Loading...
HomeMy WebLinkAboutPE 2.10.37; ROYAL HOMES UNIT 7; Engineering Application1 1ENO.P e. 2-,/O. 37 Application for Grading Permit - •---'.-• Validation by• Finance Department CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 729-1181 Building Permit Plan Check No. FOR APPLICANT TO FILL IN Site Address -, / Surety Bond Bond No. Legal Descriptior? Map No. Surety Compan .........._....._ $Øivision Name 7 Surety Address OwRer Phone 61L'4'z)Só1 Date Filed Rec'd by Owner' Addresc Cash deposit' Rec'd by Date filed o,f4 C/sô-. $ The following documents are required and shall become a part Plan R.C.E. 13. '(? y CiviJ Engineer - ? \ T: of the grading permit when they are approved. Grading plans Specifications Address POn e j— 667~ A14- Soil report Retaining Walls >- Drainage structures ______ Other So'(,5ng'neer ... R.C.E. Phone ô '' '7 Compaction report Gradin Contractor Phone Addrds SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Party responsible for overall supervision Authorized hours of operation: 7:00 AM to 5:00 PM, Monday - Friday. Proposed use of gra&e site Haul routes are to be approved by City Engineer. Number of cubic yards Adequate provisions shall be made for erosion and siltation control. Cut Fill - Import Waste I All slopes shall be planted per direction of Parks & Recreation Director. Proposed Schedule of Start Finish. Operations (dates) All fills to be compacted to at least 90%-of optimum I hereby acknowledge that I have read the application and state that density unless noted otherwise. the information I have provided is correct and agree to comply with and the provisions and cond it an mt all City ordinances and State w ;7 s regulating excavating and grading, ;issuedpursuant this application. INSPECTOR'S DATE SIGNATURE Signature of Permit-tee und Ground preparation Owner or authorized agent Rough grading ENVIRONMENTAL CLEARANCE - Compaction report rec'd. Date ______________________ E IA Log No. Planting & drainage Final certification rec'd. By Grading permit fee $ 900-0 Permit Issue by (14 Date Permit Expiration Date Work completed Surety bond released Copies: White-Office; Green-Building; Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DOTHE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD