Loading...
HomeMy WebLinkAboutPD 277; CARLSBAD GATEWAY CENTER; Engineering Applicationr, \ . ' ·• Ike \ PREPARED BY:_..:;;D.;;,:a=n_C __ l=a=r=-=-k---:, DATE: 3/5/87 \ PROJECT NAME: __ P_D_2_7_7..;.,_c_a_r_l_s_b_a...,.d_G_a_t_e_w_a __ y=------- N/A \ TENTATIVE PAR~EL MAP FEE , , , , , , , , , , , , , , , , , , , , , , '----------. .. MAP FEE ( __ LOTSHPARCEL MAP/FINAL MAP NO, OF LOTf ____ ). I I N/A (EXPEDITED/NOT EXPEDITED) ------------. PARCEL MAP EXTENSION FEE •••• '.I •• I I I I •• I ••••••• __ N_/_A ____ _ IMPROVEMENT PLAN CHECK FEE: DEPOSIT WITH SUBMITTAL $13,7_~9.:..Q9_ RECEIPT NO, 62016 IMPROVEMENT DESCRIPTION Street, S.D., Water Sewer To'TAL: IMPROVEMENT iNSPECTION FEE: .l.W1 Street, S.D. Water, Sewer TOTAL.: PARK-IN-LIEU FEE (CIRCLE ONE): DWELLING TYPE: SF OR DUPLEX AREA: 1 2 3 4 . BONQEP VALUE $637,000.00 _ VALUE .$637,000.00 ' MF (<4 UNITS) X ____ 2_. _2_5 __ PERCENTAGE X .. 4. 5 PERCENTAGE MF (> 4 UNITS) = $14,333.00 .-$28,665.00 MH X = NUMBER OF UNITS: N/A ------------AREA FEE/UNIT STREET LIGHT ~NERGIZING: s,.800 LUMEN -----AT 81~.oo = ------------ 9,500 LUMEN 5 AT $111;06 = $555.30 _........,. ____ _ 16,000 LUMEN . AT . 152', 10 = ______ _ 20,000 LUMEN • AT 16~.38 ~ .......... _____ _ TOTAL: = $ 555.30 GRADING PLAN CHECK FEE DEPOSIT 108~93 RECEIPT NO, 62016 · (EXPEDITED/NOT EXPE-DITED·) GRADING PLAN CHECK FEE ( 34, SQQ CUBIC YARDS) I • • I I I I I I I I I I $ 125.00 GRADING CASH DEPOSIT I • I I • I I I I I I I • I I . . I I I I I I I I $27.000.00 PD DUPLICATE TRACING .FEE I • I • I • • • I I •• I I I I I I I I I I • • • __ N--"/_A ____ _ STREET SIGN DEPOSIT: Stop + Name, 5@$175 $ 875. 00 No Park 7 AT $ 84 = _ 588. 00 -----------Stop Ahead 4 AT $111 = $ 444.00 Type "L" Dilen 17 AT $ 45 = $ 7f2~.QQ Road Narrows 1 Ti$11A1 ;1: 0 • Arrow I '$' '9i STREET HR Ip UIG DEPOSIT I • I I I I I • • • ·;,_ FRONT LINE 0~ AREA FEES (TYPE ______ ) •.• , = i lil. 00 = = · · 90.00 . • • ·2,348.'00 . . ' I I I $ 2,348.00 N/A . .... ·-..,..,...,..,..------NIA DRAINAGE AREA FEE (AREA NO, ___ .), I I I t • • • I I I I I I I I I J-------- TOTAL ACRES: ____ X = AREA FE·E LESS VALUE OF MASTER DRAINAGE IMPROVEMENTS AS NOTED. IN MASTER DRAINAGE PLAN DOCUMENTS ·MULTIPLIED BY CURRENT INFLATION FACTOR, irNE VALUE X FACTOR = AMOUNT X X X TOTAL: = = DRAINAGE FEE DUE: NiA I I,_._;,., _____ _ ADDITIONAL FEES: TYPE=--------------• • I I • • • I I • • • • • • ,_.;;.;N~/.;;.;;A ____ _ TYPE: __________ • • • • • • • • • • • • • • • • __ N_/ A _____ _ TOTAL FEES AND DEPOSITS: • • • • _,.$..:..7.;;:.3 .. , ~o:;:.2 ~6 .:..· 3""'0 __ (IN ADDITION, A GRADING PERMIT FEE OF $700. 00 paid to IS DUE UPON ISSUANCE OF THE GRADING PERMIT,) Wojcik Amount received to date: Total due: $40 I 858 • 93- $32, 167. 37