Loading...
HomeMy WebLinkAboutPE 2.10.36; PALOMAR AIRPORT BUSINESS PARK UNIT 1; Engineering ApplicationApplication for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 729-1181 Building Permit Plan Check No. !ii ion7 (n're 9600 IL Department FOR APPLICANT TO FILL IN Site Address Confluence-of Yarrow Dr. & Camuno Vida Roble Legal Description Map No. Parcel A, Lot 12 8054 Subdivision Name Palomar Airport Business Park Unit 1 Owner Phone THN-Palomar (714) 232-7911 Owner's Address 1400 Sixth Avenue, San Diego, CA 92101 Plans by Civil Engineer R.C.E. Walter T. Schwerin 22139 Address Phone (714)239-9 1400 Sixth Avenue, Suite 200, San Diego, CA Soil Engineer R.C.E. Phone Robert Prater C.E. (714) 758-9144 Grading Contractor Phone Address Party responsible for overall supervision Walter T. Schwerin, R.C.E. Proposed use of grade site Number of cubic yards Cut Fill Import Waste 3500 3500 Proposed Schedule of Start Finish Operations (dates) 7/30/79 11/1/79 I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. I nri- I oma r Signature of Permittee y _,fJ_i7_r i_I.. Paul H. TI11ias, Jr. Owner or authorized agent ENVIRONMENTAL CLEARANCE - Date EIA Log No By Grading permit fee $ Permit Issue by 9 AIZ Date -7-73/-77 Permit Expiration Date 7 3 1 8i7 Surety Bond Bond No. Surety Company Surety Address Date Filed Rec'd by Cash deposit Rec'd by Date filed $ The following documents are required and shall become a part of the grading permit when they are approved. _*'Grading plans Specifications Soil report Retaining Walls Drainage structures ______ Other Compaction report SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Authorized hours of operation: 7:00 AM to 5:00 PM, Monday - Friday. Haul routes are to be approved by City Engineer. Adequate provisions shall be made for erosion and siltation control. All slopes shall be planted per direction of Parks & Recreation Director. All fills to be compacted to at least 90% of optimum density unless noted otherwise. INSPECTION DATE SIGNATURE Ground preparation Rough grading Compaction report rec'd. Planting & drainage Final certification rec'd. Work completed Surety bond released Copies: White-Office; Green-Building; Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD