planchecker Project Engineer David Rick C. TH£ FOLLOWING MARKED ITEMS MUST BE SUBMITTED FOR FINAL APPROVAL: This Resubmittal Checklist ^ y 1. Transmittal from Engineer of Work listing all items being submitted /_ / 3. Copy of previous City transmittal letter y 4. Digital copy of plans 5. All previous checkprints of plans, review checklist, reports, calculations, and estimates \/^/ 6. sets of corrected prints of the grading and erosion control plan folded to 9" X 12" (Distribution: 1 File, Planchecker, I Eng P&P, Other - specify) 7. One copy of all signed Conditions of Approval 8. One copy of approved bound Soils Report sealed and signed by Soils Engineer \l_ 9. Original mylars sealed and signed by Engineer of Work and including all other required signatures /V^A 10- Concurrent mylar submittal(s) required (as applicable): Final/Parcel Map, Improvement Plans, . J. Easement documents. Temporary Construction Easement for Off-Site Grading, etc. V_j/l 1. One copy of approved Storm Water Pollution Prevention Plan (SWPPP) One copy of Notice of Intent (NOI) Receipt letter with WDID number separated from SWPPP 13. Two sets of approved Storm Water Management Plan (SWMP) sealed and signed by Engineer of Work D £ it '*' 1 V 14. Two copies of transmittal to City showing submittal of securities and agreements Payment of plancheck fee balance. See enclosed Fee Summary Listing(s) for fee itemization. (Please note: If the grading cash deposit is not yet paid, it may appear on the enclosed Fee Summary Listing. However, the grading cash deposit is collected separately and should not be included in this payment. The grading permit fee amount listed below is included as a courtesy. The grading permit fee may be paid with this submitta^Sf^ater with the application for grading permit.) Plancheck Fee Balance $ 3^ ^ ^ ^ ^ Grading Permit Fee $ l*<^.ao O P. ^7^47 Total ^'p%.^^ A>^/A"16. Department approvals: Planning, ^Traffic, Parks, Fire, Eng P&P, _M&0, , Other-specify COMMENTS SUBMFTTAL COMPLETE. CHECKED B' DATE Doc ER-02-01 10/15/2007 An employee-owned company PROJECT REVIEW COMPLETION The following project has been reviewed and is recommended for approval: Project Name: Project No.: Document No.: Sheets No.: Magellan Aviation Hangars PD 06-21 Grading Plan, Dwg. 447-8B 1 Through: DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the review of this project as defined in Section 6703 of the Business and Professions Code and have found the project to be in substantial compliance with applicable codes and standards. Review of this project does not relieve the Land Surveyor or Engineer of Work of the responsibilities with state MjdJgSgfc^^l"^'^^^^' ,yj /a: NO.C57649 ^\ 3) ¥ \ Fyp 12-31-Oq / ^ I ;igned rjUL R-.^7^ Date S -j4'0^ Charles R. St. John, RCE C57649 Expiration Date 12/31/09 H:\Public Works\082 Carlsh.id\620821 Carlsbad Dev Review\<)2, Magellan Aviation Hangar, PD 06-2l\Grading Plan. Dwg 447-8B\447-8B Project Rcspoasibility Letterdoc 9275 Sky Park Court • Suite 200 • San Diego, Califomia 92123-4386 •Telephone 858.874.1810 • Fax 858.514.1001 • www.pbsj.com CITY OF CARLSBAD SUBMITTAL CHECKLIST City Project No. 002- City Drawing No. QUITCLAIM ^ ^ Jl/. .1 City Project Name (\AA<^(^U.AfO /V/AH^lVf jWfeMC City Project Engineer PLEASE NOTE: • To insure the timely processing of Easement Dedications, Covenants and Quitclaims for development projects in the City, those submitting Easements for City review should check their submittal packages for completeness and compliance to the following checklist. Applicants are required to acknowledge completeness by Initialing the spaces provided for each item. City staff will inventory these items upon submittal. • Unless specifically marked "N/A" (not applicable) and initialed by the City Project Engineer, all items listed are required to to be submitted. • Please do not detach this checklist when attached to the Easement documents. This checklist is a part of the Easement documents check comments. • Should you have any questions, please contact the City Engineering Department, Development Services. A. THE FOLLOWING ITEMS MUST BE INCLUDED IN THE INITIAL SUBMITTAL: f^l. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Engineering Plancheck Application form completed and signed by Owner/Applicant (Distribution: Original to File, copy to Planchecker). Letter from the OwnetyApplicant requesting Quitclaim. The letter should indicate the reasons for the request (Distribution: Planckecker). Two (2) sets of Preliminary Title Report issued within 6 months of application submittal (Distribution: 1 Planchecker, 1 File). Three (3) sets of typewritten Legal Description of the Easement to be quitclaimed, marked Exhibit "A" on 8 1/2" X 11" size paper completed by a Licensed Land Surveyor or appropriately Licensed Engineer. The area (in square feet or acres) to be quitclaimed shall be called out on the Legal Description. The dsescription should be exactly as it was dedicated by previous Deed or Grant on the Subdivision Map (Distribution: 2 Planchecker, 1 File). Three (3) sets of Plat to illustrate Easement to be quitclaimed on 8 1/2" X 11" size paper completed by a Licensed Land Surveyor or appropriately Licensed Engineer. Each Plat shall as a minimum include the following data: (Distribution: 2 Planchecker, 1 File) The Easement to be quitclaimed Nort:h arrow and scale and bar scale Street name(s) and width(s) Lot/parcel number(s), subdivision name(s) and Map number(s) Black border and title box per city format - (see attached format) Plat marked as Exhibit "B" Any existing structures affected Matches Legal Description and Calculations exactly Processing fee (see current fee schedule).^^^^ . ADDITIONAL ITEMS/INFORMATION REQUIRED: CM>[.CS Of^ 7X1 8 waier[iv\o SUBMrnALCOMPLETE. CHECKED BY, CA>i.cs of qh^nf cjcrd. .DAT^^^ COMMENTS Out TO SEE REVERSE SIDE piancliackar H:/DEVELOPMENT SERVICES/MASTERS/Quitdaim Submittal Checklist Revised 1/14/02 GRADING AND EROSION CONTROL PLAN RESUBMITTAL CHECKLIST - PART B Engineering Dept. Development Services 1635 Faraday Ave Carlsbad CA 92008 760-602-2750 THIS SECTION TO BE COMPLETED BY CITY PEflSONNEL Project ID PD06-2 I DWG No. 447-8B GR No.: Project Name Magellan Aviation Hangars Planchecker Rick St. John. PBS&J Project Engineer David Rick puMaccnenuKCMtv B. THE FOLLOWING MARKED ITEMS ML|ST BE INCLUDED IN RESUBMITTAL: "Z"^. This Resubmittal Checklist . Transmittal from Engineer of Work listing ail items being submitt^' Copy of previous City transmittal letter ^'''^ ^fb(V A, Original and one copy of completed Security and Agreement Data Sheet j. All previous checkprints of plans, review checklist, reports, calculations, and estimates 6. A' sets of corrected prints of the grading and erosion control plans folded to 9" X 12" (Distribution; 1 File, 1 SCE, Planchecker Planning, Eng P&P Other - specify) 7. Two sets, of corrected bound Drainage Report sealed and signed by Engineer of Work ^/A^ 8. Two sets of corrected bound Soils Report sealed and signed by Soils Engineer . Two sets of corrected Engineer's Cost Estimate sealed and signed by Engineer of Work i//Ar 10. Jlwe-sets of corrected Earthwork Quantity Calculations sealed and signed by Engineer of Work . Concurrent regiibmittal required (as applicable): Final/Parcel Map, Improvement Plans, ''Easement documeTitS^^Temporary Construction Easement for Off-Site Grading, etc. corrected N/fic 12. Two sets of corrected Storm Water Pollution Prevention Plan (SWPPP) V^^IS^S. Two sets of corrected Storm Water Management Plan (SWMP) f//Ar 14 Department comments: Planning, ^Traffic, Parks, Fire, Other-specify (Distribution: to indicated departments) 15. OTHER: _Eng P&P, M&O, COMMENTS DATE ^//y/^ SUBMITTAL COMPLETE. CHECKED l?Y_ "T- Out To r-!ancheck55r Doc ER-02-01 cmr OF CARLSBAD SUBMITTAL CHECKLIST QUITCLAIM PD 06-21 City Project Name Magellan Aviation Hangars City Project No. City Drawing No. B. /THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL: PR 07-125 City Project Engineer David RkJc Transmittal letter from the Engineer or Sun^eyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to Fite). Copy of prevrous transmittal letter from the City and Planchecker's marlced checklist (Distribution: Planched^i^ All prevkjus checkprints of Legal Descnption, Hat, and Preliminary Title Report (Distribution: Planchecker) Two (2) sets of Preliminary Title Report (Distributksn: 1 Planchecker, 1 File). Three (3) sets of typewritten Legal Descriptron of the Easement to be quitclaimed and corrected as necessary (Distribution: 2 Planchecker, 1 File). Three (3) sets of Plat corrected as necessary (Distribution: 2.Planchecker, 1 File). ADOmONAL 1 . ITEMS/INFORMATION REQUIREDt^''''^C^y^ If^c^ <0p. \\X^ i^.O-S. i77:SZ., SUBMITTAL COMPLETE. CHECKED COMMENTS C. THE FOLLOWING ITEMS MUST BE SUBMITTED BEFORE CITY ENGINEER WILL RECOMMEND APPROVAL OF THE QUITCLAIM FOR CTTY COUNOL ACTION: CZ] E 1. 2. 3. 4. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distributon: Original to Planchecker, copy to File). Copy of previous transmittal letter from the Qty and Planchecker's marked checklist (Distribution: Planchecker). All previous checkprints of Legal Description, Plat, and Preliminary Title Report (Disfribution: Planchecker). Two (2) sets of updated Preliminary Title Report (dated within 30 days of submittal) (Dlstributron: 1 Planctiecker, 1 File). Three (3) sets of the corrected typewritten Legal Description corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: 2 Planchecker, 1 File). Three (3) sets of Plat corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: ADDITIONAL ITEMS/INFORMATION REQUIRED: BMITTAL COMPLETE. CHECKED BY DATE COMMENTS QutTo PianchftcKgr H /DEVELOPMENT SEBVlCE&MASTrRSQuBdain- Subnittal Checklist Page ? Revised 1 1*02 OTY OF CARLSBAD SUBMITTAL CHECmST QUITCLAIM PD 06-21 aty Project Name Magellan Aviation Hangars City Project No. City Drawing No. _ B. ;rHE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL: PR 07-125 City Project Engineer David Rk:k Transmittal letter from the Engineer or Sun/eyor of Work listing all the items being submitted (CHstribution: Original to Plandiecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked diecklist (Distribution: Planched<er). All previous checkprints of Legal Desaiption, Mat, and Preliminary Title Report (Distribution; Planchecker) Two (2) sets of Preliminary Title Report (Distribution: 1 Planchecker, 1 RIe). Three (3) sets of typewritten Legal Descriptton of the Easement to be quitclaimed and conected as necessary (Distribution: 2 Planchecker, 1 File). Three (3) sets of Plat con-ected as necessary (Distribution: 2 Planchecker, 1 File). ADDITIONAL ITEMS/INFORMATION REQUIREDs/U* »]BMnTAL COMPLETE. CHECKED COMMENTS THE FOLLOWING ITEMS MUST BE SUBMITTED BEFORE CnY ENGINEER WILL RECOMMEND APPROVAL OF THE QUITCLAIM FOR CITY COUNOL ACTION: 1. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). All prevbus checkprints of Legal Description, Plat, and Preliminary Title Report (DIstiibution: Planchecker). Two (2) sets of updated Preliminary Trtle Report (dated within 30 days of submittal) (Distribution: 1 Ranchecker, 1 File). Three (3) sets of the corrected typewritten Legal Description corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: 2 Planchecker, 1 RIe). Three (3) sets of Plat corrected as necessary, signed and sealed by the Engineer or Surveyor of Work (Distribution: ADDITIONAL ITEMS/INFORMATION REQUIRED: 2. 3. 4. 5. 6. 7. BMITTAL COMPLETE. CHECi«DBY DATE COMMENTS H/DEVELOPMENT SERViCES'MASTEBSjQuBclaim Submittal Oteddist Page 2 Revised 1/14/02 GRADING AND EROSION CONTROL PLAN RESUBMITTAL CHECKLIST - PART B Engineering Dept. • Development Services • 1635 Faraday Ave Carlsbad CA 92008 • 760-602-2750 THIS SECTION TO BE COMPLETED BY CITY PERSONNEL Project ID PD 06-21 DWG No. 447-8B GRNc; Project Name Magellan Aviation Hangars Planchecker Rick,St. John. PBS&J Project Enaineer David Rick ING MARKED ITEMS MUST BE INCLUDED IN RESUBMITTAL: esubmittal Checklist transmittal from Engineer of Work listing all items being submitted PLANCHECKER USE ONLY Plancheck No. ^ PCE Initials Date Jb-Z^-Og y 2i. Copy of previous City transmittal letter ^(kv^Jf^m\c\2\ and one copy of completed Security and Agreement Data Sheet '•^V^..AfTprftvinii.'; checkprints of plans, review checklist, reports, calculations, and estimates 6. A" sets of corrected prints of the grading and erosion control plans folded to 9" X 12" (Distribution: 1 File, 1 SCE, Planchecker, Planning, Eng P&P, Other - specify) A^/V 7. Two sets-of corrected bound Drainage Report sealed and signed by Engineer of Work A//4r Q^filoseis of corrected bound Soils Report sealed and signed by Soils Engineer 9. Two sets of corrected Engineer's Cost Estimate sealed and signed by Engineer of Work M/^ 1 g Tw&^ts of corrected Earthwork Quantity Calculations sealed and signed by Engineer of Work j3oncurrent_iesubmittal required (as applicable): Final/Parcel Map, Improvement Plans, "TEasement document^ Temporary ConstructionE^sement for Off-Site Grading, etc. corrected Wieceseeiy ^ Qj^ f-LS U/f^ 12. Two sets of corrected Storm Water Pollution Prevention Plan (SWPPP) \/^t^t^T. Two sets of corrected Storm Water Management Plan (SWMP) VA^id Department comments: Planning, ^Traffic, Parks, Fire, Eng P&P, M&O, Other-specify (Distribution: to indicated departments) 15. OTHER: COMMENTS DATE ^/^mK SUBMITTAL COMPLETE. CHECKED Doc ER-02-01 10/15/2007 GRADING AND EROSION CONTROL PLAN RESUBMITTAL CHECKLIST - PART B Engineering Dept. • Development Sen/ices • 1635 Faraday Ave • Carlsbad CA 92008 • 760-602-2750 THIS SECTION TO BE COIttlPLETED BY CITY PERSONNEL Project IpyP OlO'Z,] DWG No. ^ ^l3> GR No.:. Project Name N\ftftpiWA Msc^ors - f\/o<"\\\ t'^rsfi,'*^ Planchecker 'pi rk Z^(?UA ?tSS^.S" Project Engineer t^^v^U i^'oL B. THE FOLLOWING MARKED ITEMS MUST BE INCLUDED IN RESUBMITTAL: V Vxi This Resubmittal Checklist Transmittal from Engineer of Work listing all items being submitted 3. Copy of previous City transmittal letter <^/Ar 4. Original and one copy of completed Security and Agreement Data Sheet PLANCHECKER USE ONLY Plancheck No. ^ PCE Initials Datel^Z^^£i All previous checkprints of plans, review checklist, reports, calculations, and estimates 6. ^ sets of corrected prints of the grading and erosion control plans folded to 9" X 12" (Distribution: 1 File, 1 SCE, ^ Planchecker, _J Planning, Eng P&P, Other - specify) 7. Two sets of corrected bound Drainage Report sealed and signed by Engineer of Work . Two sets of corrected bound Soils Report sealed and signed by Soils Engineer 9. Two sets of corrected Engineer's Cost Estimate sealed and signed by Engineer of Work ^If^ 10. Two sets of corrected Earthwork Quantity Calculations sealed and signed by Engineer of Work ^Ik 11. Concurrent resubmittal required (as applicable): Final/Parcel Map, Improvement Plans, Easement documents, Temporary Construction Easement for Off-Site Grading, etc. corrected as necessary fV/(V 1^. Two sets of corrected Storm Water Pollution Prevention Plan (SWPPP) i^ji^J^Two sets of corrected Storm Water Management Plan (SWMP) Department comments: Y^PIanning. ^Traffic, Parks, Fire, Eng P&P, M&O, _Other-specify (Distribution: to indicated departments) . • i .15. OTHER: <%ro</el/ ^^l^^ij/^^^^^ ^'^' ^'^^^'^^ Jfa'/x^^ p W i .COMPLETE. CHE<^KED'grj^|{]^?^^^T<g^^^^^ DATE.^^^<>fe' Doc ER-02-01 I , -J*^ 10/15/2007 F CARLSBAD SUBMITTAL CHECKI ^ ING AND EROSION CONTROL PLAN City Project No. City Drawing No. B PD 06-21 City Project Name Magellan Aviation Hangars 447-8B City Project Engineer David Rick N/A N/A I 5 N/A THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL: roject Engineer/Planchecker will mark items not required with N/A. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker^copy to Fjle). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchectei:). 4_sets of bluelines of the corrected grading and erosion control plans folded to 9" X 12" (Distribution: 1 Btanchecker, Planning, l_Eng P&P, 1 File, 1"" Fire). _ y / i Two (2) sets of bound Drainage Report corrected as necessary, sealed and signed by the Engineer of Work (Distribution; 1 Planchecker, 1 File). Two (2) sets of bound Soils Report corrected as necessary, sealed and signed by the Soils Engineer (Distribution: 1 Planchecker, 1 File). Two (2) sets Engineer's Cost Estimate corrected as necessary sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). Two (2) sets of Earthwork Quantity Calculations corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). Concurrent resubmittal (as applicable): Final/Parcel Map, Improvement Plans, Easement documents corrected as necessary when such Map, plans and documents are required. Two (2) sets of corrected Stormwater Management Plan (SWMP) (Distribution: 1 Planchecker, 1 File). Comments and re-submittal for other departments: Planning , Traffic , Parks , Fire X . Eng P&P Water Op. , Other . 10. 11. fKiTA" 12. ADDITIONAL ITEMS/INFORMATION REOUIRED: COMMENTS: SUBMITTAL COMPLETE. CHECKED BY, DATE THE FOLLOWING ITEMS MUST BE SUBMITTED BEFORE CITY APPROVAL: Project Engineer/Planchecker will mark items not required with N/A. ] 1. Transmittal letter from the Engineer of Work listing all the items tieing submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). Digital copy of plans (Distribution: Eng. GIS). All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). sets of the corrected bluelines of the grading and erosion control plan folded to 9" X 12" Planchecker, Eng P&P, _ 2. 3. 4. 5. 6. 7. 8. 10. 11. (Distribution: File, _Other - specify). One (1) copy of Conditions of Approval (Distribution: Engineering Inspection). Two (2) copies Stormwater Pollution Prevention Plan (SWPPP) and/or Storm Water Management Plan (SWMP) (Distribution: 1 Engineering Inspection, 1 File ). Original mylars or photo mylars of the plans sealed and signed by the Engineer of Work and other required signatures (Distribution: Planchecker). Proof of approval of securities and agreements, and verification of payment of balance of fees (Distribution: Planchecker). Approvals from other departments: Planning , Traffic , Parks , Fire , Eng P&P , Water Op. , Other_ ADDITIONAL ITEMS/INFORMATION REQUIRED: COMMENTS: SUBMITTAL COMPLETE. CHECKED BY Out To DATE ^^iancnecKer GP J47-8B PC? XIS cn »F CARLSBAD - ENGINEERING DEPAldE APPLICATION ENGINEERING PLAN CHECK NT Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: H/!kcS>-e>UL^N) Av/iATnc?M H-A-t^Jo^^^'^^-^^'^^^i^TE: 1 "2- PROJECT DESCRIPTION: W/VTrF^ e^f>wKAP.^\T W^^SO^ON) PROJECT ADDRESS:^I(& PA t^g AiF^pg-p-r P-^O. ^ Cifi'c'f>--L^e*f^, <\7^\ LOT NO(S).: " ^ " MAP NO.: .^.^^ APN(S).: '1Q>0 - g> NUMBER OF LOTS: ' 1 NUMBER OFABEIT^ W.Q^S MILES OF TRAILS: OWNER: "^cM p PA u-o>M./VT=^ L^i.,.t:::> Mailing Address: i goo A^yje-. cpp THfe- Srrvt-'s. Phone Number: Fax Number: E-Mail: I certify that I am the legal owner and that all the above information is true and correct to the best of my knowledge. Signature: Date: E-Maih ^cK\ja.A .-V'tAAbcL^iAot^.' (S-^y^dX , CL^VA. APPLICANT: Mailing Address: Phone Number: Fax Number: Signature:^^S^vA<A y^lZl^^^ate: / ? (f^/ot CIVIL ENGINEER: TAvZ/rp T>M^ 0A-^-tX^^ FIRM: TAVAP T/VIVI g^-^ , f. ^. Mailing Address: l^-•^go \/i>c p-£xC^(NJo SOILS ENGINEER FIRM: c2r^<^g>rJ Mailing Address: (^°\(aO •pT-^.rT^PIg^ft-^ PP-. Phone Number: Fax Number: E-Mail: .-Wv^tyeik^^uJvi P^>v\gn'l . cotAA State Registration Number: ^Q>'\1% Phone Number: Fax Number: E-Mail: State Registration Number: ADDITIONAL COMMENTS: IMPROVEMENT VALUATION 1. What water district is the proposed project located in? (check one) [Carisbad Municipal Water District Qoiivenhain [] Vallecitos 2, If in the Carisbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water Improvements, sewer (for Carisbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (ifappllcable)? $ cut cy fill cy GRADING QUANTITIES — M/ remedial cy import cy export. cy SEE REVERSE SIDE H /DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check ReiseSJ 06/0l|07, CI CARLSBAD - ENGINEERING DEPA NT APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. APPLICATION FOR ( ^ all that apply) FOR CITY USE ONLY APPLICATION FOR ( ^ all that apply) PROJECT I.D. DRAWING NUMBER DEPOSIT/FEES PAID COMMENTS [] Adjustment Plat (ADJ) ___ Q Certificate of Compliance (CE) ___ Q Dedication of Easement (PR) Type: ___ Q Dedication of Easement (PR) Type: ___ Type: ___ Type; ___ [] Encorachment Permit (PR) ___ • Final Map (FM) ___ • Grading Plancheck (DWG) ___ []] Improvement Plancheck (DWG) ___ n Parcel Map (PM) ___ Quitclaim of Easement (PR) Type: \hJ^i^^ ___ Quitclaim of Easement (PR) Type: \hJ^i^^ ___ Type: ___ Type: ___ [2 Reversion to Acreage (RA) ___ • Street Vacation (STV) ___ Tentative Parcel Map (MS) ___ [3 Certificate of Correction (CCOR) ___ Q Covenant of Easement (PR) ___ Substantial Conformance Exhibit (SCE) ___ [2 Trails []]<mile []]> mile ___ [] Other H /DEVELOPMENT SERVICES/MASTERS/Applicalion for Engineering Plan Check Page 2 Revised 05/01/07 CITY OF CARLSBAD SUBMITTAL CHECKLIST QUITCLAIM City Project No. City Drawing No. PLEASE NOTE: City Project Name City Project Engineer Engineering PlancheckApplicationformo :Opy to Planchecker). Nc€i(Z^ \N To insure the timely processing of Easement Dedications, Covenants and Quitclaims for development projects in the City, those submitting Easements for City review should check their submittal packages for completeness and compliance to the following checklist. Applicants are required to acknowledge completeness by initialing the spaces provided for each item. City staff will inventory these items upon submittal. Unless specifically marked "N/A" (not applicable) and initialed by the City Project Engineer, all items listed are required to to be submitted. Please do not detach this checklist when attached to the Easement documents. This checklist is a part of the Easement documents check comments. Should you have any questions, please contact the City Engineering Department, Development Services. piE FOLLOWING ITEMS MUST BE INCLUDED IN THE INITIAL SUBMriTAL: ^I^Transmittal letter from the Engineer or Sun/eyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). letedand signed/by Owner/Applicatit (Distribution: Original to File, ([SZ^Letter from the Owner/Applicant requesting Quitclaim. The letter shoiiW indicate the reasons for the request (Distribution: Planckecker). Two (2) sets of Preliminary Title Report: issued within 6 months of application submittal (Distribution: 1 Planchecker, 1 File), >es. F !•-£ 5. ^Three (3) sets of typewritten Legal Description of the Easement to be quitclaimed, mari<ed Exhibit "A" on 8 1/2" X 11" size paper completed by a Licensed Land Surveyor or appropriately Licensed Engineer. The area (in square feet or acres) to be quitclaimed shall be called out on the Legal Description. The dsescription should exactly as it was dedicated by previous Deed or Grant on the Subdivision Map (Distribution: 2 Planchecker, 1 File). Three (3) sets of Plat to illustrate Easement to be quitclaimed on 8 1/2" X U" size paper completed by a Licensed Land Surveyor or appropriately Licensed Engineer. Each Plat shall as a minimum include the following data: (Distribution: 2 Planchecker, 1 File) I The Easement to be quitclaimed North arrow and scale and bar scale Street name(s) and width(s) Lot/parcel number(s), subdivision name(s) and Map number(s) Black border and title box per city format - (see attached format) Plat marked as Exhibit "B" Any existing structures affected Matches Legal Description and Calculations exactly Processing fee (see current fee schedule). ADDITIONAL ITEMS/INFORMATION REQUIRED: 12^ ] COMMENTS Out To PlancheckeffEE REVERSE SIDE H:/DEVELOPMENT SERVICES/MASTERS/Quitdaim fiubmittal£fieckli5t Revised 1/14/02 «r OF CARLSBAD SUBMITTAL CHECKI^ DING ANO EROSION CONTROL pH City Project Name Magellan Aviation Hangars City Project Engineer David Rick City Project No. PD 06-21 City Drawing No. 447-8B B. THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL: J>roject Engineer/Planchecker will mark Items not required with N/A. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). 4 sets of bluelines of the corrected grading and erosion control plans folded to 9" X 12" (Distribution: 1 Planchecker, Planning, l_Eng P&P, 1 File, 1 Fire). Two (2) sets of bound Drainage Report corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). Two (2) sets of bound Soils Report corrected as necessary, sealed and signed by the Soils Engineer (Distribution: 1 Planchecker, 1 File). Two (2) sets Engineer's Cost Estimate corrected as necessary sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). Two (2) sets of Earthwork Quantity Calculations corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). Concurrent resubmittal (as applicable): Final/Parcel Map, Improvement Plans, Easement documents corrected as necessary when such Map, plans and documents are required. Two (2) sets of corrected Stormwater Management Plan (SWMP) (Distribution: 1 Planchecker, 1 File). Comments and re-submittal for other departiments: Planning , Traffic , Parks , Fire X , Eng P&P X_ Water Op. , Other . IN/A I 12. ADDITIONAL ITEMS/INFORMATION REQUIRED COMMENTS: SUBMriTAL COMPLETE. CHECKED BY/ .DATE THE FOLLOWING ITEMS MUST BE SUBMITTED BEFORE CITY APPROVAL: Project Engineer/Planchecker will mark items not required with N/A. I / 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Transmittal letter from the Engineer of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). Digital copy of plans (Distribution: Eng. GIS). All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). sets of the corrected bluelines of the grading and erosion control plan folded to 9" X 12" (Distribution: Planchecker, Eng P&P, File, Other - specify). One (1) copy of Conditions of Approval (Distribution: Engineering Inspection). Two (2) copies Stormwater Pollution Prevention Plan (SWPPP) and/or Storm Water Management Plan (SWMP) (Distribution: 1 Engineering Inspection, 1 File ). Original mylars or photo mylars of the plans sealed and signed by the Engineer of Work and other required signatures (Distribution: Planchecker). Proof of approval of securities and agreements, and verification of payment of balance of fees (Distribution: Planchecker). Approvals from other departments: Planning , Traffic , Parks , Fire , Eng P&P , Water Op. , Other_ ADDITIONAL ITEMS/INFORMATION REQUIRED: COMMENTS: SUBMITTAL COMPLETE. CHECKED BY DATE GP 447-8B PC2.xls I I mil mill iiiiiiiiiiii I Mil III IMPROVEMENT PLAN 4ll&l&^ City Project No. City Drawing No B. PD 06-2L . City Project Name Magellan Aviation Hangars City Project Engineer David Rick THE FOLLOWING IT^MS MUST BE INCLUDED IN EACH RESUBMITTAL: Project Engineer/Planchecker will mark items not required with N/A. 1. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). sets of bluelines of the corrected improvement plans folded to 9" x 12" (Distribution: Planchecker, Fire, Parks, ^Traffic, Design, Eng P&P, File,. _Other-specify). Two (2) sets of bound Drainage Report corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). Two (2) sets of bound Soils Report corrected as necessary, sealed and signed by the Soils Engineer (Distribution: 1 Planchecker, 1 File). Two (2) sets Engineer's Cost Estimate corrected as necessary sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). IN/A I 7. Two (2) sets of Earthwork Quantity Calculations (if applicable) corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). X ^8r-^1l previous checkprints of plans, reports, calculations and estimab Concurrent resubmittal (as applicable): Final/Parcel Map, ribution: Planchecker). ditHapd Erosion Control Plans^d Right of Way/ asement documents corrected as necessary when such Map, plans and documents are reqijired. Comments from other departments:"^^ZFire, Parks, ^Traffic, ^ ^Design. )^ Ena P&P,^I^pther-specify. ^ ^ //^"f^^^ COMMENTS: 11. ADDJTIQI^^L^ITpl^IN^WM/^^ Revised sewer study SUBMITTAL COMPLETE. CHECKED BY DATE C. THE FOLLOWING FTEMS MUST BE SUBMITTED BEFORE CITY APPROVAL: Project Engineer/Planchecker will mark items not required with N/A. 2. 3. 4. 5. 6. 7. 9. 10. Transmittal letter from the Engineer of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). Digital copy of plans (Distribution: Eng. GIS). All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). sets of the corrected bluelines of the improvement plan folded to 9" X 12" (Distribution: Planchecker,. Eng P&P, File, ^Other - specify). One (1) copy of signed Conditions of Approval (Distribution: Engineering Inspection). Original mylars or photomylars of the plans sealed and signed by the Engineer of Work and other required signatures (Distribution: Planchecker). Proof of approval of securities and agreements, and verification of payment of balance of fees (Distribution: Planchecker). Approvals from other departments: _Fire, _Parks, ^Traffic, Design, Eng P&P, Other. ADDITIONAL ITEMS/INFORMATION REQUIRED: COMMENTS: SUBMITTAL COMPLETE. CHECKED BY DATE H:/DEVELOPMENT SERVICES/MASTERS/lmprovement Plan Submittal Checklist Page 2 Revised 3/13/02 CII^F CARLSBAD SUBMITTAL CHECKLIS GRADING AND EROSION CONTROL PLAN PD 06-21 City Project Name Magellan Aviation Hangars 447-8B City Project No. City Drawing No. B. THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL: oject Engineer/Planchecker will mark items not required with N/A. City Project Engineer David Rick Pre Zl 1-Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). X 1/ I jCqpy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). sets of bluelines of the corrected grading and erosion control plans folded to 9" X 12" _ File, Other-specify). (Distribution: . Planchecker,, , Planning, Eng P&P,. N/A IM. 5. Two (2) sets of bound Drainage Report corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). Two (2) sets of bound Soils Report corrected as necessary, sealed and signed by the Soils Engineer (Distribution: 1 Planchecker, 1 File). Two (2) sets Engineer's Cost Estimate corrected as necessary sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). Two (2) sets of Earthwork Quantity Calculations corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). 1 previous checkprints of plans, reports, calculations and es5lmertsrCDisErlbtrtkj{T: Planchecker). Concurrent resubmittal (as applicable): Final/Parcel Map,|miprovement Plans, Easement documents corrected as necessary when such Map, plans and documents are required;___^_-^ ]K 11^ Two (2) sets of corrected Stormwater Pollution Prevention Plan (SWPR^^istribution: 1 Planchecker, 1 File). Comments and re-submittal for other departments: Planning , Traffic , Parks , Fire L^<^m P&P_ Water Op. , Other . 12. ADDITIONAL ITEMS/INFORMATION REQUIRED: COMMENTS: SUBMITTAL COMPLETE. CHECKED BY DAT C. THE FOLLOWING ITEMS MUST BE SUBMITTED BEFORE CITY APPROVAL: Project Engineer/Planchecker will mark items not required with N/A. 1. Transmittal letter from the Engineer of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). 2. Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). 3. Digital copy of plans (Distribution: Eng. GIS). 4. All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). 5. sets of the corrected bluelines of the grading and erosion control plan folded to 9" X 12" (Distribution: Planchecker, Eng P&P, File, Other - specify). 6. One (1) copy of Conditions of Approval (Distribution: Engineering Inspection). 7. Two (2) copies Stormwater Pollution Prevention Plan (SWPPP) and/or Storm Water Management Plan (SWMP) (Distribution: 1 Engineering Inspection, 1 File ). 8. Original mylars or photo mylars of the plans sealed and signed by the Engineer of Work and other required signatures (Distribution: Planchecker). 9. Proof of approval of securities and agreements, and verification of payment of balance of fees (Distribution: Planchecker). 10. Approvals from other departments: Planning , Traffic , Parks , Fire , Eng P&P , Water Op. , Other_ 11. ADOmONAL FFEMS/INFORMATION REQUIRED: COMMENTS: SUBMITTAL COMPLETE. CHECKED BY DATE GP447-8BPC1.xls Cl'n^ CARLSBAD - ENGINEERING DEPARI^NT APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: KAr(»^UUAv^ /WIATVON] HfvriGr»c-V2-£^ DATE: PROJECT DESCRIPTION: H^fejivp-«> /v^g> . o, |7 PROJECT ADDRESS: f/^rU^^A>»Of^- /Vifi-fgt^T P-P. ^ OMM^"3e>^^ , {{ LOT NO(S).: fot^Tlosl tfp-'s-" MAP NO.: ^2^3- APN(S).: "^^^^O- 7^-2^ -13^ NUMBER OF LOTS: NUMBER OF ACRES: OWNER: Mailing Address: \9>Oo t<\)^. Of^ The "^TB^S Phone Number: Fax Number: E-Mail: I certify that I am the legal owner and that all the above information is true and correct to the best of my knowledge. Signature: Date: APPLICANT: Mailing Address: Phone Number: Fax Number: E-Mail: Signatun CIVIL ENGINEER: ^j^^/^rQ T/VtJg^vi^C>fH FIRM: ^3>V^ tA>iBMa>L^-H ) f • g^. Mailing Address: i2^??o VIA- Pg^M^ Phone Number Fax Number: E-Mail: State Registration Number: ^C? 1 X-B SOILS ENGINEER: To& ertt T. vreTTLg, FIRM: Mailing Address: Phone Number: Fax Number: E-Mail: State Registration Number: ADDITIONAL COMMENTS: IMPROVEMENT VALUATION 1. What water/listrict is the proposed project located in? (check one) fCarisbad Municipal Water District Qoiivenhain 0Carls Qvallecitos 2. If in the Carisbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (ifappllcable)? $ GRADING QUANTITIES cut U60 cy fill 1cy remedial ZT-poo cy import. cy export. cy SEE REVERSE SIDE H;/DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Checl< Revised 1/14/02 I CITY OF CARLSBAD - EN6INbbKlN(d UtPAKI MbNf APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. APPLICATION FOR ( • all that apply) FOR CITY USE ONLY APPLICATION FOR ( • all that apply) PROJECT I.D. DRAWING NUMBER DEPOSIT/FEES PAID COMMENTS [] Adjustment Plat (ADJ) ^//^- NZ/A- K/A- ^/h Q Certificate of Compliance (CE) ^//^- NZ/A- K/A- ^/h Dedication of Easement (PR) Type: ^//^- NZ/A- K/A- ^/h Dedication of Easement (PR) Type: ^//^- NZ/A- K/A- ^/h Type: ^//^- NZ/A- K/A- ^/h Type: ^//^- NZ/A- K/A- ^/h Q Encorachment Permit (PR) ^//^- NZ/A- K/A- ^/h • Final Map (FM) ^//^- NZ/A- K/A- ^/h [g^Grading Plancheck (DWG) ^//^- NZ/A- K/A- ^/h [^improvement Plancheck (DWG) L/)^.5S ^//^- NZ/A- K/A- ^/h • Parcel Map (PM) / ^//^- NZ/A- K/A- ^/h Quitclaim of Easement (PR) Type: ^//^- NZ/A- K/A- ^/h Quitclaim of Easement (PR) Type: ^//^- NZ/A- K/A- ^/h Type: ^//^- NZ/A- K/A- ^/h Type: ^//^- NZ/A- K/A- ^/h Q Reversion to Acreage (RA) ^//^- NZ/A- K/A- ^/h [] Street Vacation (STV) ^//^- NZ/A- K/A- ^/h [] Tentative Parcei Map (MS) ^//^- NZ/A- K/A- ^/h [2 Certificate of Correction (CCOR) ^//^- NZ/A- K/A- ^/h Q Covenant of Easement (PR) ^//^- NZ/A- K/A- ^/h Q Substantial Conformance Exhibit (SCE) ^//^- NZ/A- K/A- ^/h • Other ^//^- NZ/A- K/A- ^/h RECEIVED MAR 12 2007 ENGINEERING DEPARTMEN-^ DATE STAMP APPLICATON RECEIVED H:/DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check Page 2 Revised 1/14/02 CITY OF CARLSBAD ENGINEERING DEPARTMENT SUBMITTAL CHECKLIST GRADING AND EROSION CONTROL PLAN SUBMITTAL Drawing No. Project No. Project Engineer Planchecker g Q M - ^1 Project Name (VsAg^l UA^ AV^^SW fAg^gii/^ Telephone Telephone THE^OLLOWING ITEMS MUST BE SUBMITTED FOR INITIAL PLANCHECK: ^r^ct Engineer/Planchecker will mark items not required with N/A. ransmittal letter from Engineer of Work listing all items being submitted (Distribution: Original to Planchecker, to File). Completed and signed Application (Distribution: Copy Planchecker, original to file). a) Digital submittal of plans, b) Completed digital submittal checklist, c) Layer description ribution: Eng. P&P). Engineering Standards for digital submittal requirements and checklist on City website (www. ci carisbad. ca. us/cserv/engin ly of environmental clearance or completed E.I.A. form. Part 1 (Distribution: Planning). - '-(j/r; -\ (6) sets of bluellne prints of the grading and erosion control plans folded to 9" X 12" ^ (Distribution: _] Planchecker, I Planning, / Eng P&P, ( File. T Other-specify). /voj(2) sets of bound Drainage Report (Distribution: 1 Planchecker, 1 File). ) sets of bound Soils Report (Distribution: 1 Planchecker, 1 File). TvTO (2) copies of Earthwork Quantity Calculations (Distribution: 1 Planchecker, 1 File). - wo (^) copies of Engineer's Cost Estimate (for bonds) (Distribution: 1 Planchecker, 1 File). Two (2) copies of Preliminary Title Report issued within 6 months of submittal (Distribution: 1 Planchecker, 1 File). Three (3) copies of all project signed Conditions of Approval (if applicable) (Distribution: 1 Planchecker, 1 Planning, 1 File). Two (2) bluellne print of approved Site Plan or Tentative Map signed by Project Planner and Engineer (ifappllcable) (Distribution: 1 Planchecker, 1 Planning). 13. Two (2) copy of Coastal Development Permit Conditions if issued by California Coastal District (Dlstribytton: 1 Planchecker, 1 Planning). Plancheck fee (see fee schedule). Sncurrent submittal (as applicable): Final/Parcel map. Improvement Plans, Easement Documents, Temporary Construction Easement for Off-Site Grading. C. - 'I ] 18. 1 19. 6 (2) sets of Stormwater Pollution Prevention Plan (SWPPP) for projects of one (1) acre or greater or if conditioned with project (Distribution: 1 Planchecker, 1 File). Two sets of Storm Water Management Plan (SWMP); Required if project is defined as a priority project per SUSMP or if conditioned with project. (Distribution: 1 Planchecker, 1 File). SWPPP/SWMP review fee, if applicable (see fee schedule), "i^" "f ^00 -0 ^ Other COMMENTS: NOTE: INCOMPLETE SUBMITTALS MAY BE RETURNEDiJNG HECKED. SUBMITTAL COMPLETE: CHECKED BY: ^SIDE GRADING AND EROSION CONTROL PLAN SUBMITTAL CHECKLIST - Both Sides (updated 1-10-2006).xls CITY OF CARLSBAD ENGINEERING DEPARTMENT SUBMITTAL CHECKLISl" IMPROVEMENT PLAN SUBMITTAL Drawing No. Project No. CY^-r^l City Project Engineer City Planchecker Project Name {hX^k^ Ayf ^^^SwK^ l^o^ Telephone: Telephone THTFOLLOWING ITEMS MUST BE SUBMITTED FOR INITIAL PLANCHECK: roject Engineer/Planchecker will mark items not required with N/A. 1. /Transmittal letter from Engineer of Work listing all items being submitted (Distribution: Original to Planchecker, / copy to File). Completed and signed Application (copy Planchecker). ^) Digital submittal of plans, b) Completed digital submittal checklist, c) Layer description (Distribution: Eng P&P). -jee Engineering Standards for digital submittal requirements and cftecklist on City website (vmw.d.carlsbad.ca.us/cserv/engin.html) Copy of environmental clearance or completed E.I.A. form, Part 1 (Distribution: Planning). (8) setsof blueline prints of the improvement plans folded to 9" X 12" ibution: 3^* Planchecker. 1 Fire. Parks, 1 Traffic. 1 fno P&P, Design, ^ ^J^o (2) sets of bound Drainage Report (Distribution: 1 Planchecker, 1 File). Two (2) sets of bound Soils Report (Distribution: 1 Planchecker, 1 File). Jwo (2) copies of Earthwork Quantity Calculations and street cross sections (if applicable) (Distribution: 1 Planchecker, 1 File). -File, Other-spedfyV. 12. Two (2) copies of Engineer's Cost Estimate (for bonds) (Distribution: 1 Planchecker, 1 File). Two (2) copies of Preliminary Title Report issued within 6 months of submittal (Distribution: 1 Planchecker, 1 RIe). Three (3) copies of all projects signed Conditions of Approval (if applicable) (Distribution: 1 Planchecker, 1 Planning, 1 Fiie). Two (2) blueline print of approved Site Plan or Tentative Map signed by Project Planner and Engineer (if^p^Iicable) (Distribution: 1 Planchecker, 1 Planning). -m 14. ~y \ Ifi r Two (2) sets of Water System Analysis <if in CMWD) (Distribution: 1 Planchecker, 1 File) Two (2) sets of Sewer Study (if in CMWD) (Distribution: 1 Planchecker, 1 File). drawings and Maps as required (identify items) (Distribution: Planchecker). Wans, Easement Documents, Temporary 16. Concurrent submittal (as applicable): Final/Parcel map, Gradii Construction Easement for Off-Site Grading, etc. 17. Plancheck fee (see fee schedule). 18. Other COMMENTS: NOTE: INCOMPLETE SUBMITTALS MAY BE RETURNED UNCHECKED. IMPROVEMENT PLAN SUBMITTAL CHECKUST - Both Skies (updated 1-10-2006).xls OF CARLSBAD SUBMITTAL CHECKH IMPROVEMENT PLAN City Project No. City Drawing No. B. City Project Name City Project Engineer cz: rri THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL: Project Engineer/Planchecker will mark items not required with N/A, 1 5. 8. 9. 10. 11. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). sets of bluelines of the corrected improvement plans folded to 9" x 12" (DistributkMi: Planchecker, Fire, Parks, ^Traffic, Design, Eng P&P, RIe, Other-spedfy). Two (2) sets of bound Drainage Report corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). Two (2) sets of bound Soils Report corrected as necessary, sealed and signed by the Soils Engineer (Distribution: 1 Planchecker, 1 File). Two (2) sets Engineer's Cost Estimate corrected as necessary sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). Two (2) sets of Earthwork Quantity Calculations (if applicable) corrected as necessary, sealed and signed by the Engineer of Work (Distfibution: 1 Planchecker, 1 File). All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). Concurrent resubmittal (as applicable): Final/Parcel Map, Gradino and Erosion Control Plans, and Right of Way/ Easement documents corrected as necessary when such Map, plans and documents are j^ulred. Comments from other departments: Fire, Parks, ^Traffic, Design, Eng P&P, __Other-specify. ADDITIONAL ITEMS/INFORMATION REQUIRED: COMMENTS: SUBMITTAL COMPLETE. CHECKED BY DATE THE FOLLOWING ITEMS MUST BE SUBMITTED BEFORE CITY APPROVAL: Project Engineer/Planchecker will mark items not required with N/A. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Transmittal letter from the Engineer of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). Digital copy of plans (Distribution: Eng. GIS). All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). sets of the corrected bluelines of the improvement plan folded to 9" X 12" (Distribution: . Planchecker,. _Eng P&P,. RIe,. .Other - specify). One (1) copy of signed Conditions of Approval (Distribution: Engineering Inspection). Original mylars or photomylars of the plans sealed and signed by the Engineer of Work and other required signatures (Distribution: Planchecker). Proof of approval of securities and agreements, and verification of payment of balance of fees (Distribution: Planchecker). Approvals from other departments: _Fire, Parks, ^Traffic, Design, Eng P&P, Other. ADDITIONAL ITEMS/INFORMATION REQUIRED: COMMENTS: SUBMITTAL COMPLETE. CHECKED BY DATE IMPROVEMENT PLAN SUBMITTAL CHECKLIST - Botti Sides (updated 1-10-2006).xls jClTY OF CARLSBAD SUBMITTAL CH^jLIST ^GRADING AND EROSION CONTROL PLAN City Project No. PD 06-21 City Project Name Magellan Aviation Hangars City Drawing No. 447-8A City Project Engineer David Rick B. THE FOLLOWING ITEMS MUST BE INCLUDED IN EACH RESUBMITTAL: Project Engineer/Planchecker will mark items not required with N/A. 1. Transmittal letter from the Engineer or Surveyor of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). •4~ sets of bluelines of the corrected grading and erosion control plans folded to 9" X 12" (Distribution: '9\ Planchecker, j Planning, Eng P&P, _] File, Other-specif/). N/A I 4. Two (2) sets of bound Drainage Report corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). N/A I 5. Two (2) sets of bound Soils Report corrected as necessary, sealed and signed by the Soils Engineer (Distribution: 1 Planchecker, 1 File). Two (2) sets Engineer's Cost Estimate corrected as necessary sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). N/A I 7. Two (2) sets pf Earthwork Quantity Calculations corrected as necessary, sealed and signed by the Engineer of Work (Distribution: 1 Planchecker, 1 File). 7^ 8. All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). N/A I 9. Concurrent resubmittal (as applicable): Final/Parcel Map, Improvement Plans, Easement documents corrected as necessary when such Map, plans and documents are required. N//^ I 10. Two (2) sets of corrected Stormwater Pollution Prevention Plan (SWPPP) (Distribution: 1 Planchecker, 1 File). Traffic , Parks , Rre , Eng P&P_ (A I 10. Two (2) sets of corrected Stormwater Pollution Prevention Plan (SW 11. Comments and re-submittal for other departments: Planning Water Op. , Other . I I 12. ADDITIONAL ITEMS/INFORMATION REOUIRED: S> U <^-rJ f COMMENTS THE FOLLOWING ITEMS MUST BE SUBMITTED BEFORE CITY APPROVAL: Project Engineer/Planchecker will mark items not required with N/A. I I 1. Transmittal letter from the Engineer of Work listing all the items being submitted (Distribution: Original to Planchecker, copy to File). 2. Copy of previous transmittal letter from the City and Planchecker's marked checklist (Distribution: Planchecker). 3. Digital copy of plans (Distribution: Eng. GIS). 4. All previous checkprints of plans, reports, calculations and estimates (Distribution: Planchecker). 5. sets of the corrected bluelines of the ^grading and erosion control plan folded to 9" X 12" (Distribution: Planchecker, Eng P&P, File, Other - specify). 6. One (1) copy of Conditions of Approval (Distribution: Engineering Inspection). 7. Two (2) copies Stormwater Pollution Prevention Plan (SWPPP) and/or Storm Water Management Plan (SWMP) (Distribution: 1 Engineering Inspection, 1 File ). 8. Original mylars or photo mylars of the plans sealed and signed by the Engineer of Work and other required signatures (Distribution: Planchecker). 9. Proof of approval of securities and agreements, and verification of payment of balance of fees (Distribution: Planchecker). 10. Approvals from other departments: Planning , Traffic , Parks , Fire , Eng P&P , Water Op. , Other_ 11. ADDITIONAL ITEMS/INFORMATION REQUIRED: COMMENTS: SUBMITTAL COMPLETE. CHECKED BY DATE GP447-8APC1.XIS CITY OF CARLSBAD ENGINEERING DEPARTMENT PLANCHECKER ASSIGNMENT FOR ENGINEERING PLANCHECKING DATE: PROJECT NAME: |T\ PROJECT NUMBER: Engineer of Work: \/^A T'rTun loa {l^XvI Contact Person: Address; \ ^ 76o \/r^ OA lV^ rJ)~ fUg>/t/ Telephone: ((^[cf)/ofQ> - 3^c^^ FAX: DRAWING NO. PROJECT SIZE CONSULTANT'S EST. FEE HH7-^Pr C^QD cy. ^5^0- - APPLICATION TYPE •r^Grading Plan • Improvement Plan • Final Map • Parcei Map • Adjustment Plat • Dedication of Easement(s) (or Covenant of Easement) • Quitclaim of Easement • Street Vacation (• Summary) • Certification of Correction • Certificate of Compliance • Construction Revision • ASSIGN TO: • Berryman & Henigar $ Helming Engineering PBS & J ^ By: • In-house: (for) Deputy City Engineer Original to: Project File Copies to: Senior Office Specialist Assigned Planchecker acres lots shts .1^ Project Engineer: Date: H:\D8»elopment S«rvioo8\MASTERS\FORMS -\MISCELLANEOUS -\PLANCHECKER ASSIGNMEhfr SHEET 6-2-05.doo REVISED 10/26/06 CITY OF CARLSBAD - ENGINEERING ^ARTMENT APPLICATION W ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: Ma^^<.ll«t»^ ^v/.-.wVia.^ DATE: PROJECT DESCRIPnONrr^-Ur.-^ (ir^Ac^i^ g^^ tfe^, ^jfctrW BirkoO og- Projfi^fL PROJECT ADDRESS: LOT NO(S).: PaUo^ ^nt<^ P^Uv^^^ fj^Ofporf Ro^A. r^r^i^^J r.A ^7nl\ '^f'fc'' MAP NO.: ftl':^ APN(S).: 760-2^1-^7^0 NUMBER OF LOTS: NUMBER OF ACRES OWNER: Mailing Address: Phone Number: Fax Numt)er: E-Mail: I certify that I am the legal owner and that all the above information Is true and correct to the best of my knowledge.- Signature: Date: 12-7 fto \/m g> li kiQ jvur^ rA q7Ai4 E-Mail: •^g.y/^ZT^I^ku.cMi'(^A-M^A » Co» APPLICANT: Mailing Address: Phone Number: Fax Number: ^ /Signature; Date: FIRM: ^A.N/RM<UCtfT,PE Mailing Address: iX'TfeO Via Fg-lrnn SOILS ENGINEER: .r^^^gpt, :\ . \y<>.H^\ Phone Number: Fax Number: E-Mail: 3<^v/<^.A .'Ta^lo^ \iu.ck.-^/:M.\ State Registration Number: ^6^2.ft *'^* ' Mailing Address: Phone Number: Fax Number: E-Mail: B«kft- t^p^l A^oc> state Registration Number: 2^nA ADDITIONAL COMMENTS IMPROVEMENT VALUATION 1. What water district is the proposed project located in? (check one) |^(carlsbad Municipal Water District Qoiivenhain Qvallecitos 2. If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? $ GRADING QUANTTTIES cut ^Ro cy fill ^6 o cy remedial 0 cy import cy export cy SEE REVERSE SIDE H;/DEVELOPMENT SERVICES/MASTERS/Applicatior lor Engineoring Plan Check Revised 1/14/02 PARTMENT CITY OF CARLSBAD - ENGINEERING APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. FOR CITY USE ONLY APPLICATION FOR ( ^ all that apply) PROJECT I.D. DRAWING NUMBER DEPOSIT/FEES PAID COMMENTS • Adjustment Plat (ADJ) [2 Certificate of Compliance (CE) hJ/A [] Dedication of Easement (PR) Type: Type: Type: Q Encorachment Permit (PR) • Final Map (FM) 0^ Grading Plancheck (DWG) Improvement Plancheck (DWG) NO ^ • Parcel Map (PM) N/A Quitclaim of Easement (PR) WA Type: Type: Type: [2 Reversion to Acreage (RA) /V//A • Street Vacation (STV) A//A [] Tentative Parcel Map (MS) /V//A Certificate of Correction (CCOR) [3 Covenant of Easement (PR) Q Substantial Conformance Exhibit (SCE) • Other RECEIVED NOV 22 2006 ENGINEERING DEPARTMENT DATE STAMP APPLICATON RECEIVED H:/DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check Page 2 Revised 1/14/02 CITY OF CARLSBAD ENGINEERING DEPARTMENT SUBMITTAL CHECKLIST GRADING AND EROSION CONTROL PLAN SUBMITTAL Drawing No. Project No. iDQ> (T^<^ I Project Name Project Engineer Planchecker Telephone 76)0^^0/^-^2'']^ Telephone THE/OLLOWING ITEMS MUST BE SUBMITTED FOR INITIAL PLANCHECK: tject Engineer/Planchecker will mark items not required witli N/A. Transmittal letter from Engineer of Work listing all items being submitted (Distribution: Original to Planchecker, :o File). Completed and signed Application (Distribution: Copy Planchecker, original to file). 3. a) Digital submittal of plans, b) Completed digital submittal checklist, c) Layer description (Distribution: Eng. P&P). -see Engineering Standards for digital submittal requirements and checklist on City website (www.ci.carlsbad.ca.us/cserv/engin :opy of environmental clearance or completed E.I.A. form. Part 1 (Distribution: Planning), sets of blueline prints of the grading and erosion control plans folded to 9" X 12" ution: .Planchecker,. .Planning,. _Eng P&P,. -File,. _Other-specify). TWOJC2) sets of bound Drainage Report (Distribution: 1 Planchecker, 1 File). (2)sets of bound Soils Report (Distribution: 1 Planchecker, 1 File). woX2)'copies of Earthwork Quantity Calculations (Distribution: 1 Planchecker, 1 File). Two (2) copies of Engineer's Cost Estimate (for bonds) (Distribution: 1 Planchecker, 1 File). Two (2) copies of Preliminary Title Report issued within 6 months of submittal (Distribution: 1 Planchecker, 1 File). 11. Three (3) copies of all project signed Conditions of Approval (if applicable) (Distribution: 1 Planchecker, 1 Planning, 1 File). y/^l 12. Two (2) blueline print of approved Site Plan or Tentative Map signed by Project Planner and Engineer (ifappllcable) (Distribution: 1 Planchecker, 1 Planning). 13. Two (2) copy of Coastal Development Permit Conditions if issued by California Coastal District (Distribution: 1 Planchecker, 1 Planning). v \ 14. Grading Plancheck fee (see fee schedule). current submittal (as applicable): Final/Parcel map. Improvement Plans, Easement Documents, Temporary Construction Easement for Off-Site Grading. 16. JwO (2) sets of Stormwater Pollution Prevention Plan (SWPPP) for projects of one (1) acre or greater or if conditioned with project (Distribution: 1 Planchecker, 1 File). Two (2) sets of Storm Water Management Plan (SWMP); Required if project is defined as a priority project per SUSMP or if conditioned with project. (Distribution: 1 Planchecker, 1 File). 17. iy \ 18. SWPPP/SWMP review fee, if applicable (see fee schedule). ] 19. Other COMMENTS: NOTE: INCOMPLETE SUBMITTALS MAY BE RETURNED UNCHECKED. SUBMITTAL COMPLETE: CHECKED BY: SEE REVET^E S|DE DATE! GRADING AND EROSION CONTROL PLAN SUBMITTAL CHECKLIST - Both Sides (updated 1-10-2006).xls BOOKMARK FOR DMS (DO NOT SCAN THIS PAGE) 1. ACCOUNTING/APPLICATIONS a) DECLARATION OF RESPONSIBLE CHARGE 2. PUBLIC NOTICES - COMMISSION AND COUNCIL ACTIONS f^ir\:ORRESPONDENCE 'x^^^T^X^ General DJ Completion of Grading c) Inter-Departmental Correspondence d) AS BUILT transmittal e) DMS Data Entry Form f) Minutes g) MIsc Correspondence h) Notes to file/photographs i) RAP Sheet j) Records of Conferences k) Records of Telephone Calls I) Records of Emails m) Request for Project Review n) Utility Company Correspondence 4. SECURED AGREEMENTS & BONDS 5. RECORDED AGREEMENTS a) Notice of (Grading Violations) b) Misc. Agreements c) Petition for Inclusion Street & Landscaping District d) Traffic Impact Fee Agreement 6. PERMITS-LICENSES 7. EASEMENTS 8. SUBDIVISION GUARANTEE & TITLE REPORTS a) Parcel Map Guarantee b) Subdivision Guarantee 9. ADJUSTMENT PLAT 10. STREET VACATION 11. ENCROACHMENT PERMIT 12. CLMOR/LOMR FLOOD MODIFICATIONS 13. CONDEMNATION ACTIONS 14. REIMBURSEMENT AGREEMENTS CttT Of CavlsbAA 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO^ 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL DATE: June 9, 2008 JOB NO.: PD 06-21 ATTENTION: Magellan Aviation Hangars - Water Easement Quitclaim PR 07-125; Final Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION Plan Check Review Responsibility Letter Legal Description: No further comments Plat: No further comments 1 Draft CMWD Quitclaim Deed Preliminary Title Report THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • As requested • • For review and comment • For your action Approved as submitted . copies for approval • Resubmit • Design only, not for construction • Return corrected prints • COMMENTS: COPY TO: File In From planchecker SIGNED Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. CttT Ot CMlaibfia 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL DATE: June 9, 2008 JOB NO.: PD 06-21 ATTENTION: RE: Magellan Aviation Hangars - Water Easement Quitclaim PR 08-19; Final Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated ^ Attached • Under separate cover via • Prints ^ Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Plan Check Review Responsibility Letter 1 Legal Description: No further comments 1 Plat: No further comments 1 Draft CMWD Quitclaim Deed 0 Preliminary Title Report (Copy included with PR 07-125 submittal) THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval Q For your use • As requested D For review and comment ^ For your action COMMENTS: • For checking Approved as submitted • Approved as noted • Returned for corrections , copies for approval • Resubmit • Design only, not for construction • Return corrected prints • COPY TO: File In From Planchecker SIGNED: R^JL Rick St. John, PBSAJ (858) 514-1039 // enclosures are not as noted, kindly notify us at once. MAGELLAN AVIATION 5-05-08 City of Carisbad Mr. David Ricl<, Project Engineer Engineering Dept. 1635 Faraday Ave. Carisbad, CA 92008 2006 Palomar Airport Road Carisbad, CA 92011 tel (760) 438-7603 fax (760) 431-6964 magellanavration.aero MAV 08 OEPARTw^r^/J Subject: Letter of Authorization Magellan Aviation Hangars A, B, & D - North Portion Project ID: PD 06-21 780-221-47 (North portion); 760-221-73 (South portion) Dear Mr. Ricl<: i, Martin Slusser, hereby grant permission to Robert Levine, Director of Magellan Aviation and General Manager of the Magellan Aviation facility at Palomar Airport, to sign the Grading Permit and any other associated documents to obtain this permit (such as the Best Management Practices (BMPs) Maintenance Agreement) on behalf of SCIF Palomar LLC, which is managed by The Magellan Group, Inc. The project consists of grading & site improvements shown on plans, Prj. ID# PD 06-21. If you require additional information, please contact me at (310) 277-8337, ext.11. Thank you for your assistance in this matter. Sincerely, Martin Slusser Chairman of the Board The Magellan Group, Inc. Manager of SCIF Palomar LLC City of Carlsbad ^ Engineering Department, Development Services Division Secured Agreement Transmittal BONDS/CASH ROUTED TO I I Associate Analyst (Donna Harvey) • Developer: SCIF Palomar, LLC I I Associate Analyst (Doima Harvey) City Attorney I I Associate Analyst (Donna Harvey) n Deputy City Eng. I I Associate Analyst (Donna Harvey) d] Office Specialist II (C. Fernandez) • City Clerk INITIALS dh dh DATE RECEIVED DATE SENT Signed: REQUEST TO PROCESS SECURED AGREEMENTS; Grading and Erosion Control Agreennent Grading and Erosion Control Bond Hold Harmless Agreennent, Drainage Pernnanent BMP Maintenance PROJECT ID, DWG NO.(S) PROJECT NAME: PD 06-21, DWG447-8B S NOTARIZED H COST ESTIMATE OfKJi^i--'^ ^ POWER OF ATTORNEY ^ SIGNATURE AUTHORITY SURETY CO RATING Magellan Aviation Hangars A, B, D & FBO, North Phase • FEES PAID CASH RECEIPT(S) W-9 STATUS FORM TO PE • INSP • • LINK SEC & DWG • • • INSTRUCTIONS; City Attorney: Please obtain City Attorney's signature on the attached agreement(s). Please return the agreement(s) to Associate Analyst, Engineering. Associate Analyst: Please obtain appropriate City staff signatures, initialize in Permits Plus Office Specialist II: Photocopy^ageonc of eaeh document, this transmittal and Information Sheet; route original to City Clerk. Place copies in Central Files. City Clerk: Please scan and file as appropriate. SPECLy;. INSTRUCTIONS; Project Engineer: David Rick 01nspection and Project Eng notified - Contact: JavadTanbakuchi Status Update form: Dote: / OX cc: File CltyofCarlsi Enilneerini Department Secured Aireement Infennatien Sheet Project ID: PD 06-21 Project Name: MAGELLAN AVIATION A,B,D & FBO Date: 07/10/2008 Grading and Erosion Control Agreement Completion Date: Work Covered: GILDING AND EROSION CONTROL Agreement: SEC08027 Drawing No: DWG4478B Security Type Eff Date Bond# Orig Amt Sec Type Grading Casfi Deposit Grading Security Cash G//2/0^ GRSU5025015 CASH RECPT R0069918 $506,526.00 $20,000.00 Surety Company ARCH INSURANCE COMPANY STE 825 135 N LOS ROBLESAVE PASADENA CA 91101 cc: File Engineering Inspection Developer Owner SCIF PALOMAR LLC <DBA MAGELLAN AVIA ATTN: MARTIN SLUSSER 1800 AVENUE OF THE STARS #105 LOS ANGELES CA 90067 rptSECAGMTJnfoSheet GRADING AND EROSION CONTROL BOND PD 06-21 1 NAME OF APPLICANT: SCIF Palomar. LLC, a Delaware limited liability company (referred to as "Applicant") DATE OF AGREEMENT: -yoA/^ U . ^-OO & 2 ^ NAME OF DEVELOPMENT: Magellan Aviation Hangars A, B, D & FBO. North Phase 4 (referred to as "Development") NAME OF SURETY: Arch Insurance Company 5 (referred to as "Surety") 6 ADDRESS: 369 S. Fair Oaks Avenue, Pasadena, CA 91105 AMOUNT OF SECURITY BOND: $506,526.00 EFFECTIVE DATE: May 28, 2008 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 BOND NUMBER: SU5025015 PREMIUM: $io, 131.00 WHEREAS, tlie City of Carlsbad, State of Califomia, hereinafter referred to as "City", and Applicant named on Line 1 of Page 1,- hereinafter referred to as "PRINCIPAL", have entered into an agreement entitled Grading and Erosion Control Agreement, dated as shown on Line 2 of Page 1 and incorporated by reference, whereby PRINCIPAL agrees to complete certain designated grading and erosion control work; and, WHEREAS, said PRINCIPAL is required under the terms of said Grading and Erosion Control Agreement and Chapter 15.16 of the Carlsbad Municipal Code to furnish a bond for the faithful performance and guarantee of work under said agreement; NOW, THEREFORE, we the PRINCIPAL and the Surety named on Line 4 of Page 1, hereinafter referred to as "SURETY", are held and firmly bound unto City in the penal sum of the amount stated on Line 6 of Page 1, lawful money of the United States, for payment of which sum, well and truly to be made, we bind ourselves, our heirs, successors, executors and administrators, jointly and severally, firmly by these presents. The condition of this obligation is such that if the above bounded PRINCIPAL, their heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Grading and Erosion Control Agreement and Chapter 15.16, and any alteration thereof made as therein provided, on their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save H:\D8V9lopment Services\PROJECTS\PD F1LES\PD 06VPD 06-21 Magellan Aviation Hangars - Ricl<\Bonds and AgraemanftGRADING AND EROSION CONTROL BOND(DWG 447-8B)#2.do« GRADING AND EROSION CONTROL AGREEMENT —v-^ ^ / PD 06-21 NAME OF APPLICANT: SCIF Palomar, LLC, a Delaware limited liability company (referred to as "Applicant") DATE OF AGREEIMENT: -j"^A/'B / ? , 2-^ o 6 GRADING PERMIT NO.: GR 07-49 (referred to as "Grading Permit") LOCATION: North Side of Runway, South of Wind Sock, APN: 760-221-47 & 760-221-73 (referred to as "Grading Site") OFFSITE LOCATION (IF ANY): N/A (referred to as "Offsite Grading Location") NAME OF DEVELOPMENT: Magellan Aviation Hangars A, B, D & FBO, North Phase (referred to as "Development") GRADING PLAN NUMBER: DWG 447-8B (referred to as "Grading Plans and Specifications" SURETY/FINANCIAL INSTITUTION: Arch Insurance Company ADDRESS: 135 N. Los Robles Avenue, Suite 825, Pasadena, CA 91101 TOTAL AMOUNT OF SECURITY: $526,526.00 TAXPAYER I.D. NO: 95-4663726 AMOUNT OF SECURITY POSTED AS CASH DEPOSIT: $20,000.00 RECEIPT NO. AMOUNT OF SECURITY POSTED OTHER THAN CASH: $506,526.00 SECURITY FORM FOR AMOUNT OTHER THAN CASH: Surety Bond (Surety Bond, Letter of Credit) This agreement is made and entered into by and between the City of Carlsbad, California, a Municipal Corporation of the State of California, hereinafter referred to as City, and the Applicant. RECITALS A. The Applicant has applied for a Grading Permit, pursuant to Chapter 15.16 of the Carlsbad Municipal Code (hereinafter referred to as "Code"), to perform grading work including excavation, fill, installation of drainage facilities, installation of desiltation/retention basins, landscaping, erosion control or any combination thereof and storm damage protection, within the City of Carlsbad, State of California, more specifically described in the application for Grading Permit referred to above and incorporated by reference herein. 1 C:\Documents and Settings\byeung\Local SettingsNTemporary Internet Files\OLK7E\GRADiNGANDEROSIONCONTROLAGREEMENT(DWG447-8B)_rev30IVIay2008.doc City of Carlsbad Engineering Department-Development Services Division City Clerk Document Recordation Transmittal ROUTED TO INITIALS DATE RECEIVED DATE SENT 1 1 Associate Analyst, Engineering, Donna Harvey dh 6/13/08 7/10/08 1^ Office Specialist II, Development Services cf O City Clerk REQUEST TO PROCESS DOCUMENTS FOR RECORDATION PROJECT ID NO(s).: PD 06-21 PROJECT NAME: MAGELLAN AVIATION HANGARS A, B, D, FBO PROJECT DESCRIPTION: INSTRUCTIONS: OFFICE SPECIALIST II: Make a copy of this transmittal. File in project folder. Forward the original documents listed below to the City Clerk's Office for recording. (No staples.) Include original DMS Data Entry Form with the appropriate document. CITY CLERK: Please process the attached document for recordation and scanning. Recording fees are to be charged to the City in accordance with the standard letter agreement with the Recorder's Office. SPECIAL INSTRUCTIONS: ATTACHMENTS: n Certificate of Compliance •^GIS Coordinator, n Certificate of Compliance-Adj Plat *GIS Coordinator, Project Planner n Certificate of Compliance-Minor Sub *GIS Coordinator n Certificate of Correction *GIS Coordinator n Deed Restriction n Easement(s)/Covenant of Easement(s) CH Encroachment Agreement S] Permanent Storm Water Quality BMP Maintenance n Petition for Inclusion (c: Kevin Branca, Assistant ] n Extension Agreement •"Inspection Division n Final Map ^ Hold Harmless Agreement-Drainage n Hold Harmless Agreement-Driveways n Hold Harmless Agreement-Geological Failure n Hold Harmless Agreement-Panhandle Lots 0 Neighborhood Improvement Agreement 1 I Req. to Record a Release of Lien For ""Planchecker, (Transmittal only) r~l Req. for Recordation of Notice •"Project Engineer : Finance Director) (Original to Central Files - Engineering) • OTHER C: File '"see individual document title for other copies for distribution WITH THIS EXCEPTION: Retain the original Petition for Inclusion for Engineering Centi-al files. It is not recorded, (c: Kevin Branca, Assistant Finance Director with a copy of this transmittal) H:Development Services/Masters/Routing & Transmittals/City Clerk Document Recordation 11/8/05 City of Carlsbad Engineering Department DMS Data Entry Form Document Class: Recorded Agreement *APN(s): 760-221-47,760-221-73 *ProjectlD: PD 06-21 *Related Project ID(s): "Project Name: Magellan Aviation Hangars A, B, D, FBO "Property Owner: SCIF Palomar, LLC *Recorded Agreement Type: Hold Harmless Agreement/Release Tile No.: 0700-55 Keep Until Date: 01/01/9999 Hard Copy Location: Clerk's Vault Permanent?: YES "Recordation Number: Recordation Date: •" Project Engineer to fill in Data •"•" City Clerk to fill in Data Document Recorded Agreement Type File Number Certificate of Compliance Certificate of Compliance/Non Compliance 0500-05 Deed Restriction Deed Restriction 0775-50 Drainage Fee Payment Agreement Drainage Fee Agreement/Release Encroachment Agreement Encroachment Agreement 0770-50 Hold Harmless Agreement - Drainage Hold Harmless Agreement/Release 0700-55 Hold Harmless Agreement - Driveways Hold Harmless Agreement/Release 0700-55 Hold Harmless Agreement - Geological Hold Harmless Agreement/Release 0700-55 Hold Harmless Agreement - Panhandle Hold Harmless Agreement/Release 0700-55 Neighborhood Improvement Agreement Future Inqjrovement Agreement/Release 0700-50 Notice of Violation Notice of Violation/Release 0500-15 Petition for Assessment District Formation Petition and Waiver 1065-30 Permanent Stormwater Quality BMP Maintenance Agreement Storm Water BMP Maintenance Agreement 0775-50 Reimbursement Agreement/Release Reimbursement Agreement/Release Release a Lien 0770-63 SDG&E Joint Use Agreement Joint Use Agreement 0775-50 Subordination Agreement Subordination Agreement 0775-50 H:\Developinent Services\MASTERS\FORMS -Data Entry Forms\DMS Recorded Agreements Data Entry Form I l9-08.doc 1/8/08 City of Carlsbad Engineering Department DMS Data Entry Form Document Class: Recorded Agreement *APN(s): 760-221-47,760-221-73 "Project ID: PD 06-21 "Related Project ID(s): "Project Name: Magellan aviation Hangers A, B, D & FBO, "Property Owner: SCIF Palomar, LLC *Recorded Agreement Type: Storm Water BMP Maintenance Agreement *FileNo.: 0775-50 Keep Until Date: 01/01/9999 Hard Copy Location: Clerk's Vault Permanent?: YES ''^Recordation Number: **R(Bcordation Date: * Project Engineer to fill in Data •"•" City Clerk to fill in Data Document Recorded Agreement Type File Number Certificate of Compliance Certificate of Compliance/Non Compliance 0500-05 Deed Restriction Deed Restriction 0775-50 Drainage Fee Payment Agreement Drainage Fee Agreement/Release Encroachment Agreement Encroachment Agreement 0770-50 Hold Harmless Agreement - Drainage Hold Harmless Agreement/Release 0700-55 Hold Harmless Agreement - Driveways Hold Harmless Agreement/Release . 0700-55 Hold Harmless Agreement - Geological Hold Harmless Agreement/Release 0700-55 Hold Harmless Agreement - Panhandle Hold Harmless Agreement/Release 0700-55 Neighborhood Improvement Agreement Future Improvement Agreement/Release 0700-50 Notice of Violation Notice of Violation/Release 0500-15 Petition for Assessment District Formation Petition and Waiver 1065-30 Permanent Stormwater Quality BMP Maintenance Agreement Storm Water BMP Maintenance Agreement 0775-50 Reimbursement Agreement/Release Reimbursement Agreement/Release Release a Lien 0770-63 SDG&E Joint Use Agreement Joint Use Agreement 0775-50 Subordination Agreement Subordination Agreement 0775-50 H:\Development Services\MASTERS\FORMS -\D^^Bta Entry FormsVDMS Recorded Agreements Data Entry Form 08.doc 1/8/08 ^ Engineering Department - Development Services^ Plan Signature Routing Form - lnterdepa\f%0tltl)B^QE^ To: Planning Senior Office Specialist For: , Project Planner From: , Project Engineer (PE) Project Name: f^^SjLLAhl A^^ATV«^/V/ Proiect ID: 6(>^V\ DWG No(s).: ^V7'S(S Sheets: INSTRUCTIONS Project Planner - Please verify all Planning conditions/comments are satisfied before signing attached mylars. If issues prevent signing of the mylars, please indicate issues in comments section below. After signing mylars or after noting reason(s) mylars cannot yet be signed, please return mylars and this transmittal to Terie Rowley, Engineering Development Services Senior Office Specialist (ext 2774). Senior Office Specialist - Log date mylars are returned. Route mylars and this form to PE. Eng Development Services COMMENTS CC^J^AAGAJX% Attachment: Mylars ( Grading, Improvement, Map) Copy of Recipient's Departmental Reviev\/ Approval cc: Senior Office Specialist, Engineering Development Services Doc ER-99-08 10/15/2007 ^ [U/ 13/ZUU/ # City of Carlsbad 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: Approved Bonding Company for Javad Tambakuchi LETTER OF TRANSMITTAL DATE: JOB NO.: PD 06-21 ATTENTION: RE: Magellan Aviation Hangars Grading Plan, Dwg. No. 447-8B WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints ^ Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Mylars, Dwg. No. 447-8B consisting of 9 sheets i^^^^^ THESE ARE TRANSMITTED AS CHECKED BELOW: • Resubmit. copies for approval • For approval • For checking • For your use D Approved as submitted • As requested • Approved as noted • For review and comment • Returned for corrections • For your action COMMENTS: Please make^hree copies as follows: Two (2) full-sized sets of prints and ORe-|/) reduced (11X17) set. Return copies and original mylars to City ASAP. • Design only, not for construction • Return corrected prints ^ For Reproduction COPY TO: SIGNED: y > D^id-Rl6k, Associate Engineer (760) 602-2781 If enclosures are not as noted, kindly notify us at once. Engineering Department - Development Services Plan Signature Routing Form - DCE To: ^Sie^ Deputy City Engineer, Development Services (DCE) Date: l^ht Via: __^2j£ljk^ Senior Civil Engineer, Development Services (SCE) Initial From: David Rick , Project Engineer (PE) And: Rick St. John. PBS&J , Plancheck Engineer (PCE) Project Name: Magellan Aviation Hangars Project ID: PD 06-21 Related Project ID(s): Grading Plan DWG No(s).: 447-8B Improvement Plan DWG No(s).: N/A INSTRUCTIONS: SCE - Perform quality assurance check of attached documents. Initial above. Fon/vard all documents to DCE. DCE - Review attached documents. Sign mylars, discard copy of map, initial above, and forward all documents to: DSOS or K|PE {Note to PE when completing ttiis section: If PE is selected, the SOS will not receive this form and will not see the SOS instructions below.) A/iTT tS*^ >T^'J'* ''^'^^ - SOS - Create Plan Track "Purge" activity status if instructed to do so below (use date you received this * * package as Purge In date). Prepare Plancheck Completion letter and forward to PE; distribute copies as indicated on letter after PE signs letter. Notify EOW/Developer as instructed below. File Conditions of Approval and RAP Sheet(s) in project file. Complete instructions on Project Status sheet, then discard sheet. Forward this routing form to OS. Forward signed mylars and reprographic transmittals to counter. . ^ CREATE "PURGE" ACTIVITY IN PLAN TRACK? DYES [^NO ' INFORM the following people the mylars are signed and a city-approved reprographic company f y may now make prints for the City Engineer of Work (EOW) (name) Javad Tambakuchi of (company) Javad Tambakuchi at (ph) (858) 793-4531 Developer/Owner (name) Robert Levine of (company) SCIF Palomar. LLC at (ph) (760) 804-3999 OS - Record the following for use in completing DMS scanning forms: Project Name, Project ID, Related Project ID(s), Drawing Type, DWG No., and DMS Comments. File this routing form in project file. SPECIAL INSTRUCTIONS: DMS COMMENTS (SPECIFY DRAWING NO.): Attachments: 1 Set(s) of Mylars (enter number of sets attached) A^/ftJCopy of Final/Parcel Map (check box if attached) Proje&t Status Oheet HAK isnoot(s) ^/^Annotated Conditions of Approval (check box if attached) STransmittal(s) to Reprographic Company for Engineering Firm (check box if attached) SDraft Plancheck Completion Letter (check box if attached) Doc ER-99-09 10/15/2007 Transmittal Letter To: Carlsbad, City of Public Works - Engineering 1635 Faraday Avenue Carlsbad, CA 92008 Date: 6/3/2008 Job No: 061183 Project: Galicia Slope Repair Re: Construction Change Attention: David Rick TM; DWG: 448-7A Transmitted Delivery Email: Drick@ci.carisbad.ca.us Enclosed, please find the following: 2 Copies - Soils Report 2 Copies - Redline Construction Change (Sheet 2) Remarl(s: David- Phone No: (760) 602-2781 Fax No: (760) 602-8562 Ext: I am sending you the enclosed for your review and approval. Should you have any questions or comments, please let me know. CC; Larry Van Wey By: Garrett Shriver Design Engineer For: John P. Strohminger Project Manager O;\ProjectManagers\JPS\061183\t080603a.doc 2710 Loker Avenue West Civil Engineering Suite 100 Planning Carlsbad, California 92010 Processing (760) 931-7700 Surveying Fax: (760) 931-8680 E-mail: oday@pdayconsultants.com LETTER OF TRANSMITTAL CONSULTING To: City of Carlsbad Engineering Department 1635 Faraday Avenue Carlsbad, CA 92008 ATTN: David Rick DATE: June 4, 2008 RBF JOB NO: 55-100473.001 REFERENCE: TaylorMade Driving Range PD 08-02 DESCRIPTION: Precise Grading Plan Dwg No. 456-7A Mylar Submittal SENT To You VIA: • Mail • Blueprinter • Overnight Delivery • E-Mail • Your Pick-Up M RBF Messenger • Messenger (Other Courier) No. of Copies 1 1 No. of Originals 1 1 DESCRIPTION City Letter of Transmittal Previous Redlined Checkprints Mylar Precise Grading Plan Dwg No. 456-7A Grading Permit Fee $1,275.00 SENT FOR YOUR: • Files Approval Signature • Review • Use • Comments • Information • Per Your Request • REMARKS: Enclosed are the revised Mylars and a check for the grading permit fee of $1,275.00. If you have any questions, please contact me or Tim Thiele at 760-476-9193. Thank you. RBF CONSULTING BY: COPIES TO: Assistant Engine Project File PLANNING DESIGN CONSTRUCTION 5050 Avenida Encinas, Suite 260, Carlsbad, CA 92008-4386 • 760.476.9193 • Fax 760.476.9198 Offices located throughout California, Arizona & Nevada • www.RBF.com printed on recycled p To City of Carlsbad Engineering Department . J . 1635 Faraday Ave. Address City Date Job No. Project 5/30/08 MAG AV 2007 03 12 Carlsbad, CA 92008 Magellan Hangars A, C, & D - Prj. ID; PR 07-125; APN: 760-221-73 North & South Development - 3rd submittal 1 1 Messenger - One Hour • For Your Information O Original 1 1 Messenger - Two Hours 1 1 Messenger - Three Hours • For Use on Job lEI Prints • By Mail For Review and Comments 1 1 Photocopy • Overnight-By 11:00 A.M. • Overnight - By 4:00 P.M. • As Requested n Electronic Data ^ By Blueprinter • For Approval • • For Pickup • Quantity Date Description 1 4/25/08 City of Carlsbad, Letter of Transmittal: PubUc Works / Engineering (listing easement quitclaim / vacation documents) 1 4/23/08 City of Carlsbad, Quitclaim Submittal Checklist 1 4/22/08 Quitclaim Plat, Exhibit B, Prj. ID: PR 07-125 - with plan review comments 1 12/22/08 Quitclaim Legal Description, Exhibit A, Prj. ID: PR 07- 125 - with plan review comments 3 4/29/08 (Revised) Exhibit A: Legal Description, Prj. ID: PR 07- 125 3 4/29/08 (Revised) Exhibit B: Quitclaim Plat, Prj. ID: PR 07-125 2 5/14/08 Updated Title report Dear Engineering Department: If you have any questions, the best way to reach me is my cell phone: 619-666-3803. Thank You - Javad Tanbakuchi, Office: 858-350-5845, FAX: 858-350-9745, Cell: 619-666-3803 Copies Via Q Mail Q Overnight ^ Messenger Javad Tanbakuchi, PE RECEIVED MAY 3 0 2008 ENGINEERING DEPARTMENT h/S^/09 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com To City of Carlsbad Engineering Department . J J 1635 Faraday Ave. Address ^ City Date Job No. Project 5/30/08 MAG AV 2007 03 12 Carlsbad, CA 92008 Magellan Hangars A, C, & D - Prj. ID: PR 08-19; APN: 760-221-73 North & South Development - 2rd submittal n Messenger - One Hour • Messenger - Two Hours I I Messenger - Three Hours • By Mail • Overnight-By 11:00 A.M. • Overnight-By 4.00 P.M. ^ By Blueprinter I I For Your Information I I For Use on Job ^ For Review and Comments [~l As Requested I I For Approval I I For Pickup I I Original ^ Prints r~l Photocopy r~| Electronic Data • • Quantity Date Description 1 4/25/08 City of Carlsbad, Letter of Transmittal: PubUc Works / Engineering (listing easement quitclaim / vacation documents) 1 4/24/08 City of Carlsbad, Quitclaim Submittal Checklist 1 4/23/08 Quitclaim Plat, Exhibit B, Prj. ID: PR 08-19 - with plan review comments 1 12/23/08 Quitclaim Legal Description, Exhibit A, Prj. ID: PR 08-19 - with plan review comments 3 4/29/08 (Revised) Exhibit A: Legal Description, Prj. ID: PR 08- 19 3 4/29/08 (Revised) Exhibit B: Quitclaim Plat, Prj. ID: PR 08-19 2 5A4/08 Updated Title report Dear Engineering Department: If you have any questions, the best way to reach me is my ceU phone: 619-666-3803 Thank You - Javad Tanbakuchi, Office: 858-350-5845, FAX: 858-350-9745, CeU: 619-666-3803 ENGINEERING Copies Via • MaU • Overnight ^ Messenger Javad Tanbakuchi, PE DEPARTMENT RECEIVED MAY 3 0 2008 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com City of Carlsbad 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBUC WORKS/ENGINEERING DEPARTMENT TO: 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL May 14, 2008 JOB NO.: PD 06-21 ATTENTION: Magellan Aviation Hangars - Grading Plan Drawing 447-8B; Final Plan Check WE ARE SENDING YOU Q Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Project Review Responsibility Letter 1 Grading Plans, Dwg. 447-8B: w/ minor comments 1 Grading Plan Mylars, Dwg. 447-8B 1 Storm Water Management Plan: Record Copy 1 Hydrology Report: Record Copy 1 Plan Signature Routing Form Draft Project Completion Letter 1 Transmittal to Blueprint Company THESE ARE TRANSMITTED AS CHECKED BELOW: Approved as noted • For approval • • For your use • • As requested • • For review and comment • For your action • Resubmit. . copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: Comments can be addressed and revised on mylars or slip sheets may be submitted as you see fit. COPY TO: File SIGNED: Rick (858) 514-1039 // enclosures are not as noted, kindly notify us at once. •.t.:,L„ TRANSMITTAL To Address City of Carlsbad Engineering Department Date Job No. 5/8/08 MAG_AV_2007_03_12 1635 Faraday Ave. City Carlsbad, CA 92008 . Magellan Hangars A, C, & D - Prj. ID: PD mject North & South Development - Mylar submittal r~l Messenger - One Hour r~l Messenger - Two Hours Q Messenger - Three Hours • By Mail • Overnight-By 11.-00A.M. • Overnight-By 4:00 P.M. ^ By Blueprinter n For Your Information n For Use on Job Q For Review and Comments Q As Requested ^ For Approval [3 For Pickup S Original M Prints n Photocopy • Electronj^gj^j^ • • MAY 0 8 2008 ENGINEERING Quantity Date DescripHon QEPARTMENT 1 4/25/08 City of Carlsbad, Letter of Transmittal (Public Works / Engineering 1 3/28/08 Engineer's Cost Estimate - no further comment (OK by Rick St. John, 4/22/08) 1 4/23/08 City of Carlsbad, Re-Submitlal Checklist - Part C 1 4/22/08 Grading and Erosion Control Plan - 5* submittal, Dwg. 447- 8B, with plan review comments 3 5/2/08 (Revised) Gradii^ Plan, Dwg. 447-8B (9 sheets each set) 1 5/2/08 Original Mylar Grading Plan, Dwg. 447-8B (9 sheets) 1 3/4/08 Soil Report 1 2/15/08 Hydrology Study, stamped record copy - 3/20/08 1 7/13/07 Storm Water Pollution Prevention Plan (SWPPP), stamped record copy - 8/21/07 2 2/15/08 Storm Water Memagement Plan (SWMP), stamped record copy-4/23/08 1 3/15/04 Notice of Intent (NOI) Receipt Letter, WDID 937C326382 1 3/^/o% Storm Water Compliance Form, Tier 3 Construction SWPPP - signed copy 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchl@gmail.com Page 1 of 2 City of Carlsbad 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBUC WORKS/ENGINEERING DEPARTMENT TO^ Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL DATE: JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE: Magellan Aviation Hangars - North Phase Grading Plan Drawing 447-8B; Fifth Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated 13 Attached • Under separate cover via • Prints 13 Plans • Samples • Specifications • Change Order • the following items: C0PIE9 PATI NO, DESCRIPTION 1 Submittal Checklist 1 Grading Plans, Dwg. 447-8B: w/comments 1 Engineer's Cost Estimate: No further comments THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • • For review and comment • For your action • Resubmit. . copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File 4;Z^/o3 SIGNED: J If enclosures are not as noted, kindly notify us at once. UL Mil tick St. John, PBS^J Rickl (858) 514-1039 City of Carlsbad 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBUC WORKS/ENGINEERING DEPARTMENT TO: Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL JOB NO.: PD 06-21 ATTENTION: jgyg^, janbakuchj Magellan Aviation Hangars - Water Easement Quitclaim PR 07-125; Second Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated ^ Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES OAtE NO. ^ DESCFIIPTI0N> ; - 1 Submittal Checklist 1 Legal Description: No further comments 1 Plat: w/minor comments THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval r~| For your use • As requested O For review and comment • For your action • For checking n Approved as submitted • Approved as noted M Returned for corrections • Resubmit . copies for approval n Design only, not for construction • Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED: Rick St. John, PBS&J (858) 514-1039 // enclosures are not as noted, kindly notify us at once. City of Carlsbad 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL DATE: JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE: Magellan Aviation Hangars - Water Easement Quitclaim PR 08-19; First Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated ^ Attached • Under separate cover via • Prints 13 Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. :.;-:v''' V DE^fttPTION'^;^'' 1 Submittal Checklist 1 Legal Description: w/ minor comments 1 Plat: w/minor comments THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • For your use • As requested • For review and comment • For your action • For checking • Approved as submitted • Approved as noted S Returned for corrections • Resubmit . copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED Rick St John, PB6&J (858)514-1039 if enclosures are not as noted, kindly notify us at once. City of Carlsbad 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO; 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL DATE: April 23, 2008 JOB NO.: PD 06-21 ATTENTION: RE: Magellan Aviation Hangars - Water Easement Quitclaim PR 07-125; Second Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints ^ Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Legal Description: No further comments 1 Plat: w/minor comments 1 Transmittal to Engineer-of-work THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • For review and comment • • For your action • Resubmit copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: COPY TO: File In From pianchecKir SIGNED Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. City of Carlsbad 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO^ 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL DATE: April 24, 2008 JOB NO.: PD 06-21 ATTENTION: RE: Magellan Aviation Hangars - Water Easement Quitclaim PR 08-19; First Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated K Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Legal Description: w/ minor comments 1 Plat: w/minor comments 1 Transmittal to Engineer-of-work THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • For your use • As requested ^ For review and comment • For your action COMMENTS: • For checking • Approved as submitted • Approved as noted • Returned for corrections • Resubmit. copies for approval • Design only, not for construction • Return corrected prints • COPY TO: File In From Planchecker SIGNED: Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. City of Carlsbad 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL DATE: April 23, 2008 JOB NO.: PD 06-21 ATTENTION: Magellan Aviation Hangars - Grading Plan Drawing 447-8B; Fifth Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated K Attached • Under separate cover via • Prints H Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION Submittal Checklist 1 Grading Plans, Dwg. 447-8B: w/ comments 1 Engineer's Cost Estimate: No further comments 1 Storm Water Management Plan: Record Copy 1 Hydrology Report: Record Copy 1 Transmittal to Engineer-of-Work 1 Hardcopy of Document Preparation Request Form and fee update THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • For checking • For your use • Approved as submitted • As requested • Approved as noted For review and comment Returned for corrections • For your action • Resubmit . copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: COPY TO: File In From Planchecker SIGNED: lick St. John, PBS&J Rick! (858) 514-1039 If enclosures are not as noted, kindly notify us at once. TRANSMITTAL City of Carlsbad P^^^ 4/15/08 Engmeering Department MAG_AV_2007_03_12 1635 Faraday Ave. _ . Magellan Hangars A, C, & D- Prj. ID; PR TBD; APN: 760-221-73 City Carlsbad, CA 92008 South Development- 1st submittal RECEIVEB LJ Messenger - One Hour LJ For Your Information [_J Onginal • Messenger-Two Hours ^p|^ 15 2008 [~1 Messenger - Three Hours • For Use on Job ^ Prints • By Mail ^ For Review and Comments • Photocopy ^^pMTmENT • Overnight-By 11.00 A.M. ^-i r-i . • Overnight - By 4:00 P.M. ° ^ ^^^^^^'^ ° ^ By Blueprinter • For Approval Q • For Pickup 1 1 Quantity Date Description 1 4/15/08 City of Carlsbad, Engineering Dept. - Application for Water Easement Quitdaim 1 4/15/08 Letter from Applicant, requesting Quitclaim 1 1/2/08 City of Carlsbad, Letter of Transmittal: Public Works / Engineering (listing easement quitclaim / vacation documents) 1 1/2/08 City of Carlsbad, Quitclaim Submittal Checklist 1 11/30/07 Quitclaim Plat, Prj. ID: PR TBD - with plan review comments 1 12/6/07 Quitclaim Legal Description, Exhibit A, Prj. ID: PR TBD - with plan review comments 3 -(Revised) Exhibit A: Legal Description, Prj. ID: TBD 3 4/3/08 (Revised) Exhibit B: Quitclaim Plat, Prj. ID: TBD 1 10/21/05 Document 2005-0916162 (item #89,8 shts.). County recorded 10/21/05 - for reference only 1 1/25/82 Document 82-020109 (item #53,4 shts.) County recorded 1/25/82 — for reference only 1 See ea. map Copy of Map. # 11288, ROS # 17732, ROS # 179% - for reference only 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi(ggmail.com Page 1 of 2 Dear Engineering Department Per your request, attached please find a separate application, fee & quitclaim documents illustrating the vacation of the existing public water easement on Magellan's private leasehold, as all utilities are private at Magellan Aviation. If you have any questions, the best way to reach me is my cell phone: 619-666-3803. Thank You - Javad Tanbakuchi, Office: 858-350-5845, FAX: 858-350-9745, CeU: 619-666-3803 Copies Via Q Mail Q Overnight ^ Messenger Javad Tanbakuchi, PE 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi(ggmail.com Page 2 of 2 City of Carlsbad 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO; 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL DATE: January 2,2008 JOB NO. PD 06-21 ATTENTION: Magellan Aviaticm Hangars - Water Easement Quitclaim PR 07-125: First Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached D Under separate cover via • Prints • Plans • Samples • Specifications • Change Order M Plat & Legal Description the following items: COPIES . -; NO.-:;; 1 Submittal Checklist 1 Quitclaim Plat: w/ comments 1 Quitclaim Legal Description: w/ comments 1 Transmittal to Engineer-of-work THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • For your use • As requested S For review and comment • For your action COMMENTS: • For checking Q Approved as submitted D Approved as noted El Returned for corrections • • • • . copies for approval Resubmit _ Design only, not for construction Return corrected prints COPY TO: File SIGNED: Rick St. John, PB6&J (858)514-1039 If enclosures are not as noted, kindly notify us at once. • ^ TRANSMITTAL To City of Carlsbad Date 4/14/08 Engineering Department MAG AV 2007 03 12 Job No. ~ ~ ~ " . J J 1635 Faraday Ave. Address ^ _ . Magellan Hangars A, C, & D - ' Prj. ID: PR 07-125; APN: 760-221-73 Carlsbad, CA 92008 City North & South Development - 2nd submittal • •• Messenger - One Hour I I Messenger - Two Hours Messenger - Three Hours D For Your Information n Original For Use on Job ^ Prints • By Mail ^ For Review and Comments Q Photocopy • • Overnight - By 11:00 A.M. ^ Overnight-By 4:00 P.M. '—' As Requested Electronic Data By Blueprinter D For Approval Q • For Pickup 1 1 Quantity Date Description 1 1/2/08 City of Carlsbad, Letter of Transmittal: Public Works / Engineering (listing easement quitclaim / vacation documents) 1 1/2/08 City of Carlsbad, Quitclaim Submittal Checklist 1 11/30/07 Quitclaim Plat (2 shts.), Prj. ID: PR 07-125 - with plan review comments 1 12/6/07 Quitclaim Legal Description, Exhibit A (2 shts.), Prj. ID: PR 07-125 - with plan review comments 3 (Revised) Exhibit A: Legal Description, Prj. ID: PR 07- 125 3 4/^/018 (Revised) Exhibit B: Quitclaim Plat, Prj. ID: PR 07-125 1 3/5/91 Document 1991-0095890 (item #10,5 shts.). County recorded 3/5/91 - for reference only 3 (Revised) Exhibit A: Legal Description, Prj. ID: TBD 3 4/^08 (Revised) Exhibit B: Quitclaim Plat, Prj. ID: TBD 10/21/05 Document 2005-0916162 (item #89,8 shts.). County recorded 10/21/05 - for reference only 1 See ea. map Copy of Map. # 11288, ROS # 17732, ROS # 179% - for reference only 1 4/1/08 Existing Water Easement & Fire Service Exhibit (highUted in orange) - for reference only 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 1 of 2 Dear Engineering Department Attached please find the quitclaim documents illustrating the vacation of the existing public water easement on Magellan's private leasehold, as all utilities are private at Magellan Aviation. Per my discussion with David Rick, he has agreed that the existing 15' public water easement within the Service Road (private Aircraft Road) is sufficient and therefore a new water easement dedication is not reqtiired. If you have any questions, the best way to reach me is my cell phone: 619-666-3803. Thank You - Javad Tanbakuchi, Office: 858-350-5845, FAX: 858-350-9745, Cell: 619-666-3803 Copies Via O Mail • Overnight |3 Messenger Javad Tanbakuchi, PE 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:JavadTanbakuchi@gmail.com Page 2 of 2 TRANSMITTAL To City of Carlsbad Engineering Department Date Job No. 4/14/08 MAG AV_2007_03_12 . ,, 1635 Faraday Ave. Address City Carlsbad, CA 92008 „ . Magellan Hangars A, C, & D - Prj. ID: PD P"*'^ 06-21 North & South Development - 5th submittal f~l Messenger - One Hour I I Messenger - Two Hours Q Messenger - Three Hours • By Mail • Overnight - By 11:00 A.M. • Overnight - By 4:00 P.M. ^ By Blueprinter Quantity 1 l~l For Your Information n For Use on Job ^ For Review and Comments [~1 As Requested r~1 For Approval i~l For Pickup Date 3/26/08 ^ Original ^ Prints r~| Photocopy Q Electronic Data • RECEIVED ° ^'^14 21108 City of Carlsbad, Letter of Transmittal ^BK^Wftlgft^ 7" Engineering (listing the grading & storm water docs) 1 3/20/08 City of Carlsbad, Re-Submittal Checklist - Part B - see memo below 1 3/4/08 Grading and Erosion Control Plan - 4* submittal, Dwg. 447- 8B, with plan review comments 4 W)8 (Revised) Grading Plan, Dwg. 447-8B (9 sheet each set) 1 3/20/08 Engineer's Grading Bond Estimate, with plan review comments 2 3/28/08 (Revised) Engineer's Grading Bond Estimate 1 2/15/08 Storm Water Management Plan, with plan review comments from David Rick, no further comments from Rick St John, PBS&J 2 2/1^ (Revised) Storm Water Management Plan 1 2/15/08 Hydrology Study, record copy - no comments 1 4/11/08 Digital Submittal Checklist for Magellan Aviation, Grading Plans, 5^ submittal 1 DVD for Magellan Aviation, Grading Plans, 5*'' submittal, AutoCAD R 2004 1 ^1/08 Autocadd Layer Listing for Magellan Aviation, Grading Plans, 5* submittal 1 3/4^ Site Utility Plan - for information / reference only 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 1 of 2 id. Dear Engineering Department: Attached pk. find the revised grading & storm water documents - 5* submittal for Magellan Aviation. Concurrent with this resubmittal is a separate transmittal listing the easement documents - 2"^ submittal for Magellan Aviation. If you have any questions, the best way to reach me is my cell phone: 619-666-3803. Thank You - Javad Tanbakuchi, Office: 858-350-5845, FAX: 858-350-9745, CeU: 619-666-3803 Copies Via O Mail O Overnight ^ Messenger Javad Tanbakuchi, PE 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 2 of 2 CttY Ot CflivlsbAtt 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TQ^ Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE: Magellan Aviation Hangars - North Phase Grading Plan Drawing 447-8B; FourthPlan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated ^ Attached • Under separate cover via • Prints K Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Grading Plans, Dwg. 447-8A: w/ comments Engineer's Cost Estimate: w/ comments Storm Water Management Plan: No further comments 1 Hydrology Report: No further comments I THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • • For review and comment • For your action Returned for corrections • Resubmit copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED: Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. CttT Ot CAPlsbaA 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL March 20, 2008 JOB NO.: PD 06-21 ATTENTION: RE Magellan Aviation Hangars - Grading Plan Drawing 447-8i^ Fourth Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated ^ Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTTON Submittal Checklist Grading Plans, Dwg. 447-8A: w/ comments Engineer's Cost Estimate: w/comments Storm Water Management Plan: No further comments Hydrology Report: No further comments 1 Transmittal to Engineer-of-Work THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • For review and comment • For your action Returned for corrections • Resubmit copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: COPY TO: File In From SIGNED: If enclosures are not as noted, kindly notify us at once. Rick St. John, PB6&J (858) 514-1039 TRANSMITTAL To Address City City of Carlsbad Engineering Etepartment 1635 Faraday Ave. Date Job No. Project 3/5/08 MAG_AV_2007_03_12 Magellan Hangars A, C, & D Carlsbad, CA 92008 North & South Development - 4* submittal O Messenger - One Hour Q Messenger - Two Hours r~l Messenger - Three Hours • By MaU • Overnight-By 11:00 A.M. • Overnight-By 4:00 P.M. 13 By Blueprinter Quantity 1 [~| For Your Information 113 For Use on Job 13 For Review and Comments 0 As Requested O For Approval n For Pickup 13 Original [3 Prints n Photocopy n Electronic Data • • RECEIVED MAR 0 5 2008 ENGINEERING DEPARTMENT Date 1/2/08 12/27/07 12/5/07 9/12/07 9/12/07 9/5/07 1/31/08 2/19/OS 2/22/08 4/5/07 &c 2/14/08 10/1/07 Description City of Carlsbad, Letter of Transmittal: Grading, City of C£irlsbad,Re-Submittal Checklist - Part B - see memo below Grading and Erosion Control Plan - S""" submittal, Dwg. 447-8B, with plan review comments (Revised) Grading Plan (9 sheet each) (Revised) Earthwork Quantity (Cut/ Fill Map) Storm Water Management Plan, with plan review comments (Revised) Storm Water Management Plan Hydrologic Study (Drainage Report), with plan review comments (Revised) Hydrologic Study (Drainage Report) Engineer's Grading Bond Estimate & Plan Check Fee Calculation, with plan review comments, 12/27/07 (Revised) Engineer's Grading Bond Estimate & Plan Check Fee Calculation Letter, le: Withdraw of Project ID: PD 06-21 and Dwg.447-8A (Interim Grading for South Portion) Letter, re: Request for Resubmittal, Project ID: PD 06-21 and Dwg.447-8B, without Schedule "F" drainage E-mail correspondence, re: Request for Resubmittal, Project ID: PD 06- 21 and Dwg.447-8B, without Schedule "F" drainage Letter from the County of SD, re: Storm Water discharge Letter from Ayers, Inc., re: Storm Water discharge 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 1 of 2 ^0 0W-^( 7L_ Digital Submittal Checklist for Magellan Aviation, Grading Plans, 4* submittal (Dwg. 447-8B; Project PD 06-21) a/'VDS DVD for Magellan Aviation, Grading Plans, 3^ submittal, AutoCAD R 2004 3^^08 Autocadd Layer Listing for Magellan Aviation, Grading Plans, 3^ submittal (Dwg. 447-8B; Project: PD 06-21) 3/4/OS Site Utility Plan - for information / reference only Dear Engineering Department Per my disctission with David Rick, he has agreed to accept this resubmittal of Magellan Aviation's proposed grading plans, without the pre-requisite of an approved County of San Diego, Schedule "F" Dramage plan. Please note the foUowing revisions have occurred and are illustrated on this 4"! submittal: A. Due to an existing fire main break, water damage has occurred and we are proposing to pave the taxiway in front of the existing office area. B. There is an additional storm drain pipe & catch basin in front of the existing office area. Lastly, all utilities are private at Magellan Aviation. David Rick requested we provide a copy of om utility plan for information / reference only. If you have any questions, the best way to reach me is my cell phone: 619-666-3803. Thank You - Javad Tanbakuchi, Office: 858-350-5845, FAX: 858-350-9745, CeU: 619-666-3803 Copies Via Q Mail Q Overnight ^ Messenger Javad Tanbakuchi, PE 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 2 of 2 CttT Ot CMlsbAA 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO^ Javad Tanbakuctii, (858) 793-4531 -A LETTER OF TRANSMITTAL DATE: JOB NO.: PD 06-21 Javad Tanbakuctii RE: Magellan Aviation Hangars - North Phase Grading Plan Drawing 447-8B; Third Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated (3 Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Grading Plans, Dwg. 447-8A: w/comments 1 Engineer's Cost Estimate: w/ comments 1 Storm Water Management Plan: w/comments 1 Hydrology Report: w/ comments THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • • For review and comment IE! • For your action Returned for corrections • Resubmit copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED: If enclosures are not as noted, kindly notify us at once. Rick St. John, FBS&J (858)514-1039 city ot CmrlsbaA 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL DATE: December 27, 2007 JOB NO.; PD 06-21 ATTENTION: Magellan Aviation Hangars - Grading Plan Drawing 447-8<^ Third Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Grading Plans, Dwg. 447-8A: w/ comments 1 Engineer's Cost Estimate: w/comments 1 Storm Water Management Plan: w/ comments Hydrology Report: w/ comments Transmittal to Engineer-of-work THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • For review and comment • For your action • Resubmit. copies for approval Returned for corrections • Design only, not for construction • Return corrected prints • COMMENTS: COPY TO: File In From Planchecker SIGNED: Rick St. John, PB8&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. • TRANSMITTAL To City of Carlsbad Date 12/19/07 Engineering Department Job No. MAG_AV_2007_03_12 / Prj. FD 06-21 1635 Faraday Ave. Address Project Magellan Hangars A, B, & D City Carlsbad, CA 92008 North Development - 3"'^ submittal • • • Messenger - One Hour Messenger - Two Hours Messenger - Three Hours • • For Your Information For Use on Job n Original • Prints • • • By Mail Overnight - By 11:00 A.M. Overnight - By 4:00 P.M. • IE! For Review and Comments As Requested r~l Photocopy 13 Electronic Data By Blueprinter • For Approval • • For Pickup • Quantity Date Description 1 12/7/07 City of Carlsbad, Eng P&P, Plan review comments by Scott Evans, received 12/13/07 via e-mail 1 -Digital Submittal Checklist for Magellan Aviation, Grading Plans, 3'''' submittal (Dwg. 447-8B; Project: PD 06-21) 1 12/6/07 DVD for Magellan R2004 Aviation, Grading Plans, 3"' submittal, AutoCAD 1 12/19/07 Autocadd Layer Listing for Magellan Aviation, Grading Plans, 3"^ submittal (Dwg. 447-8B; Project: PD 06-21) Dear Engineering Department: These documents are being submitted in response to plan review comments by Scott Evans, Eng P&P, received on Thank You - Javad Tanbakuchi, Office: 858-350-5845, FAX: 858-350-9745, Cell: 619-666-3803 Copies Via Q Mail O Overnight |3 Messenger Javad Tanbakuchi, FE 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 1 of 1 TRANSMITTAL To Address City City of Carlsbad Engineering Department 1635 Faraday Ave. Carisbad, CA 92008 Date Job No. Project 12/6/07 MAG_AV 2007 03_12 Magellan Hangars A, C, & D North Development - 3"'' submittal [J Messenger - One Hour [~l Messenger - Two Hours D Messenger - Three Hours • By Mail • Overnight-By 11:00 A.M. • Overnight-By 4:00 P.M. ^ By Blueprinter n For Your Information n For Use on Job 13 For Review and Comments • As Requested r~l For Approval • For Pickup ^ Original ^ Prints • Photocopy ri Electronic Data • • RECEIVED DEC 0 6 2007 ENGINEERING DEPARTMEN! Quantity 1 1 Date 8/29/07 Description 8/6/07 12/6/07 7/18/07 7/10/07 7/13/07 9/12/07 7/12/07 9/12/07 8/6/07 9/5/07 2/26/07 12/6/07 12/6/07 12/6/07 11/30/07 Letter of Transmittal: Grading, Submittal Checklists - Grading Grading and Erosion Control Plan - 2"'' submittal, Dwg. 447-8B, with plan review comments (Revised) Grading and Erosion Control Plan (7 sheet each) Earthwork Quantity (Cut / Fill Map), with no plan review comments Geotechnical Investigation Report, with no plan review comments Storm Water Management Plan, with plan review comments (Revised) Storm Water Management Plan Hydrologic Study (Drainage Report), with plan review comments (Revised) Hydrologic Study (Drainage Report) Engineer's Grading Bond Estimate & Plan Check Fee Calculation, with plan review comments (Revised) Engineer's Grading Bond Estimate & Flan Check Fee Calculation ALTA/ACSM Land Title Survey, by K& S Engineering - for ref. only Submittal Checklists - Quitclaim Engineering Flan Check Application Letter from Applicant, requesting Quitclaim Legal Description of Easement to be quitclaimed. Exhibit "A" Water Easement Vacation, Sht. 1 of 2 and Sht. 2 of 2 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi(ggmail.com Page 1 of 2 11/5/01 10/21/05 3/5/91 12/6/07 Title Report, 5/1/07, Item #11: Grant Deed of Water Pipeline Easement, Doc. #2001-0804399 - for reference only Title Report, 5/1/07, Item #89: Grant Deed of Water Line Easement, Doc. # 2005-0916162 - for reference only Title Report, 5/1/07, Easement, Doc. # 1991-0095890 - for reference only Check for $590, Easement Document Processing & Recording Dear Engineering Department: Please note the following revisions have occurred and are illustrated on this S'** submittal: A. Hangar "B" has been extended, i.e. lengthen to the west B. Hangar "C" has been eliminated C. FBO Building has shifted to the west D. The proposed turnaround drive aisle has shifted to the west to accommodate the revised FBO Building location E. Hangar "E" & "I" have been permitted through the Bldg. Dept., and a grading permit was not req'd.; The pavement around Hangar "E" & "I" are for reference only, to provide a comprehensive plan. Thank You - Javad Tanbakuchi, Office: 858-350-5845, FAX: 858-350-9745, Cell: 619-666-3803 Copies Via 0 Mail O Overnight |3 Messenger Javad Tanbakuchi, FE By: —_ \2^/ £/O-^ 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Emall:Javad.Tanbakuchi@gmail.confi Page 2 of 2 CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO^ Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL DATE: JOB NO.: PD 06-21 ATTENTION-, Javad Tanbakuchi Magellan Aviation Hangars - North Phase Grading Plan Drawing 447-8B; Second Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated 13 Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION Submittal Checklist 1 Grading Plans, Dwg. 447-8A: w/ comments 1 Engineer's Cost Estimate: w/ comments 1 Earthwork Calculations: No further comments 1 Soils Report: No further comments 2 Storm Water Management Plan: w/comments 1 Document Preparation Request THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • For your use • As requested • For review and comment • For your action • For checking • Approved as submitted • Approved as noted M Returned for corrections . copies for approval • Resubmit • Design only, not for construction O Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED: (ZiJL ^ Rick St. John, PBS. (858)514-1039 If enclosures are not as noted, kindly notify us at once. CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO; Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL DATE: JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE: Magellan Aviation Hangars - North Phase Improvement Plan Drawing 447-8; Second Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Improvement Plans, Dwg. 447-8: w/ comments 1 Engineer's Cost Estimate: w/ comments 1 Drainage Report: w/comments 1 Sewer Study: w/comments 1 Document Preparation Request THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • • For review and comment • For your action • Resubmit. copies for approval Returned for corrections • Design only, not for construction • Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED: Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO^ 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL August 22, 2007 JOB NO.: PD 06-21 ATTENTION: Magellan Aviation Hangars - North Phase Improvement Plan Drawing 447-8; Second Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Improvement Plans, Dwg. 447-8: w/ comments 1 Engineer's Cost Estimate: w/ comments 1 Drainage Report: w/ comments 1 Sewer Study: w/comments 1 Document Preparation Request 1 Transmittal to Engineer-of-work THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • For checking • Resubmit copies for approval • For your use • Approved as submitted • Design only, not for construction • As requested • Approved as noted • Return corrected prints For review and comment • Returned for corrections • • For your action COMMENTS: COPY TO: File In From Planchecker SIGNED: Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL August 22, 2007 JOB NO.: PD 06-21 ATTENTION: Magellan Aviation Hangars - Grading Plan Drawing 447-8i^ Second Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints ^ Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Grading Plans, Dwg. 447-8A: w/ comments 1 Engineer's Cost Estimate: w/ comments 1 Earthwork Calculations: No further comments 1 Soils Report: No further comments 2 Storm Water Management Plan: w/ comments 1 Document Preparation Request 1 Transmittal to Engineer-of-work THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • For review and comment • • For your action • Resubmit copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: In From Pianchecker COPY TO: File SIGNED: Rick (858) 514-1039 If enclosures are not as noted, kindly notify us at once. CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO^ Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL DATE; JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE: Magellan Aviation Hangars - North Phase Improvement Plan Drawing 447-8j First Plan Check WE ARE SENDING YOU O Shop Drawings • Copy of letter Dated ^ Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE S:::::=iii0!'"'l DESCRIPTION Submittal Checklist Improvement Plans, Dwg. 447-8: w/ comments Engineer's Cost Estimate: w/ comments Drainage Report: w/comments 1 Sewer Study: w/ comments THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • • For review and comment • For your action • Resubmit. copies for approval Returned for corrections • Design only, not for construction • Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED: Rick St. John, PBS&J (858)514-1039 If enclosures are not as noted, kindly notify us at once. CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO^ Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL DATE: JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE: Magellan Aviation Hangars - North Phase Grading Plan Drawing 447-8B; First Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES NO. DESCRIPTION Submittal Checklist Grading Plans, Dwg. 447-8A: w/ comments Engineer's Cost Estimate: w/ comments 1 Earthwork Calculations: w/ comments 1 Soils Report: No comments or concerns 2 Storm Water Management Plan: w/ comments THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • • For review and comment • For your action Returned for corrections • Resubmit copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED: Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. TRANSMITTAL To Address City City of Carlsbad Engineering Department 1635 Faraday Ave. Carlsbad, CA 92008 n Messenger - One Hour n Messenger - Two Hours n Messenger - Three Hours • By Mail • Overnight - By 11:00 A.M. • Overnight-By 4:00 P.M. ^ By Blueprinter Date Job No. Project 8/8/07 [~l For Your Information l~l For Use on Job El For Revievif and Comments • As Requested l~1 For Approval n For Pickup MAG_AV_2007_03_12 Magellan Hangars A,B,C, D, E & I North Development - 2"'' submittal S Original S Prints n Photocopy • ElectronicData'^^S ^9 2007 • • Quantity 4 Date 4/13/07 4/10/07 8/6/07 8/6/07 7/18/07 3/9/07 7/18/07 6/23/05 7/10/07 10/9/06 11/17/06 1/17/06 7/13/07 11/17/06 7/13/07 Description Letter of Transmittal: Grading, Improvements, Fire & Water Submittal Checklists - Grading & Improvements Grading and Erosion Control Plan, Dwg. 447-8B, with plan review comments (Revised) Grading and Erosion Control Plan (7 sheet each) Improvement Plan, E>wg. 447-8B, with plan review comments (Revised) Improvement Plan (5 sheets each) Earthwork Quantity (Cut/fill Map), with plan review comments (Revised) Earthwork Quantity (Cut/fill Map) Preliminary Sewer Report, with plan review comments (Revised) Sewer Report Geotechnical Investigation Report, with no plan review comments (Revised) Geotechnical Investigation Report Water Quality Technical Report & Water Pollution Control Plan, with plan review comments Water Quality Technical Report & Water Pollution Control Plan, with plan review comments Storm Water Management Plan, with plan review comments (Revised) Storm Water Management Flan Storm Water Pollution Prevention Plan (SWPPP), previously approved (Revised) Storm Water Pollution Prevention Plan 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 1 of 2 10/9/06 11/16/07 3/9/07 3/9/07 4/16/07 2/26/07 4/5/07 1/13/90 Hydrologic Study (Drainage Report), with plan review comments Hydrologic Study (Drainage Report), with plan review comments (Revised) Hydrologic Study (Drainage Report) Engineer's Grading Bond Estimate & Plan Check Fee Calculation, with plan review comments (Revised) Engineer's Grading Bond Estimate & Flan Check Fee Calculation Engineer's Improvement Cost Estimate & Plan Check Calculation, with plan review comments (Revised) Improvement Bond Estimate & Plan Check Fee Calculation Drainage Plan & Profile (ShL 17 & 18 of 44), by Ptoject Design Consultants - for reference only ALTA/ACSM Land Title Survey, by K& S Engineering - for refereiKe only County of SD, DPW, re: Magellan Storm Water discharge pipe - for reference only C.W.M.D. Job 89-210 - for reference only Dwg. No. 447-8A - for refererKC only Dear Engineering Department All proposed grading & improvements shown at Magellan Aviation are private with the exception of the proposed public sidewalk at Hangar "I" and Airaaft Road. Hangars E & I's surface improvements & utilities were included in the bldg. permitted set (PC 07-19). We have included these ateas in this resubmittal set, for refereiKe only, to provide a comprehensive plan. Please note the Geotechnical Investigation Report dated 6/23/05, was not requested in the resubmittal, yet a (Revised) Geotechnical Investigation Report dated 7/1^05, have been updated to reflect the revised plans. As requested the Water (Quality Technical Report plan review comments from the (3) previous rejxsrts have been reviewed & incorporated into a (Revised) Storm Water Management Plan dated 7/13/07. The previously approved Storm Water Pollution Prevention Plan (SWPPP) was not requested in the resubmittal, yet an (Revised) Stonn Water PoUution Prevention Plan dated 7/1^07, have been provided to reflect the revised plans. The Hydrologic Study (Drainage Report), with plan review comments from the (2) previous reports have been reviewed & iiKorporated into a (Revised) Hydrologic Study dated 7/i2/V7. Please note the existing 24" storm drain pipe, located southeast of Magellan Aviation, has been blocked. Therefore, our proposed storm drain wUl connect to the future curb inlet at Aircraft Road, £is shown on our plan. We have iiKiuded reference dwgs., from Ptoject Design Consultants and K& S Engineering, and a letter from the County of SD dated 4/5/07, for refereiKe. If 1 can be assistant to you in any way, please feel free to contact me: Thank You - Javad Tanbakuchi, Office: 858-793-4531, Cell: 619-666-3803 Copies Via • Mail • Overrught El Messenger Javad Tanbakuchi, PE By: 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 2 of 2 CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TOj Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL DATE: JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE: Magellan Aviation Hangars - North Phase Grading Plan Drawing 447-8B; First Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated 13 Attached • Under separate cover via • Prints K Plans • Samples • Specifications • Change Order • the following items: conEs DATE NO. DESCRIPTION Submittal Checklist Grading Plans, Dwg. 447-8A: w/ comments Engineer's Cost Estimate: w/ comments Earthwork Calculations: w/ comments Soils Report: No comments or concerns 2 Storm Water Management Plan: w/ comments THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • • For review and comment • For your action • Resubmit. copies for approval Returned for corrections • Design only, not for construction • Return corrected prints • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TQ^ Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE: Magellan Aviation Hangars - North Phase Improvement Plan Drawing 447-8; First Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated 13 Attached • Under separate cover via • Prints El Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION Submittal Checklist 1 Improvement Plans, Dwg. 447-8: w/ comments Engineer's Cost Estimate: w/ comments 1 Drainage Report: w/ comments 1 Sewer Study: w/comments THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • For your use • As requested • For review and comment • For your action • For checking • Approved as submitted im Approved as noted M Returned for corrections • Resubmit copies for approval • Design only, not for construction l~l Return corrected prints • • COMMENTS: See re-submittal checklist for further requirements. COPY TO: File SIGNED: 4/1-3/ Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008 (760) 602-2720 PUBLIC WORKS - ENGINEERING TO ATTINTION 4 /)u^L- HMl-'^b WE ARE SENDING YOU t>l(ttached • Under separate cover via • Shop drawings • Prints • Plans • Samples • Copy of letter • Change order • .the following Items: • Specifications Dated- COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: • For approval • For Checking • For your use • Approved as submitted • As requested • Approved as noted • For review and comment H'^turned for corrections • For your action REMARKS • Resubmit. . copies for approval • Design only, not for construction • Return corrected prints • 4/(3/0? COPY TO. Printed on recycled paper SIGNED: ' ^ // enclosures are not as noted, kindly notify us at once, TO (EttQ of (EutiBbul^ 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008 (760) 602-2720 PUBLIC WORKS - ENGINEERING ATTINTIOR -JL I WE ARE SENDING YOU (Jk^^ttached • Under separate cover via • Shop drawings • Prints • Plans • Samples • Copy of letter • Change order • _the following items: • Specifications Dated. COPIES DATE NO. DESCRIPTION n For approval • For your use • As requested • For review and comment • For your action REMARKS • For Checking • Approved as submitted • Approved as noted E-fleturned for corrections • Resubmit. . copies for approval • Design only, not for construction • Return corrected prints • COPY TO. Printed on recycled paper SIGNED: If enclosures are not as noted, kindly notify us at once. 1635 FARADAYAVENUE CARLSBAD, CALIFORNIA 92008 (760) 602-2720 PUBUC WORKS - ENGINEERING TO Ml'-. JOB NO. ) , . ATTENTION MM 1-^'*S WE ARE SENDING YOU O-I^ttached • Under separate cover via • Shop drawings • Prints • Plans • Samples • Copy of letter • Change order • .the following items: • Specifications Dated- COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: • For approval • For your use • As requested • For review and comment • For your action • For Checking • Approved as submitted • Approved as noted 0''Returned for corrections • Resubmit. . copies for approval • Design only, not for construction • Return corrected prints • REMARKS COPY TO Printed on recycled paper SIGNED: ' ' If enclosures are not as noted, kindly notify us at once. 3L- CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL April 10,2007 JOB NO.: PD 06-21 ATTENTION; Magellan Aviation Hangars - Grading Plan Drawing 447-8i|^ First Plan Check WE ARE SENDING YOU n Shop Drawings • Copy of letter Dated 13 Attached • Under separate cover via • Prints M Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Grading Plans, Dwg. 447-8A: w/comments Engineer's Cost Estimate: w/ comments 1 Earthwork Calculations: w/ comments Soils Report: No comments or concerns 2 Storm Water Management Plan: w/ comments 1 Transmittal to Engineer-of-work THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • n As requested • For review and comment • • For your action COMMENTS: O Resubmit copies for approval O Design only, not for construction • Return corrected prints • In From COPY TO: File SIGNED: If enclosures are not as noted, kindly notify us at once. CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TOj 1) Terie Rowley 2) David Rick LETTER OF TRANSMITTAL April 10, 2007 JOB NO.: PD 06-21 ATTENTION: Magellan Aviation Hangars - North Phase Improvement Plan Drawing 447-8; First Plan Check WE ARE SENDING YOU D Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist Improvement Plans, Dwg. 447-8: w/ comments 1 Engineer's Cost Estimate: w/ comments 1 Drainage Report: w/ comments 1 Sewer Study: w/ comments 1 Transmittal to Engineer-of-work THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • For review and comment • • For your action • Resubmit . copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: In From pianctiecKer COPY TO: File SIGNED: Rick St. John, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. TO 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008 (760) 602-2720 PUBUC WORKS - ENGINEERING DATE ^ ATTENTIO* WE ARE SENDING YOU O^ached • Under separate cover via • Shop drawings • Prints • Plans • Samples • Copy of letter • Change order • .the following Items: • Specifications Dated- COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below • For approval • For your use • As requested • For review and comment • For your action REMARKS • For Checking • Approved as submitted • Approved as noted Q-'^eturned for corrections . copies for approval • Resubmit • Design only, not for construction • Return corrected prints • COPY TO. Printed on recycled paper SIGNED if enclosures are not as noted, kindly notify us at once 3L_ TRANSMITTAL To City of Carlsbad _ ^ 3/12/07 Date Engineering Department 1 MAG AV 2007 03 12 Job No. "~ ~ ~ ~ Address 1635 Faraday Ave. Project Magellan Hangars A,B,C & D City Carlsbad, CA 92008 South & North Development • •• Messenger Messenger Messenger - One Hour - Two Hours - Three Hours • • For Your Information ^ Original For Use on Job |3 Prints • • • By Mail Overnight - Overnight - By 11.00 A.M. By 4:00 P.M. • For Review and Comments • Photocopy As Requested S Electronic Data By Blueprinter • For Approval • MCEIVED • For Pickup • MAR 12 200? Quantity Date ENGINEERING Description DEPARTMENT 1 3/9/07 Application 6 3/9/07 Grading and Erosion Control Plan (4 sheet each) 8 3/9/07 Improvement Plan (4 sheets each) 2 3/9/07 Earthwork Quantity (Cut/fill Map) 2 3/9/07 Preliminary Sewer Report 2 9/9/05 Preliminary Title Report 2 6/23/05 Geotechnical Investigation 2 11/17/06 Storm Water Pollution Prevention Plan 2 10/9/06 Hydrologic Study (Drainage Report) 1 3/9/07 Digital Submittal Check list & Cadd Layer List 2 3/9/07 Engineer's Bond Estimate & Plan Check Fee Calculation 2 3/9/07 Improvement Cost Estimate & Plan Check Calculation 1 3/9/07 Grading, Improvement & SWPPP Plan Check Fees 1 3/9/07 Environmental Impact Assessment (EIA) Form; Letter, re: additional EIA info. & photos 1 FAA - Condition of Approval 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 1 of • . Dear Engineering DepartmenT Please note the following items are not provided, because it is an existing development, under the Palomar Airport Authority: approved Site Plan or Tentative Map Coastal Development Permit Conditions If I can be assistant to you in any way, please feel free to contact me: Cell: 619-666-3803 Office: 858-793-4531 Thank You - Javad Tanbakuchi Copies Via • Mail • Overnight ^ Messenger Javad Tanbakuchi, PE By: 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Emai!:Javad.Tanbakuchi@gmail.com Page 2 of 2 CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: 1) Linda Ontivaros 2) David Rick LETTER OF TRANSMITTAL 3) Javad Tanbakuchi, (858) 793-4531 JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE: Magellan Aviation Hangars - Grading Plan Drawing 447-8A; Second Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE DESCRIPTION 1 Submittal Checklist 1 Grading Plans, Dwg. 447-8A: w/ comments 1 Engineer's Cost Estimate: w/ comments 1 Storm Water Management Plan: w/ comments \nfTom THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • • For your use • • As requested • • For review and comment • For your action Returned for corrections • Resubmit copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: See resubmittal checklist for further requirements. COPY TO: File SIGNED: lick St. Jotin, PB6&J Rick St. Jotin, PB6&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. f/) -x-i CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: 1) Linda Ontivaros 2) David Rick 3) Javad Tanbakuchi, (858) 793-4531 LETTER OF TRANSMITTAL DATE: JOB NO.: PD 06-21 ATTENTION: Javad Tanbakuchi RE Magellan Aviation Hangars - Grading Plan Drawing 447-8A; Second Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated El Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: COPIES DATE NO. DESCRIPTION 1 Submittal Checklist 1 Grading Plans, Dwg. 447-8A: w/ comments 1 Engineer's Cost Estimate: w/ comments 1 Storm Water Management Plan: w/ comments \n From THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval D For your use • As requested • For review and comment • For your action D For checking • Approved as submitted • Approved as noted S Returned for corrections • Resubmit copies for approval • Design only, not for construction • Return corrected prints • COMMENTS: See resubmittal checklist for further requirements. COPY TO: File SIGNED: If enclosures are not as noted, kindly notify us al once. Rick St. Jotin, F^S&J (858) 514-1039 CnY OF CARLSBAD 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008-7314 (760) 602-2720 PUBLIC WORKS/ENGINEERING DEPARTMENT TO: 1) Linda Ontivaros 2) David Rick LETTER OF TRANSMITTAL 3) Javad Tanbakuchi, (858) 793-4531 December 26, 2006 JOB NO.: pp gg ^., ATTENTION: Javad Tanbakuchi • Magellan Aviation Hangars - Grading Plan Drawing 447-8A; First Plan Check WE ARE SENDING YOU • Shop Drawings • Copy of letter Dated S Attached • Under separate cover via • Prints S Plans • Samples • Specifications • Change Order • the following items: (Sopiis DATE"".-••. NO. •' •'DEScliirnoN^ • . - ' 1 Submittal Checklist 1 Grading Plans, Dwg. 447-8A: w/comments 1 Engineer's Cost Estimate: w/comments ' 1 Earthwork Calculations: No comments or concerns 1 Soils Report: No comments or concerns 1 Storm Water Management Plan: w/ comments 1 Drainage Report: No comments 1 Storm Water Pollution Prevention Plan: No comments THESE ARE TRANSMITTED AS CHECKED BELOW: • For approval • For your use • As requested O For review and comment • For your action • For checking • Approved as submitted • Approved as noted K Returned for corrections • Resubmit. , copies for approval • Design only, not for construction n Return corrected prints • COMMENTS: The reports submitted with this interim plan should be re-submitted and reviewed with the ultimate conditions grading plans. COPY TO: File SIGNED: I' Rick St. Jolin, PBS&J (858) 514-1039 If enclosures are not as noted, kindly notify us at once. TO 1635 FARADAY AVENUE CARLSBAD, CALIFORNIA 92008 (760) 602-2720 PUBLIC WORKS - ENGINEERING 'nhx>if)(o rtNTicfN I . ,r A TN the following items: WE ARE SENDING YOU [fl/Attached • Under separate cover via , • Shop drawings • Prints • Plans • Samples • Specifications • Copy of letter • Change order • Dated- COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: • For approval • For Checking • For your use • Approved as submitted • As reojjested • Approved as noted • Preview and comment • Returned for corrections Or For your action REMARKS -^.^.^^L • Resubmit. . copies for approval • Design only, not for construction • Return corrected prints • COPY TO. Printed on recycled paper If enclosures are not as noted, kindly notify us at once. TRANSMITTAL To Address City City of Carlsbad Engineering & Planning Departments 1635 Faraday Ave. Date Job No. Project 1/23/2007 Carlsbad, CA 92008 • Messenger - One Hour Q Messenger - Two Hours • Messenger-Three Hours • By Mail • Overnight-By 11:00 A.M. • Overnight - By 4:00 P.M. S By Blueprinter PD 06-21 / Dwgs 447 - 8A Magellan Aviation / Interim Grading 1 O For Your Information • For Use on Job ^ For Review and Comments • As Requested • For Approval O For Pickup S Original IE! Prints • Photocopy < J • • Quantity 4 Date Description Revised Grading and Erosion Control Plan (3 shts each) 2 1/8/07 Revised Engineer's Bond Estimate 2 1/17/07 Revised Storm Water Management Plan (SWMP) 1 1/22/07 & 1/16/07 Revised Environmental Impact Assessment Information (EIA) Form & attached letter 1 12/26/06 Copy of City of Carisbad's transmittal 1 Grading Plans, dwgs. 447-8A, with pin. Ck. comments 1 Engineer's Cost Estimate, with pin. Ck. comments 1 Water Quality Technical Report & Water Pollution Control Plan, with pin. Ck. comments Dear Engineering & Planning Departments: Attached please find the revised resubmittal documents & your original plan check comments & redlined plans. Given that we are attempting to protect the existing southern slopes from further erosion, we greatly appreciate your expedited review. If I can be assistant to you in any way, please feel free to contact me: Cell: 619-666-3803 Office: 858-793-4531 Thank You - Javad Tanbakuchi Copies Via • Mail • Overnight S Messenger Javad Tanbakuchi, PE 12780 Via Felino, Del Mar, CA 92014, C: 619-666-3803, Email:Javad.Tanbakuchi@gmail.com Page 1 of 1 f 0 0^ -4i , <;/&'$'•• CITY or- ^ CARLSBAD Utilities Department www.carisbadca.gov January 13, 2012 Robert J. Torres County of San Diego Department of Public Works 5500 Overland Ave., Suite 320 San Diego, CA 92123 McClellan-Palomar Airport Water and Sewer Plans Dear Mr. Torres: I want to thank-you for your cooperation during the preparation of the water and sewer map sheets for McClellan-Palomar Airport. We received the signed mylars (City DWG. 468-9) that you transmitted to us on December 7, 2011, and have scanned the drawings into our public record system so that they can be found by anyone doing utility research for this area. Additionally, these signed drawings satisfy the condition placed on the Airport Expansion Project by the City to provide a record drawing of all water and sewer lines located within the airport property. As noted on the drawings, a couple of easement related issues still need to be resolved to help minimize confusion over ownership and maintenance responsibilities of water and sewer facilities on the airport property. We look forward to your continued cooperation on this issue. Also, as noted on the plans, those water and sewer pipelines shown as private shall be the responsibility of the County to maintain. The City of Carlsbad and the Carlsbad Municipal Water District will only be responsible for maintenance of those sewer and water pipelines located within easements granted to the City/District. Sincerely, Terry L. Smith, PE Senior Engineer cc: Glenn Pruim, Utilities Director Glen Van Peski, Engineering Manager Utilities Department 5950 El Camino Real I Carlsbad, CA 92008 I 760-438-2722 I 760-431-1601 fax <^^> CITY OF CARLSBAD Community & Economic Development www.carisbadca.gov January 30,2012 Robert J Torres County of San Diego Department of RjblicV\forks 5500 Overland Avenue, Suite 320 San Dego, 0^92123 Dear Mr. Torres: On the attached grant deed of easement, please obtain signature(s) with notary acknowledgement from the individual(s) granted authority to sign for the GDunty of S&n Diego and return to my attention for processing. Also, submit 1^ documentation that grants said signature authority. Rease call me at (760) 602-2781 or email me at david.rick@carisbadca.aov if you have any questions. David Rck Associate Bigineer Attachment: Grant Deed of Beement with BdiibitsAand B, cc: Terry L 8nith, Sfenior Qvil Bigineer Land Development Bigineering ^35 Faraday Ave. I Carlsbad, 0^92008 I 760-602-2740 I 760-602-1052 fax • • RECORDING REQUESTED FOR THE BENEFIT OF THE CITY OF CARLSBAD WHEN RECORDED MAIL TO: City Clerk CITY OF CARLSBAD 1200 Carlsbad Village Drive Carlsbad, CA 92008 MAIL TAX EXEMPT STATEMENTS TO: EXEMPT SPACE ABOVE THIS LINE FOR RECORDER'S USE The undersigned grantor(s) declare(s): Assessor's Parcel No.: 213-020-18 Documentary transfer tax is $0.00 Project ID: PR 12-09 ( ) computed on full value of property conveyed, or Related Project ID: ( ) computed on full value less value of liens and Related Project ID: encumbrances remaining at time of sale. Project Name: McClellan-Palomar ( ) Unincorporated area: (x) City of Carlsbad, and Airport Sewer Easement GRANT DEED OF EASEMENT FOR A VALUABLE CONSIDEF^TION, receipt of which is hereby acknowledged, County of San Diego, a political subdivision of the State of California the owner of real property described herein located in the City of Carlsbad, San Diego County, California hereby GF^NTS to City of Carlsbad, a Municipal Corporation the following described real property in the City of Carlsbad, County of San Diego, State of California: an easement for PUBLIC SEWER PURPOSES over, under, upon and across said real property, RESERVING THEREFROM the following rights and privileges: 1. For the use and benefit of the Public, the right of flight for the passage of aircraft in the airspace above said easement, together with the right to cause in said airspace such noise and such incident of flight as may be inherent in the operation of aircraft, now known or hereafter used for navigation or of flight in air, using airspace taking off from, landing at or operating on McClellan-Palomar Airport. 2. The continuing and perpetual right to cut to ground level and remove trees, bushes, shrubs, or any other perennial growth or undergrowth extending into, or which in the future could infringe upon or extend into or above, the McClellan-Palomar Airport clear zone approach surface. 3. The right to require Grantee, at Grantee's sole cost and expense to remove, raze or destroy any of Grantee's facilities infringing upon or extending into said McClellan- Palomar Airport clear zone approach surface, together with the right to prohibit the future erection of buildings or other structures which would infringe upon or extend into said surface. 4. The right to require Grantee, at Grantee's sole cost and expense, to mark and light as obstructions to air navigation, any and all of Grantee's facilities that may at any time project or extend above said surface. Q:\CED\LandDev\PROJECTS\PR\PR 12\PR 12-09 McClellan Palomar Airport - Rick\PR 12-09 Grant Deed of SEWER Easement City.doc REV 4/15/10 5. The right of ingress to and egress from, and passage over the herein described easement, for the above purpose. Said easement is described in Exhibit "A", attached hereto and made a part hereof. Exhibit "B" is attached for clarity only. DATED OWNER: County of San Diego, a political subdivision of the State of California By: (Sign Here) (Print Name Here) (Title) By: (Sign Here) (Print Name Here) (Title) Q:\CED\LandDev\PROJECTS\PR\PR 12\PR 12-09 McClellan Palomar Airport - Rick\PR 12-09 Grant Deed of SEWER Easement City.doc REV 4/15/10 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California County of On Date personally appeared before me, } Here Insert Name and Title of the Officer NanTO(s) of Signer(s) Place Notary Seal Atwve who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature Signature of Notary Public OPTIONAL Though ihe information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document Description of Attached Document Title or Type of Document: Document Date: Number of Pages:, Signer(s) Other Than Named Above: CapaGity(ies) Claimed by Signer(s) Signer's Name:. • Individual • Corporate Officer — Title(s): • Partner — • Limited • General • Attorney in Fact • Trustee • Guardian or Conservator • Other: Signer Is Representing: RIGHT THUMBPRINT OF SIGNER Top of thumb here Signer's Name: • Individual • Corporate Officer — Title(s): • Partner — • Limited • General • Attorney in Fact • Trustee • Guardian or Conservator • Other: Signer Is Representing: RIGHTTHUMBPRINT OF SIGNER Top of thumb here ©2007 National Notary Association• 93S0 De Soto Ave., RO. Box 2402 • Ctiatsworth, CA 91313-2402• www.NationalNotary.otg Item #5907 Reoider.Call Toll-Ftee 1-800-876-6827 Q;\CED\LandDev\PROJECTS\PR\PR 12\PR 12-09 McClellan Palomar Airport - Rick\PR 12-09 Grant Deed of SEWER Easement City.doc REV 4/15/10 EXHIBIT A PR 12-09 LEGAL DESCRIPTION That portion of Lot "G" of the Rancho Agua Hedionda, In the County of San Diego, State of California, according to partition map thereof No. 823, filed in the Office of the County Recorder of said County, November 16, 1896, being an easement over a 20-foot strip of land, parallel to and measured at right angles to the following described centeriine: COMMENCING at the southeasteriy terminus of the centeriine of a sewer easement described in the deed to the City of Carisbad, a municipal corporation, recorded December 5, 2007, as Document No. 2007-0755945, filed in the Office of the County Recorder of San Diego County; being also a point along the northwesteriy right-of-way line of Palomar Airport Road; Thence, along the northwesteriy right-of-way line of Palomar Airport Road North 53°53'39 " East 118.68 feet to the TRUE POINT OF BEGINNING; Thence, leaving said right-of-way line North 43°22'28" East 313.45 feet; Thence, North 78°59'17" East 126.47 feet to the POINT OF TERMINUS. The sidelines of said 20-foot strip of land shall be prolonged and shortened so as to begin and terminate along the northwesterly right-of-way line of Palomar Airport Road. Cirr OF OCEANStK H!«H«!«L-~2L SITE. VICINITY MAP NOT •n SCALE POINT OF COMMENCEMENT TRUE POINT OF BEGINNING .0^ LEGEND: EASEMENT PROPERTY LINE s Sf WE/? LINE SCALE r = 100 0 50 100 SHEET 1 OF 1 PROJECT NAME McCLELLAN-PALOMAR AIRPORT SEWER EASEMENT PROJECT NUMBER PR12-09 EXHIBIT B PtOTTED BY: SCOTT EVANS PLOT DATE: 1/26/12 PATH:!): \OEVaOPM£NT TO0UEC7S\PR\PRJ2-(M.0IIG ncxco no,»,^,Ax=o DEPARTIWENT OF PUBLIC WORKS PETER DRINKWATER rnilWTV AIRDr>PT<S DIRECTOR OF AIRPORTS COUNTY AIRPORTS 1960 Joe Crosson Drive, El Cajon, CA 92020 (619) 956-4800 FAX: (619) 956-4801 Web Site: www.sdcounty.ca.gov/dpw/airports.html July 31, 2012 SFNT VIA EMAIL AND USPS Mr. Glen K. Van Peski, P.E. City Engineer City of Carisbad Community & Economic Development 1635 Faraday Avenue Carlsbad, CA 92008 Dear Mr. Van Peski: MCCLELLAN-PALOMAR AIRPORT - CSDI, LLC (PALOMAR COMMONS) - COUNTY CONTRACT 503254 - APPLICATION OF TRAFFIC IMPACT FEE CREDITS FOR FORMER OLYMPIC RESORT DEVELOPMENT TO PLANNED PALOMAR COMMONS DEVELOPMENT As stated in your letter to Lowes HIW, Inc, dated April 13, 2012, the traffic impact fees collected by the City of Carisbad for the former Olympic Resort site (future Palomar Commons site) include 3,206 ADT. These fees have been tentatively allocated between Lowes and the Palomar Commons on a 71.49%/28.51% basis, subject to confirmation from County as property owner. As property owner, the County of San Diego does hereby confirm that this is an appropriate allocation of the traffic impact fees previously collected for the Olympic Resort Hotel and Spa. Thank you for the opportunity to provide direction regarding the application of these fee credits to the future Palomar Commons development If you have any questions regarding this matter, please contact me at (619) 956-4819 or anne.baldwin(5).sdcountv.ca.qov. Very truly yours, Anne T. Baldwin Department of Public Works ATB:ab Cc: Mark Radelow, CSDI LLC (via email); Michelle Alfieri, SSOE Group (via email) Safe Communities • Sustainable Environments » Healthy FaivHies Steve Bobbett From: Sent: To: Subject: Attachments: Glen Van Peski Tuesday, July 31, 2012 9:46 AM Steve Bobbett; Kathleen Lawrence FW: TIF credits for Palomar Commons/Lowes Lowes TIF credits_001.pdf From: Baldwin, Anne rmailto:Anne.Baldwin@sdcounty.ca.gov1 Sent: Tuesday, July 31, 2012 9:28 AM To: Glen Van Peski Cc: 'Mark@sudprop.com'; Alfieri Lowinger, Michelle Subject: TIF credits for Palomar Commons/Lowes Hi Glen, By the attached letter, County of San Diego confirms the allocation of 3206 ADT traffic impact fees collected by the City of Carisbad for the former Olympic Resort site (future Palomar Commons site) between Lowes and the Paiomar Commons on a 71.49%/28.51% basis Original letter to follow via USPS. Please let me know if you have any questions regarding this matter. Anne Baldwin, Sr. Real Property Agent Dept. of Public Works, Airports County of San Diego 1960 Joe Crosson Drive El Cajon, CA 92020-1236 p. (619) 956-4819 f. (619) 956-4801 anne.baldwin©sdcountv.ca.Qov Steve Bobbett From: Mark Radelow < Mark@sudprop.com> Sent: Tuesday, July 31, 2012 10:03 AM To: Greg Lang; Steve Bobbett Cc: matt.adams@devcon-cpm.com Subject: RE: Palomar Commons - Traffic Fee Credit Distribution Traffic Fee Credit should be distributed to buildings 4,5,6 first then 2,3. Thanks Mark Radelow PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS EMAIL From: Greg Lang rmailto:qlang@>fuscoe.com] Sent: Tuesday, July 31, 2012 10:02 AM To: sbobb(a)ci.carisbad.ca.us Cc: Mark Radelow; matt.adams(a)devcon-cpm.com Subject: Palomar Commons - Traffic Fee Credit Distribution Steve, Please contact Mark Radelow directly for traffic fee credit distribution among the Sudberry portion of the development. Thank you, Greg Gregory W. Lang, P.E. Project Manager alana&fuscoe. com Follow us on Twitter: http://twitter.coiTi/FuscoeFCT FUSCOE ENGINEERING, INC full circle thinking® 6390 Greenwich Drive, Suite 170 San Diego, CA 92122 tel 858.554.1500 ext. 4066 fax 858.597.0335 mobile 760.419.6276 vwwv.fuscoe.com IRVINE . SAN DIEGO . ONTARIO . LOS ANGELES . EL CENTRO WARNING: This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. This infonnation is not to be reproduced or forwarded without permission from the sender. If you have received this e-mail in error, please notify the sender or system manager. From time to time, our spam filters eliminate or block legitimate email. If your email contains important attachments or instmctions, please ensure that we acknowledge receipt of those attachments or instructions Please consider the environment before printing this email PETER DRINKWATER DIRECTOR OF AIRPORTS DEPARTMENT OF PUBLIC WORKS COUNTY AIRPORTS I960 Joe Crosson Drive, El Cajon, CA 92020 (619) 956-4800 FAX: (619) 956-4801 Web Site: www.sdcounty.ca.gov/dpw/airports.html December 21, 2012 David Rick, Engineer City of Carlsbad 1635 Faraday Ave. Cadsbad, CA 92008 MCCLELLAN-PALOMAR AIRPORT - GRANT DEED (SEWER) EASEMENT - COUNTY PARCEL NO. 2012-0099-A; - CITY PROJECT: PR 12-09 Dear Mr. Rick: Enclosed is the executed Grant Deed of Easement covering an existing sewer line at McClellan- Palomar Airport. Thank you for getting the changes made and coordinating with on site county personnel. Please call me at (619) 956-4806 if you have any questions. Very truly yours, TIM CAULDER Senior Real Property Agent TC:tc Enclosure RECEIVED JAN 0 2 2013 LAND DEVELOPMEM T ENGINEERING Safe Communities » Sustainable Environments • Healthy Families PETER DRINKWATER DIRECTOR OF AIRPORTS May 14, 2013 DEPARTMENT OF PUBLIC WORKS COUNTY AIRPORTS I960 Joe Crosson Drive, El Cajon, CA 92020 (619) 956-4800 FAX: (619) 956-4801 Web Site: www.sdcountyairports.com Mr. Glen Van Peski, P.E. City Engineer City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 Dear Mr. Van Peski: MCCLELLAN-PALOMAR AIRPORT - COUNTY PARCEL NUMBER 2005-0176-A - REQUEST FOR QUITCLAIM OF 20-FT WIDE WATERLINE EASEMENT In conjunction with Magellan Aviation's redevelopment project at McClellan-Palomar Airport, County of San Diego issued to the Carlsbad Municipal Water District a GRANT DEED OF WATERLINE EASEMENT recorded on October 21, 2005 as File/Page No. 2005-0916162 of Official Records of San Diego County, California, and describing land therein as shown in Exhibit A (PR 04-29) attached hereto. It is County's understanding that the proposed waterlines and fire hydrants which necessitated this easement were never built and it is not anticipated that the facilities will be built in the future. As such, this easement is no longer needed and County requests the Carlsbad Municipal Water District quitclaim the easement for no fee cost return to County as the undedying fee owner of the property. If you have any questions regarding this matter, please contact me, or Anne Baldwin of my staff at (619) 956-4819. Peter Dnnk Director of Alf-ports Enclosure Cc: David Rick, Associate Engineer, City of Carlsbad, 1635 Faraday Avenue, Carlsbad, CA 92008, david.rick(a>carisbadca.qov Safe Communities • Sustainable Environments • Healthy Families EXHIBIT A PR 04-29 LEGAL DESCRIPTION PUBLIC WATER EASEMENT THAT PORTION OF McCLELLAN-PALOMAR AIRPORT, BEING A PORTION OF LOT "G" OF THE RANCHO AGUA HEDIONDA, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO THE PARTITION MAP THEREOF NO. 823 FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COLiNTY ON NOVEMBER 16,1896, DESCRIBED AS FOLLOWS: COMMENCING AT THE MOST SOUTHERLY CORNER OF McCLELLAN-PALOMAR AIRPORT, AS SHOWN ON RECORD OF SURVEY NO. 17732, BEING ALSO THE NORTHWEST CORNER OF LOT 32 OF CARLSBAD TRACT NO. 81-46, ACCORDING TO MAP THEREOF NO. 11288; THHSTCE ALONG THE SOUTHERLY LINE OF MCCLELLAN-PALOMAR AIRPORT NORTH 79''40'49" EAST, 647.15 FEET; THENCE LEAVING SAID SOUTHERLY LINE, NORTH IO"! 9' 11" WEST, 153.29 FEET to the TRUE POINT OF BEGINNING; THENCE, SOUTH 79°44*01" WEST, 545.20 FEET; THENCE NORTH 10°15'59" WEST, 289.04 FEET; THENCE SOUTH 79°44'01" WEST, 21.86 FEET; THENCE NORTH 10°15'59" WEST, 7.00 FEET; THENCE SOUTH 79"44'01" WEST, 5.00 FEET; THENCE NORTH 10''15'59" WEST, 13.00 FEET; THENCE NORTH 79«44'01" EAST,4^tFEET; THENCE NORTH 10°15'59" WEST, 16.49 FEET; THENCE NORTH 79°44'01" EAST, 140.88; THENCE NORTH 10»15^9" WEST, 76.89 FEET; THENCE NORTH 79°44'01" EAST, 12.00 FEET; THENCE SOUTH 10»15'59" EAST, 10.00 FEET; THENCE NORTH 79"44'01" EAST, 8.00 FEET; THENCE SOUTH 10°15'59" EAST, 66.89 FEET; THENCE NORTH 79"44'01" EAST, 164.25 FEET; THENCE SOUTH 10n5'59" EAST, 20.00 FEET; THENCE SOUTH 79°44*01" WEST, 305.13 FEET; THENCE SOUTH 10°15'59" EAST, 285.54 FEET; THENCE NORTH 79°44'01" EAST, 525.18 FEET; THENCE SOUTH 10°19'11" EAST, 20.00 FEET TO THE TRUE POINT OF BEGINNING. CONTAINS 25,077 SQ. FT., 0.576 ACRES, MORE OR LESS. ROBERT C. MSANDE DATE R.C.E. 25609 EXPIRATION DATE 12/31/2005 David Rick From: Helga Stover Sent: Thursday, August 13, 2009 8:17 AM To: David Rick Subject: RE: PR 06-21 AB for Magellan Aviation waterline quitclaims PR 08-19, PR 07-125 David - I didn't realize there was an AB - sorry. Please take out the first line in the fiscal impact - otherwise you may be asked to quantify those "savings" and they are quite immaterial. Just leave that whole statement out and it reads just fine© Helga From: David Rick Sent: Wednesday, August 12, 2009 2:14 PM To: Helga Stover Cc: Glen Van Peski; Aaron Beanan Subject: FW: PR 06-21 AB for Magellan Aviation watedine quitclaims PR 08-19, PR 07-125 Helga, have you had a chance to review this AB yet? From: Aaron Beanan Sent: Wednesday, July 29, 2009 8:26 AM To: Helga Stover Cc: David Rick Subject: FW: PR 06-21 AB for Magellan Aviation watedine quitclaims PR 08-19, PR 07-125 Helga, I believe this is a water one. Do you want to review it? A From: David Rick Sent: Tuesday, July 28, 2009 5:28 PM To: Ron Ball; Lisa Irvine Cc: Glen Van Peski; Aaron Beanan; Ronald Kemp Subject: PR 06-21 AB for Magellan Aviation watedine quitclaims PR 08-19, PR 07-125 Please review and comment. Thanks! ^ c I r V Of CARLSBAD David Rick Associate Engineer City of Cadsbad 1635 Faraday Av. Carlsbad, CA 92008 www.cadsbadca.gov P: 760-602-2781 City of Carisbad liffllirBSflSlBBBiE^^HflB June 10, 2008 SCIF Palomar, LLC Attn: Robert Levine 1800 Avenue of the Stars, Ste 105 Los Angeles, CA 90067 COMPLETION OF GRADING PLANCHECK PROJECT ID: PD 06-21 DWG NO.: 447-88 GR NO.: 07-49 PROJECT NAME: Magellan Aviation Hangars The Grading Plancheck process has been completed for the project noted above. The following information will assist you in completing the next steps in obtaining the required grading permit. Our records indicate your project is clear for grading permit issuance provided the following items are completed to the satisfaction of the City Engineer. If you have not already done so, please submit these items to the Engineering Development Services counter at 1635 Faraday Avenue. 1. Grading pennit application (enclosed) submitted within 12 months of the date of mylar signing (see www.carisbadca.gov/engineering for cun-ent version of forms). If application is submitted later than 12 months, an additional plancheck and fee may be required. 2. Four copies (two full size and two 11" x 17") of the approved grading plans 3. Verification of a valid Coastal Development Permit from the California Coastal Commission 4. Verification of Council approval of final map 5. Verification of the submittal of a building permit application 6. A copy of this letter Since permit fees are subject to change, you may wish to verify the permit fee amount prior to applying for your permit. After complying with the requirements listed above, you will be provided with contact information for scheduling the preconstruction meeting with a Public Works Inspector. The Inspector will give you your copy of the grading permit at the preconstruction meeting. Please do not begin construction until vou have received your permit from the Public Works Inspector. Additionally, the following items may be required during the construction of your project. Please coordinate the timing of these items with your Inspector. Doc ER-02^34 05)22/2008 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-2720 • FAX (760) 602-8562 ^ : .... v ,> I V .-,. SCIF Palomar, LLC June 10, 2008 Page 2 of 2 1. An approved haul route permit pnor to hauling any construction equipment or materials onsite or offsite 2. An approved traffic control plan and a valid right-of-way permit prior to performing any work in the public right of way (allow two weeks for approval) 3. A retaining wall permit from the Building Department As part of the Grading Plancheck process, the City Engineer signed the grading plans for the project noted above. These plans are now the property of the City of Carisbad and have been filed for permanent record with this office. You may obtain copies and other reproductions at your cost through one of several bonded reprographic firms in the area. Approval of these plans by the City of Carisbad does not authorize the applicant to violate any federal, state, or city laws, ordinances, regulations, or policies. Also, issuance of your grading permit is subject to the limitations and requirements of City ordinances, policies, and regulations; your conditions of approval, if any; and all required state and federal agency permits and approvals including, but not limited to, the California Department of Fish and Game, United States Fish and Wildlife Service, California Coastal Commission, and San Diego Regional Water Quality Control Board. Thank you for your cooperation and assistance. It has been a pleasure working with you through the plancheck process. If you have any questions, please contact me at 760-602-2781 or via email at drick@ci.carlsbad.ca.us. Respectfully, <ick Associate Engineer Enclosures: Grading Permit Application Right of Way Permit Application Package cc: Engineer of Work: Javad Tanbakuchi Project Planner: Pam Drew Inspection: Office Specialist Engineering Counter File Doc ER-02.04 05/22C008 PLANNING DEPARTMENT MEMORANDUM TO: Don FROM: Meghan SUBJECT: PD 06-21 / DWG 447-8B DATE: 05/22/2008 The attached GRADING PLANS are ready for your signature, Upon completion, please return to my desk for tracking & routing. © Thank you, Meghan "RAP Sheet" Public Works DeparTment • Engineering DevelopmenTServices Division ROUTING AND PROCESSING TRANSMITTAL - CITY PROJECT* f t do'J-\ DWG# M4"|'%o PROJECT NAME: PROJECT ENGINEER: PLANCHECKER NAME: ^ Telephone No. (760)602- JLI^I Telephone No. C^S^) SI4-I^J>^ ENGINEER OF WORK: JAy/A^ T^-h/^H 1 Telephone No. (.i*=>%J ^ - VS?I ENGINEER (firm) ^A^/^ TAAj6^*iuL» t Fax No. •^=t*^!r City Date Received \2\Uo1 3|5|o2; PC Date Due 1 1 Out to EOW •-I)l3}v)-| Distribution ieck 2"" Check 3"* Check 4th Check -Mvter Date Aooroved In Out In Out in Out In Out In Out ' Plan Checker ^\\° \^ Ur Planning 5ftrvo Ur Planning 5ftrvo 1 Eng./P&P {forFM.PM, GP, IP) (1*' plan check always) A% Fire 1 Fire • Parks • Building • Eng./Traffic (l" Imp plan always) • Eng./Design • PW/MTCE & Ops PW/Streets 1*' Imp & Grading plan check NW QUADRANT ONLY ^\>° PW/Streets 1*' Imp & Grading plan check NW QUADRANT ONLY ^\>° • SD County Health Dept./ Reclaimed Water 1 -^THER (Storms) ^onds & Agreements Completed • Date: Fees Paid • Date: Comments: /y^oy^g^ S-tW^U 5kJU^'j^^ ROUTING & PROCESSING RAP SHEET TRANSMITTAL - form field (updated 01-19-06).doc storm Water Compliance Form For a Tier 3 Construction SWPPP I am applying to the City of Carlsbad for the following type of construction permit(s): Grading Pennit Building Permit Right-of-Way Permit My project requires preparation and approval of a Tier 3 Construction Storm Water Pollution Prevention Plan (SWPPP) because my project meets one or more of the following criteria demonstrating that the project potentially poses a significant threat to storm water quality: ET My project includes clearing, grading or other disturbances to the ground resulting in soil disturt)ance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas; or, • My project is part of a phased development plan that will cumulatively result In soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas; or, • My project is located inside or within 200 feet of an environmentally sensitive area and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 3 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH CITY STANDARDS AND THE REQUIREMENTS OF THE STATE WATER RESOURCES CONTROL BOARD GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES - WATER QUALITY ORDER NO 99-08-DWQ (GENERAL CONSTRUCTION PERMIT) AND ANY AMENDMENT. REVISION OR RE-ISSUANCE THEREOF. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST SUBMIT THE CITY APPROVED TIER 3 CONSTRUCTION SWPPP TO THE SAN DIEGO REGIONAL WATER QUALITY CONTROL BOARD TOGETHER WITH A NOTICE OF INTENTION (NOI), AN APPROPRIATE FILING FEE AND OTHER REQUIRED DOCUMENTATION AND RECEIVE A STATE WASTE DISCHARGER'S IDENTIFICATION (WDID) NUMBER PRIOR TO CITY ISSUANCE OF THE ABOVE REQUESTED CONSTRUCTION PERMIT(S). I ALSO UNDERSTAND AND ACKNOWLEDGE THAT I MUST ADHERE TO, AND AT ALL TIMES, COMPLY WITH THE CITY APPROVED TIER 3 CONSTRUCTION SWPPP THROUGHTOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. Owner/Owner's Authorized Agent InformaSon and Signature Box Atidress/Lpc«4ipn; \ n i Assessor Parcel Numberis): 2,oo6 Vulom*/- (?.i{po(r r>°<»i 76o - 2-2.\ - 4-7 Ovn\eclO<me!'& Authorized Agent H9rm: pfiC^C/tf U\l/i\/t Title; 1 OwTier/oynVsAO*orized Agent Signalufe: Dale: . This Box for City Use Only City ConcaiTcncc: Yes No By: Date: Project ID: Construction SWPPP Standards and Requirements 3/24/2008 MAGELLAN AVIATION 2006 Palomar Airport Road Carisbad, CA 92011 tel (760) 438-7603 fax (760) 431-8964 magdlanaviation.aero m 08 pflflfl City of Carisbad "° Mr, David Ricl<, Project Engineer ^'^^""^EERIMQ Engineering Dept. ^^^^^Th/\£f^ j 1635 Faraday Ave. Carlsbad, CA 92008 Subject: Letter of Authorization Magellan Aviation Hangars A, B, & D - North Portion Project ID: PD 06-21 760-221-47 (North portion); 760-221-73 (South portion) Dear Mr. Rick: I, Martin Slusser, hereby grant permission to Robert Levine, Director of Magellan Aviation and General Manager of the Magellan Aviation facility at Paiomar Airport, to sign the Grading Permit and any other associated documents to obtain this permit (such as the Best Management Practices (BMPs) Maintenance Agreement) on behalf of SCIF Palomar LLC, which is managed by The Magellan Group, inc. The project consists of grading & site improvements shown on plans, Prj. ID# PD 06-21. If you require additional information, please contact me at (310) 277-8337, ext.11. Thank you for your assistance in this matter. Sincerely, Martin Slusser Chairman of the Board The Magellan Group, Inc. Manager of SCIF Palomar LLC Engineering Departonent - Development Services Request for Project Review RETURN to Terie Rowley, Senior Office Specialist (SOS), Eng Dev Svcs bv: 5/15/08 To: DBuilding Will Foss •M&O-Water Joe Adams •Eng-Design Bill Plummer DPW-Trees & Medians Mike Bliss ^Eng-P&P Scott Evans QPIanning •Eng-Traffic Bob Johnson •Recreation-Trails Liz Ketabian •Fire Greg Ryan •Streets Nick Roque •M&O-Sewer Don Wasko • Jeremy Riddle •M&O-Storm Drain Clayton Dobbs • From:David Rick , Project Engineer (PE), ext: 2781 Attached: • Improvement Plans Date: 5/9/08 K(Precise) Grading & Erosion Control Plans • Final/Parcel Map •other: Project ID: PD 06-21 DWG No.: 447-8B Plancheck No.: Mvlar Project Name: Magellan Aviation Hangars Engineer of Work (EOW): Javad Tanbakuchi EOW Ph: (858)793-4531 EOW Firm: Javad Tanbakuchi Planchecker (PCE): PBS & J INSTRUCTIONS Recipient - Please review attached plans and complete "Department Comments" section below (attach additional pages if necessary). Please return bv date above even if no comments. Eng SOS - Log date received from recipient and initial below. Forward all documents to PE. When received from PE, notify EOW (copy notification to PE and PCE) and enter date below. If comments are written on plans, forward plans to counter for EOW. Distribute form as indicated below. PE - Review comments. Initial and date below. Return to SOS. DEPARTMENT COMMENTS (see instructions above) •Comments on plans •No comments eviewer's Printed Name Initials Telephone PE: Comments reviewed ^ ^hfjbSsOS: Logged 'X"^ EOW Notified Sll'lloj' <^ic>- x-yv^.^^' Initial date initial date Distribution: Original to file, copy to PCE, copy to EOW Doc ER-99-32 11/26/2007 manner to permit and construct the first phase of our improvement plan. We feel it would be of benefit to both the City of Carlsbad and the overall Magellan Aviation development plan for all the hangar and office buildings in the improvement plan to conform to the same codes and standards. V. We moved tenants out of the structures on the site where the new buildings that are the subject our current Building Permit application are to be built, obtained a demolition permit following two Plan Check review cycles and recently proceeded with demolition of those pre-existing buildings. Both the displacement and relocation of those tenants and the demolition were based upon a reliance that our subsequent Building Permits would be issued. vi. We have made lease commitments to new tenants for the new buildings who are significant contributors to the economic health and prosperity of north San Diego County, the City of Carlsbad and Palomar Airport, and the delays that would certainly be occasioned by a new Building Permit submittal and review process would gravely jeopardize those commitments. vii. Such delays would also cause permanent financial harm to Magellan Aviation and to our tenants at Palomar Airport. viii. The Building Code section 18.14.030 "Building permit Expiration" states an applicant can request a six-month extension to a Building Permit. ix. Working with Mr. David Rick of the City of Carlsbad Engineering Department, our civil engineer, Mr. Javad Tanbankuchi, has made considerable progress in our application for a grading permit and we believe that our application for that permit is very close to completion. For the reasons cited above, SCIF Palomar, LLC, the ownership of Magellan Aviation, therefore respectfully requests relief from the expiration of the current Building Permit application in process and an extension until June 30, 2008 to complete the approval of that application. We do further understand that we must complete our grading plan application and pad certification within this timeframe in order for the Building Permit to be issued. Finally, on behalf of Magellan Aviation I would like to thank you and Mr. David Rick personally for taking the time to meet with us and for agreeing to give consideration of our request to extend our completion date until June 30, 2008, and hope you will find in favor of such an extension. If you have any questions I can be reached at 760-438- 7603. Yours sincerely. Magellan Aviation Robert Levine, Director and General Manager cc. Mr. David Rick MAGELLAN AVIATION BY HAND May 7, 2008 2006 Palomar Airport Road Carlsbad, CA 92011 tel (760) 438-7603 fax (760) 431-8964 magellanavlation.aero City of Carlsbad Building Department Attn. Michael Peterson, Development Services Manager 1635 Faraday Avenue Carlsbad, CA 92008 Phone: (760)602-2721 RE: Building Permit for Magellan Aviation, 2006 & 2016 Palomar Airport Road, Carlsbad 92011, Plan Check # PC070036 Subject: Request for Extension of Building Permit Application Completion Date Dear Mr. Peterson, Following our meeting with you last Thursday, on behalf of Magellan Aviation in this letter I am formally requesting that the City of Carlsbad consider extending the completion date of our application for a Building Permit (Plan Check # PC070036) concerning new improvements on the property listed above. The following are several of the pertinent facts about the project that we hope might be useful to you in evaluating our request for an extension i. Our original application for the referenced submittal was made on May 8, 2007 and, according to Building Code Section 18.04.035, would normally expire on May 7, 2008; however, our plan check corrections have required more time due to circumstances beyond our control. ii. Several geotechnical investigations made during the course of the application period required significant modifications to both building structure and storm drainage systems contained in our original submittal. Following the recommendations of our consultants, we modified our metal building plans and storm drain systems to accommodate these needed changes. In particular, the County Airports Division made changes to the County storm drain system requiring many of the changes to the drainage systems contained on the Magellan Leasehold referenced immediately above. The buildings for which we have applied for a Building Permit are part of a more comprehensive leasehold improvement plan, fully approved by the Airports Division of the County of San Diego Department of PubWc Works, a portion of which is already in an advanced state of construction and is proceeding under permit from the City of Carlsbad. As Section 105.3.1 of the California Building Code provides that the Building Official may issue a permit for part of a building or structure before the entire plans have been approved, we proceeded in that 111. IV. April 15, 2008 Javad Tanbakuchi, P.E. 46928 12780 Via Felino Del Mar, CA 92014 W: (858) 793-4531; C: (619) 666-3803 Javad.Tanbakuchi@gmail.com City of Carlsbad David Rick, Project Engineer Engineering Dept. 1635 Faraday Ave. Carlsbad, CA 92008 Subject: Request for Water Easement Vacation (Quitclaim) - South Portion Magellan Aviatron Hangars A, B, & D - North Portion Project ID: PD 06-21 760-221-47 (North portion); 760-221-73 (South portk>n) BECE1VEX> Dear David Rick, As previously discussed in our meeting on 8/28/07, all proposed grading & improvennents shown at Magellan Aviation are private. Given the nature of the private hangar fadlify at Magellan Aviation, access is restricted and monitored due to FAA security regulations. At our meeting, we discussed that the City of Carlsbad prefers to have the existing publk; water easement on Magellan's private leasehold vacated, given the restrbted access, the City's desire to not maintain the aging utilities, and potential future parking tot repairs. Therefore, attached please find our proposed Plat 4/12/08, illustrating the vacatnn (quitclaim) of the existing public water easement on Magellan's private leasehold. Per the City's request we have provided a separate appltoatton, fee, transmittal & associated documents Ibr ttiis easement vacatbn (quitclaim). I look foHA/ard to continuing to work with you on this project. Shoukj you require any further information or wish to discuss this, please contact me at c: 619-666-3803 or the surveyor, Fred Le Page, c: 760- 525-1975. Sincerely, Javad Tanbakuchi, P.E. 46928 Engineering Department - Development Services Request for Project Review RETURN to Terie Rowley, Senior Office Specialist (SOS), Eng Dev Svcs bv: 3/14/08 To: DBuilding •Eng-Design •Eng-P&P •Eng-Traffic •Fire •M&O-Sewer Will Foss Joe Adams Bill Plummer Scott Evans Bob Johnson Greg Ryan Don Wasko •M&O-Water •PW-Trees & Medians Mike Bliss •Planning •Recreation-Trails •streets S Liz Ketabian Nick Roque Jeremv Riddle •M&O-Storm Drain Clavton Dobbs From:David Rick •. ., Project Engineer (PE), ext: 2781 Attached: • Improvement Plans ^(Precise) Grading & Erosion Control Plans • Final/Parcel Map •other: Date: 3/5/08 .1 Project ID: PD 06-21 Project Name: Magellan Aviation Hangars DWG No.: 447-8B Plancheck No.: 4 Engineer of Work (EOW): Javad Tanbakuchi EOW Ph: (858)793-4531 EOW Firm: Javad Tanbakuchi Planchecker (PCE): PBS&J INSTRUCTIONS Recipient - Please review attached plans and complete "Department Comments" section below (attach additional pages if necessary). Please return bv date above even if no comments. Eng SOS - Log date received from recipient and initial below. Forward all documents to PE. When received from PE, notify EOW (copy notification to PE and PCE) and enter date below. If comments are written on plans, forward plans to counter for EOW. Distribute form as indicated below. PE - Review comments. Initial and date below. Return to SOS. DEPARTMENT COMMENTS (see instructions above) •Comments on plans •No comments CTLt (760) (ntfl-TI-bl 3\ Initials Telephone ll PE; Comments h Initial date Distribution: Original to file, copy to PCE, copy to EOW SOS: Logged 3>| 13 |t>^ [f^^^^jJ^^'^Q- Engineering Department - Development Service^ Request for Project Review RETURN to Terie Rowley, Senior Office Specialist (SOS), Eng Dev Svcs bv: 3/14/08 To: •Building Will Foss •M&O-Water Joe Adams •Eng-Design Bill Plummer •PW-Trees & Medians Mike Bliss Q. jEng-P&P Scott Evans •Planning 0^ •Eng-Traffic Bob Johnson •Recre#fc^-f;fai1fiq7^ Ketabian •Fire Greg Ryan •Streets Nick Rogue •M&O-Sewer Don Wasko ^ Jeremv Riddle {J^ •M&O-Storm Drain Clavton Dobbs • ^ From:David Rick Project Engi©gf^^|^j|^^pi U • Attached: • Improvement Plans Date: 3/5/08 ^(Precise) Grading & Erosion Control Plans • Final/Parcel Map •other: Project ID: PD 06-21 DWG No.: 447-8B Plancheck No.: 4_ Project Name: Magellan Aviation Hangars Engineer of Work (EOW): Javad Tanbakuchi EOW Ph: (858)793-4531 EOW Firm: Javad Tanbakuchi Planchecker (PCE): PBS&J INSTRUCTIONS Recipient - Please review attached plans and complete "Department Comments" section below (attach additional pages if necessary). Please return bv date above even if no comments. Eng SOS - Log date received from recipient and initial below. Forward all documents to PE. When received from PE, notify EOW (copy notification to PE and PCE) and enter date below. If comments are written on plans, forward plans to counter for EOW. Distribute form as indicated below. PE - Review comments. Initial and date below. Return to SOS. DEPARTMENT COMMENTS (see instructions above) •Comments on plans •No comments OK- (SudMiJTAc CCfy^Plttt - /JO CHA/^6e5 A/3£(PB/P y^^^^yyCoiT £vf^fJS c^^^^ nm6C^-^y'^ V ^Reviewer's Printed Name Initials Telephone PE: Comments reviewed P.^^. ll^k^ SOS: Logged "T^ EOW Notified 3|5|Q^ t^ir^ ^_w~^^-J- initial date initial date Distribution: Original to file, copy to PCE, copy to EOW Doc ER-99-32 11/26/2007 . I - 1^ "RAP Sheet" g| Public Works DepRnent • Engineering Developm^Pservices Division ROUTING AND PROCESSING TRANSMITTAL DWG# 4-^7-CITY PROJECT* PROJECT NAME: PROJECT ENGINEER: \^\0K Telephone No. (760) 602- ^"/^ I PLANCHECKER NAME: Telephone No. ^5^-5'/-^-to3^ ENGINEER OF WORK: J^VAf) fAhJg^U^Telephone No. <^I9-^^36P3 ENGINEER ^ n Fax No. _ , -f^ Email Address: \(X\/aa 'fOY] \oakUc\n i ^CimdCu CflfW City Date Received PC Date Due il Distribution 1'* Check 2"" Check 3"* Check 4th Check Mylar Date Approved Plan Checker. kl Out In Planning 3 Out In Out In A' 1 Out In Out 0 A^oiL' Eng./P&P (forFM,PM, GP. IP) (1*' plan check always) Fire 5i) • F»arks • Building • Eng./Traffic (1^' Imp plan always) • Eng./Design PW/MTCE & Ops PW/Streets 1^' Imp & Grading plan check NW QUADRANT ONLY • NPDES • SD County Health Dept./ Reclaimed Water OTHER( ) Bonds & Agreements Completed • Date: Fees Paid • Date: omments: ROUTING & PROCESSING RAP SHEET TRANSMITTAL - form field (updated 01-19-06) CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: 1/23/07 • • • • • • • • • SUBJECT: • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P&P PW/MTCE & Ops PW/Streets Building Other Jason Goff Greg Ryan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson 5 CL Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other Project Id: PD 06-21 DWG No.: 447-8A Project Name: Magellan Aviation Hangars Plancheck No.: 2 Please review and return comments by. Engineer of Work: Javad Tanbakuctii Planchecker: PBS & J 2/1/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuctii Project Engineer: Rick DEPARTMENT COMMENTS: If comments are written on plans, please indicate as such C^\^ ^ih for.v^ ^-^^ ' fC^Oe^Wj*- f.-U. "^^^ ^'^W^ r (Signat d2 (^>ate) Proje<Jt-£ngineer - please initialafter reviewing comments: X^jj^ • Entered [a Email/Fax Date:_ Distribution: Original lo Project Engineer, then to file; copy to plan checker; copy to Engineer of Work H \Development Services\PROJECTS\PD F1LES\PD 06\PD 06-21 Magellan Aviation Hangars - RickXCorrespondenceVRequest for Project Review, DWG 447-8A,doc 11-17-05 (02/05/2%07) Terie Rowley - Magellan Avigfen - DWG 447-8A Page 1 From: To: Date: Subject: Jason Goff Rick, David 02/05/2007 7:51 AM Magellan Aviation - DWG 447-8A Rowley, Terie CC: David, When we last spoke, I believe that you were going to check with the outside plan check consultant to see if they had receive my copy of the updated EIA Form and project description. This most recent plan check request was absent of these two previously requested items. If you'll recall, this was the heart of my comments from the last review. Please let me know as soon as possible where these items are. I will hold comments on DWG 447-8A until I have heard from you one way or another. Thank you. Jason Goff Associate Planner City of Carlsbad Planning Department 1635 Faraday Avenue Carlsbad, CA 92008 760-602-4643 jgoff@ci.carisbad.ca.us Javad Tanbakuchi, P.E. 46928 12780 Via Felino Del Mar, CA 92014 W: (858) 350-5845; C: (619) 666 -3803 Javad.Tanbakuchi@gmail.com January 31, 2008 City of Carlsbad David Rick, Project Manager Engineering Dept. 1635 Faraday Ave. Carlsbad, CA 92008 Subject: Withdraw of Project ID: PD 06-21 and Dwg. 447 - 8A Magellan Aviation Interim Grading for the South Portion 760-221-73 (South portion) Dear David Rick, This letter shall serve to confirm that SCIF Palomar LLC hereby withdraws our interim grading application, as mentioned above. We have incorporated the proposed scope of work on one comprehensive grading application Project ID: PD 06-21 and Dwg. 447 - BB. We look forward to working with you on this project. Should you require any further information or wish to discuss this, please let us know. Sincerely, Javad Tanbakuchi, P.E. 46928 Civil Engineer of Record C: (619)666 -3803 Robert Levine Magellan Aviation SCIF Palomar LLC W: (760) 804-3999 n 0^- 0~l Febmary 19,2007 Javad Tanbakuchi, P.E. 46928 12780 Via Felino Del Mar, CA 92014 W: (858) 350-5845; C: (619) 666 -3803 Javad.Tanbakuchi@gmail.com City of Carlsbad Davkj Rick, Project Engineer, Engineering Dept. 1635 Faraday Ave. Carlsbad, CA 92008 Subject: Request for Resubmittal - Project ID: PD 06-21 Magellan Aviatk)n Hangars A, B, & D - North Portion 760-221-47 (North portion) & 760-221-73 (South portkjn) Dear David Rick, As a follow-up to our mtg. on 2/14/08, we would like to respectfully request the resubmittal of Magellan Aviatk>n's proposed grading plans, without the pre-requisite of an approved County of San Diego, Schedule "P Drainage plan. Attached is the Resutmittal CheckUst, 12/27/07. P& discussed, the County is in process to prepare the necessary Storm Water Management Plans (SWMP) & Hydrology studies for the City of Carlsbad's review & approval, yet these documents are not complete, nor has it been reviewed & approved at this time. For the City to delay Magellan Aviatk>n's resubmittal until the plans are approved, wouki be detrimental to our project schedule and our responsibility to complete the constructkm per Magellan's lease hoM obligatkxis. We can assure the City that the stonn water runoff leaving the Magellan Aviatk>n site will be filter through our on-site Best Management Practices (BMPs) and that the County has agreed to pump the filter water and dispose of rt properly. Attached please find a letter from the County, 12/14/08. Dat^ Activity 3107 Grading & Improvement Plans submitted 4/07 Existing Storm Drain pipe is discovered to be plugged; Magellan installs bulkhead to seal outfknw drainage to County's storm drain system at Aircraft Rd. 5/07 Bldg. Pemnrt for Hangars E & 1 (plans include private utilities & re-pavement) 8A)7 Grading & Improvement Plans - 2"^ resubmittal 10/07 County of SD agree to pump the storm water rurKtff leaving Magellan Aviatkm, due to the Count/s project being delayed 12^)7 Grading Plans - 3 submitted (improvements are private & part of liidg. Plans) 12A)7 Plan Check Comments received 2108 Grading plans ready for 4*" submittal, except Sch. F plans We appreciate your consideratkxi of our request and kx)k fbnMard to continuing to worV with you on this project. ShoukJ you require any further information or wish to discuss this, please contact me at c: 61&*66-3803. Since! Javad Tanbakuchi Attachments: Grading & Eroston Control Plan Resubmittal Checklist- Part B, 12/27/07 Revised Grading plans, 218108 Letter from the County of SD, 4/5/07 & 2/14/08 Letterfi^m Ayers, Inc., 10/1/07 I. imail - Magellan Grading Plan - Palomar AirpQ|^ http://mail.google.con^ail/?ui=2&ik=lcl759d556&view=pt&search.. ijj^pa 1^*^ 11 Javad Tanbakuchi <javad.tanbakuchi@gmail.com> Gi Magellan Grading Plan - Palomar Airport Tecla Levy <Tievy@ci.carlsbad.ca.us> Fri, Feb 22, 2008 at 12:57 PtA To: David Rick <Drick@ci.carlsbad.ca.us> Cc: propman45@aol.com, javad.tanbakuchi@gmail.com, crsjohn@pbsj.com Hi David, This is regarding the plancheck comment from the City consultant, PBS&J, requiring Magellan Grading Plan hydrology report to include hydrology report for the downstream parking lot, Schedule F, prior to the next plan check submittal. Per our discussion last week. Rick engineering is still in the process of preparing the hydrology report for the parking lot. I do not see a reason to hold the Magellan Grading Plan Review. The parking lot does not contribute drainage to the Magellan Project, it is the Magellan Project wtiich contributes to the parking lot drainage. Therefore it is important that we expedite the review of ttie Magellan t-iydroiogy report because the data (discharge and velocity) from Magellan is needed to complete the parking lot hydrology report. I got a call from Magellan developer who is eager to proceed. Since you were not available this week, I had instructed tiim to submit ttie next submittal package for City review. I have copy of Sctiedule F plan if PBS&J needs it. Thanks, Tecla Levy, PE Associate Engineer of I 3/4/2008 2:53 PV JOHN L. SNYDER DIRECTOR Count? of Biego DEPARTMENT OF PUBLIC WORKS S5SS OVERLAND AVE, SUITE 2188 SAN OIEGO, CALIFORNIA 92123-1295 (858) 694-2212 FAX: (858) 268-0461 Web Site: sdcdpw.org February 14, 2008 Mr. Javad Tanbakuchi, PE 12780 Via Felino Del Mar, CA 92014 Dear Mr. Tanbakuchi, MCCLELLAN-PALOMAR AIRPORT TERMINAL REDEVELOPMENT PROJECT, MAGELLAN AVIATION DRAINAGE This is to confinn our conversation relative to the Magellan Aviation proposed storm drainage system. The County of San Diego has not submitted the design for the storm drainage, for the parking lots, to the City of Carlsbad. Therefore, there are no city approved storm sewer design plans. Once the plans are submitted and approved, the county will construct a storm drainage system to drain the parking lots and Aircraft Road. The storm sewer pipe, which you are designing from the Magellan Aviation facility to Aircraft Road, will be accommodated by the county's storm sewer system. If you have any questions regarding this project, please call me (858) 694-2635. Sincerely, ^^^^^^ Jgs^^iC^^ Antonio L. Dos Santos, PE Senior Civil Engineer Department of Public Works Attadiments AD:ad cc: Michael Khoury-Antonio Dos Santos Kids • The Environment * Safe and Uvci)le Communities Count? of ©lep DEPARTMENT OF PUBLIC WORKS Peter Ortnkwater County Aitports AIRPORTS DIRECTOR I960 Joe Crosson Drive, El Cajon, CA 92020 (619) 9S6-4800 FAX: (619) 9S6-4801 Web Site: sdcdpw.org April 5, 2007 Robert Levine, Director Magellan Aviation 2006 Palomar Airport Road Carisbad, CA 92011 MAGELLAN STORM WATER DISCHARGE PIPE Mr. Levine: In regards to the blocked storm drain located southeast of the Magellan leasehold, your Project Engineer and myself have worked out a solution we believe makes the most sense. As you know, County Airports plans to construct an additional stonn drain system along the cui-de-sac road east of your leasehold. This project will commence in the near future and will be coordinated with the construction of the lower parking lots. This new system will be used to discharge storm water from both the Jet Source and the Ma^llan leaseholds. We have determined that the blocked discharge end of the pipe ia approximately 20 feet below the surface. Relative to most storm drain systems, this is an extremely deep discharge point. Unblocking this pipe and discharging it to its previous discharge point would be cost prohibitive since the proposed drainage system will intercept the blocked pipe (before the blockage). We therefore recommend that we solve the problem with the planned cul-de-sac road drainage project, Magellan should construct their drainage system to tie in to the proposed County's cul- de-sac road drainage project. If Magellan completes its drainage system before the County completes the cul-de-sac road drainage project, Magellan will keep this drainage system sealed until the County conpfetes the tie-in to the Ma^Han system. Kids • Ttie Enyirorment • Safe and Livable Communities •ff - Robert Levine Page 2 April 5,2007 Until these drainage systems are complete and functional, we ask that Magellan continue to utilize their Best Management Practices (BMPs) to assure only clean/clear stonn waters c^harge from the leasehold. If you have any questions, please call me at (619) 956-4825, Sincerely, ERIC NELSON Airport Engineer cc: Peter Drinkwater (S119); Willie Vasquez (N137); Olivier Brackett (N137) AYERS, INC. October 1,2007 McClellan Palomar Airport Mr. Willie Vasquez 2192 Palomar Airport Road Carlsbad, CA 92011 Dear Mr. Vasquez: 1 would like to take this opportunity to elaborate on our telephone conversation regarding storm water drainage from Magellan's leasehold. It is mutually understood that the County will assume the responsibility for drainage of the current storm water drain facility from the Magellan leasehold. The reason for ttiis action is the delay in hooking up the major drain line to the county system. We recognize the necessity for delaying this important connection and will work closely with the county to maintain the system in compliance with all state, county, and city regulations. We look forward to the final hookup of this important drain line. If I can be of fiirther assistance in this matter, please do not hesitate to contact me. Sincerely, Leiand C. Ayers Consultant for Magellan Aviation CC: Robert Levine Sandy Walker Dave Sapper Steve Horine 2006 Palomar Airport Road - Carlsbad, California 92011 Telephone (760) 431-7600 • Facsimile (760) 431-2848 j) 7 Engineering Department - Dev^pment Services Request for Project Review RETURN to Terie Rowley, Senior Office Specialist (SOS), Eng Dev Svcs bv: 12/31/07 Will Foss Bill Plummer Scott Evans Bob Johnson To: DBuilding O Eng-Design lElEng-P&P •Eng-Traffic •Fire •M&O-Sewer •M&O-Storm Drain Clavton Dobbs From:David Rick Joe Adams Greg Ryan Don Wasko •M&O-Water •PW-Trees & Medians Mike Bliss •Planning •Recreation-Trails Liz Ketabian •streets • • Nick Rogue ., Project Engineer (PE), ext: 2781 Q. 08 J^CEIVED^ DEC C 2037 ^ Attached: • Improvement Plans ^(Precise) Grading & Erosion Control Plans • Final/Parcel Map •other: Date: 12/19/07 ENGINEER.'NG ||> DEPARTMENT Project ID: PD 06-21 Project Name: Magellan Aviation Hangars DWG No.: 447-8B Plancheck No.: In response to PC 3 Engineer of Work (EOW): Javad Tanbakuchi EOW Ph: (858)793-4531 EOW Firm: Javad Tanbakuchi Planchecker (PCE): PBS&J INSTRUCTIONS Recipient - Please review attached plans and complete "Department Comments" section below (attach additional pages if necessary). Please return by date above even if no comments. Eng SOS - Log date received from recipient and initial below. Forward all documents to PE. When received from PE, notify EOW (copy notification to PE and PCE) and enter date below. If comments are written on plans, forward plans to counter for EOW. Distribute form as indicated below. PE - Review comments. Initial and date below. Return to SOS. DEPARTMENT COMMENTS (see instmctions above) •Comments on plans •No comments eviewer's Printed Name Initials (760) /^^~^760 Telephone 'Dat( PE: Comments reviewed 0€ ^ izkf>l>>l SOS: Logged EOW Notified Distribution: Original to file, copy to PCE, copy to EOW 1^1 Doc ER-99-32 11/26/2007 Engineering Department - Development Services Request for Project Review RETURN to Terie Rowley, Senior Office Specialist (SOS), Eng Dev Svcs bv: 12/18/07 To: •Building Will Foss •M&O-Water Joe Adams •Eng-Design Bill Plummer •PW-Trees & Medians Mike Bliss A ^Eng-P&P Scott Evans QPIanning "^J •Eng-Traffic Bob Johnson •Recreation-Trails Liz Ketabian OQ •Fire Greg Ryan •Streets Nick Rogue •M&O-Sewer Don Wasko • •M&O-Storm Drain Clayton Dobbs • \^ Z From:David Rick , Project Engineer (PE), ext: 2781 Attached: • Improvement Plans Date: 12/7/07 ^(Precise) Grading & Erosion Control Plans • Final/Parcel Map •other: Project ID: PD 06-21 DWG No.: 447-8B Plancheck No.: J_ Project Name: Magellan Aviation Hangars Engineer of Work (EOWl: Javad Tanbakuchi EOW Ph: (858)793-4531 EOW Firm: Javad Tanbakuchi Planchecker (PCE): PBS&J INSTRUCTIONS Recipient - Please review attached plans and complete "Department Comments" section below (attach additional pages if necessary). Please return bv date above even if no comments. Eng SOS - Log date received from recipient and initial below. Forward all documents to PE. When received from PE, notify EOW (copy notification to PE and PCE) and enter date below. If comments are written on plans, fonward plans to counter for EOW. Distribute form as indicated below. PE - Review comments. Initial and date below. Return to SOS. DEPARTMENT COMMENTS (see instructions above) •Comments on plans •No comments ^ /I/O mmL. 5U6M/mL m/^\A(^. ^^^^'^C/JT^ jE\4^S. (760) (bOZ-Z?60 —• Reviewer's Printed Name Initials Telephone PE: Comments reviewed 0^(^ AlV"^ SOS: Logged • EOW Notified UIIB/^T Initial date initial date Distribution: Original to file, copy to PCE, copy to EOW Doc ER-99-32 11/26/2007 4^.-, Javad Tanbakuchi, P.E. 46928 12780 Via Felino Del Mar, CA 92014 W: (858) 793-4531; C: (619) 666 -3803 Javad.Tanbakuchi(ggmail.com December 6,2007 RECEIVED City of Carlsbad 0 6 2007 David Rick, Project Engineer Engineering Dept. ENGINEERING 1635 Faraday Ave. DEPARTMENT Carlsbad, CA 92008 Subject: Request for Water Easement Vacation (Quitclaim) - South Portion IVlagellan Aviation Hangars A, B, & D - North Portion Project ID: PD 06-21 760-221-47 (North portion); 760-221-73 (South portion) Dear David Rick, As previously discussed in our meeting on 8/28/07, all proposed grading & improvements shown at Magellan Aviation are private. Given the nature of the private hangar facility at Magellan Aviation, access is restricted and monitored due to FAA security regulations. At our meeting, we discussed that the City of Carlsbad prefers to have the existing public water easement on Magellan's private leasehold vacated, given the restricted access, the City's desire to not maintain the aging utilities, and potential future parking lot repairs. Therefore, attached please find our proposed Plat, 11/30/07, illustrating the vacation (quitclaim) of the existing public water easement on Magellan's private leasehold. At our meeting, we also discussed the potential need to dedicate a new water easement across the public main (within the private Aircraft Road) up to Magellan leasehold. Upon further review of the Title Report, 5/1/07, item #11: Grant Deed of Water Pipeline Easement, already exists (attached herein). Therefore, we have not included a new water easement dedication. I look fonward to continuing to work with you on this project. Should you require any further information or wish to discuss this, please contact me at c: 619-666-3803 or the surveyor, Fred Le Page, c: 760- 525-1975. Sincerely, Javad Tanbakuchi, P.E. 46928 Engineering Department - Development Servii^ Re<pest fw Project Revlwf RETURN to Terie Rowley, SOS, Eng Dev Svcs bv: 8/23/07 Scott Evans Greg Ryan Mike Bliss Will Foss To: •Planning •Eng/P&P lElFire •Parks •Building •Eng/Traffic •Eng/Design Bill Plummer lElPW/M&O Joe Adams •PW/Streets Nick Roaue •ottier From: David Rick Bob Johnson Project Engineer (PE), Ext: 2781 Date: 8/14/07 Attached: ^ Improvement Plans •(Precise) Grading & Erosion Control Plans • Final/Parcel Map •other: UJ oc iT Project ID: PD 06-21 Project Name: Magellan Aviation Hanger DWG No.: 447-8 Plancheck No.: 2 Engineer of Work (EOW): Javad Tanbakuchi EOW Ph: 858-793-4531 EOW Firm: Javad Tanbakuchi Planchecker (PCEV. PBS&J INSTRUCTIONS Recipient - Please review attached plans. Comment below (attach additional page(s) if necessary) or comment on plans. If applicable, check "Comments on plans" or "No comments" below. Sign and date below. Please return bv date above even if no comments. Eng SOS - Log date received from recipient and initial below. Fonward all documents to PE. When received from PE, notify EOW (copy notification to PE and PCE) and enter date below. If comments are written on plans, fon/vard plans to counter for EOW. Distribute form as indicated below. PE - Review comments. Initial and date below. Return to SOS. DEPARTMENT COMMENTS (see instructions above) •Comments on plans •No comments Signature PE: Comments reviewed Initial date Distribution:Original to file, copy to PCE, copy to EOW SOS: Logged. initial Date EOW Notified: S|*-»jo'^ date Rev 07/19/2007 CARLSBAD FIRE DEPARTMENT Fire Prevention Division PROJECT NAME: Date: Project number: Staff Planner: Land Use Review Report Magellan Aviation Hangers 08/21/07 PD 06-21 / DWG: 447-8)( Engineer: D. Rick Proiect conditions: (Note: The following identifies specific conditions necessary to achieve Fire Department approval.) Fire Department has reviewed this Improvement Plan and has no comments or conditions. GR Engineering Ctepartnwnt - Devetopment Services Request for Project Fteview RETURN to Terie Rowley, SOS, Eng Dev Svcs bv: 8/23/07 To: Scott Evans Greg Ryan Mike Bliss •Planning •Eng/P&P lElFire •Parks •Building •Eng/Traffic •Eng/Design Bill Plummer •PW/M&O Joe Adams F rom: David Rick Will Foss Bob Johinson •PW/Streets Nick Rogue •ottier Project Engineer (PE), Ext: 2781 Date: 8/14/07 Attached: • Improvement Plans ^(Precise) Grading & Erosion Control Plans • Final/Parcel Map •ottier: UJ LL Project ID: PD 06-21 Project Name: Magellan Aviation Hanger DWG No.: 447-8B Plancheck No.: 2 Engineer of Work (EOW): Javad Tanbakuchi EOW Ph: 858-793^531 EOW Firm: Javad Tanbakuctii Planchecker (PCE>: PBS&J INSTRUCTIONS Recipient - Please review attached plans. Comment below (attach additional page(s) if necessary) or comment on plans. If applicable, check "Comments on plans" or "No comments" below. Sign and date below. Please return bv date above even if no comments. Eng SOS - Log date received from recipient and initial below. Forward all documents to PE. When received from PE, notify EOW (copy notification to PE and PCE) and enter date below. If comments are written on plans, fonward plans to counter for EOW. Distribute form as indicated below. PE - Review comments. Initial and date below. Return to SOS. DEPARTMENT COMMENTS (see instructions above) •Comments on plans •No comments Signature PE: Comments reviewed Tnitial SOS: Logged Date EOW Notified: Distribution: Original to file, copy to PCE, copy to EOW initial Rev 07/19/2007 CARLSBAD FIRE DEPARTMENT Fire Prevention Division PROJECT NAME: Date: Project number: Staff Planner: Land Use Review Report Magellan Aviation Hangers 08/21/07 PD 06-21/DWG: 447-8^ Engineer: D. Rick Proiect conditions: (Note: The following identifies specific conditions necessary to achieve Fire Department approval.) Fire Department lias reviewed this Improvement Plan and has no comments or conditions. GR CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: 3/14/07 • • • • • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P&P PW/MTCE & Ops PW/Streets Building Housing & Redev. Other Jason Goff Greg Ryan Mike Bliss Bob Johnson Bill Plummer UJ DC li- Scott Evans Joe Adams Nick Roque Mike Peterson SUBJECT: • • • Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other Project Id: PD 06-21 DWG No.: 447-88 Project Name: IVlagellan Aviation Hanger Plancheck No.: 1 Please review and return comments by Engineer of Work: Javad Tanbakuchi Planchecker: PBS & J 4/2/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuchi DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such Project Engineer: Rick (^Mgnaturej ^<KP^IQ) . Project Engineer - please initial after reviewing comments: 't Entered [Qx^maiKFax Date:_n_5i^^ Distribution: Original to Project Engineer, then to file; copy to plan checker; copy to Engineer of Work H:\Development Services\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - RicWConrespondenceVRequest for Project Review, DWG 447.8B.doc 11-17<I5 CARLSBAD FIRE DEPARTMENT Fire Protection Services PROJECT REVIEW REPORT PROJECT NAME: Date: Project number: Staff Planner: Magellan Aviation Hanger 04/03/07 PD 06-21/DWG: 447-8 Engineer: D. Rick Initial review: (Note: This report identifies fire protection issues associated with the project, and/or prescribes specific corrections or information needed to achieve Fire Department approval.) Fire Department has reviewed this project as requested and would comments that based on the proposed use and size of this building, that the water service main proposed may be undersized. It is suggested that the applicant consult with a fire protection engineer or systems designer to make this determination. Fire department review has identifled this proposed building as a "Extra Hazard- Group 2" use, and this information should be passed on to the fire protection consultant. GR CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: 3/14/07 • • • • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P&P PW/MTCE & Ops PW/Streets Building Housing & Redev. Other Greg Rvan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson LE SUBJECT: ^ Improvement Plans I I (Precise) Grading (& Erosion Control) Plans I I Final / Parcel Map • Other Project Id: PD 06-21 DWG No.: 447-8 Project Name: Magellan Aviation Hanger Plancheck No.: 1 Please review and return comments by 4/2/07 to Terie Rowley who will route to: Engineer of Work: Javad Tanbakuctii Contact Name: Javad Tanbakuchi Planchecker: PBS & J Project Engineer: Rick DEPARTMENT COMMENTS: If comments are written on plans, please indicate as such (Signature) Project Engineer - please initial after reviewing comments: Entered Distribution: Original to Project Engineer, then to file; copy to plan checker; copy i HADevelopment Services\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - Rick\Correspondence\Request for Project Review, DWG 447.8.doc 11-17<I5 (Date) . , Fax Date:_T\SI^^ neer of Work CARLSBAD FIRE DEPARTMENT Fire Protection Services PROJECT REVIEW REPORT PROJECT NAME: Date: Project number: Staff Planner: Magellan Aviation Hanger 04/03/07 PD 06-21 / DWG: 447-8 Engineer: D. Rick Initial review: (Note: This report identifies fire protection issues associated with the project, and/or prescribes specific corrections or information needed to achieve Fire Department approval.) Fire Department has reviewed this project as requested and would comments that based on the proposed use and size of this building, that the water service main proposed may be undersized. It is suggested that the applicant consult with a fire protection engineer or systems designer to make this determination. Fire department review has identified this proposed building as a "Extra Hazard- Group 2" use, and this information should be passed on to the fire protection consultant. GR DATE: TO: CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence 3/14/07 • • • • • • • Plaiming Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Housing & Redev. Other PLANNING DEPT TRACKING DESK REC'D: ny^K/o^ Greg Ryan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson SUBJECT: • • • Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other Project Id: PD 06-21 DWG No.: 447-88 Project Name: Magellan Aviation Hanger Plancheck No.: 1 Please review and return comments by Engineer of Work: Javad Tanbakuchi Planchecker: PBS & J 4/2/07 DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such to Terie Rowley who will route to: Contact Name: Javad Tanbakuchi Project Engineer: Rick (Signature) Project Engineer - please initial after reviewing comments: ' Entered Distribution: Original to Project Engineer, then to file; copy to plan checker; copy ti y ' (Date) Q/^Efnajfl/Fax Date; ^ lg^><'0^ fineer of Work HADevelopment Services\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - Rick\Correspondence\Request for Project Review, DWG 447.8B.doc 11-17.05 CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: 3/14/07 • • • • • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Housing & Redev. Other Jason Goff Greg Rvan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson CO H LU UJ H SUBJECT: • • • Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other Project Id: PD 06-21 DWG No.: 447-8B Project Name: Magellan Aviation Hanger Plancheck No.: 1 Please review and return comments by Engineer of Work: Javad Tanbakuctii Planchecker: PBS & J 4/2/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuchi Project Engineer: Rick DEPARTMENT COMMENTS: If comments are written on plans, please indicate as such AJ>o CoMotejiyTS - srfieers (Signatiie) (Date) ' Project Engineer - please initial after reviewing comments: Entered IQ^iEifiaWFax Date: o (-^t \ <=> Distribution: Original to Project Engineer, then to file; copy to plan checker; copy t(>£agfneer of Work HADevelopment Services\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - Rick\Correspondence\Request for Project Review, DWG 447-8B.doc 11-17-05 _ . / CITY OF CARLSBAD ^^rlJ n^W ENGINEERING - DEVELOPMENT SERVICES DIVISION'^^^'^''^^ "^^•y REQUEST FOR PROJECT REVIEW REC'D: oV/v/o? ^ Inter-Office Correspondence DATE: 3/14/07 TO: lEI Planning • Fire • Parks I I Eng/Traffic Q Eng/Design • Eng/P & P • PW/MTCE & Ops • PW/Streets I I Building I I Housing & Redev. • Other Greg Ryan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson SUBJECT: • Improvement Plans I I (Precise) Grading (& Erosion Control) Plans O Final / Parcel Map M Other EIA Form Project Id: PD 06-21 DWG No.: 447-8 Project Name: Magellan Aviation Hanger Plancheck No. Please review and return comments by. Engineer of Work: Javad Tanbakuchi Planchecker: PBS & J 4/2/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuchi Project Engineer: Rick DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such (Signature) ^ >X-s(Date) , Project Engineer - please initial after reviewing comments:^Pt Entered Email/Fax Date: J Distribution: Original to Project Engineer, then to file; copy to plan checker; copy to\ iheer of Work HADevelopment Services\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - Rick\Correspondence\Request for Project Review, DWG 447-8.doc 11-17-05 CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: 3/14/07 • • • • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Housing & Redev. Other Greg Ryan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson (0 lil lii K H CO SUBJECT: |E1 Improvement Plans n (Precise) Grading (& Erosion Control) Plans I I Final / Parcel Map • Other Project Id: PD 06-21 Project Name: Magellan Aviation Hanger DWG No.: 447-8 Plancheck No.: 1 Please review and return comments by Engineer of Work: Javad Tanbakuctii Planchecker: PBS & J 4/2/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuchi Project Engineer: Rick DEPARTMENT COMMENTS: If comments are written on plans, please indicate as such /V6 dotnM£*^rS - STZeCTS (Signature) 3>- is-'Cr? Project Engineer - please initial after reviewing comments: LjyT'Entered Distribution: Original to Project Engineer, then to file; copy to pta\(checker; copy (Date) , il/FaxDatef^Ll-l' meer of Work HADevelopment Services\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - Rick\Correspondence\Request for Project Review, DWG 447-8.doc 11-17-05 DATE: TO: CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence 3/14/07 • • • • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Housing & Redev. Other Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson CC m 5 SUBJECT: |E1 Improvement Plans I I (Precise) Grading (& Erosion Control) Plans I I Final / Parcel Map • Other Project Id: PD 06-21 DWG No.: 447-8 Project Name: Magellan Aviation Hanger Plancheck No.: 1 Please review and return comments by Engineer of Work: Javad Tanbakuchi Planchecker: PBS & J 4/2/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuchi DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such Project Engineer: Rick (Signatur^) / [oject Engineer - please initial after reviewing comments: yt) y (Date) , Entered Q^^majl/Fax Date: 3 |c»^^'Q ") istribution: Original to Project Engineer, then to file; copy to^lan checker; copy to engineer of Work HADevelopment Services\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - Rick\Correspondence\Request for Project Review, DWG 447-8.doc 11-17-05 r March 27, 2007 To; Terie Rowley From; Joe Adams, CMWD Re; Plan check Magellan Aviation Hanger In review of these plans I wish to bring to your attention that the majority of these up-grades are to the fire system behind the meter and would require Fire Dept. to Inspect. However, the area that we (CMWD) would like to address is to that fire hydrant that is located by an existing hanger behind their fence on private property. (See sheet #4) I would like to see it plumbed into their fire system that's behind their back flow device. Should you require further assistance to this matter please call. Ext.7135 Thanks, DATE: TO: CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW tie, Inter-Office Correspondence 3/14/07 • • • • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Housing & Redev. Other Greg Rvan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson O a: SUBJECT: |EI Improvement Plans I I (Precise) Grading (& Erosion Control) Plans Q Final / Parcel Map • Other Project Id: PD 06-21 DWG No.: 447-8 Project Name: Magellan Aviation Hanger Plancheck No.: 1 Please review and return comments by Engineer of Work: Javad Tanbakuchi Planchecker: PBS & J 4/2/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuchi DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such Project Engineer: Rick ProJeCT Engineer - please initial after reviewing comments: '^f"* i Entered Distribution: Original to Project Engineer, then to file; copy to plan checker; copy DaterS_(_5^-7jo 9 fWork HADevelopment Sereices\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - Rick\Correspondence\Request for Project Review, DWG 447-8.doc 11-17-05 CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: 3/14/07 • • • • • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P&P PW/MTCE & Ops PW/Streets Building Housing & Redev. Other Jason Goff Greg Rvan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Q. 0. O Mike Peterson SUBJECT: • • • Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other Project Id: PD 06-21 DWG No.: 447-8B Project Name: Magellan Aviation Hanger Plancheck No.: 1 Please review and return comments by Engineer of Work: Javad Tanbakuchi Planchecker: PBS & J 4/2/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuctii Project Engineer: Rick DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such Entered Q^mai])Tax Date:'^^ '^^oH (Signature) Project Engineer - please initial after reviewing comments: Distribution: Original to Project Engineer, then to file; copy to plan checker; copy to Engmeer of Work HADevelopment Servioes\PROJECTS\PD FILESVPD 06\PD 06-21 Magellan Aviation Hangars - Rick^CorrespondenceVRequest for Project Review, DWG 447-86.doc CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: 3/14/07 • • • • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Housing & Redev. Other Greg Rvan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson 0. 08 Q. c5 z UJ SUBJECT: |E1 Improvement Plans I I (Precise) Grading (& Erosion Control) Plans I I Final / Parcel Map • Other Project Id: PD 06-21 DWG No.: 447-8 Project Name: Magellan Aviation Hanger Plancheck No.: 1 Please review and return comments by Engineer of Work: Javad Tanbakuchi Planchecker: PBS & J 4/2/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuchi Project Engineer: Rick DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such (Signature) (Date) , axDate:d^ ''^''^1 Project Engineer - please initial after reviewing comments: Q Entered mal Distribution: Original to Project Engineer, then to file; copy to plan checker; copy to Engineer of Work HADevelopment Services\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - Rick\Correspondence\Request for Project Review, DWG 447-8 doc 11-17-05 Looking West. Area of proposed grading. Looking West Southern Slope Erosion of southem slope. V-Ditch at midsection of the slope (shown at bottom of picture). Southem slope. V-Ditch at midpoint of slope. CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: 1/23/07 • • • • • • • • • SUBJECT: • • • Plaiming Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Other Jason Goff Greg Rvan Mike Bliss Bob Johnson Bill Plummer Scott Evans Joe Adams Nick Roque Mike Peterson < a Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other Project Id: PD 06-21 DWG No.: 447-8A Project Name: Magellan Aviation Hangars Plancheck No. Please review and return comments by. Engineer of Work: Javad Tanbakuchi Planchecker: PBS & J 2/1/07 to Terie Rowley who will route to: Contact Name: Javad Tanbakuchi Project Engineer: Rick DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such c^^li.c." "T-^V 41^ e/Ar ^r.^ ^'vU -.I-., /^^-^e^txJe.- U "~rWX W : (Dal ^ ^ y^.^..^^.^, (Date) . Projedt^^ngineer - please initial after reviewing comments: Ljip . Entered 0^ /EmSi^ax Date: cy (( 3l'*g>'^ (Signamn ease initial i Distribution: Original to Project Engineer, then to file; copy to plan checker; copy to^'^Engifwer of Work HADevelopment Services\PROJECTS\PD FILES\PD 06\PD 06-21 Magellan Aviation Hangars - Rick\CoiTespondence\Request for Project Review, DWG 447-8A.doc 11-17-05 CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: • • • • • • SUBJECT: • • • 11/30/06 Planning Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Other Greg Rvan Mike Bliss Bob Johnson Bill Plummer Josh Nimetz Kurt Musser Nick Roque Mike Peterson Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other Project Id: PD 06-21 DWG No.: 447-8A Project Name: Magellan Aviation Hangars ts 3 Plancheck No.: 1 Please review and return comments by 12/14/06 to Linda Ontiveros who will route to: Engineer of Work: Javad Tanbakuchi Contact Name: Javad Tanbakuchi Planchecker: PBS&J Project Engineer: Rick DEPARTMENT COMMENTS: If comments are written on plans, please indicate as such ( P^ect Engineer - please distribution: Original to reviewing comments Entered ineer, then to file; copy to plan checker; copy to Engineer of Work H:\Development Services\PROJECTS\MS FILES\MS 04\MS 04-05 LBC Project - Wickham\A(iministrative Documents\REQUEST FOR PROJECT REVIEW - INTEROFFICE TRANSMITTAL (ms0405) doc 11-17-05 a -ff —5 Memorandum TO: David Rick, Project Engineer FROM: Jason Goff, Associate Planner DATE: December 18, 2006 RE: Magellan Aviation Hangers - DWG 447-8A (Precise Grading/Erosion Plans) Planning Department has completed their review of the above-referenced Plan Check. Please review the following corrections and revise accordingly. The project description on the EIA form discusses a proposed 160,000 square foot hanger/office building, the limits for which are not shown on these plans. In speaking with the applicant, it was explained to me that the new hanger/office building is not a part of this grading proposal, but was put there by mistake, and if fact, grading is being requested to divert drainage away from the southerly slope, where erosion is beginning to occur. Please have the applicant provide a new EIA form which more accurately describes the limits of work. A separate project description should be provided in addition to the EIA Form to more accurately describe the limits of this proposal. If in fact the applicant is proposing a new hanger and office building in this location, then additional permits are necessary. CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: TO: 11/30/06 • • • • • • SUBJECT: • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P «fe P PW/MTCE & Ops PW/Streets Building Other Greg Ryan Mike Bliss Bob Johnson Bill Plummer Josh Nimetz Kurt Musser Nick Roque Mike Peterson Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other Project Id: PD 06-21 DWG No.: 447-8A Project Name: Magellan Aviation Hangars CD 5 a Plancheck No.: 1 Please review and return comments by 12/14/06 to Linda Ontiveros who will route to: Engineer of Work: Javad Tanbakuchi Contact Name: Javad Tanbakuchi Planchecker: PBS&J Project Engineer: Rick DEPARTMENT COMMENTS: If comments are written on plans, please indicate as such Entered distribution: Original to PrJie(ft Engineer, then to file; copy to plan checker; copy to Engineer of Work HADeveloptnent Services\PROJECTS\MS FILES\MS 04\MS 04-05 LBC Project - Wickham\Administrative DocumentsKREQUEST FOR PROJECT REVIEW - INTEROFFICE TRANSMITTAL (ms0405) doc 11 -17-05 Memorandum TO: David Rick, Project Engineer FROM: Jason Goff, Associate Planner DATE: December 18, 2006 RE: Magellan Aviation Hangers - DWG 447-8A (Precise Grading/Erosion Plans) Planning Department has completed ttieir review of the above-referenced Plan Chieck. Please review thie following corrections and revise accordingly. The project description on ttie EIA form discusses a proposed 160,000 square foot tianger/office building, thie limits for wtiich are not shown on these plans. In speaking with the applicant, it was explained to me that the new hanger/office building is not a part of this grading proposal, but was put there by mistake, and if fact, grading is being requested to divert drainage away from the southerly slope, where erosion is beginning to occur. Please have the applicant provide a new EIA form which more accurately describes the limits of work. A separate project description should be provided in addition to the EIA Form to more accurately describe the limits of this proposal. If in fact the applicant is proposing a new hanger and office building in this location, then additional permits are necessary. CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: 11/30/06 TO: lEl • • • • • • SUBJECT: • • • Plaiming Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Other Greg Ryan Mike Bliss Bob Johnson Bill Plummer Josh Nimetz Kurt Musser Nick Roque Mike Peterson Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other I- lU UJ tr CO Project Id: PD 06-21 DWG No.: 447-8A Project Name: Magellan Aviation Hangars Plancheck No.: 1 Please review and return comments by 12/14/06 to Linda Ontiveros who will route to: Engineer of Work: Javad Tanbakuchi Contact Name: Javad Tanbakuchi Planchecker: PBS&J Project Engineer: Rick DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such 46 C h> (Signature) Project Engineer - please initial after reviewing comments: Entered Distribution: Original to Project Engineer, then to file; copy to plan checker; coj ate) "ax Date: ieer of Work H:\Development Services\PROJECTS\MS FILES\MS 04\MS 04-05 LBC Project - Wickham\Administrative Documents\REQUEST FOR PROJECT REVIEW - INTEROFFICE TRANSMITTAL (ms0405),doc 11-17-05 /? A ^ CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: 11/30/06 TO: lEl • • • • • • SUBJECT: • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Other Greg Rvan Mike Bliss Bob Johnson Bill Plummer Josh Nimetz Kurt Musser Nick Roque Mike Peterson Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other CL c5 Ul Project Id: PD 06-21 DWG No.: 447-8A Project Name: Magellan Aviation Hangars Plancheck No.: 1 Please review and return comments by 12/14/06 to Linda Ontiveros who will route to: Engineer of Work: Javad Tanbakuchi Planchecker: PBS&J Contact Name: Javad Tanbakuchi Project Engineer: Rick DEPARTMENT COMMENTS: If comments are written on plans, please indicate as such (Signature) " /H?-» ^/-^Date) Project Engineer - please Initial after reviewing comments: Entered [3 /Email/I^x Date: Vc^l^ofo \s Distribution: Original to Project Engineer, then to file; copy to plan checker; copy ts^jigine'er of Work H:\Development Sen/icesNPROJECTSVMS FILES\MS 04WIS 04-05 LBC Project - Wickham\Administrative Doaiments\REQUEST FOR PROJECT REVIEW - INTEROFFICE TRANSMITTAL (ms0405) doc 11-17-05 n i fTiO 3 /C CITY OF CARLSBAD ENGINEERING - DEVELOPMENT SERVICES DIVISION REQUEST FOR PROJECT REVIEW Inter-Office Correspondence DATE: 11/30/06 TO: ^ • • • • • • SUBJECT: • • • Planning Fire Parks Eng/Traffic Eng/Design Eng/P & P PW/MTCE & Ops PW/Streets Building Other Greg Rvan Mike Bliss Bob Johnson Bill Plummer Josh Nimetz Kurt Musser Nick Roque Lit DC LL Mike Peterson Improvement Plans (Precise) Grading (& Erosion Control) Plans Final / Parcel Map Other Project Id: PD 06-21 DWG No.: 447-8A Project Name: Magellan Aviation Hangars Plancheck No.: 1 Please review and return comments by 12/14/06 to Linda Ontiveros who will route to: Engineer of Work: Javad Tanbakuchi Contact Name: Javad Tanbakuchi Planchecker: PBS&J Project Engineer: Rick DEPARTMENT COMMENTS; If comments are written on plans, please indicate as such (Signature) / (Datg^ Project Engineer - please initial after reviewing comments: CH Entered>^ Email/Fax^ Distribution: Original to Project Engineer, then to file; copy to plan checker; copy to Engineer of I' H:\Development Services\PROJECTS\MS FILES\MS 04\MS 04-05 LBC Project - Wiokham\Administrative Documents\REQUEST FOR PROJECT REVIEW - INTEROFFICE TRANSMITTAL (ms0405) doc 11-17-05 _ . iL, •of Work ( I CARLSBAD FIRE DEPARTMENT Fire Prevention Division PROJECT NAME: Date: Project number: Staff Planner: Land Use Review Report Magellan Aviation Hangers 12/20/06 PD 06-21/ DWG: 447-8A Engineer: D. Rick Proiect conditions: (Note: The following identifies specific conditions necessary to achieve Fire Department approval.) Fire Department has reviewed this Grading Plan and has no comments or conditions. GR BOOKMARK FOR DMS (DO NOT SCAN THIS PAGE) 1. ACCOUNTING/APPLICATIONS a) DECLARATION OF RESPONSIBLE CHARGE 2. PUBLIC NOTICES-COMMISSION AND COUNCIL ACTIONS 3. CORRESPONDENCE a) General b) Completion of Grading c) Inter-Departmental Correspondence d) AS BUILT transmittal e) DMS Data Entry Form f) Minutes g) Misc Correspondence h) Notes to file/ptiotographs i) RAP Sheet j) Records of Conferences k) Records of Telephone Calls I) Records of Emails m) Request for Project Review n) Utility Company Correspondence 4. SECURED AGREEMENTS & BONDS 5. RECORDED AGREEMENTS a) Notice of (Grading Violations) b) Misc. Agreements c) Petition for Inclusion Street & Landscaping District d) Traffic Impact Fee Agreement 6. PERMITS-LICENSES 7. EASEMENTS 8. SUBDIVISION GUARANTEE & TITLE REPORTS a) Parcel Map Guarantee b) Subdivision Guarantee 9. ADJUSTMENT PLAT 10. STREET VACATION 11. ENCROACHMENT PERMIT 12. CLMOR/LOMR FLOOD MODIFICATIONS 13. CONDEMNATION ACTIONS 14. REIMBURSEMENT AGREEMENTS Engineering Department REQUEST TO UPDATE GRADING PLANCHECK FEES Date: To: DONNA HARVEY From: ^'^jtch M- Project # i^Z> C?G~^l , Project Planchecker DWG No. S Project Name: f't^lHtM.^^^ Final Grading Quantities Cut Fill // S5^ Import cy y Waste cy cy cy SWPPP/SWi^P Required? ^ yes • no If yes, complete below # of single-family detached lots/units # of multi-family/mobilehome lots/units .# of commercial/industrial lots/units Remedial ^^/ cv^ Cubic Yards to Calculate Fee. Grading & Erosion Control Cash Deposits ik/OOO •1% Additional Grading Plancheck Fees $_ Additional Grading Inspection Fees $. Comments: H:\Public Works\082 Carlsbacl\Forms\Grading Forms\REQUEST TO UPDATE GRADING PLANCHECK FEES rev 6-14-06.doc 6-14-06 Date: To: P • Engineering Department REQUEST TO UPDATE GRADING PLANCHECK FEES February 5. 2007 ^(5^T DONNA HARVEY via David Ricl< From: RICK ST. JOHN, PBS8J , Project Planchecker Project # PD 06-21 DWG No. 447-8A Project Name: MAGELLAN AVIATION HANGARS Final Grading Quantities Cut Fill 280 280 Import 0_ Waste 0 cy cy cy cy SWPPP/SWI^IP Required? Kl yes • no If yes, complete below # of single-family detached lots/units # of multi-family/mobilehome lots/units 1 # of commercial/industrial lots/units Remedial 0 cy Cubic Yards to Calculate Fee 280 Grading & Erosion Control Cash Deposit $____2600_ Additional Grading Plancheck Fees $_ Additional Grading Inspection Fees $. Comments: ORIGINAL BASIS OF FEES = 280 CY. C:\DOCUME-1\lonti\LOCALS--1\Temp\REQUEST TO UPDATE GRADING PLANCHECK FEES rev 6-14-06,doc Project ID: PD 06-21 Project Enqineer: David Rick Jtf)CUMENT PREPARATION REQUttT Project Name: Magellan Aviation I^Pcars A. B. D & FBO. North Phase Plancheck Enaineer: Rick St. John. PBS&J Date Request Given to Project Engineer: April 1. 2008 Developer: SCIF Palomar , LL C Request to Update Fees Attached:^ Type of Legal Entity: A Delaware Limited Liabilitv Company Address: 1800 Aveue of the Stars. Suite 105, Loa Angeles, CA 90067 Contact Name of person picking up documents: Javad Tanbakuchi Phone Number: 619-666-3803 1^ GRADING & EROSION CONTROL AGREEMENT COASTAL ZONE: QYes IE|No Grading DWG No.: -487-8B- Hf-f^flS Grading Permit No.: 0?-f 9 Project Location: NORTH SIDE OF RUNWAY. SOUTH OF WIND SOCK. APN:760-221-47 & 760-221-73 Offsite Location: N/A Taxpayer ID No.: 95-4663726 Total Amount of Security: $526,526.00 Total Amount of Security Posted as Cash: $20,000.00 Amount of Security Other than Cash: $506.526.00 Security Form Other than Cash: ^ Surety Bond n IMPROVEMENTS Improvement DWG No.: Type of Agreement: Q Development Improvement Agreement O Minor Sub. Improvement Agreement • Traffic Signal Improvement Agreement Final Approving Document (specify Doc.type & Reso.No.): Total Cost of Improvements: Total Cost of Monumentation: Description of Improvements: • Letter of Credit (special handling) • Subdivision Improvement Agreement w/o MON • Subdivision Improvement Agreement w/ MON • NIA Required? Approval Date: Construction Deadline Date: Form of Security: • Surety Bond Taxpayer ID No.: • Letter of Credit (special handling) • Cash Faithful Performance / Warranty: (100%) $ • Surety Bond • Letter of Credit (special handling) Labor And Materials: (50%) $ • Surety Bond • Letter of Credit (special handling) • Cash Security • Cash Security • Cash Security Amount of Fee: Subdivision Monumentation: (100%) J • Surety Bond • Letter of Credit (special handling) • PARK-IN-LIEU • (if needed) Amount of Land Required: acres Security Form: • Surety Bond • Letter of Credit (special handling) 1^ HOLD HARMLESS AGREEMENT ^ Drainage • Geological Failure APN Legal Description: See Attached Owner (if not developer): • PETITION FOR INCLUSION (Street Liqhtina & Landscaping District) APN • Street trees proposed in the right-of-way? (e.g. livable streets) • SIGNATURES (if known) • Corporate Resolution Required Corporation: Name Title Name Title O Partnership: Partnership papers required. (General Partner needs to sign.) O LLC: Official paper listing the individual as a Member of the LLC with sole authority to bind the organization. H:\Public Wo*s\082 Carlsbad\620821 Carlsbad Dev Review\92, Magellan Aviation Hangar, PD 06-21\Grading Plan, Dwg 447-8A\GP 447-8A DOCUMENT PREPARATION REQUEST.doc 9-26/03 Engineering Department - Development Services Document Preparation Request • Page 2 of 2 Section 2 continued •GRADING AND EROSION CONTROL AGREEMENT Grading DWG No.: Grading Permit No.; Project Location: Offsite Location: Taxpayer ID No.: Security Form: •cash Security Posted as Cash: $ •Bond Security Other Than Cash: $ •Letter of Credit Total Amount of Security: $ •PARK-IN-LIEU Land Required: acres Fee: $ •Bond •Letter of Credit Approving Document: Approval Date: QPOQCC Res. No.: •Letter •HOLD HARMLESS AGREEMENT •Drainage •Geological Failure •Panhandle Lot DWG/Plan No(s).: APN: Legal Description (may attach as Exhibit A): •PETITION FOR INCLUSION APN: •UNCONTROLLED STOCKPILE AGREEMENT (also complete Grading & Erosion Control Agreement section) Stockpile: cubic yards APN: Legal Description (may attach as Exhibit A): •PERMANENT BMP MAINTENANCE SWMP No.: 07-3M Condition No.: A//^ APN: 76*^-11^-11 Approving Document: Approval Date: A/^/^ QPCQCC Res. No.: A///) •Letter Legal Description (may attach as Exhibit A): 1 ^SjtH'Kf //^-.^jL. Section 3 '^^ ^ Attachments that may be required based on the type of document(s) requested: tH^H<s>t" •ownership verification via a •Title Report or •Grant Deed • Engineer's cost estimate • Monumentation letter • Exhibit A - Legal Description Required attachments based on the type of legal entity: DLegal entity is other than an individual: sample signature block Dcorporation with a single signatory: corporate resolution identifying signatory & signatory's sole authority to legally bind the entity •Partnership: partnership papers (General Partner is required to sign for a Limited Partnership) DLLC: official document identifying signatory as an LLC Member with sole authority to legally bind the organization DMultiple Entitles: documentation of all entities involved in this venture, their relationships, and signatory's authority to legally bind the entity for which he/she is signing Print Form Reset Form Doc ER-99-04 10/15/2007 Magellan Public Grading Bond Estimate_9_05_07 PD 06-21 Bonding Cost Estimate Magellan Aviation Hangars A, B, C, D, E & I - North Development Grading & Erosion Control Plans Dwg No. 447-8B 9/5/07 Description Quantity Unit Price* Total Grading Excavate and Fill & Remedial Grading 22001 CY 6.50 143,007 Import and Fill 135 CY 28.00 3,780 Grading Subtotal 146,787 Erosion Control Gravel Bags 2330 EA 1.10 2,563 Silt Fence 390 LF 1.60 624 Stabilized Construction Entrance 1500 SF 5.25 7,875 Concrete Washout 1 EA 500.00 500 Erosion Control Subtotal 11,562 Land Development Subtotal: 158,349 Plus 15% Contingency 23,752 Public Grading Bond Estimate Total: 182,101 Note: *Unit prices shown were taken from the Unit Price List for Estimating Subdivisions and Permit Bonds, published by the City of San Diego, dated January 2006 Engineer of Worlc Javad Tanbakuchi, P.E. 46928, Expires: 6/30/09 Bond Estimate Grading Page 1 Yo Magellan Public Grading Bond Estimate_9_05_07 PD 06-21 Bonding Cost Estimate Magellan Aviation Hangars A, B, C, D, E & I - North Development Grading & Erosion Control Plans Dwg No. 447-8B 9/5/07 Grading Quantity: CUT Remedial (36" Deep Removal of Existing AC Paved area) Total Quantity: 1,356 CY 20,780 CY 22,136 CY Based on 22,136 CY, the fee is $3,580 for the first 10,000 CY, plus $180 for each additional 10,000 CY or fraction therof, per City of Carlsbad, Fee Schedule, 9/1/07 Gradino Plan Checit Fee: Quantity Unit Price* Notes For the first 10,000 CY, between 10,001 CYto 100,000 CY, an initial fee of $3,410 10,000 CY 3,580.00 Initial fee For each additional 10,000 CY or fraction therof, an incremental fee of $180 12,136 CY 540.00 Incremental fee Grading Quantity Subtotal: 22,136 CY Grading Plan Checit Fee: 4,120.00 SWPPP Fee, Commercial/Industrial 280.00 *Unit prices shown were taken from the City of Carlsbad, Fee Schedule 9/1/07 Grading Plan Check Fee ANNUAL SOLICITATION Substitute W-9 Form Request 1st 2nd 3rd To comply with Federal income tax laws concerning Form 1099 Information, the Internal Revenue Code requires that the payee furnish their Federal Employee (Taxpayer) Identification Number, assigned by the IRS, or their Social Security Number If the payee is a sole proprietor, Doing Business As, or under a different name other than their own, list the business name; i.e., John doe DBA DOE ENTERPRISES. We are required to impose a 31 percent backup withholding on any payee who fails to provide us with the correct number. Direct any question concerning this form to Accounts Payable at the City of Carlsbad or call (760) 602- 8553 or contact your nearest IRS office for further information conceming FORM 1099 requirements. To avoid bacltup withholding or IRS penalties, complete and return this form. Please provide the following Certiiication of Taxpayer Identification Number for our vendor records. L Enter TIN# (Taxpayer Identification Number - 9 digits); SSN - Social Security Number OR (not both) EIN - Employer Identification Number E> T* 6 G ^ G Name: Scip- Palomar- , LLC Business Name (DBA): SC\F Pdlonoof / M^C Address: IglC^Q Avg.ntAg "HyP. - IQS City, State, Zip: Ip^ /[fl^.S, CA ^QQLl II. Indicate Business Type: ( ) INDIVIDUAL (Enter SSN in Part I) ( ) SOLE PROPRIETOR (Have you been issued a TIN? YES NO If no, show SSN in Part I) (>/f PARTNERSHIP ( ) CORPORATION ** Exempt () **Association, Club, Religious, Charitable, or Other ( ) **Broker or Registered Nominee ( ) **Public Entity such as Foreign, Federal, State or Local Government, School, etc. ** If exempt from withholding, enter TIN in Part I of W-9 form and mark EXEMPT in block in Part n of the W-9 form and send a copy of your exemption certificate to us for our vendor files. III. Indicate Business Nature: (yf RENT (Real Estate, Equipment or Machinery) ( ) INTEREST ( ) NON-EIVII'LOYEE RELATED SERVICES (i.e., Consulting/Legal/Accounting, Professional Fees, Commissions, Awards, Pri2es, etc.) ( ) OTHER If you have applied (or) soon will apply for a number, you may stop backing withholding for a period of sixt)' days by inserting "Applied For" in Pait I on the W-9 form, sign, date and return the form to us. "Under penalties of perjury, I certify that the number shown on this form is my correct Social Security or Employer Identification Number." Signature: '^^s^ _ Date: Title: ?noc-AOa\ Phone: ^IQ-Z'?'^ - \\ ^ Rev 3/08 Magellan Aviation Hangars A, B, D, FJPF- North Development Grading & Erosion Control Plans PD 06-21 Dwg No. 447-8B Bonding Cost Estimate 3/28/08 Oescriotion Quantity Unit Price* Total Grading Cut 1944 CY 11.50 22,356 Import 121 CY 28,00 3,388 Remedial 13465 CY 11.50 154,848 Grading Subtotal 180,592 Erosion Control Gravel Bags 2630 EA 1.10 2,893 Silt Fence 1090 LF 1.60 1,744 Stabilized Construction Entrance 1500 SF 5.25 7,875 Concrete Washout 1 EA 500.00 500 Erosion Control Subtotal 13,012 Private Storm Drain 12"PVC-SDR35 202 LF 30,00 6.060 12" RCP 295 LF 60,00 17,700 18" RCP 725 LF 95.00 68,875 24" RCP 401 LF 110.00 44,110 30" RCP 59 LF 120,00 7,080 Type 1 Catch Basin 12 EA 3,850.00 46,200 24x24 Box Inlet 4 EA 2,750.00 11,000 18x18 Box Inlet 4 EA 2,500,00 10,000 Storm Drain Filter Insert 20 EA 2.500,00 50,000 Bio Swale 355 LF 5.50 1,953 Storm Drain Subtotal 262,978 Misc Site Improvement Curb & Gutter 20 LF 25,00 500 Driveway Apron /Cross Gutter 96 SF 8,00 768 Misc Site Improvement Subtotal 1,268 Land Development Subtotal: 457,849 Plus 15% Contingency 68,677 Grading Bond Estimate Total: 526,526 Note: *Unit prices shown were taken from the Unit Price List for Estimating Subdivisions and Permit Bonds, published by the City of San Diego, dated January 2006 Engineer of Worl<: loi \\<Mo. 46928i*fjl ^1 Javad Tanbakuchi, P.E. 46928, Expires: 6/30/09 Bond Estimate Grading Page 1 Project Name Magellan Aviation Hangars Project No. PD 06-21 Drawing No. 447-88 Calculation of Additional Grading Fees Original Basis 23,930 cy Original Plancheck Fee $3,940.00 Final Basis 15,530 cy Final Fee $3,760.00 Additional Fee Due -$180.00 Calculation of Drainage Fees Basis of Valuation $262,978.00 Plancheck Fee $13,910.00 Inspection Fee $5,810.00 Additional Plancheck Fees Due $13,730.00 Magellan Aviation Hangars A, B, D, FBOl^lrth Development Grading & Erosion Control Plans PD 06-21 Dwg No. 447-8B Bonding Cost Estimate 3/28/08 Description Quantity Unit Price* Total Grading Cut 1944 CY 11.50 22,356 Import 121 CY 28.00 3,388 Remedial 13465 CY 11.50 154,848 Grading Subtotal 180,592 Erosion Control Gravel Bags 2630 EA 1.10 2,893 Silt Fence 1090 LF 1.60 1,744 Stabilized Construction Entrance 1500 SF 5.25 7,875 Concrete Washout 1 EA 500.00 500 Erosion Control Subtotal 13,012 Private Storm Drain 12" PVC-SDR35 202 LF 30.00 6,060 12" RCP 295 LF 60.00 17,700 18" RCP 725 LF 95.00 68,875 24" RCP 401 LF 110.00 44,110 30" RCP 59 LF 120.00 7,080 Type 1 Catch Basin 12 EA 3,850.00 46,200 24x24 Box Inlet 4 EA 2,750,00 11,000 18x18 Box Inlet 4 EA 2,500,00 10,000 Storm Drain Filter Insert 20 EA 2,500,00 50,000 Bio Swale 355 LF 5,50 1,953 Storm Drain Subtotal 262,978 IVIisc Site Improvement Curb & Gutter 20 LF 25,00 500 Driveway Apron /Cross Gutter 96 SF 8,00 768 Misc Site Improvement Subtotal 1,268 Land Development Subtotal: 457,849 Plus 15% Contingency 68,677 Grading Bond Estimate Total: 526,526 0^ Note: *Unit prices shown were taken from the Unit Price List for Estimating Subdivisions and Permit Bonds, published by the City of San Diego, dated January 2006 Engineer of Worl<: Javad Tanbakuchi, P E, 46928, Expires: 6/30/09 Bond Estimate Grading Page 1 BOOKMARK FOR DMS (DO NOT SCAN THIS PAGE) 1. ACCOUNTING/APPLICATIONS a) DECLARATION OF RESPONSIBLE CHARGE 2. PUBLIC NOTICES - COMMISSION AND COUNCIL ACTIONS 3. CORRESPONDENCE a) General b) Connpletion of Grading c) Inter-Departmental Correspondence d) AS BUILT transmittal e) DMS Data Entry Form f) Minutes g) Misc Correspondence h) Notes to file/photographs i) RAP Sheet j) Records of Conferences k) Records of Telephone Calls I) Records of Emails m) Request for Project Review n) Utility Company Correspondence 4. SECURED AGREEMENTS & BONDS 5. RECORDED AGREEMENTS a) Notice of (Grading Violations) b) Misc. Agreements c) Petition for Inclusion Street & Landscaping District /""X d) Traffic Impact Fee Agreement 'Ce. I PERMITS-LICENSES \^ EASEMENTS 8. SUBDIVISION GUARANTEE & TITLE REPORTS a) Parcel Map Guarantee b) Subdivision Guarantee 9. ADJUSTMENT PLAT 10. STREET VACATION 11. ENCROACHMENT PERMIT 12. CLMOR/LOMR FLOOD MODIFICATIONS 13. CONDEMNATION ACTIONS 14. REIMBURSEMENT AGREEMENTS Page 1 of2 Terry Tamminen Secretary for Environmental Protection State Water Resources Control Board Division of Water Quality 1001 I Street • Sacramento, California 95814 • (915) 341-5538 Mailing Addvess:P,0, Box 1977 • Sacramento, Califomia • 95812-1977 FAX (916) 341-5543 • Internet Address: http://www.swrcb.ca.gov/stormwtr/index.html Arnold Schwarzenegger Governor Date Processed: 3/15/2004 The Magellan Group Inc 1800 Avenue Of The Stars Ste 1 Los Angeles, CA 90067-4203 RECEIPT OF YOUR NOTICE OF INTENT RECEIVED NAY 08 2008 ENGINEERING DEPARTMENT The State Water Resources Control Board (State Water Board) has received and processed your NOTICE OF INTENT TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY. Accordingly, you are required to comply with the permit requirements. The WDID identification number: 9 37C326382. communications regarding this permit. Please use this number in any future SITE DESCRIPTION OWNER: DEVELOPER: COUNTY: SITE ADDRESS: COMMENCEMENT DATE: EST. COMPLETION DATE: The Magellan Group Inc Allen & Assoc San Diego 2006 Palomar Airport Rd Carlsbad, CA 92008- 6/1/2004 6/1/2005 When construction is complete or ownership has been transferred, dischargers are required to notify the Regional Water Board by submitting a Notice of Termination (NOT). All State and local requirements must be met in accordance with Special Provision No. 7 of the General Permit. If you do not notify the State Water Board that construction activity has been completed, you will continue to be invoiced for the aimual fee each January. If you have any questions regarding permit requirements, please contact your Regional Water Board at (858) 467-2952. Please visit the storm water web page at www.swrcb.ca.gov/stormwtr/index.html to obtain storm water related information and forms. Sincerely, Storm Water Section Division of Water Quality http://swrcbnt3.swrcb.ca.gov/stormwater/search/ConReceiptLetter.asp?Receipt=326382&su... 5/3/2004 Attachment 2 State Water Resources Control Board NOTICE OF INTENT TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY (WQ ORDER No, 99-08-DWQ) I. NOI STATUS (SEE INSTRUCTIONS) MARK ONLY ONE ITEM 1. 0 New Construction 2. • Change of Information for WDID# PROPERTY OWNER Name Contact Person II The Magellan Group, Inc. Robert Levine 'L Mailing Address Title 1800 Avenue of the Stars, Suite 105 Asset Manager 1 ^'"y State Zip Ptione JL Los Angeles CA 90067 (310) 277-8337 III. DEVELOPER/CONTRACTOR INFORMATION "'Developer/Contractor Contact Person Allen & Associates Jim Allen Mailing Address Title 1 2192 Carmel Valley Road Project Manager City State Zip Ptione jl Del Mar CA 92014 (858) 755-7800 CONSTRUCTION PROJECT INFORMATION Site/Project Name Site Contact Person Magellan Aviation Hangars Martha Greenlaw Physical Address/Location Latitude Longitude County 2006 Palomar Airport Road 33.1254°N 117.2791 "W San Diego City (or nearest City) Zip Site Ptione Number Emergency Phone Numtier Carlsbad 92008 (760) 438-7603 (760) 438-7603 t A. Total size of construction site area: 3.37 Acres B. Total area to tie disturtied: 3.37 Acres (% of total 100 1 C. Percent of site imperviousness (including rooftops): Before Construction: 92.76 % After Constmction: 97.14 % D, Tract Number(s): N/A E. Mile Post Marker: N/A F. Is ttie construction site part of a larger common plan of development or sale? • VES NO G. Name of plan or development: N/A H. Construction commencement date: 06/01 / 04 I. % of site to be mass graded: 0 J, Projected construction dates: Complete grading: 09 / 01 / 04 Complete project: 06 / 01 / 05 K. Type of Construction (Check all that apply): 1. ^ Residential 6. Utility Commercial • Description: Industrial 4, ^ Reconstruction 5. 9 7. ^ Other (Please List): Transportation . BILLING INFORMATION SEND BILL TO: X OWNER 1. (as In 11. above) Name Contact Person Mailing Address Phone/Fax DEVELOPER 1 (as in 111, above) ' OTHER (enter information at right) City state Zip .VI. REGULATORY STATUS A, Has a local agency approved a required erosion/sediment control plan? (Review in process) CD YES [Zl NO Does the erosion/sediment control plan address construction activities such as infrastructure and structures? H YES CD NO Name of local agency: City of Carlsbad Phone: (760 ) 602-2720 B. Is this project or any part thereof, subject to conditions imposed under a CWA Section 404 permit of 401 Water Quality Certification? CD YES B NO If yes, provide details: VII. RECEIVING WATER INFORMATION A. Does tfie storm water runoff from the construction site discharge fo (Checit all that apply): 1. ' Indirectly to waters of the U.S. 2. 5 Storm drain system - Enter owner's name: City of Carlsbad 3. ^ Directly to waters of U.S. (e.g., river, lake, creek, stream, bay, ocean, etc.) B. Name of receiving water: (river, lake, creek, stream, bay, ocean): Pacific Ocean VJU. IMPLEMENTATION OF NPDES PERMIT REQUIREMENTS A, STORM WATER POLLUTION PREVENTION PLAN (SWPPP) (check one) D A SWPPP has been prepared for this facility and is available for review: Date Prepared: / / Date Amended:. Q A SWPPP will be prepared and ready for review by (enter date): O /Of/ ^4 (Start of Construction) ^ A tentative schedule has been included in the SWPPP for activities such as grading, street construction, home construction, etc. B, MONITORING PROGRAM [X] A monitoring and maintenance scfiedule has been developed that includes inspection of the constaiction BMPs before anticipated storm events and after actual storm events and is available for review. —1| If checked above: A qualified person has been assigned responsibility for pre-storm and post-slorm BMP inspections (—, p-, i to identify effectiveness and necessary repairs or design changes CO YES I I NO J Name: fAOir-k-^O^ r-CCr^ \ C\Uj p^^^^. C76>0) A^-n^l) 1 C. PERMIT COMPLIANCE RESPONSIBILITY A qualified person has been assigned responsibility to ensure full compliance with the Permit, and to implement all elements of the Slorm Water Pollution Prevention Plan including: 1, Preparing an annual compliance evaluation 5 YES D NO 2. Eliminating all unauthorized discharges ^ YES D NO X. VICINITY MAP AND FEE (must show site location in relation to nearest named streets, intersections, etc.) j[ Have you included a vicinity map with this submittal? 0 YES Q NO Have you included payment ot the annual fee with this submittal? P YES " O NO X. CERTIFICATIONS "I certify under penalty of law that this document and all attachments were prepared under my direction and supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibilityotfirjff'or imprisonment. In addition, I certify that the provisions of the permit, including the development and implemefitetipwjjf^^orm Water Pollution Prevention Plan and a Monitoring Program Plan will be complied with." aeveiopment ana impiemeriatipwjj^a^torm Water Pollution KreNjention 1 Printed Name: Jj^Tl "'qnature: ^ _ .^f^ \ \ ^ , Date litle: INSTRUCTION SHEET FOR FILLING OUT ENVIRONMENTAL IMPACT ASSESSMENT INFORMATION FORM This Environmental Impact Assessment Information Form will be used to assist staff in determining what type of environmental documentation (i.e., Environmental Impact Report, Mitigated Negative Declaration, Negative Declaration or Exemption) will be required to be prepared for your application, per the Califomia Environmental Quality Act (CEQA) and Title 19 of Carlsbad's Municipal Code. The clarity and accuracy of the information you provide is critical for purposes of quickly determining the specific environmental effects of your project. Any environmental studies (i.e., biological, cultural resource, traffic, noise) that are necessary to substantiate a "no impact" or "yes impact" determination should be submitted as an attachment to this Environmental Information Form. This is especially important when a Negative Declaration is being sought. The more information provided in this form, the easier and quicker it will be for staff to complete the Environmental Impact Assessment Form - Initial Study. ENVIRONMENTAL IMPACT ASSESSMENT INFORMATION FORM (To be Completed by Applicant) Date Filed: (To be completed by City) Application Number(s): O OU>- ~2.\ 3. 6. 7. 8. 9. SCIF Palomar LLC General Information 1 Name of project- Magellan Aviation, Hangars A, B, C & D - Grading, Site Utility & Improvements 2. Name of developer or project sponsor: Address • ^ ^ Palomar Airport Road City, State, Zip Code: Carlsbad, CA 92011 Phone Number: (760) 438-7603 Name of person to be contacted conceming this project: Javad Tanbakuchi Address: 12780 Via Felino Del Mar, CA 92014 City, State, Zip Code: Phone Number: Work: 858-793-4531; Cell: 619-666-3803 en • . 2016 Palomar Airport Road Address or Project: ^ Assessor's Parcel Number- 760-221-73 (South portion) & 760-221-47 (North portion) List and describe any other related pemiits and other public approvals required for this project, including those required by city, regional, state and federal agencies: RWQCB: NOI to comply w/gen, permit to discharge storm water assoc, w/const, activity Existing General Plan Land Use Designation: Industrial, Zone 0 Gcvor A /vvjaX' Existing zoning district: Unknown '^_xmQ M {_ \ r^\^'^^<S\ Existing land use(s): Palomar Airport Proposed use of site (Project for which this forni is filed): Removal of the existing hangar & replace with new Hangars A, B, C & D of the leased property. Grading. Site Utilities & Improvements are part of this grading submittal. D <ect Description Q- . 5.7 acres of an overall project site totaling 16.18 acre parcel ollG Size nosed Building square footage: 77,358 SF (Hangars A, B, C & D) 02/22/06 12: 13. 14. 15. Number of floors of construction: one Amount of off-street parking provided: Nol applicable Associated projects: If residential, include the number of units and schedule of unit sizes: Not applicable 16. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage of sales area, and loading facilities: Not applicable 17. If industrial, indicate type, estimated employment per shift, and loading facilities: Not applicable If institutional, indicate the major function, estimated employment per shift, estimated occupancy, loading facilities, and community benefits to be derived from the project: Not applicable 19. If the project involves a variance, conditional use or rezoning applications, state this and indicate clearly why the application is required: No variances, conditional use, or rezoning are being requested. Are the following items applicable to the project or its effects? Discuss all items checked yes (attach additional sheets as necessary). 20. 21. 22. 23. 24. Yes Change in existing features of any bays, tidelands, beaches, or hills, or substantial alteration of ground contours. Change in scenic views or vistas from existing residential areas or public lands or roads. Change in pattern, scale or character of general area of project. Significant amounts of solid waste or litter. Change in dust, ash, smoke, fumes or odors in vicinity. 3 No X X • ^ • m • m 02/22/06 25. Change in ocean, bay, lake, stream or ground water quality or quantity, or alteration of existing drainage pattems. 26. Substantial change in existing noise or vibration levels in the vicinity. 27. Site on filled land or on slope of 10 percent or more. 28. Use of disposal of potentially hazardous materials, such as toxic substances, flammables or explosives. Yes No • X • X • X X • 29. Substantial change in demand for municipal services (police, fire, water, r~j ^ sewage, etc.). 30. Substantially increase fossil fuel consumption (electricity, oil, natural gas, | | etc.). 31. Relationship to a larger project or series of projects. • m Environmental Setting Attach sheets that include a response to the following questions: 32. Describe the project site as it exists before the project, including information on topography, soil stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing stmctures on the site, and the use of the stmctures. Attach photographs of the site. Snapshots or Polaroid photos will be accepted. 33. Describe the surrounding properties, including information on plants and animals and any cultural, historical or scenic aspects. Indicate the type of land use (residential, commercial, etc.), intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of development (height, frontage, set-back, rear yard, etc.). Attach photographs of the vicinity. Snapshots or polaroid photos will be accepted. Certification I hereby certify that the statements flimished above and in the attached exhibits present the data and information required for this initial evaluation to the best of my ability, and that the facts, statements, and information presented are true and correct to the best of my knowledge and belief. Date: Signature 02/22/06 Javad Tanbakuchi, P.E. 46928 12780 Via Felino Del Mar, CA 92014 W: (858) 793-4531; C: (619) 666 -3803 Javad.Tanbakuchi @ gmail.com March 9, 2007 City of Carlsbad Jason Goff, Associated Planner Planning Dept. 1635 Faraday Ave. Carlsbad, CA 92008 Subject: Environmental Impact Assessment (EIA) Information Form Magellan Aviation, Hangars A, B, C & D - Grading, Site Utility & Improvements 760-221-73 (South portion) & 760-221-47 (North portion) Dear Jason Goff, In addition to the EIA form, I am providing the following requested information. Environmental Setting 32. Describe the project site as it exists before the project, including information on topography, soil stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing structures on the site, and the use of the structures. Attach photographs of the site. Snapshots or Polaroid photos will be accepted. Use, Structures & Topography: The existing site is used for aircraft storage & associated parking. The site is relatively flat. Please see attached site photos. Soil Stability: "One surficial soil type and one geologic unit exist at the site. The surficial deposit consists of undocumented fill. The geologic unit consists of Tertiary-age sedimentary rock of the Torrey Sandstone. Due to the lack of a near surface water table and the dense nature of the Torrey Sandstone, the potential for liquefaction occurring at the site is considered low." Per Geocon's Geotechical Investigation Report for Magellan Aviation, dated 10/99 & revised 6/23/05. Plants & Animals: No plants or animals exist at the existing parking area. The project will not impact the existing vegetated slopes. Cultural, historical or scenic aspects: None exist at the existing aircraft parking area. 33. Describe the surrounding properties, including information on plants and animals, and any cultural, historical or scenic aspects. Indicate the type of land use (residential, commercial, etc.), intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of development (height, frontage, set-back, rear yard, etc.) Attach photographs of the vicinity. Snapshots or Polaroid photos will be accepted. Use, Structures & Topography: The surrounding property to the north is used for aircraft hangars, offices, and associated site improvements. The site is relatively flat. There is an industrial bldg. to the west. And, there is the Palomar Airport off-site surface parking area to the south. There is a perimeter access road to the east. Please see attached surrounding property photos. Soil Stability: For the aircraft hangars, offices, and associated site improvement, the soil stability is the same as described above, for the subject property. Geocon's Geotechical Investigation Report for • Page 2 March 9,2007 Magellan Aviation, dated 10/99 & revised 6/23/05, includes the subject property: 760-221-73 (South portion) and 760-221-47 (North portion). Soils stability is unknown for the existing industrial bldg. to the west & Palomar Airport off-site parking area to the south. Plants & Animals: No plants or animals exist at the existing aircraft hangars, offices, and associated site improvements to the north, industrial bldg. to the west, or the Palomar Airport off-site parking area to the south. Cultural, historical or scenic aspects: None exist at the existing aircraft hangars, offices, and associated site improvements to the north, industrial bldg. to the west, or the Palomar Airport off-site parking area to the south. I look fon/vard to working with you on this project. Should you require any further information or wish to discuss this, please contact me at 619-666-3803. Sincerely, Javad Tanbakuchi, P.E. 46928 EXHIBIT A PR 08-19 LEGAL DESCRIPTION WATER EASEMENT VACATION ( DESCRIBED IN DOC. 2005-0916162 O R. REC'D OCTOBER 21, 2005 ) That portion of McClellan-Palomar Airport, being a portion of Lot "G" of the Rancho Agua Hedionda, in the City of Carlsbad, County of San Diego, State of California, according to the Partition Map thereof No. 823 filed in the Office of the County Recorder of San Diego County on November 16, 1896, described as follow: Commencing at the most southerly corner of McClellan-Palomar Airport, being the southeasterly terminus of the southwesterly boundary bearing North 10°19'11" West 1,000.02 feet per Record of Survey Nos. 17732 and 17996, said corner also being the Northwest corner of Lot 32 of Carlsbad Tract No. 81-46, according to Map thereof No. 11288; thence along the Southerly line of McClellan-Palomar Airport North 79°40'49" East 647.15 feet; thence leaving said Southerly line, North 10°19'11" West, 153.29 feet to the TRUE POINT OF BEGINNING; thence South 79°44'01" West 545.20 feet; thence North 10°15'59" West 289.04 feet; thence South 79°44'01" West 21.86 feet; thence North 10°15'59" West 7.00 feet; thence South 79°44'01" West 5.00 feet; thence North 10°15'59" West 13.00 feet; thence North 79°44'01" East 26.86 feet; thence North 10°15'59" West 16.49 feet; thence North 79°44'01" East 140.88; thence North 10°15'59" West 76.89 feet; thence North 79°44'01" East 12.00 feet; thence South 10°15'59" East 10.00 feet; thence North 79°44'01" East 8.00 feet, thence South 10°15'59" East 66.89 feet; thence North 79°44'01" East 164.25 feet; thence South 10°15'59" East 20.00 feet; thence South 79°44'01" West 305.13 feet; thence South 10°15'59" East 285.54 feet; thence North 79°44'01" East 525.18 feet, thence South 10°19'11" East 20.00 feet to the TRUE POINT OF BEGINNING. Contains 25,077 square feet, more or less Frederick R. Le Page, F±.S. 7524 Registration Expires 12/31/09 J EASEMENT DATA NO. BEARING LENGTH NO. BEARING LENGTH 1 S 79"44'01° W 545.20' 11 N 79*44'0r E 12.00' 2 N 10"15"59" W 289.04' 12 S 1015'59'' E 10.00' 3 S 79*44'01" W 21.86' 13 N 79-44'01'' E 8.00' 4 N 10'15'59" W 7.00' 14 s lois'sg" E 66.89' 5 S 79"44'or W 5.00' 15 N 79"44'0r E 164.25' 6 N 10'15'59" W 13.00' 16 S 10-15'59'' E 20.00' 7 N 79'44'01° E 26.86' 17 S 79"44'01'' W 305.13' 8 N 10"15'59" W 16.49' 18 S 10*15'59'' E 285.54' 9 N 79'44'01" E 140.88' 19 N 79-44'Or E 525.18' 10 N 10-15'59" W 76.89' 20 S 1019'11'' E 20.00' LOT G RANCHO AGUA HEDIONDA AVJATlOlN L£AS£ PARCEL A!A] {2006-0183-A1 I I p.o.c. MOST S'LY CORNER McCLELLAN-PALOMAR AIRPORT R.O.S. 17732 PARCEL A(SJ 12006-0183-3] LEGEND: P.O.C. T.P.O.B. N 79-40'49'' E 647.15' POINT OF COMMENCEMENT TRUE POINT OF BEGINNING LEASE BOUNDARY INDICATES QUITCLAIM AREA AS DESCRIBED IN OOC No. 2005-0916162 O.R. REC'D OCTOBER 21. 2005 BASIS OF BEARINGS: TTHE BASIS OF BEARINGS FOR THIS PLAT IS THE MOST NORTHEASTERLY LINE OF MAP No. 11288 AS SHOWN ON R.O.S. 17996. SAID BEARINGS ARE BASED ON CCS83, ZONE 6. i.e. N1019'irw LEGAL DESRCIPTION: THAT PORTION OF McCLELLAN-PALOMAR AIRPORT. AS DESCRIBED IN DEED TO THE COUNTY OF SAN DIEGO. REC. FEBRUARY 17. 1958 BOOK 6952 PAGE 391 O.R. BEING A PORTION OF LOT 'G' OF RANCHO AGUA HEDIONDA. IN THE COUNTY OF SAN DIEGO. STATE OF CALIFORNIA. ACCORDING TO PARTITION MAP THEREOF No. 823. FILED IN THE OFRCE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY. VICINITY MAP N.T.S. SHEET 1 OF 1 SHEETS EXHIBIT "B" Carlsbad Municipal Water District WATER EASEMENT QUITCLAIM PR 08-19 FREDERICK R. LePAGE P.LS. 7524 EXP. 12/31/2009 Carlsbad Municipal Water District WATER EASEMENT QUITCLAIM APN 760-221-73 DIMENSION LAND SURVEYING & MAPPING P.O. BOX 2796 RAMONA, CA 92065 PHONES FAX (760) 789-3166 EXHIBIT A PR 07-125 LEGAL DESCRIPTION WATER EASEMENT VACATION ( DESCRIBED IN DOC. 1991-0095890 O.R. REC'D MARCH 5,1991 ) An easement being a portion of Lot "G" of the Rancho Agua Hedionda, in the City of Carlsbad, County of San Diego, State of California, according to Partition Map thereof No. 823 filed in the Office of the County Recorder of San Diego County on November 16, 1896, described as follows: Commencing at the Southeast corner of that certain aviation lease dated May 24,1988; thence North 10°52'17" West along the Easterly line of said Lease 289.19 feet to the TRUE POINT OF BEGINNING; thence South 79°07'43" West, 194.53 feet; thence South 10°52'17" East, 23.49 feet; thence South 79°07'43" West, 22.00 feet; thence North 10°52'17" West, 10.00 feet; thence North 79°07'43" East, 7.00 feet; thence North 10°52'17" West, 28.49 feet; thence North 79°07'43" East, 209.53 feet to said Easterly line; thence South 10°52'17" East along said Easterly line 15.00 feet to the TRUE POINT OF BEGINNING. Contains 3,565 square feet more or less. iLMJi-/^ ^/^ AU'\Uod8 Frederick R. Le Page, PKL.S. 7524 Registration Expires 12/31/09 EASEMENT DATA NO. BEARING LENGTH 1 S 79'07'43'' W 194.53' 2 S 10*52'17'' E 23.49' 3 S 79'0r43'' W 22.00' 4 N 10"52'17" W 10.00' 5 N 79'07'43'' E 7.00' 6 N 10*52'17'' W 28.49' 7 N 79"07'43'' E 209.53' 8 S 10-52'17'' E 15.00' LOT G RANCHO AGUA HEDIONDA AVJATJON LEASE PARCEL A{AJ r2006-0183-A] L PARCEL A(SJ LEGEND: VJ^. T.P.O.B. ( ) POINT OF COMMENCEMENT TRUE POINT OF BEGINNING DENOTES RECORD DATA PER DEED REC. MARCH 5. 1991 AS DOC. NO. 1991-0095890 O.R. LEASE BOUNDARY INDICATES QUITCLAIM AREA AS DESCRIBED IN DOC. No. 1991-0095890 O.R. REC'D MARCH 5. 1991 BASIS OF BEARINGS: THE BASIS OF BEARINGS FOR THIS PLAT IS THE EASTERLY LINE OF AVIATION LEASE DATED MAY 24. 1988 AS DESCRIBED IN DOC. NO. 1991-0095890 OR. RECORDED MARCH 5. 1991. Le. N10'52'17"W LEGAL DESRCIPTION: THAT PORTION OF McCLELLAN-PALOMAR AIRPORT. AS DESCRIBED IN DEED TO THE COUNTY OF SAN DIEGO. REC. FEBRUARY 17. 1958 BOOK 6952 PAGE 391 O.R. BEING A PORTION OF LOT 'G' OF RANCHO AGUA HEDIONDA. IN THE COUNTY OF SAN DIEGO. STATE OF CAUFORNIA. ACCORDING TO PARTITION MAP THEREOF No. 823, FILED IN THE OFRCE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY EXHIBIT "B* FREDERICK R. LePAGE P.LS. 7524 EXP. 12/31/2009 Carlsbad Municipal Water District WATER EASEMENT QUITCLAIM EXHIBIT A PR ^ LEGAL DESCRIPTION WATER EASEMENT VACATION ( DESCRIBED IN DOC. 2005-0916162 O.R. REC'D OCTOBER 21, 2005 ) That portion of McClellan-Palomar Airport, being a portion of Lot "G" of the Rancho Agua Hedionda, in the City of Carlsbad, County of San Diego, State of California, according to the Partition Map thereof No. 823 filed in the Office of the County Recorder of San Diego County on November 16, 1896, described as follow: Commencing at the most southerly corner of McClellan-Palomar Airport, being the southeasterly terminus of the southwesterly boundary bearing North 10°19'11" West 1,000.02 feet per Record of Survey Nos. 17732 and 17996, said corner also being the Northwest corner of Lot 32 of Carlsbad Tract No. 81-46, according to Map thereof No. 11288; thence along the Southerly line of McClellan-Palomar Airport North 79°40'49" East 647.15 feet; thence leaving said Southerly line. North 10°19'11" West, 153.29 feet to the TRUE POINT OF BEGINNING; thence South 79°44'01" West 545.20 feet; thence North 10°15'59" West 289.04 feet; thence South 79°44'01" West 21.86 feet; thence North 10°15'59" West 7.00 feet; thence South 79°44'01" West 5.00 feet; thence North 10°15'59" West 13.00 feet; thence North 79°44'01" East 28.86 feet; thence North r^- ^ 10°15'59" West 16.49 feet; thence North 79°44'01" East 140.88; thence North 10°15'59" West 76.89 feet; thence North 79°44'01" East 12.00 feet; thence South 10°15'59" East U«l 10.00 feet; thence North 79°44'01" East 8.00 feet, thence South 10°15'59" East 66.89 —J feet; thence North 79°44'01" East 164.25 feet; thence South 10°15'59" East 20.00 feet; thence South 79°44'01" West 305.13 feet; thence South 10°15'59" East 285.54 feet; thence North 79°44'01" East 525.18 feet, thence South 10°19'11" East 20.00 feet to the TRUE POINT OF BEGINNING. Contains 25,077 square feet, more or less Frederick R. Le Page, P.L.S. 7524 Registration Expires 12/31/09 EASEMENT DATA NO. BEARING LENGTH NO. BEARING LENGTH 1 S 79'44'or W 545.20' 11 N 79*44'01'' E 12.00' 2 N 10"15'59'' W 289.04' 12 S 1015'59'' E 10.00' 3 S 79"44'01'' W 21.86' 13 N 79'44'or E 8.00' 4 N 10'15'59'' W 7.00' 14 s lois'sg" E 66.89' 5 S 79*44'0r W 5.00' 15 N 79*44'01" E 164.25' 6 N 10'15'59'' W 13.00' 16 S 10*15'59'' E 20.00' 7 N 79-44'01'' E 28.86' 17 S 79'44'01" W 305.13' 8 N lOTS'Sg" W 16.49' 18 s lois'sg" E 285.54' 9 N 79"44'01'' E 140.88' 19 N 79"44'01'' E 525.18' 10 N m5'52" W 76.89' 20 S 1019'11" E 20.00' LOT G RANCHO AGUA HEDIONDA AVIATION LEASE PARCEL MA) i2006-0l83-A] P.o.c. MOST S'LY CORNER McCLELLAN-PALOMAR AIRPORT R.O.S. 17732 PARCEL A{3J 12006-0183-3] LEGEND: P.O.C. T.P.O.B. N 79*40'49'' E 647.15' | POINT OF COMMENCEMENT TRUE POINT OF BEGINNING LEASE BOUNDARY INDICATES QUITCLAIM AREA AS DESCRIBED IN DOC. No. 2005-0916162 O.R. REC'D OCTOBER 21. 2005 BASIS OF BEARINGS: THE BASIS OF BEARINGS FOR THIS PLAT IS THE MOST McCLELLAN-PALOMAR AIRPORT OF MAP No. 11288 AS SHOWN ON R.O.S. 17732. SAID BEARINGS ARE BASED ON CCS83. ZONE 6. i.e. N1019'irw LEGAL DESRCIPTION: THAT PORTION OF McCLELLAN-PALOMAR AIRPORT. AS DESCRIBED IN DEED TO THE COUNTY OF SAN DIEGO. REC. FEBRUARY 17. 1958 BOOK 6952 PAGE 391 O.R. BEING A PORTION OF LOT 'G' OF RANCHO AGUA HEDIONDA. IN THE COUNTY OF SAN DIEGO. STATE OF CAUFORNIA. ACCORDING TO PARTITION MAP THEREOF No. 823. FILED IN THE OFRCE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY. PALOMAR VICINITY MAP N.T.S. SHEET 1 OF 1 SHEETS EXHIBIT "B" FREDERICK R. LePAGE P.LS. 7524 EXP. 12/31/2009 Carlsbad Municipal Water District WATER EASEMENT QUITCLAIM PR APN 760-221-73 DIMENSION LAND SURVEYING & MAPPING P.O. BOX 2796 RAMONA, CA 92065 PHONES FAX (760) 789-3166 f 1 • .v»y I 'it EXHIBIT A PR 07-125 LEGAL DESCRIPTION WATER EASEMENT VACATION ( DESCRIBED IN DOC. 1991-0095890 O.R. REC'D MARCH 5,1991 ) An easement being a portion of Lot "G" of the Rancho Agua Hedionda, in the City of Carlsbad, County of San Diego, State of California, according to Partition Map thereof No. 823 filed in the Office of the County Recorder of San Diego County on November 16, 1896, described as follows: Commencing at the Southeast corner of that certain aviation lease dated May 24,1988; thence North 10°52'17" West along the Easterly line of said Lease 289.19 feet to the TRUE POINT OF BEGINNING; thence South 79°07'43" West, 194.53 feet; thence South 10°52'17" East, 23.49 feet; thence South 79°07'43" West, 22.00 feet; thence North 10°52'17" West, 10.00 feet; thence North 79°07'43" East, 7.00 feet; thence North 10°52'17" West, 28.49 feet; thence North 79°07'43" East, 209.53 feet to said Easterly line; thence South 10°52'17" East along said Easterly line 15.00 feet to the TRUE POINT OF BEGINNING. Contains 3,565 square feet more or less. Frederick R. Le Page, P.L.S. 7524 Registration Expires 12/31/09 EASEMENT DATA NO. BEARING LENGTH 1 S 79"07'43'' W 194.53' 2 S 10'52'17'* E 23.49' 3 S 79'07'43'' W 22.00' 4 N 10"52'17'' W 10.00' 5 N 79'07'43'' E 7.00' 6 N 10*52'17'' W 28.49' 7 N 79"07'43'' E 209.53' 8 S 10"52'17'' E 15.00' LOT G RANCHO AGUA HEDIONDA L AVIATION LEASE PARCEL A(A) r2006-0l83-A3 PARCEL A(3J 12006-0183-31 LEGEND: Vl^. T.P.O.B. ( ) POINT OF COMMENCEMENT ' TRUE POINT OF BEGINNING DENOTES RECORD DATA PER DEED REC. MARCH 5. 1991 AS DOC. NO. 1991-0095890 O.R. LEASE BOUNDARY INDICATES QUITCLAIM AREA AS DESCRIBED IN DOC. No. 1991-0095890 O.R. REC'D MARCH 5. 1991 P.O.C. SE'LY CORNER AVIATION LEASE DATED MAY 24, 1988 BASIS OF BEARINGS: THE BASIS OF BEARINGS FOR THIS PLAT IS THE MOST NORTHEASTERLY UNE OF MAP No. 11288 AS SHOWN ON R.O.S. 17996. SAID BEARINGS ARE BASED ON CCS83. ZONE 6. Le. N10*52'17"W LEGAL DESRCIPTION: THAT PORTION OF McCLELLAN-PALOMAR AIRPORT, AS DESCRIBED IN DEED TO THE COUNTY OF SAN DIEGO. REC. FEBRUARY 17. 1958 BOOK 6952 PAGE 391 O.R. BEING A PORTION OF LOT 'G' OF RANCHO AGUA HEDIONDA. IN THE COUNTY OF SAN DIEGO. STATE OF CAUFORNIA. ACCORDING TO PARTITION MAP THEREOF No. 823. FILED IN THE OFRCE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY AIRCRAFT PALOMAR SITE ROBLE VICINITY MAP N.T.S. SHEET 1 OF 1 SHEETS EXHIBIT "B" BPAGE FREDERICK R. LePAGE P.LS. 7524 EXP. 12/31/2009 Carlsbad Municipal Water District WATER EASEMENT QUITCLAIM PR 07-125 APN 760-221-73 DIMENSION LAND SURVEYING & MAPPING P.O. BOX 2796 RAMONA, CA 92065 PHONES FAX (760) 789-3166 12-6-07 EXHIBIT A PD 06-21 LEGAL DESCRIPTION WATER EASEMENT VACATION ( DESCRIBED IN DOC. 1991-0095890 O.R. REC'D MARCH 5,1991 ) An easement being a portion of Lot "G" of the Rancho Agua Hedionda, in the City of Carlsbad, County of San Diego, State of California, according to Partition Map thereof No. 823 filed in the Office of the County Recorder of San Diego County on November 16, 1896, described as follows: Commencing at the Southeast corner of that certain aviation lease dated May 24,1988; thence North 10° 19' 11" West (N10° 52'11"W per doc No. 1991-0095890 O.R. Rec'd March 5, 1991) along the Easterly line of said Lease 289.19 feet to the TRUE POINT OF BEGINNING; thence South 79° 44' 01" West 194.53 feet; thence South 10° 19' 11" East 23.49 feet; thence South 79° 44' 01" West 22.00 feet; thence North 10° 19' 11" West 10.00 feet; thence North 79° 44' 01" East 7.00 feet; thence North 10° 19' 11" West CSl 28.49 feet; thence North 79° 44' 01" East 209.53 feet to said Easterly line; thence South CL^ 10° 19' 11" East along said Easterly line 15.00 feet to the TRUE POINT OF BEGINNING. „ Frederick R. Le Page, P.L.S. 7524 Registration Expires 12/31/09 12-6-07 EXHIBIT A PD 06-21 LEGAL DESCRIPTION WATER EASEMENT VACATION ( DESCRIBED IN DOC. 2005-0916162 O.R. REC'D OCTOBER 21, 2005 ) That portion of McClellan-Palomar Airport, being a portion of Lot "G" of the Rancho Agua Hedionda, in the City of Carlsbad, County of San Diego, State of California, according to the Partition Map thereof No. 823 filed in the Office of the County Recorder of San Diego County on November 16, 1896, described as follow: Commencing at the most southerly corner of McClellan-Palomar Airport, as shown on Record of Survey No. 17732, being also the Northwest corner of Lot 32 of Carlsbad Tract No. 81-46, according to Map thereof No. 11288; thence along the Southerly line of McClellan-Palomar Airport North 79° 40' 49" East 647.15 feet; thence leaving said Southerly line, North 10° 19' 11" West, 153.29 feet to the TRUE POINT OF BEGINNING; thence South 79° 44' 01" West 545.20 feet; thence North 10°15' 59" West 289.04 feet; thence South 79° 44' 01" West 21.86 feet; thence North 10° 15' 59" West 7.00 feet; thence South 79° 44' 01" West 5.00 feet; thence North 10° 15' 59" West 13.00 feet; thence North 79° 44' 01" East 26.86 feet; thence North 10° 15' 59" West 16.49 feet; thence North 79° 44' 01" East 140.88; thence North 10° 15' 59" West 76.89 feet; thence North 79° 44' 01" East 12.00 feet; thence South 10° 15' 59" East 10.00 feet; thence North 79° 44' 01" East 8.00 feet, thence South 10° 15' 59" East 66.89 feet; thence North 79° 44' 01" East 164.25 feet; thence South 10° 15' 59" East 20.00 feet; thence South 79° 44' 01" West 305.13 feet; thence South 10° 15' 59" East 285.54 feet; „i thence North 79° 44' 01" East 525.18 feet, thence South 10° 19' 11" East 20.00 feet to the TRUE POINT OF BEGINNING. Frederick R. Le Page, P.L.S. 7524 Registration Expires 12/31/09 ilJ '"•*4^ LEGAL DESCRIPTION THAT PORTION OF McCLELLAN-PALOMAR AIRPORT. BEING A PORTION OF LOT 'G' OF RANCHO AGUA HEDIONDA, IN THE COUNTY OF SAN DIEGO. STATE OF CALIFORNIA. ACCORDING TO PARTITION MAP THEREOF No. 823, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY. ASSESSOR'S PARCEL NO. 760-221-73 BASIS OF BEARINGS FOR THIS PROJECT IS THE MOST NORTHEASTERLY LINE OF MAP No. 11288 SHOWN ON RECORD OF SURVEY MAP 17732 Le. N10''19'irw LEGEND P.O.C. POINT OF COMMENCEMENT T.P.O.B. TRUE POINT OF BEGINNING LEASE BOUNDARY INDICATES WATER EASEMENT VACATED DESCRIBED IN DOC. No. 1991-0095890 O.R. REC'D MARCH 5, 1991 INDICATES WATER EASEMENT VACATED DESCRIBED IN DOC. No. 2005-0916162 O.R. REC'D OCTOBER 21, 2005 AIRCRAFT PALOMAR VICINITY MAP fTTT. FREDERICK R. LePAGE, P.LS. 7524 REGISTRATION EXPIRES 12/31/2009 €5 0. DIMENSIONS LAND SURVEYING Sc MAPPING P.O. BOX 2796 RAMONA, CA 92065 PHONE & FAX (760) 789-3166 LOT G RANCHO AGUA HEDIONDA WATER EASEMENT VACATION IN THE CITY OF CARLSBAD, CA CLIENT: Magellan Aviation SHEET: 1 OF: 2 BY: FRL DATE: 11-30-2007 TJ X o o 2. 5" 3 > < o' > I u o I fo o o •>l >9 to O) ^ IO vJ o O) 05 o cn vl 00 IO I o> m o o > l— in CO > p o > >2 "Deo CD CO CD -< >m o m > CO m C/) CI < m X SIO'^IS'SS-E 10.00' N79-44'rE 8.00' S10-15'59"E 20.00* N79*44'0rE 7.00' (N797'43''E) Nio'^is'sg-w (N10'^52'17"W) 10.00' N10^5'59''W (N10'52'17"W) 28.49' ^y^A^^—— N79-44'rE 525.18- •• '^es \ \ ^^^^^^^^^^^^^^^^ S79*44'rW 545.20' ' N79''44*orE CN79^7'43"E) 22.00* >4\//.4 7/OA/ LEASE PARCEL A(A) [2005-0183-A] /'•o.c o AIRPORT PARCEL A(B) [2005-0183-B] IO (O S79'404*9"W 647.15* cn CD Q. ' o Q. 00 O CO 1 CO I H GO X X LU LU ^ LL Q Z < cr LU Q LU o CL o on CL I o ti; •g •> 05 Q 00~ o o CN PROPOSED WATER EASEMENT & FIRE SERVICE EXHIBIT o 79'40'49" E 5.00' PROPOSED WATER EASEMENT TO CMWD REC. DOC. NO. ,FT ROAD N 1019'ir W 104.57' ' N _ipT9'r["_W_157J4;_ y EXIST, 15' WDE WATER EASEMENT GRANTED TO THE OSTA REAL MUNICIPAL WATER DISTRICT^EGWBID AS • "I' i^ ' \ IK \ VEXISTING; 20' WATER 1-3 / EASEMENT TO C.M.W.D. REC. |.* °: [ 11-5-01 DOC. NO. .20QW0804399 I OOC. No. 82-020109 O.R o ^°-^2' R = 48.00' N:1019'ir W 88.00' PROPOSED WATER EASEMENT EXHIBIT LandAmerica Commonwealth POLICY OF TITLE INSURANCE ISSUED BY COMMONWEALTH LAND TITLE INSURANCE COMPANY SCHEDULE A Amount of Insurance: $17,000,000.00 Policy/File No.: 03204434 Prennium: $100.00 Date of Policy: September 9, 2005 at 9:49 AM 1. Name of Insured: Isis Lending, LLC, a Delaware limited liability company, and/or its successors and assigns as tiieir interests may appear 2. The estate or interest in the described herein and which is covered by this policy: A leaseiiold as created by that certain lease dated August 30, 1990, executed by County of San Diego, as lessor, and. Mission West Properties, a California Corporation as lessee, as referenced in the document entitled "Memorandum of Lease", which was recorded September 4, 1990 as Instrument No. 90 481708, of Official Records, for the term and upon and subject to all the provisions contained in said document, and in said lease, and as contained in the modification of said lease, executed by County of San Diego, as lessor, and Mission West Executive Aircraft Center, Inc., a California Corporation, as lessee, recorded May 6, 1997 as Instrument No. 1997-0209811, of Official Records, and that certain Amended and Restated Aviation Lease executed by the County of San Diego, as Lessor, and SCIF Palomar, LLC, a Delaware limited liability company, as Lessee (County Contract No. 104567), as disclosed by that certain Memorandum of Lease dated June 22, 2005 and recorded in the Official Records of San Diego, California, on September 9, 2005 as Document No. 2005-0780873, as to Parcels A(A) and ACB), and an Easement as to Parcel Al. A leasehold as created by that certain lease dated April 11, 1997, executed by County of San Diego, as lessor, and Mission West Executive Aircraft Center, Inc., a California Corporation, as lessee, as referenced in the document entitled "Memorandum of Lease", which was recorded May 6, 1997 as Instrument No. 1997- 0209814, of Official Records, and that certain Amended and Restated Aviation Lease executed by the County of San Diego, as Lessor, and SCIF Palomar, LLC, a Delaware limited liability company, as Lessee (County Contract No. 104566, as disclosed by that certain Memorandum of Lease dated June 22, 2005, and recorded in the Official Records of San Diego, California, on September 9, 2005 as Document No. 2005- 0780874, for the term and upon and subject to all the provisions contained in said document, and in said lease, as to Parcel B, and an Easement as to Parcel Bl. A FEE, as to all buildings, structures and improvements, as to Parcels A and B. ALTA Loan Policy - 1970 (Rev. 10-17-70) I I I I I I I 1 I I File No.: 03204434 SCHEDULE A Continued The estate or interest referred to herein is at Date of Policy vested in: SCIF Palomar, LLC, a Delaware limited liability company The mortgage herein referred to as the insured mortgage, and the assignments thereof, if any, are identified as more particularly described in Exhibit "A" attached hereto and made a part hereof. The land referred to in this policy is described as set forth in the insured mortgage, is situated in the County of San Diego, State of California, and is identified as more particularly described in Exhibit "B" attached hereto and made a part hereof. by Authorized Signatory ALTA Loan Policy - 1970 (Rev. 10-17-70) Page 2 I EXHIBIT "A' File No.: 03204434 A deed of trust to secure an indebtedness in the amount shown below, and any other obligations secured thereby. Amount: Dated: Trustor: Trustee: Beneficiary: Recorded: $17,000,000.00 July 1, 2005 SCIF Palomar, LLC, a Delaware limited liability company Commonwealth Land Title Company Isis Lending, LLC, a Delaware limited liability company September 9, 2005 as File No. 2005-0780875, of Official Records ALTA Loan Policy - 1970 (Rev. 10-17-70) Page 3 File No.: 03204434 EXHIBIT "B' ALL THAT CERTAIN REAL PROPERTY SITUATED IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS: PARCEL No. Af A^: THAT PORTION OF MCCLELLAN-PALOMAR AIRPORT (AIRPORT) AS DESCRIBED IN DEED TO THE COUNTY OF SAN DIEGO, RECORDED FEBRUARY 17, 1958 IN BOOK 6952, PAGE 391 OF OFFICIAL RECORDS (DEED), IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, BEING THAT PORTION OF LOT "G" OF RANCHO AGUA HEDIONDA, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO PARTITION MAP THEREOF NO. 823, FILED IN SAID COUNTY RECORDER'S OFFICE, AND AS SHOWN ON RECORD OF SURVEY MAP NO. (ROS) 17996 RECORDED OCTOBER 3, 2003 IN SAID COUNTRY RECORDER'S OFRCE, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE MOST SOUTHERLY CORNER OF SAID AIRPORT PROPERTY SAID CORNER BEING A 2" IRON PIPE WITH TAG STAMPED "L.S. 4506" AS SHOWN ON CERTIFICATE OF CORRECTION 90-537582 FOR MAP 11288 AND SAID RECORD OF SURVEY; THENCE ALONG THE SOUTHWESTERLY BOUNDARY OF SAID AIRPORT PROPERTY NORTH 10»19''ll'' WEST 1000.04 FEET (1000.02 FEET PER ROS 17996) TO A 2" IRON PIPE WITH TAG STAMPED "SD CO SURVEYOR" AS SHOWN ON SAID RECORD OF SURVEY; THENCE LEAVING SAID BOUNDARY ON A COURSE PARALLEL WITH THE CENTERUNE OF PALOMAR AIRPORT RUNWAY AS ESTABLISHED ON SAID RECORD OF SURVEY MAP NO. 17996, NORTH 79'='42'22" EAST, 133.20 FEET; THENCE SOUTH 10''57'41" WEST, 18.00 FEET TO A LINE THAT IS PARALLEL WITH AND 517.50 FEET SOUTHERLY OF SAID RUNWAY CENTERLINE AND THE TRUE POINT OF BEGINNING; THENCE SOUTH 10''19'11" EAST, 255:09 FEET; THENCE NORTH 79''40'49" EAST, 415.52 FEET TO THE BEGINNING OF A TANGENT 50.00-FOOT RADIUS CURVE, CONCAVE SOUTHWESTERLY; THENCE SOUTHEASTERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 45''03'12", AN ARC LENGTH OF 39.32 FEET; THENCE TANGENT TO SAID CURVE SOUTH 55°15'59" EAST, 78.79 FEET TO A POINT ON A NON TANGENT 48.00 FOOT RADIUS CURVE, CONCAVE EASTERLY, A RADIAL LINE TO SAID CURVE AT SAID POINT BEARS, NORTH 55°15'59" WEST; THENCE SOUTHERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 74°38'43", AN ARC LENGTH OF 62.53 FEET TO THE BEGINNING OF A TANGENT 90.00 FOOT RADIUS REVERSE CURVE, CONCAVE SOUTHWESTERLY; THENCE SOUTHEASTERLY ALONG THE ARC OF SAID REVERSE CURVE, THROUGH A CENTRAL ANGLE OF 29°35'31", AN ARC LENGTH OF 46.48 FEET; THENCE TANGENT TO SAID CURVE SOUTH 10° 19'11" EAST, 88.00 FEET; THENCE NORTH 79°40"49" EAST, 22.00 FEET; THENCE SOUTH 10°19'11" EAST, 411.63 FEET TO A LINE THAT IS PARALLEL WITH AND 55.92 FEET NORTHWESTERLY OF THE SOUTHEASTERLY BOUNDARY OF SAID AIRPORT PROPERTY; THENCE ALONG SAID PARALLEL LINE, SOUTH 79''40'49" WEST, 249.41 FEET; THENCE LEAVING SAID PARALLEL LINE, NORTH 10°19'11" WEST, 19.00 FEET; THENCE SOUTH 79''40'49" WEST, 25.00 FEET; ALTA Loan Policy - 1970 (Rev. 10-17-70) Page 4 I I « I I I i I I I i I File No.: 03204434 EXHIBIT "B" Continued THENCE SOUTH 10''19'11" EAST, 19.00 FEET TO A LINE THAT IS PARALLEL WITH AND 55.92 FEET NORTHWESTERLY OF THE SOUTHEASTERLY BOUNDARY OF SAID AIRPORT PROPERTY; THENCE ALONG SAID PARALLEL LINE, SOUTH 79°40'49" WEST, 259.74 FEET, TO THE BEGINNING OF A TANGENT 50.00 FOOT RADIUS CURVE, CONCAVE NORTHEASTERLY; THENCE NORTHWESTERLY ALONG THE ARC OF SAID CURVE, THROUGH A CENTRAL ANGLE OF 90°00'00", AN ARC LENGTH OF 78.54 FEET; THENCE TANGENT TO SAID CURVE, NORTH 10°19'11" WEST, 194.82 FEET; THENCE NORTH 24''21'21" WEST, 185.54 FEET TO A LINE THAT IS PARALLEL WITH AND 30.00 FEET NORTHEASTERLY OF THE SOUTHWESTERLY BOUNDARY OF SAID AIRPORT THENCE NORTH 10°19'11" WEST, 502.51 FEET TO A LINE THAT IS PARALLEL WITH AND 517.50 FEET SOUTHERLY OF SAID RUNWAY CENTERLINE; THENCE ALONG SAID PARALLEL UNE, NORTH 79''42'22" EAST, 96.67 FEET TO THE TRUE POINT OF BEGINNING. (County Description No. 2005-0183-A) Assessor Parcel No. being a portion of 760-221-73 with other property PARCEL AfB^; THAT PORTION OF MCCLELLAN-PALOMAR AIRPORT (AIRPORT) AS DESCRIBED IN DEED TO THE COUNTY OF SAN DIEGO, RECORDED FEBRUARY 17, 1958 IN BOOK 6952, PAGE 391 OF OFFICIAL RECORDS (DEED), IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, BEING THAT PORTION OF LOT "G" OF RANCHO AGUA HEDIONDA, IN THE COUNTY OF SAN DIEGO, STATE OF CAUFORNIA, ACCORDING TO PARTITION MAP THEREOF NO. 823, FILED IN SAID COUNTY RECORDER'S OFFICE, AND AS SHOWN ON RECORD OF SURVEY MAP NO. 17996 RECORDED OCTOBER 3, 2003 IN SAID COUNTY RECORDER'S OFFICE, MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE MOST SOUTHERLY CORNER OF SAID AIRPORT PROPERTY SAID CORNER BEING A 2" IRON PIPE WITH TAG STAMPED "L.S. 4506" AS SHOWN ON CERTIFICATE OF CORRECTION 90- 537582 FOR MAP 11288 AND SAID RECORD OF SURVEY; THENCE ALONG THE SOUTHWESTERLY BOUNDARY OF SAID AIRPORT PROPERTY NORTH 10''19"11" WEST 1000.04 FEET (1000.02 FEET PER ROS 17996) TO A 2" IRON PIPE WITH TAG STAMPED "SD CO SURVEYOR" AS SHOWN ON SAID RECORD OF SURVEY; THENCE LEAVING SAID BOUNDARY ON A COURSE PARALLEL WITH THE CENTERUNE OF PALOMAR AIRPORT RUNWAY AS ESTABLISHED ON SAID RECORD OF SURVEY MAP NO. 17996, NORTH 79°A2'22" EAST, 133.20 FEET; I THENCE SOUTH 10''57'41" WEST, 18.00 FEET TO A UNE THAT IS PARALLEL WITH AND 517.50 FEET ^ SOUTHERLY OF SAID RUNWAY CENTERLINE; I I I THENCE SOUTH 79"42'22" WEST, 96.67 FEET TO A UNE THAT IS PARALLEL WITH AND 30.00 FEET NORTHEASTERLY OF THE SOUTHWESTERLY BOUNDARY OF SAID AIRPORT BOUNDARY; THENCE ALONG SAID PARALLEL SOUTH 10n9'll" EAST, 502.51 FEET; THENCE LEAVING SAID PARALLEL UNE, SOUTH 24=21'21" EAST, 185.54 FEET; ALTA Loan Policy - 1970 (Rev. 10-17-70) Page 5 I File No.: 03204434 EXHIBIT "B" Continued THENCE SOUTH lO'ig'll" EAST, 194.82 FEET TO THE BEGINNINIG OF A TANGENT 50-FOOT RADIUS CURVE CONCAVE NORTHEASTERLY; THENCE SOUTHEASTERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 90°00'00", A DISTANCE OF 78.54 FEET TO A POINT OF TANGENCY WITH A LINE THAT IS PARALLEL WITH AND 55.92 FEET NORTHWESTERLY OF THE SOUTHEASTERLY BOUNDARY OF SAID AIRPORT PROPERTY; THENCE TANGENT TO SAID CURVE, ALONG SAID PARALLEL UNE, NORTH 79°40'49" EAST, 259.74 FEET; THENCE LEAVING SAID PARALLEL UNE, NORTH 10n9'll" WEST, 19.00 FEET; THENCE NORTH 79''40'49" EAST, 25.00 FEET; THENCE SOUTH 10''19'11" EAST, 19.00 FEET TO A UNE THAT IS PARALLEL WITH AND 55.92 FEET NORTHWESTERLY OF THE SOUTHEASTERLY BOUNDARY OF SAID AIRPORT PROPERTY; THENCE ALONG SAID PARALLEL UNE, NORTH 79°40'49" EAST, 249.41 FEET; THENCE SOUTH 10n9'll" EAST, 55.92 FEET TO SAID SOUTHEASTERLY BOUNDARY OF THE AIRPORT PROPERTY; THENCE ALONG SAID BOUNDARY, SOUTH 79°40'49" WEST, 659.15 FEET TO THE POINT OF BEGINNING. (County Legal Description No.: 2005-0183-B) Assessor Parcei No. being a portion of 760-221-73 with other property PARCEL A-1: NON-EXCLUSIVE EASEMENTS FOR THE USE OF ALL PUBUC AIRPORT FACILITIES AT THE AIRPORT INCLUDING, BUT NOT LIMITED TO, TAXIWAYS, RUNWAYS, APRONS, NAVIGATIONAL AIDS AND FACILITIES RELATING THERETO, FOR THE PURPOSE OF LANDINGS, TAKEOFFS AND TAXIING OF LESSEE'S AND LESSEE'S CUSTOMERS' AIRCRAFT, AS WELL AS THE NON-EXCLUSIVE USE OF THE ACCESS ROAD FOR INGRESS TO AND EGRESS FROM THE PREMISES, AS CREATED BY AND DESCRIBED IN SECTION 2.1 OF THAT CERTAIN AMENDED AND RESTATED AVIATION LEASE EXECUTED BY THE COUNTY OF SAN DIEGO, AS LESSOR, AND SCIF PALOMAR, LLC, A DELAWARE UMITED UABILITY COMPANY, AS LESSEE (COUNTY AWARD NO. 104567), AS DISCLOSED BY THAT CERTAIN MEMORANDUM OF LEASE DATED DUNE 22, 2005. I PARCEL B: I THAT PORTION OF MCCLELLAN-PALOMAR AIRPORT, BEING A PORTION OF LOT "G" OF RANCHO AGUA HEDIONDA, IN THE COUNTY OF SAN DIEGO, STATE OF CAUFORNIA, ACCORDING TO PARTITION MAP THEREOF NO. 823, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, DESCRIBED AS FOLLOWS: COMMENCING AT POINT 5 ON THE NORTHERLY UNE OF SAID LOT "G"; THENCE SOUTH 10°52'17" EAST, 99.26 FEET TO A POINT ON THE CENTERUNE OF THE RUNWAY OF MCCLELLAN-PALOMAR AIRPORT, BEING ALSO ENGINEER'S STATION 33+30.21; THENCE ALONG SAID CENTERLINE NORTH 79''07'43" EAST, 183.26 FEET TO ENGINEER'S STATION 35+13.47; THENCE LEAVING SAID CENTERLINE, SOUTH 10<'52'17" EAST, 511.50 FEET; THENCE NORTH 79°07'43" EAST, 75.00 FEET TO THE TRUE POINT OF BEGINNING; THENCE SOUTH 10''52'17" EAST, 255.50 FEET; THENCE NORTH 79°07'43" EAST, 414.92 FEET TO THE BEGINNING OF A TANGENT 50.00 FOOT RADIUS CURVE, ALTA Loan Policy - 1970 (Rev. 10-17-70) Page 6 File No.: 03204434 EXHIBIT "B" Continued CONCAVE SOUTHERLY; THENCE EASTERLY ALONG THE ARC OF SAID CURVE, THROUGH CENTRAL ANGLE OF 45»00'00", A DISTANCE OF 39.27 FEET; THENCE TANGENT TO SAID CURVE SOUTH 55°52'17" EAST, 78.82 FEET TO A POINT ON THE ARC OF A NON-TANGENT 48.00 FOOT RADIUS CURVE, CONCAVE SOUTHEASTERLY, A RADIAL TO SAID CURVE AT SAID POINT BEARS NORTH 55''52'17" WEST; THENCE NORTHEASTERLY ALONG THE ARC OF SAID CURVE, THROUGH A CENTRAL ANGLE OF 32°58'23", A DISTANCE OF 27.62 FEET; THENCE LEAVING SAID CURVE, NORTH 10''52'17" WEST, 462.87 FEET TO A POINT ON A UNE THAT IS PARALLEL WITH AND 367.50 FEET (MEASURED AT RIGHT ANGLES) SOUTHERLY OF SAID CENTERUNE OF RUNWAY; THENCE ALONG SAID PARALLEL LINE SOUTH 79''07'43'' WEST, 472.28 FEET; THENCE SOUTH 10°09'43" WEST, 160.71 FEET TO THE TRUE POINT OF BEGINNING. County Legal Description No. 91-0318-Al (Formerly 87-0150-A2) Assessor Parcel No. 760-221-47 PARCEL Bl; NON-EXCLUSIVE EASEMENTS FOR THE USE OF ALL PUBUC AIRPORT FACILITIES AT THE AIRPORT INCLUDING, BUT NOT UMITED TO, TAXIWAYS, RUNWAYS, APRONS, NAVIGATIONAL AIDS AND FACILITIES RELATING THERETO, FOR THE PURPOSE OF LANDINGS, TAKEOFFS AND TAXIING OF LESSEE'S AND LESSEE'S CUSTOMERS' AIRCRAFT, AS WELL AS THE NON-EXCLUSIVE USE OF THE ACCESS ROAD FOR INGRESS TO AND EGRESS FROM THE PREMISES, AS CREATED BY AND DESCRIBED IN SECTION 2.1 OF THAT CERTAIN AMENDED AND RESTATED AVIATION LEASE EXECUTED BY THE COUNTY OF SAN DIEGO, AS LESSOR, AND SCIF PALOMAR, LLC, A DELAWARE UMITED UABILITY COMPANY, AS LESSEE (COUNTY AWARD NO. 104566 , AS DISCLOSED BY THAT CERTAIN LEASE DATED JUNE 22, 2005. ALTA Loan Policy - 1970 (Rev. 10-17-70) Page 7 OFFICERS, DIRECTORS OR PRINCIPAL INTEREST HOLDERS LIMITED LL^BILITY COMPANY AGREEMENT FOR SCIF PALOMAR, LLC ^ This Limited Liability Company Agreement (the "Agreement") is entered into as of this 'jOii^Sj of $S-p7g>H^5e . 1997, by and between SCIF CARLSBAD, LLC, a Delaware limited liability company ("SCIF"), and HILLSIDE CAPITAL INCORPORATED, a Delaware corporation ("Hillside"), with reference to the following: A. The Southem Califomia Industrial Fund, LLC ("SCIF Contact Purchaser") entered into that certain Leasehold Purchase and Sale Agreement and Joint Escrow Instructions dated July 1, 1997 with Spieker Northwest, Inc. (the "Purchase Contract"). Pursuant to the Purchase Contract, SCIF Contract Purchaser agreed to acquire the seller's interest in certain ground leases, the improvements thereon, and certain other property as more fully described in the Purchase Contract (collectively, defined in the Purchase Contract as the "Property" and defined herein as the "Spieker Property").. B. SCIF and Hillside desire to form a limited liability company to acquire the Spieker Property. C. On September 17, 1997, a Certificate of Formation for SCIF Palomar, LLC (the "Company"), a limited liability company under the laws of the State of Delaware, was filed with the Delaware Secretary of State. D. The parties desire to adopt and approve this limited liability company agreement for the Company. NOW, THEREFORE, SCIF and Hillside (hereinafter sometimes collectively referred to as the "Members," or individually as a "Member") by this Agreement set forth the limited liability company agreement for the Company under the laws of the State of Delaware upon the terms and subject to the conditions of this Agreement. ARTICLE L DEFINrnONS When used in this Agreement, the following terms shall have the meanings set forth below (all terms used in this Agreement that are not defined in this Article I shall have the meanings set forth elsewhere in this Agreement): "Acquisition Loans" shall refer to one or more loans obtained fi-om lenders for the acquisition of the Spieker Property and which will be secured by a fiirst lien on all or a portion of the Spieker Property. LA972550.070/MJM/S7944-006/1 M2-97/nihc '1. fj--l s contributed by a Member to the Company shall be the gross fair market value of such asset, as determined by the contributing Member and the Company; and (ii) the Gross Asset Value of all assets whose Gross Asset Value has been adjusted pursuant to Section 6.2H shall be adjusted pursuant to the last sentence of Section 6.2H. "Land" shall mean that portion of the Spieker Property which is subject to the Aviation Leases (as defined in the Purchase Contract) and which is more particularly described on . Exhibits "A-l" and " A::2" attached hereto, together with any improvements erected thereon. "Liquidation" shall mean (i) when used with reference to the Company, the earlier of (a) the date upon which the Company is terminated under Section 708(b)(1) of the Code, or any similar provision enacted in lieu thereof, or (b) the date upon which the Company ceases to be a going concem, and (ii) when used with reference to any Member, means liquidation of a Member's interest in the Company under Regulation Section 1.761-1(d). "Management Agreement" shall mean that certain Property Management Agreement dated to be entered into by and between the Company and The Magellan Group, Inc. "Manager" shall mean The Magellan Group, Inc. or any other person or entity that shall succeed it in that capacity. Notwithstanding anything to the contrary contained herein, all actions and decisions that may be taken or made on behalf of the Company by its Manager may be taken or made by one or both of Martin Slusser and/or Kevin Staley, acting smgly or together, on behalf of Manager. "Member" shall mean each Person who (a) is an initial signatory to this Agreement, has been admitted to the Company as a Member in accordance with this Agreement or is an assignee who has become a Member in accordance with Article Vn and (b) has not resigned, withdrawn, been expelled or, if other than in individual, dissolved. "Member Nonrecourse Debt" shaU have the meaning ascribed to the term "Member Nonrecourse Debt" in Regulations Section 1.704-2(bX4). "Member Nonrecourse Deductions" shall mean items of Company loss, deduction, or Code Section 70S(aX2)(B) expenditures which are attributable to Member Nonrecourse Debt. "Membership Interest" shall mean a Member's entire interest in the Company including the "Member's Economic Interest, the right to vote on or participate in the management, and the right to receive infonnation conceming the business and afifairs of the Company. . "Net Profit" and "Net Loss" shall mean the taxable income or loss for federal income tax purposes of the Company for each Fiscal Year, plus income and gain exempt fi-om federal income tax for such Fiscal Year, and minus Section 70S(aX2)(B) Expenditures for such Fiscal Year. Any item of income, gain, loss, deduction of Section 705(aX2)(B) Expenditure that is allocated in any Fiscal Year pursuant to Section 6.2A, 6.2B, 6.2C, 6.2D, 6.2E or 6.2F shall be excluded fi'om the computation of Net Profit or Net Loss to be allocated for such Fiscal Year pursuant to Section 6.1. Net Profit or Net Loss resulting fi'om any disposition of Company property shall be computed by reference to the Gross Asset Value of the property disposed of, -4- LA972550.070/MJM/S79444X)6/11-12-97/mhc 12.16 Remedies Cumulative. The remedies under this Agreement are cumulative and shall not exclude any other remedies to which any person may be lawfully entitled. 12.17 Goveming Law. Pursuant to Section 17450(a) of the Califomia Act, the provisions of the Agreement shall be construed and enforced in accordance with the laws of the State of Delaware without regard to principles of conflicts of law. 12.18 Partnership Intended Solelv for Tax Purposes. The Members have formed the Company as a Delaware limited liability company under the Act, and do not intend to form a general or limited pairtnership under Delaware, Califomia or any other state law. The Members do not intend to be partners to one another or to any third party. The Members intend the Company to be classified and treated as a partnership solely for federal and state income taxation purposes. Each Member agrees to act consistently with the foregoing provisions of this Section 12.18 for all purposes, including, without limitation, for purposes of reporting the transactions contemplated herein to the Internal Revenue Service and all state and local taxing authorities. IN WITNESS WHEREOF, the Manager and all of the Members of the Company have executed this Agreement, effective as of the date written above. "Manager" THE MAGELLAN GROUP, INC., a Califomia corporation Nariie: A^Ar/A/ J/i^Jis£-/? Its: ^itii^^ JJ«. JLt. «y "Member" or "SCIF"" SCEF CARLSBAD, LLC, a Delaware limited liability company By: Southern Califomia Industrial Fund, LLC, a Califomia limited liability company, Its: Member/Manager By: The Magellan Group, Inc., a Delaware corporation, Member/Manager By: , Name: Kevm Staley / Title: President -35- LA972550.070/MJM/S7944-006/11-12-97/tnhc "Member" or "Hillside" HILLSIDE CAPITAL INCORPORATED, a Delaware corporation LA972550.070/MJM/S7944^/l l-12-97/inhc By: kvL--^ Its: -36- Order^pber: NCS-352074-LA2 Page Number: 1 First American Title Insurance Company National Commercial Services 550 S. Hope Street, Suite 1950 Los Angeles, CA 90071 May 14, 2008 Robert Levine Magellan Aviation, LLC 2006 Palomar Airport Road Carlsbad, CA 92008 Phone: (760)438-4603 Fax: (760)431-8964 Customer Reference: SCIF Palomar LLC Title Officer: Phone: Fax No.: E-Mail: Anthony Rivera / Fernando Alegre (866)830-9622 (818)337-7428 arivera@firstam.com/faaleg re@firstam.com Borrower: Property: SCIF Palomar LLC and Magellan Aviation 2006 and 2016 Palomar Airport Road, Carlsbad, CA PRELIMINARY REPORT In response to the above referenced application for a policy of title insurance, this company hereby reports that it is prepared to issue, or cause to be issued, as of the date hereof, a Policy or Policies of Title Insurance describing the land and the estate or interest therein hereinafter set forth, insuring against loss which may be sustained by reason of any defect, lien or encumbrance not shown or referred to as an Exception below or not excluded from coverage pursuant to the printed Schedules, Conditions and Stipulations of said Policy forms. The printed Exceptions and Exclusions from the coverage of said Policy or Policies are set forth in Exhibit A attached. Copies of the Policy forms should be read. They are available from the office which issued this report. Please read the exceptions shown or referred to below and the exceptions and exclusions set forth in Exhibit A of this report carefully. The exceptions and exclusions are meant to provide you with notice of matters which are not covered under the terms of the title insurance policy and should be carefully considered. It Is important to note that this preliminary report is not a written representation as to the condition of title and may not list all liens, defects, and encumbrances affecting title to the land. This report (and any supplements or amendments hereto) Is issued solely for the purpose of facilitating the issuance of a policy of title insurance and no liability is assumed hereby. If it is desired that liability be assumed prior to the issuance of a policy of title insurance, a Binder or Commitment should be requested. First American Title Insurance Company Order^^ber: NCS-352074-[A2 Page Number: 2 Dated as of May 08, 2008 at 7:30 A.M. The form of Policy of title insurance contemplated by this report is: ALTA Extended Loan Policy - 2006 A specific request should be made if another form or additional coverage is desired. Title to said estate or interest at the date hereof is vested in: SCIF Palomar, LLC, a Delaware limited liability company The estate or interest in the land hereinafter described or referred to covered by this Report is: Fee as to all buildings, structures and improvements collectively known as the Leasehold improvements A Leasehold as created by that certain Lease dated June 22, 2005, executed by the County of San Diego, a political subdivision of the State of California, as Lessor, and SCIF Palomar, LLC, a Delaware limited liability company, as Lessee, a Memorandum of which recorded September 9, 2005 as Instrument No. 2005-0780873 of Official Records. As to the ground As to Parcei A(A) and A(B); Fee as to all buildings, structures and improvements collectively known as the Leasehold improvements A Leasehold as created by that certain Lease dated June 22, 2005, executed by the County of San Diego, a political subdivision of the State of California, as Lessor, and SCIF Palomar, LLC, a Delaware limited liability company, as Lessee, a Memorandum of which recorded September 9, 2005 as Instrument No. 2005-0780874 of Official Records. As to the ground As to Parcel B The Land referred to herein is described as follows: (See attached Legal Description) At the date hereof exceptions to coverage in addition to the printed Exceptions and Exclusions in said policy form would be as follows: 1. General and special taxes and assessments for the fiscal year 2008-2009, a lien not yet due or payable. First American Title Insurance Company Order|^Der: NCS-352074-LA2 Page Number: 3 2. The lien of supplemental taxes, if any, assessed pursuant to Chapter 3.5 commencing with Section 75 of the California Revenue and Taxation Code. 3. An easement for installation, maintenance and repair of underground water and/or gas pipelines across and under the land herein described, provided that said easement shall not be used and no pipeline or pipelines shall be so constructed or installed as to require the cutting of or excavation within the surface of any airplane runway or so as to interfere with any building, structure or facility or the future construction or installation within or on said real property of any building, structure or facility proposed to be constructed or installed by County of San Diego, its successors or assigns; and provided further that any such pipeline, or pipelines, shall be installed in manner and at a depth beneath the surface of the ground prescribed by said County of San Diego, its successors or assigns, and shall be maintained and repaired in a manner satisfactory to said County of San Diego, its successors and assigns and incidental purposes, recorded February 17, 1958 as Book 6952, Page 391 of Ofilcial Records. In Favor of: County of San Diego Affects: Parcel 8, as described therein Quitclaim Deed recorded April 3, 1974 as Instrument No. 74-083015 of Official Records. An Agreement Regarding said Easement, dated January 24, 1961, upon the terms, covenants, and conditions contained therein. Executed by and between: The County of San Diego and Carlsbad Properties, a Partnership. Recorded: August 3, 1961 as Instrument No. 133244 of Official Records. 4. An easement for underground water and/or gas pipelines and incidental purposes, recorded February 17, 1958 as Book 6952, Page 392 of Official Records. In Favor of: Carlsbad Properties, a Co-Partnership Affects: As described therein The location of the easement cannot be determined from record information. Said matter is also recorded April 3, 1974 as Instrument No. 74-083015 of Official Records. 5. An easement for public utilities and incidental purposes, recorded September 1, 1966 as Instrument No. 143212 of Official Records. In Favor of: San Diego Gas and Electric Company Affects: As described therein 6. An easement for electrical facilities and incidental purposes, recorded November 4, 1966 as Instrument No. 176118 of Ofilcial Records. In Favor of: San Diego Gas and Electric Company, a Corporation Affects; As described therein The location of the easement cannot be determined from record information. 7. An easement for either or both pole lines, underground conduits and incidental purposes, recorded February 9, 1967 as Instrument No. 17887 of Official Records. In Favor of: San Diego Gas and Electric Company Affects; Parcel B, as described therein First American Title Insurance Company Ordet^pber: NCS-352074-LA2 Page Number: 4 8. An easement for either or both pole lines, underground conduits and incidental purposes, recorded February 17, 1967 as Instrument No. 21962 of Official Records. In Favor of: San Diego Gas and Electric Company Affects: Parcel A, as described therein 9. An easement for electrical facilities and incidental purposes, recorded September 24, 1974 as Instrument No. 74-257252 of Official Records. In Favor of: San Diego Gas and Electric Company Affects: Parcel B, as described therein 10. An easement for water pipe lines and incidental purposes, recorded January 25, 1982 as Instrument No. 82-020109 of Official Records. In Favor of: Costa Real Municipal Water District Affects: Parcel B, as described therein 11. An easement for underground electrical system and incidental purposes, recorded March 19, 1987 as Instrument No. 87-142110 of Official Records. In Favor of: San Diego Gas and Electric Company Affects: Parcel B, as described therein 12. An easement for the construction, operation, repair, reconstruction and all activities necessary to construct, reconstruct, operate, maintain, and repair facilities designed for the general purpose of collecting, storing, transporting, pumping and treating all water, including surface water, stream water, fiood water and ground water flowing into said facilities, and all natural and artificial drainage ditches and structures of any kind and incidental purposes, recorded March 5, 1991 as Instrument No. 91-0095890 of Official Records. In Favor of: Carlsbad Municipal Water District, a Public Agency Affects: Parcel A, as described therein 13. An easement for water line and incidental purposes, recorded October 21, 2005 as Instrument No. 2005-0916162 of Official Records. In Favor of: Carlsbad Municipal Water District, a Public Agency Affects: As described therein 14. A Deed of Trust to secure an original indebtedness of $17,000,000.00 recorded September 09, 2005 as Instrument No. 2005-0780875 of Official Records. Dated: July 1, 2005 Trustor: SCIF Palomar, LLC, a Delaware limited liability company Trustee: Commonwealth Land Title Company, a California corporation Beneficiary: ISIS Lending, LLC, a Delaware limited liability company A document entitled "Assignment of Leases and Rents" recorded September 09, 2005 as Instrument No. 2005-0780876 of Official Records, as additional security for the payment of the indebtedness secured by the deed of trust. A document recorded November 27, 2007 as Instrument No. 2007-0739533 of Official Records provides that the deed of trust or the obligation secured thereby has been modified. First American Title Insurance Company Order^|ber: NCS-352074-LA2 Page NUmber: 5 15. Any failure to comply with the terms, provisions and conditions of the lease referred to in this report. 16. Rights of parties in possession. First American Title Insurance Company Ordei^^ber: NCS-352074-LA2 Page Number; 6 INFORMATIONAL NOTES 1. Taxes for proration purposes only for the fiscal year 2007-2008. First Installment: $20,202.08, PAID Second Installment: $20,202.08, PAID Tax Rate Area: 09087 APN: 760-221-73-00 (Afl^ects Parcel A(A) and A(B)) 2. Taxes for proration purposes only for the fiscal year 2007-2008. First Installment: $10,144.14, PAID Second Installment: $10,144.14, PAID Tax Rate Area: 09087 APN: 760-221-47-00 (Afi^ects Parcel B) 3. According to the latest available equalized assessment roll in the office of the county tax assessor, there is located on the land a(n) Commercial Structure known as 2006 and 2016 Palomar Airport Road, Carlsbad, California. 4. According to the public records, there has been no conveyance of the land within a period of twenty-four months prior to the date of this report, except as follows: None 5. This preliminary report/commitment was prepared based upon an application for a policy of title insurance that identified land by street address or assessor's parcel number only. It is the responsibility of the applicant to determine whether the land referred to herein is in fact the land that is to be described in the policy or policies to be issued. 6. Should this report be used to facilitate your transaction, we must be provided with the following prior to the issuance of the policy: A. WITH RESPECT TO A CORPORATION: 1. A certificate of good standing of recent date issued by the Secretary of State of the corporation's state of domicile. 2. A certificate copy of a resolution of the Board of Directors authorizing the contemplated transaction and designating which corporate officers shall have the power to execute on behalf of the corporation. 3. Requirements which the Company may impose following its review of the above material and other information which the Company may require. First American Title Insurance Company Orde^^iber: NCS-352074-LA2 Page Number: 7 B. WITH RESPECT TO A CALIFORNIA LIMITED PARTNERSHIP: 1. A certified copy of the certificate of limited partnership (form LP-1) and any amendments thereto (form LP-2) to be recorded in the public records; 2. A full copy of the partnership agreement and any amendments; 3. Satisfactory evidence of the consent of a majority in interest of the limited partners to the contemplated transaction; 4. Requirements which the Company may impose following its review of the above material and other information which the Company may require. C. WITH RESPECT TO A FOREIGN LIMITED PARTNERSHIP: 1. A certified copy of the application for registration, foreign limited partnership (form LP-5) and any amendments thereto (form LP-6) to be recorded in the public records; 2. A full copy of the partnership agreement and any amendment; 3. Satisfactory evidence of the consent of a majority in interest of the limited partners to the contemplated transaction; 4. Requirements which the Company may impose following its review of the above material and other information which the Company may require. D. WITH RESPECT TO A GENERAL PARTNERSHIP: 1. A certified copy of a statement of partnership authority pursuant to Section 16303 of the California Corporation Code (form GP-I), executed by at least two partners, and a certified copy of any amendments to such statement (form GP-7), to be recorded in the public records; 2. A full copy of the partnership agreement and any amendments; 3. Requirements which the Company may impose following its review of the above material required herein and other information which the Company may require. E. WITH RESPECT TO A LIMITED LIABILITY COMPANY: 1. A copy of its operating agreement and any amendments thereto; 2. If it is a California limited liability company, a certified copy of its articles of organization (LLC-1) and any certificate of correction (LLC-11), certificate of amendment (LLC-2), or restatement of articles of organization (LLC-10) to be recorded in the public records; 3. If it is a foreign limited liability company, a certified copy of its application for registration (LLC-5) to be recorded in the public records; 4. With respect to any deed, deed of trust, lease, subordination agreement or other document or instrument executed by such limited liability company and presented for recordation by the Company or upon which the Company is asked to rely, such document or instrument must be executed in accordance with one of the following, as appropriate: (i) If the limited liability company properly operates through officers appointed or elected pursuant to the terms of a written operating agreement, such documents must be executed by at least two duly elected or appointed officers, as follows: the chairman of the board, the president or any vice president, and any secretary, assistant secretary, the chief financial officer or any assistant treasurer; (ii) If the limited liability company properly operates through a manager or managers identified in the articles of organization and/or duly elected pursuant to the terms of a written operating agreement, such document must be executed by at least two such managers or by one manager if the limited liability company properly operates with the existence of only one manager. 5. Requirements which the Company may impose following its review of the above material and other information which the Company may require. F. WITH RESPECT TO A TRUST: 1. A certification pursuant to Section 18100.5 of the California Probate Code in a form satisfactory to the Company. First American Title Insurance Company Ordei^^ber: NCS-352074-LA2 Page Number; 8 2. Copies of those excerpts from the original trust documents and amendments thereto which designate the trustee and confer upon the trustee the power to act in the pending transaction. 3. Other requirements which the Company may impose following its review of the material require herein and other information which the Company may require. G. WITH RESPECT TO INDIVIDUALS: 1. A statement of information. The map attached, if any, may or may not be a survey of the land depicted hereon. First American Title Insurance Company expressly disclaims any liability for loss or damage which may result from reliance on this map except to the extent coverage for such loss or damage is expressly provided by the terms and provisions of the title insurance policy, if any, to which this map is attached. First American Title Insurance Company Ordei^^ber: NCS-352074-LA2 Page Number: 9 LEGAL DESCRIPTION Real property in the City of Carlsbad, County of San Diego, State of California, described as follows: PARCEL A(A): THAT PORTION OF MCCLELLAN-PALOMAR AIRPORT (AIRPORT) AS DESCRIBED IN DEED TO THE COUNTY OF SAN DIEGO, RECORDED FEBRUARY 17, 1958 IN BOOK 6952, PAGE 391 OF OFFICIAL RECORDS (DEED), IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, BEING THAT PORTION OF LOT"G" OF RANCHO AGUA HEDIONDA, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO PARTITION MAP THEREOF NO. 823, FILED IN SAID COUNTY RECORDER'S OFFICE, AND AS SHOWN ON RECORD OF SURVEY MAP NO. (ROS) 17996 RECORDED OCTOBER 3, 2003 IN SAID COUNTY RECORDER'S OFFICE, MORE PARTICUUVRLY DESCRIBED AS FOLLOWS: COMMENCING AT THE MOST SOUTHERLY CORNER OF SAID AIRPORT PROPERTY SAID CORNER BEING A 2" IRON PIPE WITH TAG STAMPED "L.S. 4505" AS SHOWN ON CERTIFICATE OF CORRECnON 90-537582 FOR MAP 11288 AND SAID RECORD OF SURVEY; THENCE ALONG THE SOUTHWESTERLY BOUNDARY OF SAID AIRPORT PROPERTY NORTH 10°19'11" WEST 1000.04 FEET (1000.02 FEET PER ROS 17996) TO A 2" IRON PIPE WITH TAG STAMPED "SD CO SURVEYOR" AS SHOWN ON SAID RECORD OF SURVEY; THENCE LEAVING SAID BOUNDARY ON A COURSE PARALLEL WITH THE CENTERLINE OF PALOMAR AIRPORT RUNWAY AS ESTABLISHED ON SAID RECORD OF SURVEY MAP NO. 17996, NORTH 79°42'22" EAST, 133.20 FEET; THENCE SOUTH 10°57'41" WEST, 18.00 FEET TO A LINE THAT IS PARALLEL WITH AND 517.50 FEET SOUTHERLY OF SAID RUNWAY CENTERLINE AND THE TRUE POINT OF BEGINNING; THENCE SOUTH 10°19'11" EAST, 255.09 FEET; THENCE NORTH 79°40'49" EAST, 415.52 FEET TO THE BEGINNING OF A TANGENT 50.00-FOOT RADIUS CURVE, CONCAVE SOUTHWESTERLY; THENCE SOUTHEASTERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 45°03'12", AN ARC LENGTH OF 39.32 FEET; THENCE TANGENT TO SAID CURVE SOUTH 55°15'59" EAST, 78.79 FEET TO A POINT ON A NON TANGENT 48.00 FOOT RADIUS CURVE, CONCAVE EASTERLY, A RADIAL LINE TO SAID CURVE AT SAID POINT BEARS, NORTH 55°15'59" WEST; THENCE SOUTHERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 74°38'43", AN ARC LENGTH OF 62.53 FEET TO THE BEGINNING OF A TANGENT 90.00 FOOT RADIUS REVERSE CURVE, CONCAVE SOUTHWESTERLY; THENCE SOUTHEASTERLY ALONG THE ARC OF SAID REVERSE CURVE, THROUGH A CENTRAL ANGLE OF 29°35'3r', AN ARC LENGTH OF 45.48 FEET; THENCE TANGENT TO SAID CURVE SOUTH 10°19'11" EAST, 88.00 FEET; First American Title Insurance Company Orde^^ber: NCS-352074-LA2 Page Number: 10 THENCE NORTH 79°40'49" EAST, 22.00 FEET; THENCE SOUTH 10°19'11" EAST, 411.53 FEET TO A LINE THAT IS PARALLEL WITH AND 55.92 FEET NORTHWESTERLY OF THE SOUTHEASTERLY BOUNDARY OF SAID AIRPORT PROPERTY; THENCE ALONG SAID PARALLEL LINE, SOUTH 79°40'49" WEST, 249.41 FEET; THENCE LEAVING SAID PARALLEL LINE, NORTH 10°19'11" WEST, 19.00 FEET; THENCE SOUTH 79°40'49' WEST, 25.00 FEET; THENCE SOUTH 10°19'11" EAST, 19.00 FEET TO A LINE THAT IS PARALLEL WITH AND 55.92 FEET NORTHWESTERLY OF THE SOUTHEASTERLY BOUNDARY OF SAID AIRPORT PROPERTY; THENCE ALONG SAID PARALLEL LINE, SOUTH 79°40'49" WEST, 259.74 FEET, TO THE BEGINNING OF A TANGENT 50.00 FOOT RADIUS CURVE, CONCAVE NORTHEASTERLY; THENCE NORTHWESTERLY ALONG THE ARC OF SAID CURVE, THROUGH A CENTRAL ANGLE OF 90O00'00", AN ARC LENGTH OF 78.54 FEET; THENCE TANGENT TO SAID CURVE, NORTH 10°19'11" WEST, 194.82 FEET; THENCE NORTH 24°21'21" WEST, 185.54 FEET TO A LINE THAT IS PARALLEL WITH AND 30.00 FEET NORTHEASTERLY OF THE SOUTHWESTERLY BOUNDARY OF SAID AIRPORT; THENCE NORTH 10°19ir' WEST, 502.51 FEET TO A LINE THAT IS PARALLEL WITH AND 517.50 FEET SOUTHERLY OF SAID RUNWAY CENTERLINE; THENCE ALONG SAID PARALLEL LINE, NORTH 79°42'22 EAST, 95.57 FEET TO THE TRUE POINT OF BEGINNING. (County Description No. 2005-0183-A) Assessor Parcel No. being a portion of 760-221-73 with other property PARCEL A(B): THAT PORTION OF MCCLELLAN-PALOMAR AIRPORT (AIRPORT) AS DESCRIBED IN DEED TO THE COUNTY OF SAN DIEGO, RECORDED FEBRUARY 17, 1958 IN BOOK 6952, PAGE 391 OF OFFICIAL RECORDS (DEED), IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, BEING THAT PORTION OF LOT"G" OF RANCHO AGUA HEDIONDA, IN THE COUNTY' OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO PARTITION MAP THEREOF NO. 823, FILED IN SAID COUNTY RECORDER'S OFFICE, AND AS SHOWN ON RECORD OF SURVEY MAP NO. 17995 RECORDED OCTOBER 3, 2003 IN SAID COUNTY RECORDER'S OFFICE, MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE MOST SOUTHERLY CORNER OF SAID AIRPORT PROPERTY SAID CORNER BEING A 2" IRON PIPE WITH TAG STAMPED "L.S. 4505" AS SHOWN ON CERTIFICATE OF CORRECnON 90-537582 FOR MAP 11288 AND SAID RECORD OF SURVEY; THENCE ALONG THE SOUTHWESTERLY BOUNDARY OF SAID AIRPORT PROPERTY NORTH 10°19"11" WEST 1000.04 FEET (1000.02 FEET PER ROS 17996) TO A 2" IRON PIPE WITH TAG STAMPED "SD CO SURVEYOR" AS SHOWN ON SAID RECORD OF SURVEY; First American Title Insurance Company Order^MDer: NCS-352074-LA2 Page Number; 11 THENCE LEAVING SAID BOUNDARY ON A COURSE PARALLEL WITH THE CENTERLINE OF PALOMAR AIRPORT RUNWAY AS ESTABLISHED ON SAID RECORD OF SURVEY MAP NO. 17996, NORTH 79°42'22" EAST, 133.20 FEET; THENCE SOUTH 10°57'41" WEST, 18.00 FEET TO A LINE THAT IS PARALLEL WITH AND 517.50 FEET SOUTHERLY OF SAID RUNWAY CENTERLINE; THENCE SOUTH 79°42'22" WEST, 95.57 FEET TO A LINE THAT IS PARALLEL WITH AND 30.00 FEET NORTHEASTERLY OF THE SOUTHWESTERLY BOUNDARY OF SAID AIRPORT BOUNDARY; THENCE ALONG SAID PARALLEL SOUTH 10°19'11" EAST, 502.51 FEET; THENCE LEAVING SAID PARALLEL LINE, SOUTH 24°21'2r' EAST, 185.54 FEET; THENCE SOUTH 10°19'11" EAST, 194.82 FEET TO THE BEGINNING OF A TANGENT 50-FOOT RADIUS CURVE CONCAVE NORTHEASTERLY; THENCE SOUTHEASTERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 90°00'00", A DISTANCE OF 78.54 FEET TO A POINT OF TANGENCY WITH A LINE THAT IS PARALLEL WITH AND 55.92 FEET NORTHWESTERLY OF THE SOUTHEASTERLY BOUNDARY OF SAID AIRPORT PROPERTY; THENCE TANGENT TO SAID CURVE, ALONG SAID PARALLEL LINE, NORTH 79°40'49" EAST, 259.74 FEET; THENCE LEAVING SAID PARALLEL LINE, NORTH 10°19'11" WEST, 19.00 FEET; THENCE NORTH 79°40'49" EAST, 25.00 FEET; THENCE SOUTH 10019'11" EAST, 19.00 FEET TO A LINE THAT IS PARALLEL WITH AND 55.92 FEET NORTHWESTERLY OF THE SOUTHEASTERLY BOUNDARY OF SAID AIRPORT PROPERTY; THENCE ALONG SAID PARALLEL LINE, NORTH 79°40'49" EAST, 249.41 FEET; THENCE SOUTH 10°19'11" EAST, 55.92 FEET TO SAID SOUTHEASTERLY BOUNDARY OF THE AIRPORT PROPERTY; THENCE ALONG SAID BOUNDARY, SOUTH 79°40'49" WEST, 559.15 FEET TO THE POINT OF BEGINNING. (County Legal Description No.: 2005-0183-B) Assessor Parcel No. being a portion of 760-221-73 with other property PARCEL A-l: NON-EXCLUSIVE EASEMENTS FOR THE USE OF ALL PUBLIC AIRPORT FACILITIES AT THE AIRPORT INCLUDING, BUT NOT LIMITED TO, TAXIWAYS, RUNWAYS, APRONS, NAVIGATIONAL AIDS AND FACILmES RELATING THERETO, FOR THE PURPOSE OF LANDINGS, TAKEOFFS AND TAXIING OF LESSEE'S AND LESSEE'S CUSTOMERS' AIRCRAFT, AS WELL AS THE NON- EXCLUSIVE USE OF THE ACCESS ROAD FOR INGRESS TO AND EGRESS FROM THE PREMISES, AS CREATED BY AND DESCRIBED IN SECTION 2.1 OF THAT CERTAIN AMENDED AND RESTATED AVIATION LEASE EXECUTED BY THE COUNTY OF SAN DIEGO, AS LESSOR, AND SCIF PALOMAR, LLC, A DELAWARE LIMITED LIABILITY COMPANY, AS LESSEE (COUNTY AWARD NO. 104567), AS First American Title Insurance Company Ordei^l^ber; NCS-352074-LA2 Page Number: 12 DISCLOSED BY THAT CERTAIN MEMORANDUM OF LEASE DATED JUNE 22, 2005. PARCEL B: THAT PORTION OF MCCLELLAN-PALOMAR AIRPORT, BEING A PORTION OF LOT "G" OF RANCHO AGUA HEDIONDA, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO PARTITION MAP THEREOF NO. 823, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, DESCRIBED AS FOLLOWS: COMMENCING AT POINT 5 ON THE NORTHERLY LINE OF SAID LOT"G"; THENCE SOUTH 10°52'17" EAST, 99.25 FEET TO A POINT ON THE CENTERLINE OF THE RUNWAY OF MCCLELLAN-PALOMAR AIRPORT, BEING ALSO ENGINEER'S STATION 33+30.21; THENCE ALONG SAID CENTERLINE NORTH 79°07'43" EAST, 183.25 FEET TO ENGINEER'S STATION 35+13.47; THENCE LEAVING SAID CENTERLINE, SOUTH 10°52'17" EAST, 517.50 FEET; THENCE NORTH 79°07'43" EAST, 75.00 FEET TO THE TRUE POINT OF BEGINNING; THENCE SOUTH 10°52'17" EAST, 255.50 FEET; THENCE NORTH 79°07'43" EAST, 414.92 FEET TO THE BEGINNING OF A TANGENT 50.00 FOOT RADIUS CURVE, CONCAVE SOUTHERLY; THENCE EASTERLY ALONG THE ARC OF SAID CURVE, THROUGH CENTRAL ANGLE OF 45°00'00", A DISTANCE OF 39.27 FEET; THENCE TANGENT TO SAID CURVE SOUTH 55°52'17" EAST, 78.82 FEET TO A POINT ON THE ARC OF A NON-TANGENT 48.00 FOOT RADIUS CURVE, CONCAVE SOUTHEASTERLY, A RADIAL TO SAID CURVE AT SAID POINT BEARS NORTH 55°52'17" WEST; THENCE NORTHEASTERLY ALONG THE ARC OF SAID CURVE, THROUGH A CENTRAL ANGLE OF 32°58'23", A DISTANCE OF 27.52 FEET; THENCE LEAVING SAID CURVE, NORTH 10°52'17" WEST, 452.87 FEET TO A POINT ON A LINE THAT IS PARALLEL WITH AND 357.50 FEET (MEASURED AT RIGHT ANGLES) SOUTHERLY OF SAID CENTERLINE OF RUNWAY; THENCE ALONG SAID PARALLEL LINE SOUTH 79°07'43" WEST, 472.28 FEET; THENCE SOUTH 10°09'43" WEST, 150.71 FEET TO THE TRUE POINT OF BEGINNING. County Legal Description No. 91-0318-Al (Formerly 87-0150-A2) Assessor Parcel No? 760-221-47 PARCEL Bl: NON-EXCLUSIVE EASEMENTS FORTHE USE OF ALL PUBLIC AIRPORT FACILmES AT THE AIRPORT INCLUDING, BUT NOT LIMFTED TO, TAXIWAYS, RUNWAYS, APRONS, NAVIGATIONAL AIDS AND FACILITIES RELATING THERETO, FOR THE PURPOSE OF LANDINGS, TAKEOFFS AND TAXIING OF LESSEE'S AND LESSEE'S CUSTOMERS' AIRCRAFT, AS WELL AS THE NON- EXCLUSIVE USE OF THE ACCESS ROAD FOR INGRESS TO AND EGRESS FROM THE PREMISES, AS CREATED BY AND DESCRIBED IN SECTION 2.1 OF THAT CERTAIN AMENDED AND RESTATED AVIATION LEASE EXECUTED BY THE COUNTY OF SAN DIEGO, AS LESSOR, AND SCIF PALOMAR, LLC, A DELAWARE LIMITED QABILTTY COMPANY, AS LESSEE (COUNTY AWARD NO. 104555, AS DISCLOSED BY THAT CERTAIN LEASE DATED JUNE 22, 2005. APN: 760-221-73-00 (Afi^ects: Parcels A(A) and A(B)) and 760-221-47-00 (Afl^ects: Parcel B) First American Title Insurance Company ^60-221 1 I I I (t-OT- \.: -MAP 853 /-eS.2H-TO STA. M+20.00 SHT I OF 3 CAR RENTAL 3/17/20(M RO 213-02 760-221 [«3- (HP r=3oo' ® ( ~t- CARGO TRANSFER I I- (ZD- (ITT- ^ Fwe>- * LuBRicAim ' n CONCeSSIOM PERMIT 1 H I-AVIATION CHARTER " " ' SERVICE PALOMAR AIRPORT - SHT 2 OF 3 Order^»|iber: NCS-352074-LA2 Pag^BPfiber: 13 *****To obtain wire instructions for deposit of funds to your escrow file please contact your Escrow Officer ***** The First American Corporation First American Title Company Privacy Policy We Are Committed to Safeguarding Customer Information In order to better serve your needs now and in the future, we may ask you to provide us with certain information. We understand that you may be concerned about what we will do with such information - particularly any personal or financial information. We agree that you have a right to know how we will utilize the personal information you provide to us. Therefore, together with our parent company. The First American Corporation, we have adopted this Privacy Policy to govern the use and handling of your personal information. Applicability This Privacy Policy governs our use of the information which you provide to us. It does not govern the manner in which we may use information we have obtained from any other source, such as information obtained from a public record or from another person or entity. First American has also adopted broader guidelines that govern our use of personal information regardless of its source. First American calls these guidelines its Fair Information Values, a copy of which can be found on our website at www.firstam.com. Types of Information Depending upon which of our services you are utilizing, the types of nonpublic personal information that we may collect include: • Information we receive from you on applications, forms and in other communications to us, whether in writing, in person, by telephone or any other means; • Information about your transactions with us, our affiliated companies, or others; and • Information we receive from a consumer reporting agency. Use of Information We request information from you for our own legitimate business purposes and not for the benefit of any nonaffiliated party. Therefore, we will not release your information to nonaffiliated parties except: (1) as necessary for us to provide the product or service you have requested of us; or (2) as permitted by law. We may, however, store such information indefinitely, including the period after which any customer relationship has ceased. Such information may be used for any internal purpose, such as quality control efforts or customer analysis. We may also provide all of the types of nonpublic personal information listed above to one or more of our affiliated companies. Such affiliated companies include financial service providers, such as title insurers, property and casualty insurers, and trust and investment advisory companies, or companies involved in real estate services, such as appraisal companies, home warranty companies, and escrow companies. Furthermore, we may also provide all the information we collect, as described above, to companies that perform marketing services on our behalf, on behalf of our affiliated companies, or to other financial institutions with whom we or our affiliated companies have joint marketing agreements. Former Customers Even if you are no longer our customer, our Privacy Policy will continue to apply to you. Confidentiality and Security We will use our best efforts to ensure that no unauthorized parties have access to any of your information. We restrict access to nonpublic personal information about you to those individuals and entities who need to know that information to provide products or services to you. We will use our best efforts to train and oversee our employees and agents to ensure that your information will be handled responsibly and in accordance with this First American Title Insurance Company Ordejgfcriber: NCS-352074-LA2 Pag^Bmber: 14 Privacy Policy and First American's Fair Information Values. We currently maintain physical, electronic, and procedural safeguards that comply with federal regulations to guard your nonpublic personal information. First American Title Insurance Company Ord^^knber: NCS-352074-LA2 Pag^Wmber: 15 EXHIBIT A LIST OF PRINTED EXCEPTIONS AND EXCLUSIONS (BY POLICY TYPE) 1. CALIFORNIA LAND TITLE ASSOCIATION STANDARD COVERAGE POLICY - 1990 SCHEDULE B EXCEPTIONS FROM COVERAGE This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. Proceedings by a public agency which may result in taxes or assessments, or notice of such proceedings, whether or not shown by the records of such agency or by the public records. 2. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of the land or which may be asserted by persons in possession thereof. 3. Easements, liens or encumbrances, or claims thereof, which are not shown by the public records. 4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by the public records. 5. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b), or (c) are shown by the public records. EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of: 1. (a) Any law, ordinance or governmental regulation (including but not limited to building and zoning laws, ordinances, or regulations) restricting, regulating, prohibiting or relating to (i) the occupancy, use, or enjoyment of the land; (ii) the character, dimensions or location of any improvement now or hereafter erected on the land; (iii) a separation in ownership or a change in the dimensions or area of the land or any parcel of which the land is or was a part; or (iv) environmental protection, or the effect of any violation of these laws, ordinances or governmental regulations, except to the extent that a notice of the enforcement thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. (b) Any governmental police power not excluded by (a) above, except to the extent that a notice of the exercise thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. 2. Rights of eminent domain unless notice of the exercise thereof has been recorded in the public records at Date of Policy, but not excluding from coverage any taking which has occurred prior to Date of Policy which would bo binding on the rights of a purchaser for value without knowledge. 3. Defects, liens, encumbrances, adverse claims or other matters: (a) whether or not recorded in the public records at Date of Policy, but created, suffered, assumed or agreed to by the insured claimant; (b) not known to the Company, not recorded in the public records at Date of Policy, but known to the insured claimant and not disclosed in writing to the Company by the insured claimant prior to the date the insured claimant became an insured under this policy; (c) resulting in no loss or damage to the insured claimant; (d) attaching or created subsequent to Date of Policy; or (e) resulting in loss or damage which would not have been sustained if the insured claimant had paid value for the insured mortgage or for the estate or interest insured by this policy. 4. Unenforceability of the lien of the insured mortgage because of the inability or failure of the insured at Date of Policy, or the inability or failure of any subsequent owner of the indebtedness, to comply with applicable "doing business" laws of the state in which the land is situated. 5. Invalidity or unenforceability of the lien of the insured mortgage, or claim thereof, which arises out of the transaction evidenced by the insured mortgage and is based upon usury or any consumer credit protection or truth in lending law. 6. Any claim, which arises out of the transaction vesting in the insured the estate or interest insured by their policy or the transaction creating the interest of the insured lender, by reason of the operation of federal bankruptcy, state insolvency or similar creditors' rights laws. 2. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY FORM B - 1970 SCHEDULE OF EXCLUSIONS FROM COVERAGE 1. Any law, ordinance or governmental regulation (including but not limited to building and zoning ordinances) restricting or regulating or prohibiting the occupancy, use or enjoyment of the land, or regulating the character, dimensions or location of any improvement now or hereafter erected on the land, or prohibiting a separation in ownership or a reduction in the dimensions of area of the land, or the effect of any violation of any such law, ordinance or governmental regulation. 2. Rights of eminent domain or governmental rights of police power unless notice of the exercise of such rights appears in the public records at Date of Policy. 3. Defects, liens, encumbrances, adverse claims, or other matters (a) created, suffered, assumed or agreed to by the insured claimant; (b) not known to the Company and not shown by the public records but known to the insured claimant either at Date of Policy or at the date such claimant acquired an estate or interest insured by this policy and not disclosed in writing by the insured claimant to the Company prior to the date such insured claimant became an insured hereunder; (c) resulting in no loss or damage to the insured claimant; (d) attaching or First American Title Insurance Company Ord|gfcnber: NCS-352074-LA2 PagWwmber: 16 created subsequent to Date of Policy; or (e) resulting in loss or damage which would not have been sustained if the insured claimant had paid value for the estate or interest insured by this policy. 3. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY FORM B - 1970 WITH REGIONAL EXCEPTIONS When the American Land Title Association policy is used as a Standard Coverage Policy and not as an Extended Coverage Policy the exclusions set forth in paragraph 2 above are used and the following exceptions to coverage appear in the policy. SCHEDULE B This policy does not insure against loss or damage by reason of the matters shown in parts one and two following: Part One 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. 2. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of said land or by making inquiry of persons in possession thereof. 3. Easements, claims of easement or encumbrances which are not shown by the public records. 4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. 5. Unpatented mining claims; reservations or exceptions in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. 6. Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished, imposed by law and not shown by the public records. 4. AMERICAN LAND TITLE ASSOCIATION LOAN POLICY - 1970 WITH A.L.T.A. ENDORSEMENT FORM 1 COVERAGE SCHEDULE OF EXCLUSIONS FROM COVERAGE 1. Any law, ordinance or governmental regulation (including but not limited to building and zoning ordinances) restricting or regulating or prohibiting the occupancy, use or enjoyment of the land, or regulating the character, dimensions or location of any improvement now or hereafter erected on the land, or prohibiting a separation in ownership or a reduction in the dimensions or area of the land, or the effect of any violation of any such law ordinance or governmental regulation. 2. Rights of eminent domain or governmental rights of police power unless notice of the exercise of such rights appears in the public records at Date of Policy. 3. Defects, liens, encumbrances, adverse claims, or other matters (a) created, suffered, assumed or agreed to by the insured claimant, (b) not known to the Company and not shown by the public records but known to the insured claimant either at Date of Policy or at the date such claimant acquired an estate or interest insured by this policy or acquired the insured mortgage and not disclosed in writing by the insured claimant to the Company prior to the date such insured claimant became an insured hereunder, (c) resulting in no loss or damage to the insured claimant; (d) attaching or created subsequent to Date of Policy (except to the extent insurance is afforded herein as to any statutory lien for labor or material or to the extent insurance is afforded herein as to assessments for street improvements under construction or completed at Date of Policy). 4. Unenforceability of the lien of the insured mortgage because of failure of the insured at Date of Policy or of any subsequent owner of the indebtedness to comply with applicable "doing business" laws of the state in which the land is situated. 5. AMERICAN LAND TITLE ASSOCIATION LOAN POLICY - 1970 WITH REGIONAL EXCEPTIONS When the American Land Title Association Lenders Policy is used as a Standard Coverage Policy and not as an Extended Coverage Policy, the exclusions set forth in paragraph 4 above are used and the following exceptions to coverage appear in the policy. SCHEDULE B This policy does not insure against loss or damage by reason of the matters shown in parts one and two following: Part One 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. 2. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of said land or by making inquiry of persons in possession thereof. 3. Easements, claims of easement or encumbrances which are not shown by the public records. 4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. 5. Unpatented mining claims; reservations or exceptions in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. 6. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not shown by the public records. First American Title Insurance Company Ordejgfcmber: NCS-352074-LA2 PagSBBnber: 17 6. AMERICAN LAND TTTLE ASSOCIATION LOAN POLICY - 1992 WITH A.L.T.A. ENDORSEMENT FORM 1 COVERAGE EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of: 1. (a) Any law, ordinance or governmental regulation (including but not limited to building and zoning laws, ordinances, or regulations) restricting, regulating, prohibiting or relating to (i) the occupancy, use, or enjoyment of the land; (ii) the character, dimensions or location of any improvement now or hereafter erected on the land; (ill) a separation in ownership or a change in the dimensions or area of the land or any parcel of which the land is or was a part; or (iv) environmental protection, or the effect of any violation of these laws, ordinances or governmental regulations, except to the extent that a notice of the enforcement thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy; (b) Any governmental police power not excluded by (a) above, except to the extent that a notice of the exercise thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. 2. Rights of eminent domain unless notice of the exercise thereof has been recorded in the public records at Date of Policy, but not excluding from coverage any taking which has occurred prior to Date of Policy which would bc binding on the rights of a purchaser for value without knowledge. 3. Defects, liens, encumbrances, adverse claims, or other matters: (a) whether or not recorded in the public records at Date of Policy, but created, suffered, assumed or agreed to by the insured claimant; (b) not known to the Company, not recorded in the public records at Date of Policy, but known to the insured claimant and not disclosed in writing to the Company by the insured claimant prior to the date the insured claimant became an insured under this policy; (c) resulting in no loss or damage to the insured claimant; (d) attaching or created subsequent to Date of Policy (except to the extent that this policy insures the priority of the lien of the insured mortgage over any statutory lien for services, labor or material or the extent insurance is afforded herein as to assessments for street improvements under construction or completed at date of policy); or (e) resulting in loss or damage which would not have been sustained if the insured claimant had paid value for the insured mortgage. 4. Unenforceability of the lien of the insured mortgage because of the inability or failure of the insured at Date of Policy, or the inability or failure of any subsequent owner of the indebtedness, to comply with the applicable "doing business" laws of the state in which the land is situated. 5. Invalidity or unenforceability of the lien of the insured mortgage, or claim thereof, which arises out of the transaction evidenced by the insured mortgage and is based upon usury or any consumer credit protection or truth in lending law. 6. Any statutory lien for services, labor or materials (or the claim of priority of any statutory lien for services, labor or materials over the lien of the insured mortgage) arising from an improvement or work related to the land which is contracted for and commenced subsequent to Date of Policy and is not financed in whole or in part by proceeds of the indebtedness secured by the insured mortgage which at Date of Policy the insured has advanced or is obligated to advance. 7. Any claim, which arises out of the transaction creating the interest of the mortgagee insured by this policy, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors' rights laws, that is based on: (i) the transaction creating the interest of the insured mortgagee being deemed a fraudulent conveyance or fraudulent transfer; or (ii) the subordination of the interest of the insured mortgagee as a result of the application of the doctrine of equitable subordination; or (iii) the transaction creating the interest of the insured mortgagee being deemed a preferential transfer except where the preferential transfer results from the failure: (a) to timely record the instrument of transfer; or (b) of such recordation to impart notice to a purchaser for value or a judgment or lien creditor. 7. AMERICAN LAND TTTLE ASSOCIATION LOAN POLICY - 1992 WITH REGIONAL EXCEPTIONS When the American Land Title Association policy is used as a Standard Coverage Policy and not as an Extended Coverage Policy the exclusions set forth in paragraph 6 above are used and the following exceptions to coverage appear in the policy. SCHEDULE B This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. 2. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of said land or by making inquiry of persons in possession thereof. 3. Easements, claims of easement or encumbrances which are not shown by the public records. 4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. 5. Unpatented mining claims; reservations or exceptions in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. 6. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not shown by the public records. 8. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY - 1992 First American Title Insurance Company Orda||te7iber: NCS-352074-LA2 igUPnb PagliPlrnber: 18 EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of: 1. (a) Any law, ordinance or governmental regulation (including but not limited to building and zoning laws, ordinances, or regulations) restricting, regulating, prohibiting or relating to (i) the occupancy, use, or enjoyment of the land; (ii) the character, dimensions or location of any improvement now or hereafter erected on the land; (iii) a separation in ownership or a change in the dimensions or area of the land or any parcel of which the land is or was a part; or (iv) environmental protection, or the effect of any violation of these laws, ordinances or governmental regulations, except to the extent that a notice of the enforcement thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. (b) Any governmental police power not excluded by (a) above, except to the extent that a notice of the exercise thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. 2. Rights of eminent domain unless notice of the exercise thereof has been recorded in the public records at Date of Policy, but not excluding from coverage any taking which has occurred prior to Date of Policy which would be binding on the rights of a purchaser for value without knowledge. 3. Defects, liens, encumbrances, adverse claims, or other matters: (a) created, suffered, assumed or agreed to by the insured claimant; (b) not known to the Company, not recorded in the public records at Date of Policy, but known to the insured claimant and not disclosed in writing to the Company by the insured claimant prior to the date the insured claimant became an insured under this policy; (c) resulting in no loss or damage to the insured claimant; (d) attaching or created subsequent to Date of Policy; or (e) resulting in loss or damage which would not have been sustained if the insured claimant had paid value for the estate or interest insured by this policy. 4. Any claim, which arises out of the transaction vesting in the insured the estate or interest insured by this policy, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors' rights laws, that is based on: (i) the transaction creating the estate or interest insured by this policy being deemed a fraudulent conveyance or fraudulent transfer; or (ii) the transaction creating the estate or interest insured by this policy being deemed a preferential transfer except where the preferential transfer results from the failure: (a) to timely record the instrument of transfer; or (b) of such recordation to impart notice to a purchaser for value or a judgment or lien creditor. 9. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY - 1992 WITH REGIONAL EXCEPTIONS When the American Land Title Association policy is used as a Standard Coverage Policy and not as an Extended Coverage Policy the exclusions set fori;h in paragraph 8 above are used and the following exceptions to coverage appear in the policy. SCHEDULE B This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: Pari: One: 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. 2. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascert:ained by an inspection of said land or by making inquiry of persons in possession thereof. 3. Easements, claims of easement or encumbrances which are not shown by the public records. 4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. 5. Unpatented mining claims; reservations or exceptions in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. 6. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not shown by the public records. 10. AMERICAN LAND TTTLE ASSOCIATION RESIDENTIAL TTTLE INSURANCE POLICY - 1987 EXCLUSIONS In addition to the Exceptions in Schedule B, you are not insured against loss, costs, attorneys' foes and expenses resulting from: 1. Governmental police power, and the existence or violation of any law or government regulation. This includes building and zoning ordinances and also laws and regulations concerning: * land use * land division * improvements on the land * environmental protection This exclusion does not apply to violations or the enforcement of these matters which appear in the public records at Policy Date. This exclusion does not limit the zoning coverage described in items 12 and 13 of Covered Title Risks. 2. The riqht to take the land by condemning it, unless: First American Title Insurance Company Ordej^fcriber: NCS-352074-LA2 PagMBiber: 19 * a notice of exercising the right appears in the public records on the Policy Date * the taking happened prior to the Policy Date and is binding on you if you bought the land without knowing of the taking. 3. Title Risks: * that are created, allowed, or agreed to by you * that are known to you, but not to us, on the Policy Date - unless they appeared in the public records * that result in no loss to you * that first affect your title after the Policy Date - this does not limit the labor and material lien coverage in Item 8 of Covered Title Risks 4. Failure to pay value for your title. 5. Lack of a right: * to any land outside the area specifically described and referred to in Item 3 of Schedule A, or * in streets, alleys, or waterways that touch your land This exclusion does not limit the access coverage in Item 5 of Covered Title Risks. 11. EAGLE PROTECTION OWNER'S POLICY CLTA HOMEOWNER'S POUCY OF TITLE INSURANCE - 1998 ALTA HOMEOWNER'S POLICY OF TTTLE INSURANCE - 1998 Covered Risks 14 (Subdivision Law Violation). 15 (Building Permit). 16 (Zoning) and 18 (Encroachment of boundary walls or fences) are subject to Deductible Amounts and Maximum Dollar Limits of Liability EXCLUSIONS In addition to the Exceptions in Schedule B, you are not insured against loss, costs, attorneys' fees, and expenses resulting from: 1. Governmental police power, and the existence or violation of any law or government regulation. This includes ordinances, laws and regulations concerning: a. building b. zoning c. land use d. improvements on the land e. land division f. environmental protection This exclusion does not apply to violations or the enforcement of these matters if notice of the violation or enforcement appears in the Public Records at the Policy Date. This exclusion does not limit the coverage described in Covered Risk 14, 15, 16, 17 or 24. 2. The failure of Your existing structures, or any part: of them, to be constructed in accordance with applicable building codes. This Exclusion does not apply to violations of building codes if notice of the violation appears in the Public Records at the Policy Date. 3. The right to take the Land by condemning it, unless: a. a notice of exercising the right appears in the Public Records at the Policy Date; or b. the taking happened before the Policy Date and is binding on You if You bought the Land without Knowing of the taking. 4. Risks: a. that are created, allowed, or agreed to by You, whether or not they appear in the Public Records; b. that are Known to You at the Policy Date, but not to Us, unless they appear in the Public Records at the Policy Date; c. that result in no loss to You; or d. that first occur after the Policy Date - this does not limit the coverage described in Covered Risk 7, S.d, 22, 23, 24 or 25. 5. Failure to pay value for Your Title. 6. Lack of a right: a. to any Land outside the area specifically described and referred to in paragraph 3 of Schedule A; and b. in streets, alleys, or waterways that touch the Land. This exclusion does not limit the coverage described in Covered Risk 11 or 18. 12. AMERICAN UND TITLE ASSOCIATION LOAN POLICY - 1992 WITH A.L.T.A. ENDORSEMENT FORM 1 COVERAGE WITH EAGLE PROTECTION ADDED EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of: First American Title Insurance Company Orda^niber: NCS-352074-LA2 PagHPnber: 20 1. (a) Any law, ordinance or governmental regulation (including but not limited to building and zoning laws, ordinances, or regulations) restricting, regulating, prohibiting or relating to (i) the occupancy, use, or enjoyment of the Land; (ii) the character, dimensions or location of any improvement now or hereafter erected on the Land; (iii) a separation in ownership or a change in the dimensions or area of the Land or any parcel of which the Land is or was a part; or (iv) environmental protection, or the effect of any violation of these laws, ordinances or governmental regulations, except to the extent that a notice of the enforcement thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the Land has been recorded in the Public Records at Date of Policy. This exclusion does not limit the coverage provided under insuring provisions 14, 15, 16 and 24 of this policy. (b) Any governmental police power not excluded by (a) above, except to the extent that a notice of the exercise thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the Public Records at Date of Policy. This exclusion does not limit the coverage provided under insuring provisions 14, 15, 16 and 24 of this policy. 2. Rights of eminent domain unless notice of the exercise thereof has been recorded in the Public Records at Date of Policy, but not excluding from coverage any taking which has occurred prior to Date of Policy which would be binding on the rights of a purchaser for value without Knowledge. 3. Defects, liens, encumbrances, adverse claims or other matters: (a) created, suffered, assumed or agreed to by the Insured Claimant; (b) not known to the Company, not recorded in the Public Records at Date of Policy, but Known to the Insured Claimant and not disclosed in writing to the Company by the Insured Claimant prior to the date the Insured Claimant became an Insured under this policy; (c) resulting in no loss or damage to the Insured Claimant; (d) attaching or created subsequent to Date of Policy (this paragraph (d) does not limit the coverage provided under insuring provisions 7, 8, 16, 17, 19, 20, 21, 23, 24 and 25); or (e) resulting in loss or damage which would not have been sustained if the Insured Claimant had paid value for the Insured Mortgage. 4. Unenforceability of the lien of the Insured Mortgage because of the inability or failure of the Insured at Date of Policy, or the inability or failure of any subsequent owner of the indebtedness, to comply with applicable doing business laws of the state in which the Land is situated. 5. Invalidity or unenforceability of the lien of the Insured Mortgage, or claim thereof, which arises out of the transaction evidenced by the Insured Mortgage and is based upon: (a) usury, except as provided under insuring provision 10 of this policy; or (b) any consumer credit protection or truth in lending law. 6. Taxes or assessments of any taxing or assessment authority which become a lien on the Land subsequent to Date of Policy. 7. Any claim, which arises out of the transaction creating the interest of the mortgagee insured by this policy, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors' rights laws, that is based on: (a) the transaction creating the interest of the insured mortgagee being deemed a fraudulent conveyance or fraudulent transfer; or (b) the subordination of the interest of the insured mortgagee as a result of the application of the doctrine of equitable subordination; or (c) the transaction creating the interest of the insured mortgagee being deemed a preferential transfer except where the preferential transfer results from the failure: (i) to timely record the instrument of transfer; or (ii) of such recordation to impart notice to a purchaser for value or a judgment or lien creditor. 8. Any claim of invalidity, unenforceability or lack of priority of the lien of the Insured Mort:gage as to advances or modifications made after the Insured has Knowledge that the vestee shown in Schedule A is no longer the owner of the estate or interest covered by this policy. This exclusion does not limit the coverage provided under insuring provision 7. 9. Lack of priority of the lien of the Insured Mortgage as to each and every advance made after Date of Policy, and all interest charged thereon, over liens, encumbrances and other matters affecting title, the existence of which are Known to the Insured at: (a) The time of the advance; or (b) The time a modification is made to the terms of the Insured Mortgage which changes the rate of interest charged, if the rate of interest is greater as a result of the modification than it would have been before the modification. This exclusion does not limit the coverage provided under insuring provision 7. SCHEDULE B This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: 1. Environmental protection liens provided for by the following existing statutes, which liens will have priority over the lien of the Insured Mortgage when they arise: NONE. 13. AMERICAN LAND TITLE ASSOCIATION LOAN POLICY - 1992 WITH EAGLE PROTECTION ADDED WITH REGIONAL EXCEPTIONS When the American Land Title Association loan policy with EAGLE Protection Added is used as a Standard Coverage Policy and not as an Extended Coverage Policy the exclusions set fort;h in paragraph 12 above are used and the following exceptions to coverage appear in the policy. SCHEDULE B This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: Part One: 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. 2. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of said land or by making inquiry of persons in possession thereof. First American Title Insurance Company OrdeigteTiber: NCS-352074-LA2 Pagl^Kiber; 21 3. Easements, claims of easement or encumbrances which are not shown by the public records. 4. Discrepancies, conflicts in boundary lines, short:age in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. 5. Unpatented mining claims; reservations or exceptions in patents or in acts authorizing the issuance thereof; water rights, claims or title to water. 6. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not shown by the public records. Part: Two: 1. Environmental protection liens provided for by the following existing statutes, which liens will have priority over the lien of the Insured Mortgage when they arise: NONE First American Title Insurance Company