Loading...
HomeMy WebLinkAboutPD 371; OLIVENHAIN ROAD; Engineering Applicationfl Project Engineer Initial____________________________ Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 2075 Las Palmas Drive 438-3634 PE NO Validation by Cashier Assessors Parcel No FOR APPLICANT TO FILL IN FOR DEPARTMENT USE Site Address Olivenhain Road between El Cainino Real DATE INITIAL and Rancho Santa Fe Road Secured Agreement Recd. Legal Description Map No. Cash Deposit Receipt No. Not Applicable Project Name Drawing No. I Building Permit Plancheck No. Olivenhain Road Owner Phone General Permit Requirements: Fieldstone/La Costa Assoc. 931-1677 Owner's Address All grading and erosion control work shall be done in accordance with P.O. Box 9000-266 Carlsbad, CA 92009 City Ordinances, Plans by Civil Engineer Phone Authorized hours of operation: 7:00 am. to Sunset, Monday through Project Design Consultants 235-6472 Friday, excluding city recognized holidays. Address Phone Grading work shall not commence until after the pre-construction 1010 Second Avenue, Suite 500 S.D., 92101 conference has been held with the City Inspector Soil Engineer ACE. Phone All off-site haul routes require separate approval by the City Engineer Geocon 22527 558-6900 A right-of-way permit is required for all work done in the city right-of- Grading-Contractor I Phone way. 24 Hr. Phone Address Special Requirements: Party responsible for overall supervision Fieldstone/La Costa Associates Proposed use of grade site 4-lane roadway Number of cubic yards Cut - Fill Import Waste Under City Code Sec. 11.06.170 this grading is: Proposed Schedule of Start Finish 0 Regular Grading - City Inspector will make inspections listed below. Operations (dates) CATT) D Controlled Grading - private grading engineer shall observe work, coordinate tests and make reports I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with Inspection Date Insp. Initial all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to Initial - Site Prep. this application. Rough - Grade Signature of Permittee ______4 -4 Owner or authorized agent_ Final - Slopes Planted Compaction Reports Read ENVIRONMENTAL CLEARANCE - Date ___________________________________ - Private Engr. Cert. Rec'd. EIA Log No. By O.K. For Release Grading permit fee $ Plan check fee $ Permit Issued Copies: by Date White - Office; Yellow - Inspector; Pink - Permittee Permit Expiration Date Golden Rod - Finance; Green - Building THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE.