HomeMy WebLinkAboutPE 2.10.45; ALTA VERDE LOTS 6&7; Engineering ApplicationE
Building Permit Plan Check No
Application for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
729-1181
PE NO. 2 rJD_
I 0V9ld,ai9by4Finance 90'* 00 BP bepartment 001 3L4 10/17/79 90'400 IL
FOR APPLICANT TO FILL IN
Site Address
C7L4, 4
Surety Bond Bond No.
Legal Description Map No.
Ln—i5 fr of /4ttp C7019'
Surety Company
Subdvision Name
4/-r4 Ve-rde.
Surety Address
Owner Phone
Rohet Dif
Date Filed Rec'd by
Owner's Address
rn ,
Cash deposit Rec'd by Date filed
$
Plans by Civil Engineer R.C.E.
t- f E AI6I)VE ZiC'&-947o
The following documents are required and shall become a part
of the grading permit when they are approved.
_J/"rading plans Specifications
_Z'Soil report Retaining Walls
Drainage structures ______ Other
Compaction report
Address Phone
/ 12 /4 W 14/ h!ii /c63
Soil Engineer R.. Phone
'2 Grading Contractor Phone
Address SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Party responsible for overall supervision Authorized hours of operation:
7:00 AM to 5:00 PM, Monday - Friday. e are s Proposed us of ad ite
C o ' / Haul routes are to be approved by City Engineer. Number of cubic yards
Adequate provisions shall be made for erosion and siltation
control.
Cut Fill Import Waste
25o/6cH All slopes shall be planted per direction of Parks a
Recreation Director. Proposed Schedule of Start Finish
Operations (dates)
All fills to be compacted to at least 90% of optimum
I hereby acknowledge that I have read the application and state that density unless noted otherwise.
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application.
Signature of Permittee
INSPECTOR'S INSPECTION DATE SIGNATURE
Ground preparation
Owner or authorized agent Rough grading
ENVIRONMENTAL CLEARANCE. Compaction report rec'd.
EIA Log No.
Date ________________ Planting & drainage
Final certification rec'd. By
Grading permit fee $ < Work completed
Permit Issu d —1 Surety bond released
IV C/ C~opies: -White-Office, Green~-BLflldin`g,
Permit Expiration Date i/ —.17 Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD