HomeMy WebLinkAboutPE 2.10.50; PALOMAR AIRPORT BUSINESS CENTER LOT 6; Engineering ApplicationApplication for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
729-1181
PE NO. LIc... 5'?
Validation by Finance
Department
Building Permit Plan Check No. 79-412
FOR APPLICANT TO FILL IN
Site Address . Surety Bond Bond No.
2600 Camino _Vida _Robl
Legal Description Map No. . Surety Company
. Lot 6 Tract 73-49 8054 .
Subdivision Name. . 0 .Surety Address
Palomar _Airport_Business
Owner . Phone Date Filed Rec'd by
DODDS,_DOMINY_&_BALMA 453-1834
Owner's. Address . • Cash deposit Rec'd by Date filed
11760Sorrenlo Valley Road, Suite A, San Diego $ _.
Plans by Civil Engineer . R.C.E. The following documents are required and shall become a part
Thomas and Sowards- .26404 of the grading permit when they are approved.
Address Phone
215.S._ Highway 101, Solana Beach 481-6818 1rading plans Specifications
oil report Retaining Walls Soil Enginee R.C.E. Phone
RobertPrater Assoc. 18121453-5605 Drainage structures _____ Other
Compaction report Grading Contractor . Phone
Not Selected .
Address . . SPECIAL CONDITIONS WHICH ARE MADE -
A PART OF THIS PERMIT
Party responsible for overall supervision . Authorized hours of operation: &BokalArchitects_. _. 7:00 AM to 5:00 PM, Monday - Friday. . -of Proposed use grade site -
Haul routes are to be approved by City Engineer. Buildinpc
Numbr of cubic yards
Adequate provisions shall be made for erosion and siltation
control.
Cut . Fill Import Waste
2800 2800 All slopes shall be planted per direction of Parks &
Recreation Director. Proposed Schedule of Start Finish
_December Operations(dates) 1,1979 _10/31/79
All fills to be compacted to at least 906/o of optimum
I hereby acknowledge that I have read the application and state that density unless noted otherwise.
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
. and the provisions and conditions of any permit issued pursuant to
this application. . . . . INSPECTOR'S •0 INSPECTION DATE
• Signature of Permittee SIGNATURE
Ground preparation
kee,44_~. Owner or authorized agent Rough grading
ENVIRONMENTAL CLEARANCE - Compaction report rec'd.
EIA Log N L
. Date Planting & drainage
Final certification rec'd. By
Grading permit fee $
Permit Issued
1w
Permit Expiration Date
Work completed
Surety bond released
Date . Copies: White-Office; Green-Building;
Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED
THIS. PERMIT IS VALID FOR A SIX (6) MONTH PERIOD