HomeMy WebLinkAboutPE 2.10.37; ROYAL HOMES UNIT 7; Engineering Application1 1ENO.P e. 2-,/O. 37 Application for Grading Permit
- •---'.-• Validation by• Finance
Department
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
729-1181
Building Permit Plan Check No.
FOR APPLICANT TO FILL IN
Site Address
-, /
Surety Bond Bond No.
Legal Descriptior? Map No. Surety Compan .........._....._
$Øivision Name 7 Surety Address
OwRer Phone
61L'4'z)Só1
Date Filed Rec'd by
Owner' Addresc Cash deposit' Rec'd by Date filed
o,f4 C/sô-. $
The following documents are required and shall become a part
Plan
R.C.E. 13. '(? y CiviJ Engineer -
? \ T: of the grading permit when they are approved.
Grading plans Specifications Address POn e
j— 667~ A14- Soil report Retaining Walls
>- Drainage structures ______ Other
So'(,5ng'neer
... R.C.E. Phone
ô '' '7 Compaction report Gradin Contractor Phone
Addrds SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Party responsible for overall supervision Authorized hours of operation:
7:00 AM to 5:00 PM, Monday - Friday. Proposed use of gra&e site
Haul routes are to be approved by City Engineer. Number of cubic yards
Adequate provisions shall be made for erosion and siltation
control.
Cut Fill - Import Waste
I All slopes shall be planted per direction of Parks &
Recreation Director. Proposed Schedule of Start Finish.
Operations (dates)
All fills to be compacted to at least 90%-of optimum
I hereby acknowledge that I have read the application and state that density unless noted otherwise.
the information I have provided is correct and agree to comply with
and the provisions and cond it an mt
all City ordinances and State w
;7
s regulating excavating and grading,
;issuedpursuant
this application. INSPECTOR'S DATE SIGNATURE Signature of Permit-tee
und Ground preparation
Owner or authorized agent Rough grading
ENVIRONMENTAL CLEARANCE - Compaction report rec'd.
Date ______________________
E IA Log No. Planting & drainage
Final certification rec'd. By
Grading permit fee $ 900-0
Permit Issue
by (14 Date
Permit Expiration Date
Work completed
Surety bond released
Copies: White-Office; Green-Building;
Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DOTHE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD