HomeMy WebLinkAboutPE 2.10.36; PALOMAR AIRPORT BUSINESS PARK UNIT 1; Engineering ApplicationApplication for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
729-1181
Building Permit Plan Check No.
!ii ion7 (n're 9600 IL
Department
FOR APPLICANT TO FILL IN
Site Address
Confluence-of Yarrow Dr. & Camuno Vida Roble
Legal Description Map No.
Parcel A, Lot 12 8054
Subdivision Name
Palomar Airport Business Park Unit 1
Owner Phone
THN-Palomar (714) 232-7911
Owner's Address
1400 Sixth Avenue, San Diego, CA 92101
Plans by Civil Engineer R.C.E.
Walter T. Schwerin 22139
Address Phone (714)239-9
1400 Sixth Avenue, Suite 200, San Diego, CA
Soil Engineer R.C.E. Phone
Robert Prater C.E. (714) 758-9144
Grading Contractor Phone
Address
Party responsible for overall supervision
Walter T. Schwerin, R.C.E.
Proposed use of grade site
Number of cubic yards
Cut Fill Import Waste
3500 3500
Proposed Schedule of Start Finish
Operations (dates) 7/30/79 11/1/79
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application. I nri- I oma r
Signature of Permittee y _,fJ_i7_r i_I..
Paul H. TI11ias, Jr.
Owner or authorized agent
ENVIRONMENTAL CLEARANCE -
Date
EIA Log No
By
Grading permit fee $
Permit Issue
by 9 AIZ Date -7-73/-77
Permit Expiration Date 7 3 1 8i7
Surety Bond Bond No.
Surety Company
Surety Address
Date Filed Rec'd by
Cash deposit Rec'd by Date filed
$
The following documents are required and shall become a part
of the grading permit when they are approved.
_*'Grading plans Specifications
Soil report Retaining Walls
Drainage structures ______ Other
Compaction report
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Authorized hours of operation:
7:00 AM to 5:00 PM, Monday - Friday.
Haul routes are to be approved by City Engineer.
Adequate provisions shall be made for erosion and siltation
control.
All slopes shall be planted per direction of Parks &
Recreation Director.
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
INSPECTION DATE SIGNATURE
Ground preparation
Rough grading
Compaction report rec'd.
Planting & drainage
Final certification rec'd.
Work completed
Surety bond released
Copies: White-Office; Green-Building;
Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD