HomeMy WebLinkAboutPD 305; VILLAGE FAIRE; Engineering Application.• -, .-' '-.
, ---·/
CITY OF CARLSBAD
~N6INEERIN6 DEPARTMENT
FEES AID DEPOSITS VQRK§HEET
·_'[\ b -3 0 5 C· .. 'C-.~ PREPARED BY: I /I --~-..,,,,,...-~ PROJECT NAME : __ T ____________________ _ DATE: f)-/ 2. -E3t3=
TENTATIVE PARCEL MAP FEE .-•. I • I I I I • I I •• I I • I I • I I ·----~
-c-,. MAP FE·E ( __ LOTSHPARCEL MAP/F~INAL MAP NO, OF LOTS ) , • • 7V_t_.i-:--(EXPEDITED/NOT EXPEDITED) ----~~
I PARCEL MAP EXTENSION FEE • I I I I I
·IMPROVEMENT PLAN CHECK FEE:
I I I I I I I I I I I I I .... ___ ,
DEPOSIT WITH SUBMITTAL ___ _ _ ___ RECEIPT NO, ______ _
IMPROVEMENT DESCRIPTION
Dw6,, 2137-2.'
TOTAL:
IMPROVEMENT INSPECTION FEE:
ma J>-wG •. ze1-2.
TOTAL:
PARK-IN-LIEU FEE (CIRCLE ONE):
DWELLING TYPE: SF OR DUPLEX
AREA: 1 2 3 4
N.UMBER OF UNITS:
STREET LIGHT ENERGIZING:
BONDED VALUE . ~ 4S: S4.ft:> ~
3. 5% X --------~PE.,..,R"""C ... E-NT.,,..A __ G,..,,E-
VALUE .l Z.tf.5, .54-1:,-
X 5% -------PERCENTAGE
=
MF (<4 UNITS) MF(> 4 UNITS) MK
_______ x -----=
AREA FEE/UNIT
5,800 .LUMEN . AT ---,,----81,00 =-
9 ,.SQQ LUMEN .................. 3 __ _ AT 111.06 =
16,QOO·LUMEN ____ _ AT 152. 10 =
20,000 LUMEN ____ _ AT 1'69.38 =
TOTAL: =
GRADING PLA~ CHECK FEE DEPOSIT _____ RECEIPT NO,
(EXPEDITED/NOT EXPEDITED)n f:!:: · 2 ~~ II ( ) s !Ea r.. t,;;,, , Yt:7 • GRADING PLAN CHECK FEE ---CUBIC YARDS I • I ~ I ' I I I I I I
__ 4~ ss "...t.
t -d • 3; 7 .3 q -
333 ~
GRADING CASH DEPOSIT •••• I • I I I I I I I I I I I I I I I I I I·-------
DUPLICATE TRACIN~ FEE
STREET SIGN DEPOSIT:
• • • • • • I I • . I I I I I I t I I ·, I I I I , _______ ,
2 AT !40 =
' • I -Z.£1;&-
AT =
AT =
TOTAL: =
STREET STRJPING DEPOSIT . •-. . I I I I ' I I I I 8 • • I• I ...... _____ ,. __
FRbNT LINE OR AREA FEES (TYPE ___ ) , ~ , , I , I t I .... ... ·---------
DRAINAGE AREA FEE (AREA NO, ___ ),II . . . . . . . . . '. . ... ·--------TOTAL ACRES: ___ X ___ = _____ _
AREA FEE
LESS VALUE OF MASTER DRAINAGE IMPROVEMENTS
AS NOTED IN HASTER DRAINAGE PLAN DOCUMENTS
MULTIPLIED BY CURRENT INFL~TION FACTOR,
LINE VALUE X FACTOR = AMOUNT
X ------=
X
X
=
=
TOTAL:
DRAINAGE FEE DUE:
ADDITIONAL FEES: t,
TYPE: fl-1vJ D/!.l)r;,cA 77th\l . . . • • • • • • • I O I
I I·--------
JSCJ~ . . ·------
TYPE: ____________ •••• ~ •••• I •••••• ______ ,
TOTAL FEES AND DEPOSITS: • . . ·---------(IN ADDITION, A GRADING ¥ERMIT FEE OF _____ _
IS DUE UPON ISSUANCE OF THE GRAD I NG PE·RM IT,)
1
• SUBDIVISION LOG
STAFF ENGINEER: c; t {::::. f
SUBDIVISION NO.: ____ .....,... SUBDIVISION NAME: // /t,_,~Cj__ ~J2..st_
OWNER/DEV ELOPER: T, .z:. £. . L f M I T 4-.l) ----------------="--'------...;;..;._,;,;,...;;
ADDRESS: ___________________________________ _
_____________________________ PHONE: _______ _
ENG I NEER oF woRK =--3--:..:.u,_:;A ___ . _______ _ FIRM: ------=-----------ADDRESS: _________________________________ ......, ___ .......,_
PHONE: g4t-/ f?/3 t ------------------------------
TENTATIVE MAP APPROVAL: IJ (,A., -------1ST EXTENSION: -----2ND EXTENSION: ____ _
IMPROVEMENT PLAN NO.:
"AS BOILTS" APPROVED: _____ _
GRAD I NG PL AN NO. =---.,,..,..-=--..,,,,_---,,.,....,,..-I
GRADING PERMIT NO.: Pc. Ct Zt. 8>Bt. f
EROSION CONTROL PLAN: ---------
BONDS AND AGREEMENTS
-FAITHFUL LABOR & MONUMEN-SECURITY
AGREEMENT TITLE EXPIRATION PERFORMANCE MATERIALS TAHON TYPE (CASH, COMMENTS DATE BOND AMT. BOND AMT. BOND AMT. SURETY. LDC)
i>WU/)P}{&/'lr q-1-r;q 24S,55tr , 112,11.r -~
( gp 11/11),
~f'lt>~i1$1)/Vtt1h ; q-(-ffe1 tS,m:.;. f ~ . •' 2,'lY'M/"' -i,,,vJ)
SlJRE TY COMPANY: _____________________________________ _
ADDRESS: __________________________________ _
CONTACT: PHONE: --------------------------------
EASEMENTS
USE LOCATION RECORD NO.
-
REPORTS
TYPE OF REPORT STATUS (IN~ N/A) CHECKED BY
Title Reoort V ::iut>ll1v1s1on 1,uarant·ee
Traverse Cales / Hv drauli.e Cales "'/
Hv oroloav t.:ales II"
Sewer Cales
Water System Cale.a / Soils Reoort .,
WATER D Is TR I GT =--~--......... f-:12;....,,...,_H__,,.,..,_w __ , _.D_,_
SCHOOL DI STR'l CT: __ __,_(' ~ ........................ !'.:i __ 9_t'~_-_£) ______ _
SEWER DISTRICT: __________ _
PLANNING AREA: ___________ _
DRAINAGE AREA: ______________ _ SPECIAL ZONES:(ASSESSMENT, THOROUGHFARE,
PLANNING ACTION: -------------BRIDGE DISTRICTS: _________ _
COMMENTS: ____________________________________ _