Loading...
HomeMy WebLinkAboutPD 495; HARRISON STREET WIDENING; Engineering ApplicationCITY •....ARLSBAD - ENGINEERING DEPA :NT APPLICATION. FOR ENGINEERING PLAN CHECK OR PROCESSING Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: A4z,ç DATE: PROJECT DESCRIPTION: I 1tJ,.o./k PROJECT ADDRESS: q,fr W LOT NO(S).: AL . re3gMAP NO.: 14 0/ APN(S).: Zô- /go -# NO. OF DWELLING UNITS: LFMP ZONE: ft LOTS: # ACRES: OWNER: APPLICANT: Mailing Address: Mailing Address: k / Phone Number: (,) 724 —499,6 7 Phone-Number I certify that I am the legal owner and. that all the above fomtnistrneZbestofrnY77e Signature ate5 CIVIL ENGINEER: Ai,W SOILS ENGINEER: J,JJA M Firm: Mailing Address: - 400 7,€__4 92-o7/ PhoneNumber: (/') S —b7z7 Firm: Mailing Address Phone Number" : State Registration Number: ç, State Registration Numbe: LANDSCAPE ARCHITECT: ,t/, ADDITIONAL COMMENTS: Firm: / Mailing Address: Phone Number: ( ) State Registration Number: IMPROVEMENT VALUATION 1. What water district is the proposed project located in (circle one)? Carlsbad Municipal Water District Olivenhairi Vallecitos 2. If in the Carlsbad Municipal Water District, what is the total cost estimate ; including the 15% contingency fee, for water and reclaimed water improvements (if applicable)? 3. What is the total cost estimate, including.the 15% contingency fee, for seWer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? $. ,/O % 4. What is the total cost of landscape and irrigation improvements on private property (if . $ / applicable)? GRADING QUANTITIES cut 3g cy fill 3s-, S­ cy remedial o cy import/export e' cy DOCS/MISFORMSIAPPLICATION ENG PLANCHECK OR PROCESSING REV. 6110/97 S . APPLICATION FOR: (/ all that apply) FOR CITY USE ONLY _ Plancheck Number Type Drawing Number Project I.D. Deposit/Fees Paid U Adjustment Plat ADJP Ll Certificate of Compliance COC lDedication of Easement Type: DOE g 5 323- Type: U Encroachment Permit ENCROACH L Engineering Standards Variance ESV • Final Map FM • Grading Plancheck GRPC 11 Grading GRADING Ur-Improvement Plancheck [PC 3_1/ £I L7/ 1- U Landscape Plancheck LPC Ll Parcel Map PM Ll Quitclaim of Easement QLJITC Type: Type: L] Reversion to Acreage RIA I Street Vacation STV • Tentative Parcel Map MS • Certificate of Correction CCOR • Covenant for Easement COVE I Substantial Conformance Exhibit SCE APPLICATION ACCEPTED BY: MASTER PROJECT ID: RECEIPT NUMBER: PRELIMINARY SIERRA SYSTEM INPUT INITIAL: SIERRA SYSTEM INPUT INITIAL: R:BASE INPUT INITIAL: MASTER FILE NUMBER: F lJ OTHER: RECEIVED MAY 118 1998 ENGINEERING DEPARTMENT DATE STAMP APPLICATION RECEIVED DOCS/MISFORMS/APPLICATION ENG PLANCHECK OR PROCESSING REV. 13110/97 'I It' PROJECT PLAN REVIEW COMPLETION The following project plans have been reviewed and are recommended for approval. Project Name: f1*ZJ9 flEE1 Project No.: P .P.4 5 Drawing No.: . Sheets No. I through DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the plan review of this project as defined in Section 6703 of the Business and Professions Code to determine that the plans are found to be in substantial compliance with applicable codes and standards. Plan review of these project drawings does not relieve the Engineer of.Wo rlç of the responsibilities for the project design. Tel By: RE (seal) ececert. wp -I • - 44 4S/ ivil No.: Expiration Rev. 2/8/96 PROJECT PLAN REVIEW COMPLETION The following project plans have .been reviewed and are recommended forapprval: Project Name: lla*rn J/recl Project No: Drawing No: P 4.34-1. Sheets NO. through DECLARATION OF RESPONSIBLE CHARGE hereby declare that I have exercised responsible charge over the plan review of this project as defined in Section 6703 of the Business and Professions Code to determine that the plans are found to be in substantial compliance- with. applicable codes and standards. Plan review of these project drawings does not relieve the Engineer of Work of the responsibilities for the project design. Firm: Ellorin Consulting Engineers 10 ,01, do**Meudi 5river __ Address: _Y _ Suite San Mros,..cAL 92069 it1I&_- ,' (seal) Rev. 2/8/96 F:\USERS\RALLE\WPDATA\PLANREV. EL PROJECT PLAN REVIEW COMPLETION The following project plans have been reviewed and are recommended - for a p proval: Project Name: ~ Project No: c Drawing'No: L - Sheets No. _through DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the plan review of this project as defined in Section 6703 of the Business and PrOessi'o:ns Code to :deter.rhin that the plãrs are found to be in substantial compliance with, applicable cod es and standards. .. Plan review, of these project drawings does not relieye the Ehgifteer of Work of the responsibiIitië.s for the project. design, Firm: _Ellorin Consulting Engineers 7: si L Te , Address: _(144 San iarcos, CA 92069 Telephone: .(7:60)_744-_987 let By: _n_B__EU_rtn Date: : 7 P.E. ( ''il) No331 : Expiration:4 (seal) Rev. 2/8/96 F \uSERS\RALLE\WPDATA\PANREv EL 2