HomeMy WebLinkAboutPD 277; CARLSBAD GATEWAY CENTER; Engineering Applicationr,
\
. '
·• Ike \ PREPARED BY:_..:;;D.;;,:a=n_C __ l=a=r=-=-k---:,
DATE: 3/5/87 \ PROJECT NAME: __ P_D_2_7_7..;.,_c_a_r_l_s_b_a...,.d_G_a_t_e_w_a __ y=-------
N/A \ TENTATIVE PAR~EL MAP FEE , , , , , , , , , , , , , , , , , , , , , , '----------.
.. MAP FEE ( __ LOTSHPARCEL MAP/FINAL MAP NO, OF LOTf ____ ). I I N/A (EXPEDITED/NOT EXPEDITED) ------------.
PARCEL MAP EXTENSION FEE •••• '.I •• I I I I •• I ••••••• __ N_/_A ____ _
IMPROVEMENT PLAN CHECK FEE:
DEPOSIT WITH SUBMITTAL $13,7_~9.:..Q9_ RECEIPT NO, 62016
IMPROVEMENT DESCRIPTION
Street, S.D., Water
Sewer
To'TAL:
IMPROVEMENT iNSPECTION FEE:
.l.W1
Street, S.D.
Water, Sewer
TOTAL.:
PARK-IN-LIEU FEE (CIRCLE ONE):
DWELLING TYPE: SF OR DUPLEX
AREA: 1 2 3 4
. BONQEP VALUE
$637,000.00 _
VALUE
.$637,000.00
' MF (<4 UNITS)
X ____ 2_. _2_5 __
PERCENTAGE
X .. 4. 5
PERCENTAGE
MF (> 4 UNITS)
= $14,333.00
.-$28,665.00
MH
X = NUMBER OF UNITS: N/A ------------AREA FEE/UNIT
STREET LIGHT ~NERGIZING:
s,.800 LUMEN -----AT 81~.oo = ------------
9,500 LUMEN 5 AT $111;06 = $555.30 _........,. ____ _
16,000 LUMEN . AT . 152', 10 = ______ _
20,000 LUMEN • AT 16~.38 ~ .......... _____ _
TOTAL: = $ 555.30
GRADING PLAN CHECK FEE DEPOSIT 108~93 RECEIPT NO, 62016
· (EXPEDITED/NOT EXPE-DITED·)
GRADING PLAN CHECK FEE ( 34, SQQ CUBIC YARDS) I • • I I I I I I I I I I $ 125.00
GRADING CASH DEPOSIT I • I I • I I I I I I I • I I . . I I I I I I I I $27.000.00 PD
DUPLICATE TRACING .FEE I • I • I • • • I I •• I I I I I I I I I I • • • __ N--"/_A ____ _
STREET SIGN DEPOSIT: Stop + Name, 5@$175 $ 875. 00
No Park 7 AT $ 84 = _ 588. 00 -----------Stop Ahead 4 AT $111 = $ 444.00
Type "L" Dilen 17 AT $ 45 = $ 7f2~.QQ
Road Narrows 1 Ti$11A1 ;1:
0
• Arrow I '$' '9i
STREET HR Ip UIG DEPOSIT I • I I I I I • • • ·;,_ FRONT LINE 0~ AREA FEES (TYPE ______ ) •.• ,
= i lil. 00 = = · · 90.00 . • • ·2,348.'00 . . ' I I I $ 2,348.00
N/A . .... ·-..,..,...,..,..------NIA DRAINAGE AREA FEE (AREA NO, ___ .), I I I t • • • I I I I I I I I I J--------
TOTAL ACRES: ____ X =
AREA FE·E
LESS VALUE OF MASTER DRAINAGE IMPROVEMENTS
AS NOTED. IN MASTER DRAINAGE PLAN DOCUMENTS
·MULTIPLIED BY CURRENT INFLATION FACTOR,
irNE VALUE X FACTOR = AMOUNT
X
X
X
TOTAL:
=
=
DRAINAGE FEE DUE: NiA I I,_._;,., _____ _
ADDITIONAL FEES:
TYPE=--------------• • I I • • • I I • • • • • • ,_.;;.;N~/.;;.;;A ____ _
TYPE: __________ • • • • • • • • • • • • • • • • __ N_/ A _____ _
TOTAL FEES AND DEPOSITS: • • • • _,.$..:..7.;;:.3 .. , ~o:;:.2 ~6 .:..· 3""'0 __
(IN ADDITION, A GRADING PERMIT FEE OF $700. 00 paid to
IS DUE UPON ISSUANCE OF THE GRADING PERMIT,) Wojcik
Amount received to date:
Total due:
$40 I 858 • 93-
$32, 167. 37