Loading...
HomeMy WebLinkAboutPE 2.10.45; ALTA VERDE LOTS 6&7; Engineering ApplicationE Building Permit Plan Check No Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 729-1181 PE NO. 2 rJD_ I 0V9ld,ai9by4Finance 90'* 00 BP bepartment 001 3L4 10/17/79 90'400 IL FOR APPLICANT TO FILL IN Site Address C7L4, 4 Surety Bond Bond No. Legal Description Map No. Ln—i5 fr of /4ttp C7019' Surety Company Subdvision Name 4/-r4 Ve-rde. Surety Address Owner Phone Rohet Dif Date Filed Rec'd by Owner's Address rn , Cash deposit Rec'd by Date filed $ Plans by Civil Engineer R.C.E. t- f E AI6I)VE ZiC'&-947o The following documents are required and shall become a part of the grading permit when they are approved. _J/"rading plans Specifications _Z'Soil report Retaining Walls Drainage structures ______ Other Compaction report Address Phone / 12 /4 W 14/ h!ii /c63 Soil Engineer R.. Phone '2 Grading Contractor Phone Address SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Party responsible for overall supervision Authorized hours of operation: 7:00 AM to 5:00 PM, Monday - Friday. e are s Proposed us of ad ite C o ' / Haul routes are to be approved by City Engineer. Number of cubic yards Adequate provisions shall be made for erosion and siltation control. Cut Fill Import Waste 25o/6cH All slopes shall be planted per direction of Parks a Recreation Director. Proposed Schedule of Start Finish Operations (dates) All fills to be compacted to at least 90% of optimum I hereby acknowledge that I have read the application and state that density unless noted otherwise. the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee INSPECTOR'S INSPECTION DATE SIGNATURE Ground preparation Owner or authorized agent Rough grading ENVIRONMENTAL CLEARANCE. Compaction report rec'd. EIA Log No. Date ________________ Planting & drainage Final certification rec'd. By Grading permit fee $ < Work completed Permit Issu d —1 Surety bond released IV C/ C~opies: -White-Office, Green~-BLflldin`g, Permit Expiration Date i/ —.17 Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD